Energy Efficient Building Design
07th April 2015, Indore
• Leading MEP consultancy firm in the country
• Well established in the field having 30 years of experience • Designing & installation of more than 3000 projects worth 400000 TR • Fully equipped offices at Ahmedabad, Mumbai, Delhi & Bangalore • Strong team of technical professionals • Experienced in all types of applications
Mumbai Office:
302, Trade Avenue, 3rd Floor,
260 Suren Road, Off. Gurunank Petrol Pump,
Andheri (East), Mumbai- 400 093.
PH: - 022-26837283 / 7349
E-mail: [email protected]
Delhi Office :-
Y-49, Okhala Industrial Area – II ,
New Delhi – 110020
MOB:- +919810000655
E-Mail :[email protected]
Ahmedabad Office:
506-507, Venus Amadeus,
Jodhpur Cross Road,
Satellite, Ahmedabad – 380015
PH:+91-79`-26924713/14/4732
/+919099045096 / 97
E-mail: [email protected]
Bangalore Office:
No. 2453, 9th Main, 17th ECross,
BSK II Stage,
Bangalore - 560070.
Mob: - +919886076642/+919900210969
E-mail: [email protected]
Indore Office:
301-302, Kothari Manor,
10, Diamond Colony, New Palasia,
Indore – 452001.
PH: - 0731-4040974
Mob: - +917869410875
E-mail: [email protected]
SOME OF THE PRESTIGIOUS GREEN BUILDING PROJECTS
JSW HQ, Mumbai
Jindal SAW, Gurgaon Corporate Office (Ganesh Housing),
Ahmedabad
Burt Hill Architects, Ahmedabad
IOCL, Hyderabad
Godrej Sahakar Nagar, Mumbai
Facet, Surat
GIHED, Ahmedabad
L & T, Hazira
Vedant School,
Ahmedabad
Skydeck, Ahmedabad
Unimark, Kolkata
Unimark, Rajarhat Apas Valmark,
Bangalore
Palais Royale,
Mumbai
Modern Sales,
Ahmedabad
Integrated Approach to Energy
Efficient Building Design
Integrated Approach to Energy Efficient Building Design
The Integrated Design Process
Integrated design, is a design process where each component is considered
part of a greater whole.
All buildings require integration, at the early stages of the design process because, they involve
coordination of complex, interdependent services.
Integrated Approach to Energy Efficient Building Design
Sustainable design is the thoughtful integration of architecture with Structural, Civil, Electrical,
Mechanical, Plumbing and Fire Engineering.
Integrated Approach to Energy Efficient Building Design
1) Architectural Interactions:
Integration of HVAC Design Solutions
2) Structural & Civil Interactions:
3) Electrical Interactions:
4) Plumbing Interactions:
5) Fire Protection Interactions:
The best building designs result from the
early integration of MEP/FP design with the
structural and architectural plans
Integrated Approach to Energy Efficient Building Design
• Well designed electrical system has to be done in coordination with other engineers to cater to external &
internal lighting, office equipment, elevators, communication system, Fire alarm, BMS, Life safety
components, HVAC systems, pumping system and to provide enough Back-up power for emergency
• Design of plumbing system for a tall building has to tackle mainly the pressure problems in piping
systems as well as at water fixture levels i.e. having adequate pressure on the top floors and limiting the
pressure on lower levels for which building is divided into multiple vertical zones (15 to 20 floors) at design
stage.
• HVAC Engineer has to provide details of chilled water, hot water and condenser water requirements to
plumbing engineer for estimate of total water requirement for the project.
• Well-integrated facade technology together with innovative HVAC systems results in significant energy
savings and improves indoor air comfort in all buildings.
• Buildings should be designed to have an Integrated Building Management System (BMS) which
coordinates and controls HVAC, fire & safety, lighting, security, communication and other systems for
better efficiency.
Integrated Approach to Energy Efficient Building Design
Energy Efficient Building Design (A Case Study)
K. G. HOUSE – A CASE STUDY
•K Girdharlal House at Surat - •Site Area : 5,430 m2
•Built-Up Area : 9,100 m2
•Total Landscape Area : 1,639 m2
•No of Floors : Bsmnt + GF + 6 Floors •No of Occupants : >2200
• K.G. House was planned on Green Building Concept much before IGBC certification was prevalent.
• K.G. House was designed with a vision to enhance the productivity by providing clean, healthy and
comfortable environment to the diamond workers along with energy savings.
• Right from the Site selection and orientation, Planning and designing, Space management, Use of
proper materials, Latest HVAC techniques, Insulated roof and many such green strategies were
implemented since inception.
First Platinum Rated Diamond Processing Unit of the World
Initial Green Features :
Site Location & planning
Rainwater Harvesting System
Efficient façade with proper orientation
Use of Recycled & Local materials
Use of china mosaic tiles on the roof
Insulated roof
Natural topography
No Smoking campus
Efficient Lighting system
Sufficient Day Lighting
Fresh Air Ventilation
Energy Efficient HVAC system
Off site renewable energy
Added Green Features :
Drip irrigation
Water efficient plumbing fixtures
Electric charging sockets for electrical vehicles.
Reducing turf area by increasing native plants
Preferred parking space for disabled.
Use of Green Seal certified products for housekeeping
Ramps have been provided for disabled.
