Gas Well Inspection Report
1st Quarter 2014
EnerVest
Operating, INC
-
8/11/2019 EnerVest 1st Quarter Inspection Reports 2014
2/20
-
8/11/2019 EnerVest 1st Quarter Inspection Reports 2014
3/20
INTRODUCTION
Purpose:
The exploration, development, and production of gas in the City of Arlington are activities whichnecessitate reasonable regulation to ensure that all property owners, mineral and otherwise, havethe right to peaceably enjoy their property and its benefits and revenues. During the 1
st
Quarter of 2014, the City of Arlington, Community Development and Planning Department(CD&P) and the City of Arlington Fire Department (AFD) conducted inspections of gas well padsites within the city limits to ensure compliance with the following: the City of Arlington GasDrilling and Production Ordinance, the Fire Prevention Ordinance and provide gas wellpermittees notice of violations on gas well pad sites.
Authority:
In accordance with City of Arlington Gas Drilling and Production Ordinance, Section 3.01 of
the Inspector of the Ordinance, the City Manager shall designate officials who shall enforce the
provisions of the Ordinance. The Inspector shall have the authority to enter and inspect anypremises covered by the provisions of the Ordinance to determine compliance with the
provisions of the Ordinance and all applicable laws, rules, regulations, standards or directives of
the State. The Inspector shall have the authority to issue any orders or directives required to carryout the intent and purpose of the Ordinance and its particular provisions. Failure of any person to
comply with an y such order or directive shall constitute a violation of the Ordinance. In accordance
with the City o f Arlington Fire Prevention Ordinance, Section 1.03, IFC 104.3 Right of Entry,whenever necessary to make an inspection to enforce any of the provisions of the Fire Code.
Inspectors:
Jessica Minley- Gas Well Specialist (CD&P)
J ay White Fire Prevention Specialist (AFD)
Collin Gregory Gas W ell Coordinator (CD&P)
Maria Carbajal Gas Well Coordinator (CD&P)
Page 3 of 20
-
8/11/2019 EnerVest 1st Quarter Inspection Reports 2014
4/20
NOTICE OF VIOLATION LETTER
During the dates in the reports listed below, the City of Arlington Gas Well Specialist and FirePrevention Specialist conducted compliance inspections to identify and inform EnerVest
Operating, LLC (EnerVest) of violations on gas well pad sites within the City of Arlington.Each EnerVest site was inspected and violations documented in the reports attached.
Section 10.01 and IFC 109.3 Penalty
A. It shall be unlawful and an offense for any person to do the following:
1. Engage in any activity not permitted by the terms of a Gas Well Permit issuedunder this Chapter; or the Fire Prevention Chapter.
2. Fail to comply with any condition set forth in a Gas Well Permit issued under thisChapter or the Fire Prevention Chapter
B. A person who violates any provision of these Chapters by performing an act prohibitedor by failing to perform an act required is guilty of a misdemeanor; each day theviolation continues shall be a separate offense.
1. If the definition of an offense under this Chapter does not prescribe a culpablemental state, then a culpable mental state is not required. Such offense shall bepunishable by a fine not to exceed Five Hundred Dollars and No Cents ($500.00).Although not required, if a culpable mental state is in fact alleged in the charge ofthe offense and the offense governs fire safety, zoning, or public health andsanitation, including dumping of refuse, such offense shall be punishable by a fine
not to exceed Two Thousand Dollars and No Cents ($2,000.00).
3. If the definition of an offense under these Chapters prescribes a culpable mental stateand the offense governs fire safety, zoning, or public health and sanitation, includingdumping of refuse, then a culpable mental state is required and the offense shall bepunishable by a fine not to exceed Two Thousand Dollars and No Cents ($2,000.00).(Amended Gas Drilling and Production Ord 10-012, 1/12/10) (Amended FirePrevention Ord 12-021, 4/24/2012 )
EnerVest Operating, LLC is hereby required, per section 5.06 (A) and (B) of the Gas
Drilling and Production Ordinance and IFC 109.3 of the Fire Prevention Ordinance, to
correct any noted violations on each corresponding pad site report. Failure to complywith the following stated instructions, and/ or failure to comply with the
following stated instructions in the future will result in penalties or fines in
accordance with the Ordinances.
Page 4 of 20
-
8/11/2019 EnerVest 1st Quarter Inspection Reports 2014
5/20
PAD SITE INSPECTION REPORTSThe following infractions are found in the Gas Drilling and Production Ordinance Chapter of the Code of the City
Of Arlington and/ or the Fire Prevention Ordinance Chapter of the Code of the City of Arlington.
