Energy Efficiency Quality Assurance: Past, Present, and Future
Dave Bohac | Director of ResearchJim Fitzgerald | Senior AnalystCarl Nelson | Manager of Residential ProgramsIsaac Smith | Program Assistant
3/6/2014
![Page 2: Energy Efficiency Quality Assurance](https://reader033.fdocuments.in/reader033/viewer/2022061203/546cf8d3b4af9f662c8b52db/html5/thumbnails/2.jpg)
Pg. 2
![Page 3: Energy Efficiency Quality Assurance](https://reader033.fdocuments.in/reader033/viewer/2022061203/546cf8d3b4af9f662c8b52db/html5/thumbnails/3.jpg)
Pg. 3
![Page 4: Energy Efficiency Quality Assurance](https://reader033.fdocuments.in/reader033/viewer/2022061203/546cf8d3b4af9f662c8b52db/html5/thumbnails/4.jpg)
Pg. 4
Meeting Utility Resource Needs with Solar: The Merits of the Aurora Solar Project
Wednesday, March 19th
11:00 – 12:00 CST
Betsy Engelking | Geranimo Energy Vice PresidentNathan Franzen | Geranimo Director of Solar
• Introduction to the Aurora Solar Project that has been selected in MN
• The design and technical merits of the proposed project
![Page 5: Energy Efficiency Quality Assurance](https://reader033.fdocuments.in/reader033/viewer/2022061203/546cf8d3b4af9f662c8b52db/html5/thumbnails/5.jpg)
Pg. 5
Presenters & Overview
• Experience that have informed best practices• Innovations currently being used in the field• Future implementation opportunities
Dave BohacDirector of Research
Jim FitzgeraldSenior Research Analyst
Carl NelsonManager of Residential Programs
Isaac Smith Program Assistant
![Page 6: Energy Efficiency Quality Assurance](https://reader033.fdocuments.in/reader033/viewer/2022061203/546cf8d3b4af9f662c8b52db/html5/thumbnails/6.jpg)
Pg. 6
Operation Insulation
• Beginning of Quality Assurance (QA) at CEE• ~1983
![Page 7: Energy Efficiency Quality Assurance](https://reader033.fdocuments.in/reader033/viewer/2022061203/546cf8d3b4af9f662c8b52db/html5/thumbnails/7.jpg)
Pg. 7
Community Based Outreach
• One-stop shop for home improvement
![Page 8: Energy Efficiency Quality Assurance](https://reader033.fdocuments.in/reader033/viewer/2022061203/546cf8d3b4af9f662c8b52db/html5/thumbnails/8.jpg)
Pg. 8
Partnered with contractors
• Agreed to standards
![Page 9: Energy Efficiency Quality Assurance](https://reader033.fdocuments.in/reader033/viewer/2022061203/546cf8d3b4af9f662c8b52db/html5/thumbnails/9.jpg)
Pg. 9
Post Inspection
• Every job was inspected• Borrowed IR camera from
fire department and Hughes Aircraft• Cooled with argon gas
![Page 10: Energy Efficiency Quality Assurance](https://reader033.fdocuments.in/reader033/viewer/2022061203/546cf8d3b4af9f662c8b52db/html5/thumbnails/10.jpg)
Pg. 10
Operation Insulation
• Over 4,000 homes participated• Funded by Minnegasco
![Page 11: Energy Efficiency Quality Assurance](https://reader033.fdocuments.in/reader033/viewer/2022061203/546cf8d3b4af9f662c8b52db/html5/thumbnails/11.jpg)
Pg. 11
Sound Insulation Program
• Began in 1992 to reduce airport noise• CEE hired to administer the program
• Funded by the Federal Aviation Administration (FAA) and Metropolitan Airports Commission (MAC)
• Over 13,000 homes participated over next decade
• Work completed:• Acoustic windows and doors• Air-Conditioning• Attic insulation and air-sealing• Wall insulation
![Page 12: Energy Efficiency Quality Assurance](https://reader033.fdocuments.in/reader033/viewer/2022061203/546cf8d3b4af9f662c8b52db/html5/thumbnails/12.jpg)
Pg. 12
Health and Safety
• 1996 Headline
![Page 13: Energy Efficiency Quality Assurance](https://reader033.fdocuments.in/reader033/viewer/2022061203/546cf8d3b4af9f662c8b52db/html5/thumbnails/13.jpg)
Pg. 13
Health and Safety
• Indoor Air Quality (IAQ) issues discovered in treated homes
• 3,200 homes had completed the program by 1996• Issues of concern:
• Gas appliance combustion spillage• Gas appliance carbon monoxide• House tightness/ventilation