Exterior lighting to bend towards downside
Green education for the staff
Silver Rating(61-70) Gold Rating(71-80) Platinum Rating(80 Above)
K. G. HOUSE – A CASE STUDY
Total Points=100 Points Achieved-82 Rating- Platinum
Points
available
Initial Green
Features - Points
Added Green
Features - Points
Mandatory Requirement 1 Compliance with Local Regulations Required Achieved
Mandatory Requirement 2 Soil Erosion Prevention & Control Required Achieved
SS Credit 1 Contaminated Site Remediation 1
SS Credit 2 Access to Public Transport/Shuttle Services 3 1
SS Credit 3 Basic Amenities 2 2
SS Credit 4 Natural Topography & Landscape, 20%, 30% 2 2
SS Credit 5 Heat Island Effect on Roof and Parking Areas 4 4
SS Credit 6 Non Fossil Fueling Facility for Vehicles 1 1
SS Credit 7 Design for Differently Abled 2 2
SS Credit 8 Night Sky Pollution Reduction 1 1
16 9 4
Mandatory Requirement 1 Rainwater Harvesting, 50% Roof & Non-Roof Run-Off Required Achieved
WC Credit 1 Limit Turf Area, 20%, 30%, 40% 3 3
WC Credit 2 Drought Tolerant Species, 30%, 40% 2 2
WC Credit 3 Management of Irrigation System 2 2
WC Credit 4 Rainwater Harvesting, 75%, 95% 6 6
WC Credit 5 Non-process Wastewater - Treatment, 75%, 95% 4
WC Credit 6 Water Use Reduction, 20%, 30% 4 4
21 8 9
Mandatory Requirement 1 CFC-Free Equipment Required Achieved
Mandatory Requirement 2 Minimum Energy Performance Required Achieved
EC Credit 1 HCFC Free/Low Impact HCFC Equipment 1 1
EC Credit 2 Optimise Energy Performance, 10%, 12.5%, 15%, 17.5% 6 6
EC Credit 3 Metering 2 2
EC Credit 4 Onsite Renewable Energy, 5%, 10%, 15% 6
EC Credit 5 Green Power, 50%, 75%, 100% 6 6
EC Credit 6 Eco-friendly Captive Power Generation for Factory Building Requirement 2
23 15
K.G House - Green FeaturesSite Selection & Planning (SSP) (Max. 16 Points)
Water Conservation (WC) (Max 21 points)
Energy Conservation (EC) (Max. 23 Points)
Certified – 50 to 60 Silver – 61 to 70 Gold – 71 to 80 Platinum – 80 above
K. G. HOUSE – A CASE STUDY
Total Points=100 Points Achieved-82 Rating- Platinum
Points
available
Initial Green
Features - Points
Added Green
Features - Points
Mandatory Requirement 1 Handling of Non-precess Waste (Post Occupancy) Required Achieved
MC Credit 1 Waste Reduction During Construction, 50%, 75% 2 2
MC Credit 2 Materials with Recycled Content, 10%, 20% 2 2MC Credit 3 Local Materials, 50%, 75% 4 4
MC Credit 4 Materials Reuse, 5%, 10% 4 4
MC Credit 5 Certified Wood/Rapidly Renewable Building Materials and Furniture, 50%, 75% 4 4
16 16
Mandatory Requirement 1 Tobacco Smoke Control Required Achieved
Mandatory Requirement 2 Minimum Fresh Air Requirements Required Achieved
Mandatory Requirement 3 Avoid Use of Asbestos in the Building Required Achieved
IEQ Credit 1 Improves Fresh Air Ventilation 4 4
IEQ Credit 2 Building Flush Out 2 2
IEQ Credit 3 Daylighting 50%, 75%, 95% 6 4
IEQ Credit 4 Low VOC Materials 2 2
IEQ Credit 5 Reduction of Workmen Fatigue (Break out spaces) 2 2
IEQ Credit 6 Eco-friendly Housekeeping Chemicals 1 1
IEQ Credit 7 Aerobic & Cardiovascular Gymnasium 2 2
19 16 1
ID Credit 1.1 Innovation in Design 1
ID Credit 1.2 Innovation in Design 1 1
ID Credit 1.3 Innovation in Design 1 1
ID Credit 1.4 Innovation in Design 1 1
ID Credit 2 IGBC AP 1 1
5 2 2
100 66 16
K.G House - Green Features
Total Maximum Points
Total Points Achieved - 82 (66 - Initial, 16 - Added)
Material Conservation (MC) (max 16 points)
Indoor Environmental Quality and Occupational Health (IEQ) (max 19 points)
Innovation in Design (ID) (max 5 points)
Certified – 50 to 60 Silver – 61 to 70 Gold – 71 to 80 Platinum – 80 above
K. G. HOUSE – A CASE STUDY
Points
available
Initial Green
Features - Points
Added Green
Features - Points
Mandatory Requirement 1 Compliance with Local Regulations Required Achieved
Mandatory Requirement 2 Soil Erosion Prevention & Control Required Achieved
SS Credit 1 Contaminated Site Remediation 1
SS Credit 2 Access to Public Transport/Shuttle Services 3 1
SS Credit 3 Basic Amenities 2 2
SS Credit 4 Natural Topography & Landscape, 20%, 30% 2 2
SS Credit 5 Heat Island Effect on Roof and Parking Areas 4 4
SS Credit 6 Non Fossil Fueling Facility for Vehicles 1 1
SS Credit 7 Design for Differently Abled 2 2
SS Credit 8 Night Sky Pollution Reduction 1 1
16 9 4
Mandatory Requirement 1 Rainwater Harvesting, 50% Roof & Non-Roof Run-Off Required Achieved
WC Credit 1 Limit Turf Area, 20%, 30%, 40% 3 3
WC Credit 2 Drought Tolerant Species, 30%, 40% 2 2
WC Credit 3 Management of Irrigation System 2 2
WC Credit 4 Rainwater Harvesting, 75%, 95% 6 6
WC Credit 5 Non-process Wastewater - Treatment, 75%, 95% 4
WC Credit 6 Water Use Reduction, 20%, 30% 4 4
21 8 9
Mandatory Requirement 1 CFC-Free Equipment Required Achieved
Mandatory Requirement 2 Minimum Energy Performance Required Achieved
EC Credit 1 HCFC Free/Low Impact HCFC Equipment 1 1
EC Credit 2 Optimise Energy Performance, 10%, 12.5%, 15%, 17.5% 6 6
EC Credit 3 Metering 2 2
EC Credit 4 Onsite Renewable Energy, 5%, 10%, 15% 6
