Energy-Efficient Housing

Transcript of Energy-Efficient Housing€¦ · BRICKBAT COBA CEMENT SCREED INSULATION REFLECTIVE SURFACE FINISH....

Page 1: Energy-Efficient Housing€¦ · BRICKBAT COBA CEMENT SCREED INSULATION REFLECTIVE SURFACE FINISH. ... concrete wall; 115 mm brick 230 mm brick; 115 mm + 50 mm cavity +115 mm brick

Energy-Efficient Housing

Page 2: Energy-Efficient Housing€¦ · BRICKBAT COBA CEMENT SCREED INSULATION REFLECTIVE SURFACE FINISH. ... concrete wall; 115 mm brick 230 mm brick; 115 mm + 50 mm cavity +115 mm brick

2Indo-Swiss Building Energy Efficiency Project

Outline

• Introduction to Energy Efficient Housing

• Climate analysis of Rajkot & its impact on

design of buildings

• Key Design Strategies for Energy Efficient

Housing

• Conclusions

Page 3: Energy-Efficient Housing€¦ · BRICKBAT COBA CEMENT SCREED INSULATION REFLECTIVE SURFACE FINISH. ... concrete wall; 115 mm brick 230 mm brick; 115 mm + 50 mm cavity +115 mm brick

3Indo-Swiss Building Energy Efficiency Project

Survey of electricity use and designs

of flats – NCR & Chennai

• Flat Area ~ 800-1300 sq. ft

• Year 2009/2010

NCR: 732 Flats

Chennai: 417 Flats

Page 4: Energy-Efficient Housing€¦ · BRICKBAT COBA CEMENT SCREED INSULATION REFLECTIVE SURFACE FINISH. ... concrete wall; 115 mm brick 230 mm brick; 115 mm + 50 mm cavity +115 mm brick

4Indo-Swiss Building Energy Efficiency Project

Conclusions - Survey

Climate Responsive Design + EE Appliances + Energy conscious

occupants

Poor Design+ High reliance

on AC20-40 kWh/m2/year(Rs 1000-1500 per month)

80 -100 kWh/m2/year(Rs 5000 per month)Average EPI 45-50

kWh/m2/year(Rs 2000-3000 per

month)

Page 5: Energy-Efficient Housing€¦ · BRICKBAT COBA CEMENT SCREED INSULATION REFLECTIVE SURFACE FINISH. ... concrete wall; 115 mm brick 230 mm brick; 115 mm + 50 mm cavity +115 mm brick

5Indo-Swiss Building Energy Efficiency Project

Design Guidelines for Energy-Efficient Residential Buildings – 15 key Recommendations

Building Massing

Building Envelope

Space Cooling Systems

Energy Efficient

Appliances

Common Services

Renewable Energy

Page 6: Energy-Efficient Housing€¦ · BRICKBAT COBA CEMENT SCREED INSULATION REFLECTIVE SURFACE FINISH. ... concrete wall; 115 mm brick 230 mm brick; 115 mm + 50 mm cavity +115 mm brick

6Indo-Swiss Building Energy Efficiency Project

Energy-Efficient Housing ?

• Does not heat up abnormally during long summer season. – The requirement for use of coolers and ACs is minimized.

• Good ventilation to utilize cool breeze during evening, night and mornings.

• Adequate day lighting (kitchen, corridors, rooms,..); minimizes the need to switch-on artificial light during day.

• The use of electricity/fuel for heating water is minimized. Utilizes solar energy for meeting part of electricity/ water heating requirements.

• Energy-efficient lighting, equipments, appliances,…

• Low embodied energy in construction – minimizing the use of energy intensive materials – steel, cement, glass,….

• Affordable – No/low additional construction cost.

– Low electricity bill for occupants.

– Easy and low-cost maintenance.