Page 5 of 20
-
8/11/2019 EnerVest 1st Quarter Inspection Reports 2014
6/20
Gas Well Inspection Form
Signage (IFC 3406.3.7/Section 7.02) Nearest Receptor
Address properly displayed Yards
Well Name
Well Number Tank Batteries/Well Head/Pipes/Other:
Name of Operator Tank batteries 25' from well head(IFC 3406.3.1.1/ Section 7.01)
(2) Emergency Phone Numbers Well Head 75' from street or railway( IFC 3406.3.1.1)
No smoking signage(IFC 2703.3.1/Section 7.02) Secondary Containment System(IFC 2704.2.2/ Section 7.01)
Hazmat Identification (IFC 3406.3.3) Lightning Arrestor System(IFC 3406.3.4.1/ Section 7.01)
Suppression system as required by(Fire Dept IFC 3406.3.8.4)
Security (IFC: 3406.3.9/ Section 7.01) Fire Extinguisher(IFC 3406.3.8.4)
Fencing intact Pipe supports, bracing, foundations and anchoring(IFC 3406.3.1.5)
Gate Locked Soundproof material non-combustible (IFC 3406.3.6)
Gate width Dust, Odors, Vibrations(Section 7.01)
Knox Lock Equipment Painted(Section 7.02)
Vehicle Impact Protection(IFC 3406.3.12) Gas Lift Compressor(Section 7.01)
Gas Processing Onsite(Section 7.01)
Accessibility (IFC:3406.3.1.2.1/ Section 7.01) Storage of Equipment(Section 7.01)
Entry/Approach maintained Muffling Exhaust(Section 7.01)
24' width 8' Height Requirement (Section 7.01)
14' high clearance Grass, Weeds, Trash(Section 7.02)
Unobstructed access
Fracture Stimulation Earthen Pit (Section 7.01)
Landscaping & Perimeter Fencing(Section 7.01) Tier 1
Tier 1 Tier2
Tier 2
Monitoring
Meteorological Data Gas Detection(IFC 3406.3.8.2)
Wind Direct GFIR Observation (IFC 3406.3.8.2)
Temp TVA Readings in PPM (Section 7.01)
Security Camera(IFC 3406.3.9)
Wind Speed
Average
Current
Max
Gas well inspections are conducted jointly by Community Development and Planning and the Fire Department.
The section of the Fire Code and/ or Gas Well Ordinance is noted on each item.
PHASE
Drilling Fracking Flowback Production Abandoned
Company:
Contact Info:
Inspection Date:
Time:
SITE NAME:
ADDRESS:
Page 6 of 20
Fannin Farms
2322 Eden Rd. EnerVest
817-477-9955
3/10/2014
3:50PM
PASS
PASS
PASS
PASS
PASS
PASS
PASS
N/A
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
N/A
N/A
PASS
N/A
PASS
PASS
PASS
N/A
PASS
N/A
PASS
PASS
PASS
PASS
PASS
PASS
PASS
N/A
N/A
N/A
S
75.9F
6.0MPH
10.4MPH
12.0MPH
PASS
N/A
PASS
PASS
(IFC 3406.3.1.2.2)
-
8/11/2019 EnerVest 1st Quarter Inspection Reports 2014
7/20
-
8/11/2019 EnerVest 1st Quarter Inspection Reports 2014
8/20
Gas Well Inspection Form
Signage (IFC 3406.3.7/Section 7.02) Nearest Receptor
Address properly displayed Yards
Well Name
Well Number Tank Batteries/Well Head/Pipes/Other:
Name of Operator Tank batteries 25' from well head(IFC 3406.3.1.1/ Section 7.01)
(2) Emergency Phone Numbers Well Head 75' from street or railway( IFC 3406.3.1.1)
No smoking signage(IFC 2703.3.1/Section 7.02) Secondary Containment System(IFC 2704.2.2/ Section 7.01)
Hazmat Identification (IFC 3406.3.3) Lightning Arrestor System(IFC 3406.3.4.1/ Section 7.01)
Suppression system as required by(Fire Dept IFC 3406.3.8.4)
Security (IFC: 3406.3.9/ Section 7.01) Fire Extinguisher(IFC 3406.3.8.4)
Fencing intact Pipe supports, bracing, foundations and anchoring(IFC 3406.3.1.5)
Gate Locked Soundproof material non-combustible (IFC 3406.3.6)
Gate width Dust, Odors, Vibrations(Section 7.01)
Knox Lock Equipment Painted(Section 7.02)
Vehicle Impact Protection(IFC 3406.3.12) Gas Lift Compressor(Section 7.01)
Gas Processing Onsite(Section 7.01)
Accessibility (IFC:3406.3.1.2.1/ Section 7.01) Storage of Equipment(Section 7.01)
Entry/Approach maintained Muffling Exhaust(Section 7.01)
24' width 8' Height Requirement (Section 7.01)
14' high clearance Grass, Weeds, Trash(Section 7.02)
Unobstructed access
Fracture Stimulation Earthen Pit (Section 7.01)
Landscaping & Perimeter Fencing(Section 7.01) Tier 1
Tier 1 Tier2
Tier 2
Monitoring
Meteorological Data Gas Detection(IFC 3406.3.8.2)
Wind Direct GFIR Observation (IFC 3406.3.8.2)
Temp TVA Readings in PPM (Section 7.01)
Security Camera(IFC 3406.3.9)
Wind Speed
Average
Current
Max
Gas well inspections are conducted jointly by Community Development and Planning and the Fire Department.