EC Credit 5 Green Power, 50%, 75%, 100% 6 6
EC Credit 6 Eco-friendly Captive Power Generation for Factory Building Requirement 2
23 15
K.G House - Green FeaturesSite Selection & Planning (SSP) (Max. 16 Points)
Water Conservation (WC) (Max 21 points)
Energy Conservation (EC) (Max. 23 Points)
Access to Public Transport :1 Point Initial Natural Topography & Landscape : 2 Points Initial Basic amenities : 2 Points Initial
Heat Island Effect on Roof and Parking : 4 Points Initial
Total Points (SSP) = 16 Points Achieved (SSP) - 13 Initial - 9 Added - 4
K. G. HOUSE – A CASE STUDY
Points
available
Initial Green
Features - Points
Added Green
Features - Points
Mandatory Requirement 1 Compliance with Local Regulations Required Achieved
Mandatory Requirement 2 Soil Erosion Prevention & Control Required Achieved
SS Credit 1 Contaminated Site Remediation 1
SS Credit 2 Access to Public Transport/Shuttle Services 3 1
SS Credit 3 Basic Amenities 2 2
SS Credit 4 Natural Topography & Landscape, 20%, 30% 2 2
SS Credit 5 Heat Island Effect on Roof and Parking Areas 4 4
SS Credit 6 Non Fossil Fueling Facility for Vehicles 1 1
SS Credit 7 Design for Differently Abled 2 2
SS Credit 8 Night Sky Pollution Reduction 1 1
16 9 4
Mandatory Requirement 1 Rainwater Harvesting, 50% Roof & Non-Roof Run-Off Required Achieved
WC Credit 1 Limit Turf Area, 20%, 30%, 40% 3 3
WC Credit 2 Drought Tolerant Species, 30%, 40% 2 2
WC Credit 3 Management of Irrigation System 2 2
WC Credit 4 Rainwater Harvesting, 75%, 95% 6 6
WC Credit 5 Non-process Wastewater - Treatment, 75%, 95% 4
WC Credit 6 Water Use Reduction, 20%, 30% 4 4
21 8 9
Mandatory Requirement 1 CFC-Free Equipment Required Achieved
Mandatory Requirement 2 Minimum Energy Performance Required Achieved
EC Credit 1 HCFC Free/Low Impact HCFC Equipment 1 1
EC Credit 2 Optimise Energy Performance, 10%, 12.5%, 15%, 17.5% 6 6
EC Credit 3 Metering 2 2
EC Credit 4 Onsite Renewable Energy, 5%, 10%, 15% 6
EC Credit 5 Green Power, 50%, 75%, 100% 6 6
EC Credit 6 Eco-friendly Captive Power Generation for Factory Building Requirement 2
23 15
K.G House - Green FeaturesSite Selection & Planning (SSP) (Max. 16 Points)
Water Conservation (WC) (Max 21 points)
Energy Conservation (EC) (Max. 23 Points)
Non Fossil Fueling Facility for Vehicles : 1 Point Added
Design For Differently Abled People : 2 Points Added
Ramp Night Sky Pollution Reduction :
1 Point Added
Total Points (SSP) = 16 Points Achieved (SSP) - 13 Initial - 9 Added - 4
K. G. HOUSE – A CASE STUDY
Water Efficiency : 2 Points Initial Rain Water Harvesting : 6 Points Initial
Total Points (WC) = 21 Points Achieved (WC) - 17 Initial - 8 Added - 9
Points
available
Initial Green
Features - Points
Added Green
Features - Points
Mandatory Requirement 1 Compliance with Local Regulations Required Achieved
Mandatory Requirement 2 Soil Erosion Prevention & Control Required Achieved
SS Credit 1 Contaminated Site Remediation 1
SS Credit 2 Access to Public Transport/Shuttle Services 3 1
SS Credit 3 Basic Amenities 2 2
SS Credit 4 Natural Topography & Landscape, 20%, 30% 2 2
SS Credit 5 Heat Island Effect on Roof and Parking Areas 4 4
SS Credit 6 Non Fossil Fueling Facility for Vehicles 1 1
SS Credit 7 Design for Differently Abled 2 2
SS Credit 8 Night Sky Pollution Reduction 1 1
16 9 4
Mandatory Requirement 1 Rainwater Harvesting, 50% Roof & Non-Roof Run-Off Required Achieved
WC Credit 1 Limit Turf Area, 20%, 30%, 40% 3 3
WC Credit 2 Drought Tolerant Species, 30%, 40% 2 2
WC Credit 3 Management of Irrigation System 2 2
WC Credit 4 Rainwater Harvesting, 75%, 95% 6 6
WC Credit 5 Non-process Wastewater - Treatment, 75%, 95% 4
WC Credit 6 Water Use Reduction, 20%, 30% 4 4
21 8 9
Mandatory Requirement 1 CFC-Free Equipment Required Achieved
Mandatory Requirement 2 Minimum Energy Performance Required Achieved
EC Credit 1 HCFC Free/Low Impact HCFC Equipment 1 1
EC Credit 2 Optimise Energy Performance, 10%, 12.5%, 15%, 17.5% 6 6
EC Credit 3 Metering 2 2
EC Credit 4 Onsite Renewable Energy, 5%, 10%, 15% 6
EC Credit 5 Green Power, 50%, 75%, 100% 6 6
EC Credit 6 Eco-friendly Captive Power Generation for Factory Building Requirement 2
23 15
K.G House - Green FeaturesSite Selection & Planning (SSP) (Max. 16 Points)
Water Conservation (WC) (Max 21 points)
Energy Conservation (EC) (Max. 23 Points)
Points
available
Initial Green
Features - Points
Added Green
Features - Points
Mandatory Requirement 1 Compliance with Local Regulations Required Achieved
Mandatory Requirement 2 Soil Erosion Prevention & Control Required Achieved
SS Credit 1 Contaminated Site Remediation 1
SS Credit 2 Access to Public Transport/Shuttle Services 3 1
SS Credit 3 Basic Amenities 2 2
SS Credit 4 Natural Topography & Landscape, 20%, 30% 2 2
SS Credit 5 Heat Island Effect on Roof and Parking Areas 4 4
SS Credit 6 Non Fossil Fueling Facility for Vehicles 1 1
SS Credit 7 Design for Differently Abled 2 2
SS Credit 8 Night Sky Pollution Reduction 1 1
16 9 4