![Page 14: Energy Efficiency Quality Assurance](https://reader033.fdocuments.in/reader033/viewer/2022061203/546cf8d3b4af9f662c8b52db/html5/thumbnails/14.jpg)
Pg. 14
Program Response
• Temporarily suspend program• Assemble panel of international experts
• Led by Dave Bohac• Design process to predict and resolve possible issues
• CEE developed inspection and testing standards• “Worst-case” testing of natural and induced-draft appliances• Carbon monoxide testing for each appliance
• Pass/Fail limits set• Compare vent system size to code• Establish house tightness criteria
![Page 15: Energy Efficiency Quality Assurance](https://reader033.fdocuments.in/reader033/viewer/2022061203/546cf8d3b4af9f662c8b52db/html5/thumbnails/15.jpg)
Pg. 15
Ventilation standards
• Sound ventilation requirement developed• Air leakage (cfm50) < Floor
area (sf)
• Add continuous exhaust ventilation
• Predicting the future• 10% to 35% reduction expected
![Page 16: Energy Efficiency Quality Assurance](https://reader033.fdocuments.in/reader033/viewer/2022061203/546cf8d3b4af9f662c8b52db/html5/thumbnails/16.jpg)
Pg. 16
Problem Solved
• Detailed inspection helped reduce post-treatment issues
• 3,200 treated homes were re-inspected
• Pre-tests found many of the problems were pre-existing
![Page 17: Energy Efficiency Quality Assurance](https://reader033.fdocuments.in/reader033/viewer/2022061203/546cf8d3b4af9f662c8b52db/html5/thumbnails/17.jpg)
Pg. 17
Contractor Quality Assurance
• Homes were open for bid on monthly cycle• 35-75 homes per month
• In order to bid: • Contactors agree to
standards• Complete contractor
entry and certification• On-going QA
![Page 18: Energy Efficiency Quality Assurance](https://reader033.fdocuments.in/reader033/viewer/2022061203/546cf8d3b4af9f662c8b52db/html5/thumbnails/18.jpg)
Pg. 18
Why is it important to have an entry process for new contractors? • Initial process was incomplete • Two process issues
• Contractor agreement to meet program work requirements • Contractor’s staff may not know requirements or how to meet
them• Entry process informs contractors and installers
• Pre bid demonstration on first jobs• Crew has chance to demonstrate compliance
• Required tasks were the same as the QA test by CEE
![Page 19: Energy Efficiency Quality Assurance](https://reader033.fdocuments.in/reader033/viewer/2022061203/546cf8d3b4af9f662c8b52db/html5/thumbnails/19.jpg)
Pg. 19
Contractor Entry
• 5 test jobs before contractor on bid list• QA assessor verifies skills on-site
• Required skills• Effective air sealing of bypasses• Dense-pack insulation, equipment test• Blower door test
• Contractor training as necessary• Bid limit removed once skills verified
• Basic certification of each installer recorded
![Page 20: Energy Efficiency Quality Assurance](https://reader033.fdocuments.in/reader033/viewer/2022061203/546cf8d3b4af9f662c8b52db/html5/thumbnails/20.jpg)
Pg. 20
Quality Assurance• Every job inspected using
blower door and IR camera
• Contractor Requirements• Maintain 90% pass rate• Correct jobs within 14 days• Failure to comply => off bid list
If necessary, another contractor completed all work before CEE final test
• Over 13,000 homes inspected complete in full compliance
![Page 21: Energy Efficiency Quality Assurance](https://reader033.fdocuments.in/reader033/viewer/2022061203/546cf8d3b4af9f662c8b52db/html5/thumbnails/21.jpg)
Pg. 21
Evolution of Standards
• Not part of code at the time, only voluntary standards• “best practices” developed in funded pilot programs• Had to be adapted locally• Learned from other programs
• Adapted this process for other Sound Insulation programs, including Milwaukee
• This process contributed to the development of national
standards• M200/advanced WX• BPI and NYSERDA
![Page 22: Energy Efficiency Quality Assurance](https://reader033.fdocuments.in/reader033/viewer/2022061203/546cf8d3b4af9f662c8b52db/html5/thumbnails/22.jpg)