Page 7: Energy-Efficient Housing€¦ · BRICKBAT COBA CEMENT SCREED INSULATION REFLECTIVE SURFACE FINISH. ... concrete wall; 115 mm brick 230 mm brick; 115 mm + 50 mm cavity +115 mm brick

7Indo-Swiss Building Energy Efficiency Project

Approach to Energy Efficient Building Design

BUILDING

ENERGY

CONSUMPTION

Architectural

design

Climate

Building

envelope

Building usage:

function, number of

users; period of use etc.

Artificial lighting,

HVAC, equipment,

Renewable energy

A design approach that integrates

architectural and engineering

solutions at an early design stage

is required for getting an energy-

efficient design.

Page 8: Energy-Efficient Housing€¦ · BRICKBAT COBA CEMENT SCREED INSULATION REFLECTIVE SURFACE FINISH. ... concrete wall; 115 mm brick 230 mm brick; 115 mm + 50 mm cavity +115 mm brick

8Indo-Swiss Building Energy Efficiency Project

Climate

Temperature Humidity

Wind Rain

Solar Radiation-

Direct & Diffused

Rajkot

Page 9: Energy-Efficient Housing€¦ · BRICKBAT COBA CEMENT SCREED INSULATION REFLECTIVE SURFACE FINISH. ... concrete wall; 115 mm brick 230 mm brick; 115 mm + 50 mm cavity +115 mm brick

9Indo-Swiss Building Energy Efficiency Project

Rajkot - Ambient Temperatures Avg. Max. Temperature > 35 C → reducing heat gains from building envelope

Evening, night, morning temperatures < 24 C → natural ventilation can be used

Page 10: Energy-Efficient Housing€¦ · BRICKBAT COBA CEMENT SCREED INSULATION REFLECTIVE SURFACE FINISH. ... concrete wall; 115 mm brick 230 mm brick; 115 mm + 50 mm cavity +115 mm brick

10Indo-Swiss Building Energy Efficiency Project

Rajkot- Solar Radiation

Very high solar radiation

Insulation of roof/cool roof a must

Reasonable window to wall ratio (< 30 %). High glazing area to be avoided

Windows shading a must –static and shutters

Good outputs from solar PV or hot water systems

Rajkot

Page 11: Energy-Efficient Housing€¦ · BRICKBAT COBA CEMENT SCREED INSULATION REFLECTIVE SURFACE FINISH. ... concrete wall; 115 mm brick 230 mm brick; 115 mm + 50 mm cavity +115 mm brick

11Indo-Swiss Building Energy Efficiency Project

Rajkot - Relative Humidity

Oct to May → Dry Climate →Evaporative cooling possibleJune to August →Warm & Humid →Air Conditioning

Jan May Sept Dec

Sunrise

Sunset

Page 12: Energy-Efficient Housing€¦ · BRICKBAT COBA CEMENT SCREED INSULATION REFLECTIVE SURFACE FINISH. ... concrete wall; 115 mm brick 230 mm brick; 115 mm + 50 mm cavity +115 mm brick

12Indo-Swiss Building Energy Efficiency Project

Rajkot - Sun Exposure In Different Directions

N

S

E

W

South façade is

highly exposed in

winter, but less in

summer.

North façade

receives very

little direct

radiation, only

in summer

mornings and

evenings

Winter

21st Dec

Summer

21st Jun

Horizontal surface

receives the greatest

intensity

East and West façades

receive high amount of

radiation both in

summer and winter

• Reducing heat gains from roof – insulation, shading, reflection,..• Minimizing exposed surfaces on east & west; fixed shades not effective• Windows on north & south can be protected to some extent by fixed shades

Page 13: Energy-Efficient Housing€¦ · BRICKBAT COBA CEMENT SCREED INSULATION REFLECTIVE SURFACE FINISH. ... concrete wall; 115 mm brick 230 mm brick; 115 mm + 50 mm cavity +115 mm brick

13Indo-Swiss Building Energy Efficiency Project

1. Reducing Solar Heat Gains Through Proper Orientation & Massing

Reduction in solar exposure:1. By orienting the buildings i.e. larger façade on North

and South direction.2. Double Loaded Corridors, to reduce exposed wall area.