Mandatory Requirement 1 Rainwater Harvesting, 50% Roof & Non-Roof Run-Off Required Achieved
WC Credit 1 Limit Turf Area, 20%, 30%, 40% 3 3
WC Credit 2 Drought Tolerant Species, 30%, 40% 2 2
WC Credit 3 Management of Irrigation System 2 2
WC Credit 4 Rainwater Harvesting, 75%, 95% 6 6
WC Credit 5 Non-process Wastewater - Treatment, 75%, 95% 4
WC Credit 6 Water Use Reduction, 20%, 30% 4 4
21 8 9
Mandatory Requirement 1 CFC-Free Equipment Required Achieved
Mandatory Requirement 2 Minimum Energy Performance Required Achieved
EC Credit 1 HCFC Free/Low Impact HCFC Equipment 1 1
EC Credit 2 Optimise Energy Performance, 10%, 12.5%, 15%, 17.5% 6 6
EC Credit 3 Metering 2 2
EC Credit 4 Onsite Renewable Energy, 5%, 10%, 15% 6
EC Credit 5 Green Power, 50%, 75%, 100% 6 6
EC Credit 6 Eco-friendly Captive Power Generation for Factory Building Requirement 2
23 15
K.G House - Green FeaturesSite Selection & Planning (SSP) (Max. 16 Points)
Water Conservation (WC) (Max 21 points)
Energy Conservation (EC) (Max. 23 Points)
• Drought Tolerant Species > 40%
• Dedicated Water Meter
• Stored rainwater used for plants
K. G. HOUSE – A CASE STUDY
Limiting Turf Area : 3 Points Added Water Use Reduction : 4 Points Added
Total Points (WC) = 21 Points Achieved (WC) - 17 Initial - 8 Added - 9
Points
available
Initial Green
Features - Points
Added Green
Features - Points
Mandatory Requirement 1 Compliance with Local Regulations Required Achieved
Mandatory Requirement 2 Soil Erosion Prevention & Control Required Achieved
SS Credit 1 Contaminated Site Remediation 1
SS Credit 2 Access to Public Transport/Shuttle Services 3 1
SS Credit 3 Basic Amenities 2 2
SS Credit 4 Natural Topography & Landscape, 20%, 30% 2 2
SS Credit 5 Heat Island Effect on Roof and Parking Areas 4 4
SS Credit 6 Non Fossil Fueling Facility for Vehicles 1 1
SS Credit 7 Design for Differently Abled 2 2
SS Credit 8 Night Sky Pollution Reduction 1 1
16 9 4
Mandatory Requirement 1 Rainwater Harvesting, 50% Roof & Non-Roof Run-Off Required Achieved
WC Credit 1 Limit Turf Area, 20%, 30%, 40% 3 3
WC Credit 2 Drought Tolerant Species, 30%, 40% 2 2
WC Credit 3 Management of Irrigation System 2 2
WC Credit 4 Rainwater Harvesting, 75%, 95% 6 6
WC Credit 5 Non-process Wastewater - Treatment, 75%, 95% 4
WC Credit 6 Water Use Reduction, 20%, 30% 4 4
21 8 9
Mandatory Requirement 1 CFC-Free Equipment Required Achieved
Mandatory Requirement 2 Minimum Energy Performance Required Achieved
EC Credit 1 HCFC Free/Low Impact HCFC Equipment 1 1
EC Credit 2 Optimise Energy Performance, 10%, 12.5%, 15%, 17.5% 6 6
EC Credit 3 Metering 2 2
EC Credit 4 Onsite Renewable Energy, 5%, 10%, 15% 6
EC Credit 5 Green Power, 50%, 75%, 100% 6 6
EC Credit 6 Eco-friendly Captive Power Generation for Factory Building Requirement 2
23 15
K.G House - Green FeaturesSite Selection & Planning (SSP) (Max. 16 Points)
Water Conservation (WC) (Max 21 points)
Energy Conservation (EC) (Max. 23 Points)
Points
available
Initial Green
Features - Points
Added Green
Features - Points
Mandatory Requirement 1 Compliance with Local Regulations Required Achieved
Mandatory Requirement 2 Soil Erosion Prevention & Control Required Achieved
SS Credit 1 Contaminated Site Remediation 1
SS Credit 2 Access to Public Transport/Shuttle Services 3 1
SS Credit 3 Basic Amenities 2 2
SS Credit 4 Natural Topography & Landscape, 20%, 30% 2 2
SS Credit 5 Heat Island Effect on Roof and Parking Areas 4 4
SS Credit 6 Non Fossil Fueling Facility for Vehicles 1 1
SS Credit 7 Design for Differently Abled 2 2
SS Credit 8 Night Sky Pollution Reduction 1 1
16 9 4
Mandatory Requirement 1 Rainwater Harvesting, 50% Roof & Non-Roof Run-Off Required Achieved
WC Credit 1 Limit Turf Area, 20%, 30%, 40% 3 3
WC Credit 2 Drought Tolerant Species, 30%, 40% 2 2
WC Credit 3 Management of Irrigation System 2 2
WC Credit 4 Rainwater Harvesting, 75%, 95% 6 6
WC Credit 5 Non-process Wastewater - Treatment, 75%, 95% 4
WC Credit 6 Water Use Reduction, 20%, 30% 4 4
21 8 9
Mandatory Requirement 1 CFC-Free Equipment Required Achieved
Mandatory Requirement 2 Minimum Energy Performance Required Achieved
EC Credit 1 HCFC Free/Low Impact HCFC Equipment 1 1
EC Credit 2 Optimise Energy Performance, 10%, 12.5%, 15%, 17.5% 6 6
EC Credit 3 Metering 2 2
EC Credit 4 Onsite Renewable Energy, 5%, 10%, 15% 6
EC Credit 5 Green Power, 50%, 75%, 100% 6 6
EC Credit 6 Eco-friendly Captive Power Generation for Factory Building Requirement 2
23 15
K.G House - Green FeaturesSite Selection & Planning (SSP) (Max. 16 Points)
Water Conservation (WC) (Max 21 points)
Energy Conservation (EC) (Max. 23 Points)
Management of Irrigation system : 2 Points Added
Sprinkler
Drip Irrigation
Turf Area limited to 20% of the Total Landscape area
Water Efficient Fixtures : Urinals – 1 LPF Water Closet – 4 LPF Faucets – 2.7 LPM Showerhead – 6 LPM
K. G. HOUSE – A CASE STUDY
HCFC Free Equipment: 1 Point Initial Green power (off site) 100% : 6 Points Initial
Total Points (EC) = 23 Points Achieved (EC) - 15 Initial - 15 Added - 0
Points
available