Pg. 22
5 Keys of QA program
1. Installation Standards2. Contractor Participation
Agreement3. Verify contractor ability4. Verify work completed to
standards5. Contractor Accountability
![Page 23: Energy Efficiency Quality Assurance](https://reader033.fdocuments.in/reader033/viewer/2022061203/546cf8d3b4af9f662c8b52db/html5/thumbnails/23.jpg)
Pg. 23
Authorized Insulation Contractor Program
1. Installation Standards• Adapted from Sound Insulation Program
2. Contractor Participation Agreement• Own required equipment• Complete work to standards• QA visits and callback completion• Blower door and combustion safety testing• Customer service
Note: Contractor needs incentive
![Page 24: Energy Efficiency Quality Assurance](https://reader033.fdocuments.in/reader033/viewer/2022061203/546cf8d3b4af9f662c8b52db/html5/thumbnails/24.jpg)
Pg. 24
Authorized Insulation Contractor Program
3. Verify contractor ability• Building Performance Institute (BPI) Installer certification
• Official name: Residential Building Envelope Whole House Air Leakage Control Installer Certification
• Skills based certification developed by Jim Fitzgerald• Certified employee must be on-site
![Page 25: Energy Efficiency Quality Assurance](https://reader033.fdocuments.in/reader033/viewer/2022061203/546cf8d3b4af9f662c8b52db/html5/thumbnails/25.jpg)
Pg. 25
Authorized Insulation Contractor Program
4. Verify work completed to standards• QA phone visits
• Complete on initial jobs
• QA on-site visits• Check a sample of jobs
• QA site visit app• Data entered on-site using iPad
• Database of info• Generates visit report including score• Provides contractor feedback
![Page 26: Energy Efficiency Quality Assurance](https://reader033.fdocuments.in/reader033/viewer/2022061203/546cf8d3b4af9f662c8b52db/html5/thumbnails/26.jpg)
Pg. 26
Authorized Insulation Contractor Program
5. Contractor Accountability• Requirements
• Maintain acceptable job score• Complete required callback work
• Probation• Additional QA phone visits• On-line training portal
• Also used during contractor entry
• Suspension• Removed from program if requirements are not met
![Page 27: Energy Efficiency Quality Assurance](https://reader033.fdocuments.in/reader033/viewer/2022061203/546cf8d3b4af9f662c8b52db/html5/thumbnails/27.jpg)
Pg. 27
Authorized Insulation Contractor Program
• Further Details on program website• http://mncee.org/AIC/
• Questions? • [email protected]
![Page 28: Energy Efficiency Quality Assurance](https://reader033.fdocuments.in/reader033/viewer/2022061203/546cf8d3b4af9f662c8b52db/html5/thumbnails/28.jpg)
Pg. 28
Future trends in residential QA• Increased need for QA -- utilities need insulation programs & rebates
to meet savings goals, and potential for bad contractors not going away
• But, delivered at low cost --- Long-term low natural gas prices drive increased need for efficiency in delivery of QA services
• Technology can lower cost and enhance performance• Software• Web-based training
• Increased need for coordination • Regional technical committees for coordination / continued refinement of
standards
![Page 29: Energy Efficiency Quality Assurance](https://reader033.fdocuments.in/reader033/viewer/2022061203/546cf8d3b4af9f662c8b52db/html5/thumbnails/29.jpg)
Dave Bohac | [email protected] Fitzgerald | [email protected] Nelson | [email protected] Smith | [email protected]
![Page 30: Energy Efficiency Quality Assurance](https://reader033.fdocuments.in/reader033/viewer/2022061203/546cf8d3b4af9f662c8b52db/html5/thumbnails/30.jpg)
Question & Answer
Webinar Link: http://www.mncee.org/Innovation-Exchange/Resource-Center/
![Page 31: Energy Efficiency Quality Assurance](https://reader033.fdocuments.in/reader033/viewer/2022061203/546cf8d3b4af9f662c8b52db/html5/thumbnails/31.jpg)
Pg. 31