Source: Happinest, Mahindra, Chennai

Page 14: Energy-Efficient Housing€¦ · BRICKBAT COBA CEMENT SCREED INSULATION REFLECTIVE SURFACE FINISH. ... concrete wall; 115 mm brick 230 mm brick; 115 mm + 50 mm cavity +115 mm brick

14Indo-Swiss Building Energy Efficiency Project

2. Reducing Heat Flow Through Roof

• In case of uninsulated concrete roof slab, the inside roof surface temperature in summer > 40 oC.

• Proper treatment of roof can help in reducing room temperatures by 4-5 oC.

Source: Coolroofs for cool Delhi, EDS

Page 15: Energy-Efficient Housing€¦ · BRICKBAT COBA CEMENT SCREED INSULATION REFLECTIVE SURFACE FINISH. ... concrete wall; 115 mm brick 230 mm brick; 115 mm + 50 mm cavity +115 mm brick

15Indo-Swiss Building Energy Efficiency Project

Reducing Heat Flow Through Roof

RCC SLAB

BRICKBAT COBA

CEMENT SCREED

INSULATION

REFLECTIVE

SURFACE FINISH

Page 16: Energy-Efficient Housing€¦ · BRICKBAT COBA CEMENT SCREED INSULATION REFLECTIVE SURFACE FINISH. ... concrete wall; 115 mm brick 230 mm brick; 115 mm + 50 mm cavity +115 mm brick

16Indo-Swiss Building Energy Efficiency Project

Reducing Heat Flow Through Roof

Broken China Tiles Fresh Reflective Paint

Hollow Clay TilesSource: TARU & BEEPShading of roof

Page 17: Energy-Efficient Housing€¦ · BRICKBAT COBA CEMENT SCREED INSULATION REFLECTIVE SURFACE FINISH. ... concrete wall; 115 mm brick 230 mm brick; 115 mm + 50 mm cavity +115 mm brick

17Indo-Swiss Building Energy Efficiency Project

3. Reducing Heat Flow Through Walls

150 mm

concrete wall;

115 mm brick

230 mm brick;

115 mm + 50 mm cavity

+115 mm brick

230 mm + 50 mm

cavity +115 mm brick

200 mm AAC

230 mm brick +

65 mm XPS

U= 3.3 W/m2.K

2.8 W/m2.K

2.0 W/m2.K

1.4 W/m2.K

1.1W/m2.K

0.7 W/m2.K 0.4 W/m2.K

Page 18: Energy-Efficient Housing€¦ · BRICKBAT COBA CEMENT SCREED INSULATION REFLECTIVE SURFACE FINISH. ... concrete wall; 115 mm brick 230 mm brick; 115 mm + 50 mm cavity +115 mm brick

18Indo-Swiss Building Energy Efficiency Project

Reducing Heat Flow Through Walls

Shear walls CLC / AAC walls

Source: Happinest, Mahindra, Chennai

Page 19: Energy-Efficient Housing€¦ · BRICKBAT COBA CEMENT SCREED INSULATION REFLECTIVE SURFACE FINISH. ... concrete wall; 115 mm brick 230 mm brick; 115 mm + 50 mm cavity +115 mm brick

19Indo-Swiss Building Energy Efficiency Project

Use Light Colours/ Lime White Wash on External Walls

Page 20: Energy-Efficient Housing€¦ · BRICKBAT COBA CEMENT SCREED INSULATION REFLECTIVE SURFACE FINISH. ... concrete wall; 115 mm brick 230 mm brick; 115 mm + 50 mm cavity +115 mm brick

20Indo-Swiss Building Energy Efficiency Project

4. Cross Ventilation at Flat & Room Level

Page 21: Energy-Efficient Housing€¦ · BRICKBAT COBA CEMENT SCREED INSULATION REFLECTIVE SURFACE FINISH. ... concrete wall; 115 mm brick 230 mm brick; 115 mm + 50 mm cavity +115 mm brick

21Indo-Swiss Building Energy Efficiency Project

Cross Ventilation

In a room of 120 sq ft, having two openings of 4x3 ft (fully openable)- 10 ACH at very low

velocities- 20-30 ACH at higher

velocity.

