Engelsby BrookEngelsby BrookFinal ProjectFinal ProjectENSC 285BENSC 285BPeter DufaultPeter Dufault
Burlington & South Burlington, Burlington & South Burlington, VermontVermont
April 29, 2005April 29, 2005
Engelsby BrookEngelsby Brook
1.0 Square Mile Watershed1.0 Square Mile Watershed 4 Reaches, 1 Tributary4 Reaches, 1 Tributary Upper Reaches in Golf CourseUpper Reaches in Golf Course
(Burlington Country Club)(Burlington Country Club) Urban SettingUrban Setting Drainage to Lake ChamplainDrainage to Lake Champlain
Engelsby Brook Engelsby Brook April 2005April 2005
USGS Gauge Height on lowest reachUSGS Gauge Height on lowest reach1.0 Foot Change in Gauge Height1.0 Foot Change in Gauge Height
Photo Date: March 30, 2005
Engelsby BrookEngelsby Brook
Weir/Impoundment Weir/Impoundment Serves as a Serves as a
junction between junction between the Main Stem and the Main Stem and Southern TributarySouthern Tributary
Regulates FlowRegulates Flow
Location: Prospect Location: Prospect St.St.
Photo Date: March 30, 2005
Engelsby BrookEngelsby Brook
Channel Straightening (575’) on Channel Straightening (575’) on Southern TributarySouthern Tributary
Golf Course in DistanceGolf Course in Distance
Photo Date: March 30, 2005
Location: Route 7Location: Route 7--Near Former Panda Inn RestaurantNear Former Panda Inn Restaurant
Bank ErosionBank Erosion Sediment into Sediment into
brookbrook
Erosion near Erosion near parking lot parking lot
Oil & Grease from Oil & Grease from Rt. 7Rt. 7
Photo Date: March 30, 2005
Englesby BrookEnglesby BrookLowest Reach, M.01Lowest Reach, M.01
Divided ChannelDivided Channel Debris JamDebris Jam
ConclusionsConclusions
Upper ReachesUpper Reaches Channel StraighteningChannel Straightening Heavy Fertilizer use from golf courseHeavy Fertilizer use from golf course
Lower ReachesLower Reaches Channel straighteningChannel straightening Significant Urbanization Significant Urbanization
Impact scores of 13-17Impact scores of 13-17 Stream types B & CStream types B & C
RecommendationsRecommendations
Construct Sedimentation basin and Construct Sedimentation basin and install riprap at culvert under Route install riprap at culvert under Route 77
Oil & Grease/Metals & Sediment Oil & Grease/Metals & Sediment from Rt. 7 could be filtered through from Rt. 7 could be filtered through a sedimentation (sand) basina sedimentation (sand) basin
Install baffles in culvert under Rt. 7 Install baffles in culvert under Rt. 7 to help decrease flow velocity to help decrease flow velocity