The section of the Fire Code and/ or Gas Well Ordinance is noted on each item.
PHASE
Drilling Fracking Flowback Production Abandoned
Company:
Contact Info:
Inspection Date:
Time:
SITE NAME:
ADDRESS:
Page 8 of 20
Lonestar
2234 Carter St. EnerVest
817-477-9955
3/17/2014
12:55PM
N/A
PASS
PASS
PASS
PASS
N/A
N/A
PASS
N/A
PASS
PASS
PASS
N/A
PASS
N/A
PASS
PASS
N/A
N/A
PASS
N/A
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
N/A
NW
53.1F
9.0MPH
8.1MPH
14.0MPH
-
8/11/2019 EnerVest 1st Quarter Inspection Reports 2014
9/20
Gas Well Inspection Form
Valves Site Inventory
Automatic shut-off valve/BOP (IFC 3406.3.4) # of Wellheads
Emergency shut-off valve(IFC 3406.3.8.2) # of Separators
# of Storage Tanks
Well Head Status After Fracing (Section 7.01) # of Fire Hydrants (If Applicable)
Covered
Completed
Cellar filled or Closed
Bradenhead Gauge Installed
Vehicle Impact Protection(IFC 3406.3.12)
Administrative
Emergency Action Plan (IFC 3406.3.10)
Hazardous Material Plan (IFC 3406.3.11)
Personnel on site (if applicable)
Credentials.
Fire extinguisher (Applicable if personnel on-site)
Explosives (if on site)
Permit from Fire Marshal (Required)
Summa Sample
Canister #
GPS coordinates
Time
Start
Finish
Notes:
Gas well inspections are conducted jointly by Community Development and Planning and the Fire Department.
The section of the Fire Code and/ or Gas Well Ordinance is noted on each item.
SITE NAME:
TCEQ Investigator Contacted
Referred to Rail Road Commission
Site Representative
Time Date Gas Well Specialist (CD&P)
Time Date Fire Prevention
Specialist (Fire Department)
Page 9 of 20
Lonestar
5
5
4
Full Compliance
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
N/A
N/A
N/A
12:55PM 3/17/2014 Jessica Minley
N/A 1/21/2014 Jay White
Inspection Verification
-
8/11/2019 EnerVest 1st Quarter Inspection Reports 2014
10/20
Gas Well Inspection Form
Signage (IFC 3406.3.7/Section 7.02) Nearest Receptor
Address properly displayed Yards
Well Name
Well Number Tank Batteries/Well Head/Pipes/Other:
Name of Operator Tank batteries 25' from well head(IFC 3406.3.1.1/ Section 7.01)
(2) Emergency Phone Numbers Well Head 75' from street or railway( IFC 3406.3.1.1)
No smoking signage(IFC 2703.3.1/Section 7.02) Secondary Containment System(IFC 2704.2.2/ Section 7.01)
Hazmat Identification (IFC 3406.3.3) Lightning Arrestor System(IFC 3406.3.4.1/ Section 7.01)
Suppression system as required by(Fire Dept IFC 3406.3.8.4)
Security (IFC: 3406.3.9/ Section 7.01) Fire Extinguisher(IFC 3406.3.8.4)
Fencing intact Pipe supports, bracing, foundations and anchoring(IFC 3406.3.1.5)
Gate Locked Soundproof material non-combustible (IFC 3406.3.6)
Gate width Dust, Odors, Vibrations(Section 7.01)
Knox Lock Equipment Painted(Section 7.02)
Vehicle Impact Protection(IFC 3406.3.12) Gas Lift Compressor(Section 7.01)
Gas Processing Onsite(Section 7.01)
Accessibility (IFC:3406.3.1.2.1/ Section 7.01) Storage of Equipment(Section 7.01)
Entry/Approach maintained Muffling Exhaust(Section 7.01)
24' width 8' Height Requirement (Section 7.01)
14' high clearance Grass, Weeds, Trash(Section 7.02)
Unobstructed access
Fracture Stimulation Earthen Pit (Section 7.01)
Landscaping & Perimeter Fencing(Section 7.01) Tier 1
Tier 1 Tier2
Tier 2
Monitoring
Meteorological Data Gas Detection(IFC 3406.3.8.2)
Wind Direct GFIR Observation (IFC 3406.3.8.2)
Temp TVA Readings in PPM (Section 7.01)
Security Camera(IFC 3406.3.9)
Wind Speed
Average
Current
Max
Gas well inspections are conducted jointly by Community Development and Planning and the Fire Department.