Openable area of openings on external walls of a flat ~ 20-25% of the flat area.

Provision of ventilators above doors.

Page 22: Energy-Efficient Housing€¦ · BRICKBAT COBA CEMENT SCREED INSULATION REFLECTIVE SURFACE FINISH. ... concrete wall; 115 mm brick 230 mm brick; 115 mm + 50 mm cavity +115 mm brick

22Indo-Swiss Building Energy Efficiency Project

Single-Sided Ventilation

Single sided ventilation 3°C Temperature difference inside-outside

Taller windows provide better ventilation.

Page 23: Energy-Efficient Housing€¦ · BRICKBAT COBA CEMENT SCREED INSULATION REFLECTIVE SURFACE FINISH. ... concrete wall; 115 mm brick 230 mm brick; 115 mm + 50 mm cavity +115 mm brick

23Indo-Swiss Building Energy Efficiency Project

Natural Ventilation

The window is designed as a system- one that brings in daylight, has

a shading fixture, can be opened to bring in cool air and can alsoaccommodate an AC if required.

Source: Happinest, Mahindra, Chennai

Page 24: Energy-Efficient Housing€¦ · BRICKBAT COBA CEMENT SCREED INSULATION REFLECTIVE SURFACE FINISH. ... concrete wall; 115 mm brick 230 mm brick; 115 mm + 50 mm cavity +115 mm brick

24Indo-Swiss Building Energy Efficiency Project

Design kitchen for good ventilation

37 oC 30 oC

Good ventilationPoor ventilation

Page 25: Energy-Efficient Housing€¦ · BRICKBAT COBA CEMENT SCREED INSULATION REFLECTIVE SURFACE FINISH. ... concrete wall; 115 mm brick 230 mm brick; 115 mm + 50 mm cavity +115 mm brick

25Indo-Swiss Building Energy Efficiency Project

Analysis of wind flow for large projects

Page 26: Energy-Efficient Housing€¦ · BRICKBAT COBA CEMENT SCREED INSULATION REFLECTIVE SURFACE FINISH. ... concrete wall; 115 mm brick 230 mm brick; 115 mm + 50 mm cavity +115 mm brick

26Indo-Swiss Building Energy Efficiency Project

5. Daylighting & Ventilation of Corridors

Break in

the corridor

which

allows air

movement

Source: Happinest, Mahindra, Chennai; Kesar City, Ahmedabad

Page 27: Energy-Efficient Housing€¦ · BRICKBAT COBA CEMENT SCREED INSULATION REFLECTIVE SURFACE FINISH. ... concrete wall; 115 mm brick 230 mm brick; 115 mm + 50 mm cavity +115 mm brick

27Indo-Swiss Building Energy Efficiency Project

6. Shading of Windows

Source: Adlakha Associates; Kesar City, Ahmedabad

Page 28: Energy-Efficient Housing€¦ · BRICKBAT COBA CEMENT SCREED INSULATION REFLECTIVE SURFACE FINISH. ... concrete wall; 115 mm brick 230 mm brick; 115 mm + 50 mm cavity +115 mm brick

28Indo-Swiss Building Energy Efficiency Project

Shading of windows

MS frames in balcony for possible installation

of chiks and blinds. Source: Happinest, Mahindra, Chennai

Page 29: Energy-Efficient Housing€¦ · BRICKBAT COBA CEMENT SCREED INSULATION REFLECTIVE SURFACE FINISH. ... concrete wall; 115 mm brick 230 mm brick; 115 mm + 50 mm cavity +115 mm brick