Initial Green
Features - Points
Added Green
Features - Points
Mandatory Requirement 1 Compliance with Local Regulations Required Achieved
Mandatory Requirement 2 Soil Erosion Prevention & Control Required Achieved
SS Credit 1 Contaminated Site Remediation 1
SS Credit 2 Access to Public Transport/Shuttle Services 3 1
SS Credit 3 Basic Amenities 2 2
SS Credit 4 Natural Topography & Landscape, 20%, 30% 2 2
SS Credit 5 Heat Island Effect on Roof and Parking Areas 4 4
SS Credit 6 Non Fossil Fueling Facility for Vehicles 1 1
SS Credit 7 Design for Differently Abled 2 2
SS Credit 8 Night Sky Pollution Reduction 1 1
16 9 4
Mandatory Requirement 1 Rainwater Harvesting, 50% Roof & Non-Roof Run-Off Required Achieved
WC Credit 1 Limit Turf Area, 20%, 30%, 40% 3 3
WC Credit 2 Drought Tolerant Species, 30%, 40% 2 2
WC Credit 3 Management of Irrigation System 2 2
WC Credit 4 Rainwater Harvesting, 75%, 95% 6 6
WC Credit 5 Non-process Wastewater - Treatment, 75%, 95% 4
WC Credit 6 Water Use Reduction, 20%, 30% 4 4
21 8 9
Mandatory Requirement 1 CFC-Free Equipment Required Achieved
Mandatory Requirement 2 Minimum Energy Performance Required Achieved
EC Credit 1 HCFC Free/Low Impact HCFC Equipment 1 1
EC Credit 2 Optimise Energy Performance, 10%, 12.5%, 15%, 17.5% 6 6
EC Credit 3 Metering 2 2
EC Credit 4 Onsite Renewable Energy, 5%, 10%, 15% 6
EC Credit 5 Green Power, 50%, 75%, 100% 6 6
EC Credit 6 Eco-friendly Captive Power Generation for Factory Building Requirement 2
23 15
K.G House - Green FeaturesSite Selection & Planning (SSP) (Max. 16 Points)
Water Conservation (WC) (Max 21 points)
Energy Conservation (EC) (Max. 23 Points)
Metering : 2 Points Initial
Points
available
Initial Green
Features - Points
Added Green
Features - Points
Mandatory Requirement 1 Compliance with Local Regulations Required Achieved
Mandatory Requirement 2 Soil Erosion Prevention & Control Required Achieved
SS Credit 1 Contaminated Site Remediation 1
SS Credit 2 Access to Public Transport/Shuttle Services 3 1
SS Credit 3 Basic Amenities 2 2
SS Credit 4 Natural Topography & Landscape, 20%, 30% 2 2
SS Credit 5 Heat Island Effect on Roof and Parking Areas 4 4
SS Credit 6 Non Fossil Fueling Facility for Vehicles 1 1
SS Credit 7 Design for Differently Abled 2 2
SS Credit 8 Night Sky Pollution Reduction 1 1
16 9 4
Mandatory Requirement 1 Rainwater Harvesting, 50% Roof & Non-Roof Run-Off Required Achieved
WC Credit 1 Limit Turf Area, 20%, 30%, 40% 3 3
WC Credit 2 Drought Tolerant Species, 30%, 40% 2 2
WC Credit 3 Management of Irrigation System 2 2
WC Credit 4 Rainwater Harvesting, 75%, 95% 6 6
WC Credit 5 Non-process Wastewater - Treatment, 75%, 95% 4
WC Credit 6 Water Use Reduction, 20%, 30% 4 4
21 8 9
Mandatory Requirement 1 CFC-Free Equipment Required Achieved
Mandatory Requirement 2 Minimum Energy Performance Required Achieved
EC Credit 1 HCFC Free/Low Impact HCFC Equipment 1 1
EC Credit 2 Optimise Energy Performance, 10%, 12.5%, 15%, 17.5% 6 6
EC Credit 3 Metering 2 2
EC Credit 4 Onsite Renewable Energy, 5%, 10%, 15% 6
EC Credit 5 Green Power, 50%, 75%, 100% 6 6
EC Credit 6 Eco-friendly Captive Power Generation for Factory Building Requirement 2
23 15
K.G House - Green FeaturesSite Selection & Planning (SSP) (Max. 16 Points)
Water Conservation (WC) (Max 21 points)
Energy Conservation (EC) (Max. 23 Points)
3 windmills with the
capacity of 800 kW each
installed (Total 2.4 MW).
The power from one
windmill utilized for
diamond cutting &
polishing unit.
The power from other
two windmills sold to
GEB at Rs. 3.31/ unit.
GEB supplies to small
scale cottage industries
and other social causes.
Optimize Energy Performance : 6 Points Initial
K. G. HOUSE – A CASE STUDY
• HVAC System with very low power consumption • Static Storage System designed since inception still working efficiently • Efficient Dust Extraction system for Diamond processing • Laser cooling system working 24 Hours • Energy Consumption Monitoring Using Power Analyzer • Under Floor Air Distribution System at Atrium Level • Adequate Indoor Air Quality for workers • Well integrated BMS helps in controlling and monitoring Energy consumption
Energy Efficient HVAC System :
K. G. HOUSE – A CASE STUDY
• Energy efficient VFD driven screw Chiller of 375 TR having lowest IKW/TR of 0.32 • Chiller with Tri-Rotor Screw Compressor selected to cater to Internal load variation and External Wet Bulb variation • Chiller used for charging the Static Storage system at night and cater to building loads during peak hours for energy savings • Natural stratification type Static Storage system has capacity of 850 TRH. • The Chilled Water TES tank made of RCC and insulated by high density EPS material. • The five compartments of tank connected by specially designed Diffusers to transfer chilled water in to and out of the TES tank. • The Tanks once charged, can supply the chilled water to the building. •When tanks are discharging the Chiller as well as the pumps can be switched-off along with the CT fans.