The section of the Fire Code and/ or Gas Well Ordinance is noted on each item.
PHASE
Drilling Fracking Flowback Production Abandoned
Company:
Contact Info:
Inspection Date:
Time:
SITE NAME:
ADDRESS:
Page 10 of 20
Matlock Thorton
6001 Coping Lane EnerVest
817-477-9955
3/10/2014
2:40PM
PASS
PASS
PASS
PASS
N/A
N/A
PASS
N/A
PASS
PASS
PASS
N/A
PASS
N/A
PASS
PASS
N/A
N/A
PASS
N/A
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
N/A
SSE
75.0F
6.0MPH
10.4MPH
12.0MPH
N/A
-
8/11/2019 EnerVest 1st Quarter Inspection Reports 2014
11/20
Gas Well Inspection Form
Valves Site Inventory
Automatic shut-off valve/BOP (IFC 3406.3.4) # of Wellheads
Emergency shut-off valve(IFC 3406.3.8.2) # of Separators
# of Storage Tanks
Well Head Status After Fracing (Section 7.01) # of Fire Hydrants (If Applicable)
Covered
Completed
Cellar filled or Closed
Bradenhead Gauge Installed
Vehicle Impact Protection(IFC 3406.3.12)
Administrative
Emergency Action Plan (IFC 3406.3.10)
Hazardous Material Plan (IFC 3406.3.11)
Personnel on site (if applicable)
Credentials.
Fire extinguisher (Applicable if personnel on-site)
Explosives (if on site)
Permit from Fire Marshal (Required)
Summa Sample
Canister #
GPS coordinates
Time
Start
Finish
Notes:
Gas well inspections are conducted jointly by Community Development and Planning and the Fire Department.
The section of the Fire Code and/ or Gas Well Ordinance is noted on each item.
SITE NAME:
TCEQ Investigator Contacted
Referred to Rail Road Commission
Site Representative
Time Date Gas Well Specialist (CD&P)
Time Date Fire Prevention
Specialist (Fire Department)
Page 11 of 20
Matlock Thorton
8
8
3
1
Full Compliance
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
PASS
PASS
N/A
PASS
PASS
PASS
PASS
PASS
PASS
N/A
N/A
N/A
2:16PM
3/10/2014
3/12/2014
Jessica Minley
Jay White
2:40PM
Inspection Verification
-
8/11/2019 EnerVest 1st Quarter Inspection Reports 2014
12/20
Gas Well Inspection Form
Signage (IFC 3406.3.7/Section 7.02) Nearest Receptor
Address properly displayed Yards
Well Name
Well Number Tank Batteries/Well Head/Pipes/Other:
Name of Operator Tank batteries 25' from well head(IFC 3406.3.1.1/ Section 7.01)
(2) Emergency Phone Numbers Well Head 75' from street or railway( IFC 3406.3.1.1)
No smoking signage(IFC 2703.3.1/Section 7.02) Secondary Containment System(IFC 2704.2.2/ Section 7.01)
Hazmat Identification (IFC 3406.3.3) Lightning Arrestor System(IFC 3406.3.4.1/ Section 7.01)
Suppression system as required by(Fire Dept IFC 3406.3.8.4)
Security (IFC: 3406.3.9/ Section 7.01) Fire Extinguisher(IFC 3406.3.8.4)
Fencing intact Pipe supports, bracing, foundations and anchoring(IFC 3406.3.1.5)
Gate Locked Soundproof material non-combustible (IFC 3406.3.6)
Gate width Dust, Odors, Vibrations(Section 7.01)
Knox Lock Equipment Painted(Section 7.02)
Vehicle Impact Protection(IFC 3406.3.12) Gas Lift Compressor(Section 7.01)
Gas Processing Onsite(Section 7.01)
Accessibility (IFC:3406.3.1.2.1/ Section 7.01) Storage of Equipment(Section 7.01)
Entry/Approach maintained Muffling Exhaust(Section 7.01)
24' width 8' Height Requirement (Section 7.01)
14' high clearance Grass, Weeds, Trash(Section 7.02)
Unobstructed access
Fracture Stimulation Earthen Pit (Section 7.01)
Landscaping & Perimeter Fencing(Section 7.01) Tier 1
Tier 1 Tier2
Tier 2
Monitoring
Meteorological Data Gas Detection(IFC 3406.3.8.2)
Wind Direct GFIR Observation (IFC 3406.3.8.2)
Temp TVA Readings in PPM (Section 7.01)
Security Camera(IFC 3406.3.9)
Wind Speed
Average
Current
Max
Gas well inspections are conducted jointly by Community Development and Planning and the Fire Department.