29Indo-Swiss Building Energy Efficiency Project

External Movable Shading of Balcony

Source: M A Architects, Jaipur

Page 30: Energy-Efficient Housing€¦ · BRICKBAT COBA CEMENT SCREED INSULATION REFLECTIVE SURFACE FINISH. ... concrete wall; 115 mm brick 230 mm brick; 115 mm + 50 mm cavity +115 mm brick

30Indo-Swiss Building Energy Efficiency Project

7. Renewable Energy Integration – Low Rise

Residential Buildings can be Net Zero Energy

Buildings

• Utilise rooftops for the generation of hot water and/or electricity using solar energy

• For energy-efficient residential buildings (overall EPI < 30 kWh/ m2/year) of up to 4 storey, it is possible to generate enough electricity over a year through rooftop solar PV to meet all electricity requirements.

Project: Topland Residency, Rajkot

Page 31: Energy-Efficient Housing€¦ · BRICKBAT COBA CEMENT SCREED INSULATION REFLECTIVE SURFACE FINISH. ... concrete wall; 115 mm brick 230 mm brick; 115 mm + 50 mm cavity +115 mm brick

31Indo-Swiss Building Energy Efficiency Project

8. Embodied Energy (MJ/m3) – Walling Materials

31

0

1000

2000

3000

4000

5000

6000

Solid fired claybricks (FCBTK)

Hollow fired-clay blocks

AAC Block Solid CementConcrete Block

FaL-G Brick MonolithicConcrete Wall

Compressedstabilized clay

Block

AAC blocks

Flyash bricks

Perforated and hollow clay fired bricks are better options

Page 32: Energy-Efficient Housing€¦ · BRICKBAT COBA CEMENT SCREED INSULATION REFLECTIVE SURFACE FINISH. ... concrete wall; 115 mm brick 230 mm brick; 115 mm + 50 mm cavity +115 mm brick

32Indo-Swiss Building Energy Efficiency Project

Embodied Energy – Complete House

Load bearing structure of up to 4 storey using perforated clay bricks/ flyash bricks

Roof slab of precast RC

planks and joist system

Steel consumption <1 kg/ ft2

(conventional 3-4 kg/ ft2)

Cement consumption <0.25

bags/ ft2 (conventional 0.45

kg/ ft2)

Source: Adlakha Associates

Page 33: Energy-Efficient Housing€¦ · BRICKBAT COBA CEMENT SCREED INSULATION REFLECTIVE SURFACE FINISH. ... concrete wall; 115 mm brick 230 mm brick; 115 mm + 50 mm cavity +115 mm brick

33Indo-Swiss Building Energy Efficiency Project

Not a good example

• Monolithic Concrete Construction: Large heat gains through walls; High consumption of steel and cement high embodied energy.

• Windows not shaded and hence high heat gains

Page 34: Energy-Efficient Housing€¦ · BRICKBAT COBA CEMENT SCREED INSULATION REFLECTIVE SURFACE FINISH. ... concrete wall; 115 mm brick 230 mm brick; 115 mm + 50 mm cavity +115 mm brick

34Indo-Swiss Building Energy Efficiency Project

Conclusion: Appropriate design interventions can lead to energy efficient housing

– Houses that are thermally comfortable and use small amount of

energy for operation.

– A significant part of this energy is produced by renewable energy

systems and it might be possible to approach net-zero energy housing.

– The embodied energy of the houses can be reduced by upto 50% and

the use of highly energy intensive materials like cement, steel, glass

reduced.

& Happy Occupants !

Page 35: Energy-Efficient Housing€¦ · BRICKBAT COBA CEMENT SCREED INSULATION REFLECTIVE SURFACE FINISH. ... concrete wall; 115 mm brick 230 mm brick; 115 mm + 50 mm cavity +115 mm brick

Click to edit Master title styleClick to edit Master title style

35Indo-Swiss Building Energy Efficiency Project

THANK YOU !

www.beepindia.org