Energy Efficient HVAC System :
INTERNET [email protected]
AIR DISTRIBUTION LAY OUT
PART BASEMENT PLAN
ARUN PRADHAN
A R C H I T E C T
NIMISH CHOKSIVAISHALI CHOKSI
S.TEAMDESIGN
SERVICES
ARCHITECTURE
INTERIORS
URBAN DESIGN
INTERIOR DESIGNER
G2
G3
G3
B1-2
G5
SUV-AHD-704-001
2
FACET POLISHING WORKS
AT SURAT
FOR PART BASEMENT
G5
HVAC CONSULTANTS :
AS BUILT
SEQUENCE E (COMBINED CHARGING AND COOLING MODE)
K. G. HOUSE – A CASE STUDY
Actual Performance of Chiller measured at different condenser water entering temperature :
K. G. HOUSE – A CASE STUDY
Energy Saving Optimized :
Energy Savings due to Initial Green Features
K. G. HOUSE – A CASE STUDY
Total Points (MC) = 16 Points Achieved (MC) - 16 Initial - 16 Added - 0
Points
available
Initial Green
Features - Points
Added Green
Features - Points
Mandatory Requirement 1 Handling of Non-precess Waste (Post Occupancy) Required Achieved
MC Credit 1 Waste Reduction During Construction, 50%, 75% 2 2
MC Credit 2 Materials with Recycled Content, 10%, 20% 2 2MC Credit 3 Local Materials, 50%, 75% 4 4
MC Credit 4 Materials Reuse, 5%, 10% 4 4
MC Credit 5 Certified Wood/Rapidly Renewable Building Materials and Furniture, 50%, 75% 4 4
16 16
Mandatory Requirement 1 Tobacco Smoke Control Required Achieved
Mandatory Requirement 2 Minimum Fresh Air Requirements Required Achieved
Mandatory Requirement 3 Avoid Use of Asbestos in the Building Required Achieved
IEQ Credit 1 Improves Fresh Air Ventilation 4 4
IEQ Credit 2 Building Flush Out 2 2
IEQ Credit 3 Daylighting 50%, 75%, 95% 6 4
IEQ Credit 4 Low VOC Materials 2 2
IEQ Credit 5 Reduction of Workmen Fatigue (Break out spaces) 2 2
IEQ Credit 6 Eco-friendly Housekeeping Chemicals 1 1
IEQ Credit 7 Aerobic & Cardiovascular Gymnasium 2 2
19 16 1
ID Credit 1.1 Innovation in Design 1
ID Credit 1.2 Innovation in Design 1 1
ID Credit 1.3 Innovation in Design 1 1
ID Credit 1.4 Innovation in Design 1 1
ID Credit 2 IGBC AP 1 1
5 2 2
100 66 16
K.G House - Green Features
Total Maximum Points
Total Points Achieved - 82 (66 - Initial, 16 - Added)
Material Conservation (MC) (max 16 points)
Indoor Environmental Quality and Occupational Health (IEQ) (max 19 points)
Innovation in Design (ID) (max 5 points)
K. G. HOUSE – A CASE STUDY
Improved Fresh Air : 4 Points Initial Day Lighting >75% : 4 Points Initial
Total Points (IEQ) = 19 Points Achieved (IEQ) - 17 Initial – 16 Added - 1
Points
available
Initial Green
Features - Points
Added Green
Features - Points
Mandatory Requirement 1 Compliance with Local Regulations Required Achieved
Mandatory Requirement 2 Soil Erosion Prevention & Control Required Achieved
SS Credit 1 Contaminated Site Remediation 1
SS Credit 2 Access to Public Transport/Shuttle Services 3 1
SS Credit 3 Basic Amenities 2 2
SS Credit 4 Natural Topography & Landscape, 20%, 30% 2 2
SS Credit 5 Heat Island Effect on Roof and Parking Areas 4 4
SS Credit 6 Non Fossil Fueling Facility for Vehicles 1 1
SS Credit 7 Design for Differently Abled 2 2
SS Credit 8 Night Sky Pollution Reduction 1 1
16 9 4
Mandatory Requirement 1 Rainwater Harvesting, 50% Roof & Non-Roof Run-Off Required Achieved
WC Credit 1 Limit Turf Area, 20%, 30%, 40% 3 3
WC Credit 2 Drought Tolerant Species, 30%, 40% 2 2
WC Credit 3 Management of Irrigation System 2 2
WC Credit 4 Rainwater Harvesting, 75%, 95% 6 6
WC Credit 5 Non-process Wastewater - Treatment, 75%, 95% 4
WC Credit 6 Water Use Reduction, 20%, 30% 4 4
21 8 9
Mandatory Requirement 1 CFC-Free Equipment Required Achieved
Mandatory Requirement 2 Minimum Energy Performance Required Achieved
EC Credit 1 HCFC Free/Low Impact HCFC Equipment 1 1
EC Credit 2 Optimise Energy Performance, 10%, 12.5%, 15%, 17.5% 6 6
EC Credit 3 Metering 2 2
EC Credit 4 Onsite Renewable Energy, 5%, 10%, 15% 6
EC Credit 5 Green Power, 50%, 75%, 100% 6 6
EC Credit 6 Eco-friendly Captive Power Generation for Factory Building Requirement 2
23 15
K.G House - Green FeaturesSite Selection & Planning (SSP) (Max. 16 Points)
Water Conservation (WC) (Max 21 points)
Energy Conservation (EC) (Max. 23 Points)
Low VOC Materials : 2 Points Initial
Building Flush Out : 2 Points Initial
Points
available
Initial Green
Features - Points
Added Green
Features - Points
Mandatory Requirement 1 Handling of Non-precess Waste (Post Occupancy) Required Achieved
MC Credit 1 Waste Reduction During Construction, 50%, 75% 2 2
MC Credit 2 Materials with Recycled Content, 10%, 20% 2 2MC Credit 3 Local Materials, 50%, 75% 4 4
MC Credit 4 Materials Reuse, 5%, 10% 4 4
MC Credit 5 Certified Wood/Rapidly Renewable Building Materials and Furniture, 50%, 75% 4 4
16 16
Mandatory Requirement 1 Tobacco Smoke Control Required Achieved
Mandatory Requirement 2 Minimum Fresh Air Requirements Required Achieved
Mandatory Requirement 3 Avoid Use of Asbestos in the Building Required Achieved
IEQ Credit 1 Improves Fresh Air Ventilation 4 4
IEQ Credit 2 Building Flush Out 2 2
IEQ Credit 3 Daylighting 50%, 75%, 95% 6 4
IEQ Credit 4 Low VOC Materials 2 2
IEQ Credit 5 Reduction of Workmen Fatigue (Break out spaces) 2 2
IEQ Credit 6 Eco-friendly Housekeeping Chemicals 1 1
IEQ Credit 7 Aerobic & Cardiovascular Gymnasium 2 2
19 16 1
ID Credit 1.1 Innovation in Design 1
ID Credit 1.2 Innovation in Design 1 1
ID Credit 1.3 Innovation in Design 1 1
ID Credit 1.4 Innovation in Design 1 1
ID Credit 2 IGBC AP 1 1
5 2 2
100 66 16
K.G House - Green Features
Total Maximum Points
Total Points Achieved - 82 (66 - Initial, 16 - Added)
Material Conservation (MC) (max 16 points)
