Braking Train Discharge Charge Emergency Runs Installed BPS Benefits Energy Saving No Regeneration Cancellation Peak Shaving Osaka Subway Verification Tests Line Voltage Stabilization Alternative to Substations Location Osaka Supply year 2011 Battery capacity 205kWh Use BPS Osaka Subway Tokyo Monorail Tokyo Monorail Sapporo Subway Location Hokkaido Supply year 2013 Battery capacity 204kWh Use BPS Washington D.C. Subway(WMATA) New York Subway Location Osaka Supply year 2013 Battery capacity 204kWh Use BPS Location Tokyo Supply year 2013 Battery capacity 203kWh Use BPS Location Tokyo Supply year 2014 Battery capacity 203kWh Use BPS Location Washington D.C. Supply year 2012 Battery capacity 385kWh Use BPS Location New York Supply year 2010 Battery capacity 367kWh Use BPS Interior of a BPS cabinet High-capacity nickel-metal hydride battery GIGACELL , used for the BPS BPS

Transcript of Energy Saving No Regeneration Cancellation Peak Shaving ......Energy Saving No Regeneration...

  • Substation

    Accelerating Train

    Direct Chargeand Discharge

    Braking Train

    Discharge

    Charge

    Emergency Runs

    Installed BPS

    Benefits

    Energy Saving No Regeneration Cancellation Peak Shaving

    Osaka Subway

    Verification Tests

    Line Voltage Stabilization Alternative to Substations

    Location Osaka Supply year 2011

    Battery capacity 205kWh Use BPS

    Osaka Subway Tokyo Monorail

    Tokyo Monorail Sapporo SubwayLocation Hokkaido Supply year 2013

    Battery capacity 204kWh Use BPS

    Washington D.C. Subway(WMATA)

    New York Subway

    Location Osaka Supply year 2013

    Battery capacity 204kWh Use BPSLocation Tokyo Supply year 2013

    Battery capacity 203kWh Use BPS

    Location Tokyo Supply year 2014

    Battery capacity 203kWh Use BPS

    Location Washington D.C. Supply year 2012

    Battery capacity 385kWh Use BPS

    Location New York Supply year 2010

    Battery capacity 367kWh Use BPS

    Interior of a BPS cabinet

    High-capacity nickel-metalhydride battery GIGACELL ,

    used for the BPS

    BPS

  • http://www.khi.co.jp/english/gigacell/

    Tokyo Head Of�ce 1-14-5, Kaigan, Minato-ku, Tokyo 105-8315, Japan Phone: +81-3-3435-2572Building 4, 29 Wells Avenue, Yonkers, New York, 10701, U.S.A. Phone: +1-914-376-4700 http://www.kawasakirailcar.com/ KAWASAKI RAIL CAR, INC.

    Apr.2015

    GIGACELL Battery Sales Sec., Machinery & Parts Sales Dept., Marketing & Sales Div., Rolling Stock Company

    GIGACELL® is a trademark of Kawasaki Heavy Industries, Ltd. in Japan and the U.S.A.

    Enhances Generation of Regenerative Energy Voltage Stabilization

    625 V DC Third Rail Voltage & Battery Power Waveforms

    Emergency Runs during Power Outages

    -1500-5 0 5 10 15 20

    -1000

    -500

    0

    500

    1000

    1500

    2000

    Po

    wer

    (kW

    )

    Time (sec)

    Regenerative Energy of NYCT Test Train "R160"

    Regenerative Energy(With BPS) 2.94 kWh

    Regenerative Energy(Without BPS) 1.34 kWh

    Start of Braking

    An extra 1.6 kWh saved per every stop

    Energy Saving

    BPS accumulates excessive electricity when there are no powering trains nearby, enabling trains to fully utilize their regenerative braking function and maximize energy savings.

    Reducing overall energy consumption by encouragingregenerative braking and then “recycling” it.

    No Regeneration Cancellation

    BPS's line voltage stabilizing effect prevents the trains' pantographs from rising to the regeneration cutoff voltage.

    Stabilized line voltage prevents regenerative braking failure

    Peak Shaving

    Heavy train traffic causes higher power demand. Discharge from BPS decreases the substation's power demand.

    Power discharged from the BPS reduces power demand atall times, including rush hours

    In an event of a power outage, BPS will feed power to move stranded trains and evacuate passengers to the next station.

    Batteries will power trains to the nearest station during apower outage

    BPS will assist in feeding power to accelerating trains, reducing voltage sags and enabling optimum train operation.

    Charging and discharging stabilizes line voltage

    BPS will support traction power and enable downsizing of substation facilities.

    The BPS can serve as an alternative to substations

    BLACKOUT!

    * HSCB= High Speed Circuit Breaker

    Powering

    0:00 2:00 4:00 6:00 8:00 10:00 12:00 14:00 16:00 18:00 20:00 22:00 24:00

    700

    650

    600

    550

    500

    450

    400

    350

    300

    250

    3rd

    Rai

    l V

    olt

    age

    (V)

    (= B

    atte

    ry V

    olt

    age

    (V))

    2500

    2000

    1500

    1000

    500

    0

    -500

    -1000

    -1500

    -2000

    Time

    3rd Rail Voltage (V)

    Battery Power (kW)

    NYCT-BPS at Central Substation 3rd Rail Voltage & Battery Power Waveforms

    Bat

    tery

    Po

    wer

    (kW

    )

    Dis

    char

    geC

    har

    ge

    Data taken in July 2010

    Emergency Runs

    Line Voltage Stabilization Alternative to Substations

    3rd

    Rai

    l V

    olt

    age

    (V)

    Time

    950

    900

    850

    800

    750

    700

    6504:00 8:00 12:00 16:00 20:00 0:00 4:00

    Max. 939 V

    Without BPS

    Min. 703 V

    Max. 854 V

    Min. 718 V

    Duration of BPS Connection

    With BPS

    Osaka Subway BPS Data

    Benefits of the BPS

    System OutlineLow CostsNo power controllers needed

    High Ef�ciencyNo loss through controllers

    No Delays and LossesMax. use of regenerative energy

    No EMINo adverse effects to signal systems Power line

    HSCB

    Battery

    SubstationⅠ SubstationⅡ

    Rail

    BPS

    HSCB

    HSCBHSCB

    Direct Connection to System