The section of the Fire Code and/ or Gas Well Ordinance is noted on each item.
PHASE
Drilling Fracking Flowback Production Abandoned
Company:
Contact Info:
Date:
Time:
SITE NAME:
ADDRESS:
Page 12 of 20
Perr
2825 S. Cooper St EnerVest
817-477-9955
3/17/2014
2:15PM
N/A
PASS
PASS
PASS
FAIL
PASS
PASS
PASS
N/A
PASS
PASS
PASS
N/A
PASS
N/A
PASS
PASS
N/A
N/A
PASS
N/A
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
N/A
NW
54.0F
9.0MPH
8.1MPH
14.0MPH
-
8/11/2019 EnerVest 1st Quarter Inspection Reports 2014
13/20
Gas Well Inspection Form
Valves Site Inventory
Automatic shut-off valve/BOP (IFC 3406.3.4) # of Wellheads
Emergency shut-off valve(IFC 3406.3.8.2) # of Separators
# of Storage Tanks
Well Head Status After Fracing (Section 7.01) # of Fire Hydrants (If Applicable)
Covered
Completed
Cellar filled or Closed
Bradenhead Gauge Installed
Vehicle Impact Protection(IFC 3406.3.12)
Administrative
Emergency Action Plan (IFC 3406.3.10)
Hazardous Material Plan (IFC 3406.3.11)
Personnel on site (if applicable)
Credentials.
Fire extinguisher (Applicable if personnel on-site)
Explosives (if on site)
Permit from Fire Marshal (Required)
Summa Sample
Canister #
GPS coordinates
Time
Start
Finish
Notes:
Gas well inspections are conducted jointly by Community Development and Planning and the Fire Department.
The section of the Fire Code and/ or Gas Well Ordinance is noted on each item.
SITE NAME:
TCEQ Investigator Contacted
Referred to Rail Road Commission
Site Representative
Time Date Gas Well Specialist (CD&P)
Time Date Fire Prevention
Specialist (Fire Department)
Page 13 of 20
Perr
5
5
4
Full Compliance
N/A
N/A
N/A
N/A
N/A
N/A
N/A
PASS
PASS
N/A
PASS
PASS
PASS
PASS
PASS
PASS
N/A
N/A
N/A
N/A
2:15PM
N/A 1/22/2014 Angie Lopez
3/17/2014 Jessica Minley
Inspection Verification
-
8/11/2019 EnerVest 1st Quarter Inspection Reports 2014
14/20
Gas Well Inspection Form
Signage (IFC 3406.3.7/Section 7.02) Nearest Receptor
Address properly displayed Yards
Well Name
Well Number Tank Batteries/Well Head/Pipes/Other:
Name of Operator Tank batteries 25' from well head(IFC 3406.3.1.1/ Section 7.01)
(2) Emergency Phone Numbers Well Head 75' from street or railway( IFC 3406.3.1.1)
No smoking signage(IFC 2703.3.1/Section 7.02) Secondary Containment System(IFC 2704.2.2/ Section 7.01)
Hazmat Identification (IFC 3406.3.3) Lightning Arrestor System(IFC 3406.3.4.1/ Section 7.01)
Suppression system as required by(Fire Dept IFC 3406.3.8.4)
Security (IFC: 3406.3.9/ Section 7.01) Fire Extinguisher(IFC 3406.3.8.4)
Fencing intact Pipe supports, bracing, foundations and anchoring(IFC 3406.3.1.5)
Gate Locked Soundproof material non-combustible (IFC 3406.3.6)
Gate width Dust, Odors, Vibrations(Section 7.01)
Knox Lock Equipment Painted(Section 7.02)
Vehicle Impact Protection(IFC 3406.3.12) Gas Lift Compressor(Section 7.01)
Gas Processing Onsite(Section 7.01)
Accessibility (IFC:3406.3.1.2.1/ Section 7.01) Storage of Equipment(Section 7.01)
Entry/Approach maintained Muffling Exhaust(Section 7.01)
24' width 8' Height Requirement (Section 7.01)
14' high clearance Grass, Weeds, Trash(Section 7.02)
Unobstructed access
Fracture Stimulation Earthen Pit (Section 7.01)
Landscaping & Perimeter Fencing(Section 7.01) Tier 1
Tier 1 Tier2
Tier 2
Monitoring
Meteorological Data Gas Detection(IFC 3406.3.8.2)
Wind Direct GFIR Observation (IFC 3406.3.8.2)
Temp TVA Readings in PPM (Section 7.01)
Security Camera(IFC 3406.3.9)
Wind Speed
Average
Current
Max
Gas well inspections are conducted jointly by Community Development and Planning and the Fire Department.