Indoor Environmental Quality and Occupational Health (IEQ) (max 19 points)
Innovation in Design (ID) (max 5 points)
Aerobic & CardioGym : 2 Points Initial
Break out spaces : 2 Points Initial
K. G. HOUSE – A CASE STUDY
Eco Friendly House Keeping Chemicals : 1 Point Added
Total Points (IEQ) = 19 Points Achieved (IEQ) - 17 Initial – 16 Added - 1
Points
available
Initial Green
Features - Points
Added Green
Features - Points
Mandatory Requirement 1 Compliance with Local Regulations Required Achieved
Mandatory Requirement 2 Soil Erosion Prevention & Control Required Achieved
SS Credit 1 Contaminated Site Remediation 1
SS Credit 2 Access to Public Transport/Shuttle Services 3 1
SS Credit 3 Basic Amenities 2 2
SS Credit 4 Natural Topography & Landscape, 20%, 30% 2 2
SS Credit 5 Heat Island Effect on Roof and Parking Areas 4 4
SS Credit 6 Non Fossil Fueling Facility for Vehicles 1 1
SS Credit 7 Design for Differently Abled 2 2
SS Credit 8 Night Sky Pollution Reduction 1 1
16 9 4
Mandatory Requirement 1 Rainwater Harvesting, 50% Roof & Non-Roof Run-Off Required Achieved
WC Credit 1 Limit Turf Area, 20%, 30%, 40% 3 3
WC Credit 2 Drought Tolerant Species, 30%, 40% 2 2
WC Credit 3 Management of Irrigation System 2 2
WC Credit 4 Rainwater Harvesting, 75%, 95% 6 6
WC Credit 5 Non-process Wastewater - Treatment, 75%, 95% 4
WC Credit 6 Water Use Reduction, 20%, 30% 4 4
21 8 9
Mandatory Requirement 1 CFC-Free Equipment Required Achieved
Mandatory Requirement 2 Minimum Energy Performance Required Achieved
EC Credit 1 HCFC Free/Low Impact HCFC Equipment 1 1
EC Credit 2 Optimise Energy Performance, 10%, 12.5%, 15%, 17.5% 6 6
EC Credit 3 Metering 2 2
EC Credit 4 Onsite Renewable Energy, 5%, 10%, 15% 6
EC Credit 5 Green Power, 50%, 75%, 100% 6 6
EC Credit 6 Eco-friendly Captive Power Generation for Factory Building Requirement 2
23 15
K.G House - Green FeaturesSite Selection & Planning (SSP) (Max. 16 Points)
Water Conservation (WC) (Max 21 points)
Energy Conservation (EC) (Max. 23 Points)
Points
available
Initial Green
Features - Points
Added Green
Features - Points
Mandatory Requirement 1 Handling of Non-precess Waste (Post Occupancy) Required Achieved
MC Credit 1 Waste Reduction During Construction, 50%, 75% 2 2
MC Credit 2 Materials with Recycled Content, 10%, 20% 2 2MC Credit 3 Local Materials, 50%, 75% 4 4
MC Credit 4 Materials Reuse, 5%, 10% 4 4
MC Credit 5 Certified Wood/Rapidly Renewable Building Materials and Furniture, 50%, 75% 4 4
16 16
Mandatory Requirement 1 Tobacco Smoke Control Required Achieved
Mandatory Requirement 2 Minimum Fresh Air Requirements Required Achieved
Mandatory Requirement 3 Avoid Use of Asbestos in the Building Required Achieved
IEQ Credit 1 Improves Fresh Air Ventilation 4 4
IEQ Credit 2 Building Flush Out 2 2
IEQ Credit 3 Daylighting 50%, 75%, 95% 6 4
IEQ Credit 4 Low VOC Materials 2 2
IEQ Credit 5 Reduction of Workmen Fatigue (Break out spaces) 2 2
IEQ Credit 6 Eco-friendly Housekeeping Chemicals 1 1
IEQ Credit 7 Aerobic & Cardiovascular Gymnasium 2 2
19 16 1
ID Credit 1.1 Innovation in Design 1
ID Credit 1.2 Innovation in Design 1 1
ID Credit 1.3 Innovation in Design 1 1
ID Credit 1.4 Innovation in Design 1 1
ID Credit 2 IGBC AP 1 1
5 2 2
100 66 16
K.G House - Green Features
Total Maximum Points
Total Points Achieved - 82 (66 - Initial, 16 - Added)
Material Conservation (MC) (max 16 points)
Indoor Environmental Quality and Occupational Health (IEQ) (max 19 points)
Innovation in Design (ID) (max 5 points)
Use of Eco-Friendly Green Seal certified house-keeping materials
K. G. HOUSE – A CASE STUDY
Total Points (ID) = 5 Points Achieved (ID) - 4 Initial - 2 Added - 2
Points
available
Initial Green
Features - Points
Added Green
Features - Points
Mandatory Requirement 1 Handling of Non-precess Waste (Post Occupancy) Required Achieved
MC Credit 1 Waste Reduction During Construction, 50%, 75% 2 2
MC Credit 2 Materials with Recycled Content, 10%, 20% 2 2MC Credit 3 Local Materials, 50%, 75% 4 4
MC Credit 4 Materials Reuse, 5%, 10% 4 4
MC Credit 5 Certified Wood/Rapidly Renewable Building Materials and Furniture, 50%, 75% 4 4
16 16
Mandatory Requirement 1 Tobacco Smoke Control Required Achieved
Mandatory Requirement 2 Minimum Fresh Air Requirements Required Achieved
Mandatory Requirement 3 Avoid Use of Asbestos in the Building Required Achieved
IEQ Credit 1 Improves Fresh Air Ventilation 4 4
IEQ Credit 2 Building Flush Out 2 2
IEQ Credit 3 Daylighting 50%, 75%, 95% 6 4
IEQ Credit 4 Low VOC Materials 2 2
IEQ Credit 5 Reduction of Workmen Fatigue (Break out spaces) 2 2
IEQ Credit 6 Eco-friendly Housekeeping Chemicals 1 1
IEQ Credit 7 Aerobic & Cardiovascular Gymnasium 2 2
19 16 1
ID Credit 1.1 Innovation in Design 1
ID Credit 1.2 Innovation in Design 1 1
ID Credit 1.3 Innovation in Design 1 1
ID Credit 1.4 Innovation in Design 1 1
ID Credit 2 IGBC AP 1 1
5 2 2
100 66 16
K.G House - Green Features
Total Maximum Points
Total Points Achieved - 82 (66 - Initial, 16 - Added)
Material Conservation (MC) (max 16 points)
Indoor Environmental Quality and Occupational Health (IEQ) (max 19 points)
Innovation in Design (ID) (max 5 points)
Points
available
Initial Green
Features - Points
Added Green
Features - Points
Mandatory Requirement 1 Handling of Non-precess Waste (Post Occupancy) Required Achieved
MC Credit 1 Waste Reduction During Construction, 50%, 75% 2 2
MC Credit 2 Materials with Recycled Content, 10%, 20% 2 2MC Credit 3 Local Materials, 50%, 75% 4 4