The section of the Fire Code and/ or Gas Well Ordinance is noted on each item.
PHASE
Drilling Fracking Flowback Production Abandoned
Company:
Contact Info:
Date:
Time:
SITE NAME:
ADDRESS:
Page 14 of 20
Rice Loh
1801 E. Arkansas Lane EnerVest
817-477-9955
3/17/2014
1:00PM
N/A
PASS
PASS
PASS
PASS
N/A
PASS
PASS
N/A
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
N/A
N/A
PASS
N/A
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
N/A
NW
53.1F
9.0MPH
8.1MPH
14.0MPH
-
8/11/2019 EnerVest 1st Quarter Inspection Reports 2014
15/20
Gas Well Inspection Form
Valves Site Inventory
Automatic shut-off valve/BOP (IFC 3406.3.4) # of Wellheads
Emergency shut-off valve(IFC 3406.3.8.2) # of Separators
# of Storage Tanks
Well Head Status After Fracing (Section 7.01) # of Fire Hydrants (If Applicable)
Covered
Completed
Cellar filled or Closed
Bradenhead Gauge Installed
Vehicle Impact Protection(IFC 3406.3.12)
Administrative
Emergency Action Plan (IFC 3406.3.10)
Hazardous Material Plan (IFC 3406.3.11)
Personnel on site (if applicable)
Credentials.
Fire extinguisher (Applicable if personnel on-site)
Explosives (if on site)
Permit from Fire Marshal (Required)
Summa Sample
Canister #
GPS coordinates
Time
Start
Finish
Notes:
Gas well inspections are conducted jointly by Community Development and Planning and the Fire Department.
The section of the Fire Code and/ or Gas Well Ordinance is noted on each item.
SITE NAME:
TCEQ Investigator Contacted
Referred to Rail Road Commission
Site Representative
Time Date Gas Well Specialist (CD&P)
Time Date Fire Prevention
Specialist (Fire Department)
Page 15 of 20
Rice Loh
7
7
3
N/A
Full Compliance
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
PASS
PASS
N/A
PASS
PASS
PASS
PASS
PASS
PASS
N/A
N/A
N/A
1:00PM 3/17/2014 Jessica Minley
9:00AM 3/24/2014 Jay White
Inspection Verification
-
8/11/2019 EnerVest 1st Quarter Inspection Reports 2014
16/20
Gas Well Inspection Form
Signage (IFC 3406.3.7/Section 7.02) Nearest Receptor
Address properly displayed Yards
Well Name
Well Number Tank Batteries/Well Head/Pipes/Other:
Name of Operator Tank batteries 25' from well head(IFC 3406.3.1.1/ Section 7.01)
(2) Emergency Phone Numbers Well Head 75' from street or railway( IFC 3406.3.1.1)
No smoking signage(IFC 2703.3.1/Section 7.02) Secondary Containment System(IFC 2704.2.2/ Section 7.01)
Hazmat Identification (IFC 3406.3.3) Lightning Arrestor System(IFC 3406.3.4.1/ Section 7.01)
Suppression system as required by(Fire Dept IFC 3406.3.8.4)
Security (IFC: 3406.3.9/ Section 7.01) Fire Extinguisher(IFC 3406.3.8.4)
Fencing intact Pipe supports, bracing, foundations and anchoring(IFC 3406.3.1.5)
Gate Locked Soundproof material non-combustible (IFC 3406.3.6)
Gate width Dust, Odors, Vibrations(Section 7.01)
Knox Lock Equipment Painted(Section 7.02)
Vehicle Impact Protection(IFC 3406.3.12) Gas Lift Compressor(Section 7.01)
Gas Processing Onsite(Section 7.01)
Accessibility (IFC:3406.3.1.2.1/ Section 7.01) Storage of Equipment(Section 7.01)
Entry/Approach maintained Muffling Exhaust(Section 7.01)
24' width 8' Height Requirement (Section 7.01)
14' high clearance Grass, Weeds, Trash(Section 7.02)
Unobstructed access
Fracture Stimulation Earthen Pit (Section 7.01)
Landscaping & Perimeter Fencing(Section 7.01) Tier 1
Tier 1 Tier2
Tier 2
Monitoring
Meteorological Data Gas Detection(IFC 3406.3.8.2)
Wind Direct GFIR Observation (IFC 3406.3.8.2)
Temp TVA Readings in PPM (Section 7.01)
Security Camera(IFC 3406.3.9)
Wind Speed
Average
Current
Max
Gas well inspections are conducted jointly by Community Development and Planning and the Fire Department.