MC Credit 4 Materials Reuse, 5%, 10% 4 4
MC Credit 5 Certified Wood/Rapidly Renewable Building Materials and Furniture, 50%, 75% 4 4
16 16
Mandatory Requirement 1 Tobacco Smoke Control Required Achieved
Mandatory Requirement 2 Minimum Fresh Air Requirements Required Achieved
Mandatory Requirement 3 Avoid Use of Asbestos in the Building Required Achieved
IEQ Credit 1 Improves Fresh Air Ventilation 4 4
IEQ Credit 2 Building Flush Out 2 2
IEQ Credit 3 Daylighting 50%, 75%, 95% 6 4
IEQ Credit 4 Low VOC Materials 2 2
IEQ Credit 5 Reduction of Workmen Fatigue (Break out spaces) 2 2
IEQ Credit 6 Eco-friendly Housekeeping Chemicals 1 1
IEQ Credit 7 Aerobic & Cardiovascular Gymnasium 2 2
19 16 1
ID Credit 1.1 Innovation in Design 1
ID Credit 1.2 Innovation in Design 1 1
ID Credit 1.3 Innovation in Design 1 1
ID Credit 1.4 Innovation in Design 1 1
ID Credit 2 IGBC AP 1 1
5 2 2
100 66 16
K.G House - Green Features
Total Maximum Points
Total Points Achieved - 82 (66 - Initial, 16 - Added)
Material Conservation (MC) (max 16 points)
Indoor Environmental Quality and Occupational Health (IEQ) (max 19 points)
Innovation in Design (ID) (max 5 points)
Optimize Energy performance (36.27%) : 1 Point Initial Off Site Green Power (100%) : 1 Point Initial
K. G. HOUSE – A CASE STUDY
Total Points (ID) = 5 Points Achieved (ID) - 4 Initial - 2 Added - 2
Points
available
Initial Green
Features - Points
Added Green
Features - Points
Mandatory Requirement 1 Handling of Non-precess Waste (Post Occupancy) Required Achieved
MC Credit 1 Waste Reduction During Construction, 50%, 75% 2 2
MC Credit 2 Materials with Recycled Content, 10%, 20% 2 2MC Credit 3 Local Materials, 50%, 75% 4 4
MC Credit 4 Materials Reuse, 5%, 10% 4 4
MC Credit 5 Certified Wood/Rapidly Renewable Building Materials and Furniture, 50%, 75% 4 4
16 16
Mandatory Requirement 1 Tobacco Smoke Control Required Achieved
Mandatory Requirement 2 Minimum Fresh Air Requirements Required Achieved
Mandatory Requirement 3 Avoid Use of Asbestos in the Building Required Achieved
IEQ Credit 1 Improves Fresh Air Ventilation 4 4
IEQ Credit 2 Building Flush Out 2 2
IEQ Credit 3 Daylighting 50%, 75%, 95% 6 4
IEQ Credit 4 Low VOC Materials 2 2
IEQ Credit 5 Reduction of Workmen Fatigue (Break out spaces) 2 2
IEQ Credit 6 Eco-friendly Housekeeping Chemicals 1 1
IEQ Credit 7 Aerobic & Cardiovascular Gymnasium 2 2
19 16 1
ID Credit 1.1 Innovation in Design 1
ID Credit 1.2 Innovation in Design 1 1
ID Credit 1.3 Innovation in Design 1 1
ID Credit 1.4 Innovation in Design 1 1
ID Credit 2 IGBC AP 1 1
5 2 2
100 66 16
K.G House - Green Features
Total Maximum Points
Total Points Achieved - 82 (66 - Initial, 16 - Added)
Material Conservation (MC) (max 16 points)
Indoor Environmental Quality and Occupational Health (IEQ) (max 19 points)
Innovation in Design (ID) (max 5 points)
Points
available
Initial Green
Features - Points
Added Green
Features - Points
Mandatory Requirement 1 Handling of Non-precess Waste (Post Occupancy) Required Achieved
MC Credit 1 Waste Reduction During Construction, 50%, 75% 2 2
MC Credit 2 Materials with Recycled Content, 10%, 20% 2 2MC Credit 3 Local Materials, 50%, 75% 4 4
MC Credit 4 Materials Reuse, 5%, 10% 4 4
MC Credit 5 Certified Wood/Rapidly Renewable Building Materials and Furniture, 50%, 75% 4 4
16 16
Mandatory Requirement 1 Tobacco Smoke Control Required Achieved
Mandatory Requirement 2 Minimum Fresh Air Requirements Required Achieved
Mandatory Requirement 3 Avoid Use of Asbestos in the Building Required Achieved
IEQ Credit 1 Improves Fresh Air Ventilation 4 4
IEQ Credit 2 Building Flush Out 2 2
IEQ Credit 3 Daylighting 50%, 75%, 95% 6 4
IEQ Credit 4 Low VOC Materials 2 2
IEQ Credit 5 Reduction of Workmen Fatigue (Break out spaces) 2 2
IEQ Credit 6 Eco-friendly Housekeeping Chemicals 1 1
IEQ Credit 7 Aerobic & Cardiovascular Gymnasium 2 2
19 16 1
ID Credit 1.1 Innovation in Design 1
ID Credit 1.2 Innovation in Design 1 1
ID Credit 1.3 Innovation in Design 1 1
ID Credit 1.4 Innovation in Design 1 1
ID Credit 2 IGBC AP 1 1
5 2 2
100 66 16
K.G House - Green Features
Total Maximum Points
Total Points Achieved - 82 (66 - Initial, 16 - Added)
Material Conservation (MC) (max 16 points)
Indoor Environmental Quality and Occupational Health (IEQ) (max 19 points)
Innovation in Design (ID) (max 5 points)
Water Use Reduction (50%): 1 Point Added IGBC AP: 1 Point Added
K. G. HOUSE – A CASE STUDY
SALIENT GREEN FEATURES:
HVAC System with very low power consumption Static Storage System designed initially and working efficiently Efficient Dust Extraction system Laser cooling system working 24 Hours Energy Consumption Monitoring Using Power Analyzer Under Floor Air Distribution System at Atrium Level Use of Off Site Green Power Generation Using Windmills Adequate Indoor Air Quality for workers Adequate Green Area and Landscape Energy Efficient Building Envelope Adequate Day lighting Designed for Differently Abled People Waste Management Practices Water Efficient Plumbing System Green certification of Existing Building at negligible cost
“First Diamond Processing Unit in the World to achieve Platinum Rating”
K. Girdharlal International Limited at Surat, Gujarat
PROJECT DETAILS: Site Area: 5,430 m2 Built-Up Area: 9,100 m2 Landscaped Area: 1,639 m2 Number of Floors: 1B+G+6F Number of Occupants: 2227
Green Building Consultancy by Pankaj Dharkar & Associates
First Platinum Rated Diamond Processing Unit of the World
K. G. HOUSE – A CASE STUDY
Be Energy Efficient!!