The section of the Fire Code and/ or Gas Well Ordinance is noted on each item.
PHASE
Drilling Fracking Flowback Production Abandoned
Company:
Contact Info:
Inspection Date:
Time:
SITE NAME:
ADDRESS:
Page 16 of 20
Rolling Hills
401 E. Lamar Blvd EnerVest
817-477-9955
2/5/2014
1:34PM
N/A
PASS
PASS
PASS
PASS
N/A
PASS
PASS
N/A
PASS
PASS
PASS
N/A
PASS
PASS
PASS
PASS
N/A
N/A
PASS
N/A
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
N/A
NW
30.0F
17.0MPH
18.4MPH
25.0MPH
-
8/11/2019 EnerVest 1st Quarter Inspection Reports 2014
17/20
Gas Well Inspection Form
Valves Site Inventory
Automatic shut-off valve/BOP (IFC 3406.3.4) # of Wellheads
Emergency shut-off valve(IFC 3406.3.8.2) # of Separators
# of Storage Tanks
Well Head Status After Fracing (Section 7.01) # of Fire Hydrants (If Applicable)
Covered
Completed
Cellar filled or Closed
Bradenhead Gauge Installed
Vehicle Impact Protection(IFC 3406.3.12)
Administrative
Emergency Action Plan (IFC 3406.3.10)
Hazardous Material Plan (IFC 3406.3.11)
Personnel on site (if applicable)
Credentials.
Fire extinguisher (Applicable if personnel on-site)
Explosives (if on site)
Permit from Fire Marshal (Required)
Summa Sample
Canister #
GPS coordinates
Time
Start
Finish
Notes:
Gas well inspections are conducted jointly by Community Development and Planning and the Fire Department.
The section of the Fire Code and/ or Gas Well Ordinance is noted on each item.
SITE NAME:
TCEQ Investigator Contacted
Referred to Rail Road Commission
Site Representative
Time Date Gas Well Specialist (CD&P)
Time Date Fire Prevention
Specialist (Fire Department)
Page 17 of 20
Rolling Hills
6
12( 6 sand sep.)
4
1
Full Complinace
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
PASS
PASS
N/A
PASS
PASS
PASS
PASS
PASS
PASS
N/A
N/A
N/A
3:15PM 3/17/2014 Jessica Minley
1:34PM 2/5/2014 Jay White
Inspection Verification
-
8/11/2019 EnerVest 1st Quarter Inspection Reports 2014
18/20
Gas Well Inspection Form
Signage (IFC 3406.3.7/Section 7.02) Nearest Receptor
Address properly displayed Yards
Well Name
Well Number Tank Batteries/Well Head/Pipes/Other:
Name of Operator Tank batteries 25' from well head(IFC 3406.3.1.1/ Section 7.01)
(2) Emergency Phone Numbers Well Head 75' from street or railway( IFC 3406.3.1.1)
No smoking signage(IFC 2703.3.1/Section 7.02) Secondary Containment System(IFC 2704.2.2/ Section 7.01)
Hazmat Identification (IFC 3406.3.3) Lightning Arrestor System(IFC 3406.3.4.1/ Section 7.01)
Suppression system as required by(Fire Dept IFC 3406.3.8.4)
Security (IFC: 3406.3.9/ Section 7.01) Fire Extinguisher(IFC 3406.3.8.4)
Fencing intact Pipe supports, bracing, foundations and anchoring(IFC 3406.3.1.5)
Gate Locked Soundproof material non-combustible (IFC 3406.3.6)
Gate width Dust, Odors, Vibrations(Section 7.01)
Knox Lock Equipment Painted(Section 7.02)
Vehicle Impact Protection(IFC 3406.3.12) Gas Lift Compressor(Section 7.01)
Gas Processing Onsite(Section 7.01)
Accessibility (IFC:3406.3.1.2.1/ Section 7.01) Storage of Equipment(Section 7.01)
Entry/Approach maintained Muffling Exhaust(Section 7.01)
24' width 8' Height Requirement (Section 7.01)
14' high clearance Grass, Weeds, Trash(Section 7.02)
Unobstructed access
Fracture Stimulation Earthen Pit (Section 7.01)
Landscaping & Perimeter Fencing(Section 7.01) Tier 1
Tier 1 Tier2
Tier 2
Monitoring
Meteorological Data Gas Detection(IFC 3406.3.8.2)
Wind Direct GFIR Observation (IFC 3406.3.8.2)
Temp TVA Readings in PPM (Section 7.01)
Security Camera(IFC 3406.3.9)
Wind Speed
Average
Current
Max
Gas well inspections are conducted jointly by Community Development and Planning and the Fire Department.
The section of the Fire Code and/ or Gas Well Ordinance is noted on each item.
PHASE
Drilling Fracking Flowback Production Abandoned
Company:
Contact Info:
Inspection Date:
Time:
SITE NAME:
ADDRESS:
Page 18 of 20
Swapo II
5408 US 287 HWY EnerVest
817-477-9955
1/28/2014
9:45AM
N/A
PASS
PASS
PASS
FAIL
N/A
PASS
PASS
N/A
PASS
PASS
PASS
N/A
N/A
PASS
PASS
PASS
N/A
N/A
PASS
N/A
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
N/A
S
53.1F
13.0MPH
12.7MPH
18.0MPH
-
8/11/2019 EnerVest 1st Quarter Inspection Reports 2014
19/20
Gas Well Inspection Form
Valves Site Inventory
Automatic shut-off valve/BOP (IFC 3406.3.4) # of Wellheads
Emergency shut-off valve(IFC 3406.3.8.2) # of Separators
# of Storage Tanks
Well Head Status After Fracing (Section 7.01) # of Fire Hydrants (If Applicable)
Covered
Completed
Cellar filled or Closed
Bradenhead Gauge Installed
Vehicle Impact Protection(IFC 3406.3.12)
Administrative
Emergency Action Plan (IFC 3406.3.10)
Hazardous Material Plan (IFC 3406.3.11)
Personnel on site (if applicable)
Credentials.
Fire extinguisher (Applicable if personnel on-site)
Explosives (if on site)
Permit from Fire Marshal (Required)
Summa Sample
Canister #
GPS coordinates
Time
Start
Finish
Notes:
Gas well inspections are conducted jointly by Community Development and Planning and the Fire Department.
The section of the Fire Code and/ or Gas Well Ordinance is noted on each item.
SITE NAME:
TCEQ Investigator Contacted
Referred to Rail Road Commission
Site Representative
Time Date Gas Well Specialist (CD&P)
Time Date Fire Prevention
Specialist (Fire Department)
Page 19 of 20
Swapo II
1
2
2
1
All listed failures represent the condition
of the site at the time of the inspection.
Corrective actions taken after the ins ection
will reflect on next quarters report.
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
PASS
PASS
PASS
PASS
N/A
PASS
PASS
PASS
PASS
N/A
N/A
N/A
1:03PM 3/5/2014 Jessica Minley
9:45AM 1/28/2014 Jay White
Inspection Verification
-
8/11/2019 EnerVest 1st Quarter Inspection Reports 2014
20/20
CONTACT INFORMATION
Community Development and Planning
101 W. Abram St.
PO Box 90231 MS 01-0241
Arlington, TX 76004-3231
www.arlingtontx.gov
Bridgett White, AICP
Assistant Director
817-459-6660
Collin Gregory
Gas Well Coordinator817-459-6593
Maria Carbajal
Gas Well Coordinator
817-459-6661
Jessica Minley
Gas Well Specialist
817-459-6520Jessica. [email protected]
Jay White
Fire Prevention Specialist
817-459-5523
http://www.arlingtontx.gov/http://www.arlingtontx.gov/mailto:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:Jessica.%[email protected]:Jessica.%[email protected]:[email protected]:[email protected]:[email protected]:Jessica.%[email protected]:[email protected]:[email protected]:[email protected]://www.arlingtontx.gov/