Energy determination at BEPC-II

Satellite Meeting «On the Need for a super-tau-charm

factory»September 26 – 27,

2008,BINP, Novosibirsk, Russia

M.N. Achasov(on behalf of BINP,IHEP and Univ. of Hawaii

collaboration)

Budker Institute of Nuclear Physics, Siberian Branch of the Russian Academy of Sciences

Page 2: Energy determination at BEPC-II  Satellite Meeting «On the Need for a super-tau-charm factory» September 26 – 27, 2008, BINP, Novosibirsk, Russia M.N.

IntroductionWhy in e+e- experiments the accurate

beam energy calibration is important in the «c-» energy region ?

• The -lepton mass determination

m=1776,76±0,15 MeV/c2

lepton is fundamental particle, its mass is important parameter of the Standard Model.

• The masses of and D mesons are also of interest.

Page 3: Energy determination at BEPC-II  Satellite Meeting «On the Need for a super-tau-charm factory» September 26 – 27, 2008, BINP, Novosibirsk, Russia M.N.

Accuracy of the mass measurement in BEPC-II – BESIII experiment

•Statistic uncertainty <20 keV (one week of data taking)

•Systematic uncertainty (without accuracy of beam energy determination) about 20 keV; include the following sources – luminosity, detection efficiency, branching ratios, background subtraction, energy spread, theoretical uncertainty )

Total error is about 30 keV.

[Y.K.Wang, X.H.Mo, C.Z.Yuan, J.P.Liu, Optimization of the data taking strategy for a high precision mass measurement, Nucl. Instr. and Meth. A583, 2007, pp. 479-484; X.H. Mo, Study of high precision mass measurement at BESIII, In Proc. Of TAU’06, Nucl. Phys. Proc. Suppl., 169, 2007, pp. 132-139]

The most important source of uncertainty is the precision of the absolute beam energy

Page 4: Energy determination at BEPC-II  Satellite Meeting «On the Need for a super-tau-charm factory» September 26 – 27, 2008, BINP, Novosibirsk, Russia M.N.

Approaches to the beam energy determination

• Calibration of the energy scale from scan of the Jand′ resonances. Expected accuracy is about 100 keV.

[BES Collaboration, Measurement of the mass of lepton, Phys. Rev. D 53, 1996, pp. 20-31]

• Beam energy measurement using Compton backscattering of monochromatic laser radiation on the e± beams.

This approach was approved in collider experiment at VEPP-4M [V.E.Blinov, A.V.Bogomyakov, N.Yu.Muchnoi, S.A..Nikitin, I.B.Nikolaev,A.G.Shamov, V.N.Zhilich, Review of beam energy measurements at VEPP-4M

collider, in Proc. Of INSTR’08]

Page 5: Energy determination at BEPC-II  Satellite Meeting «On the Need for a super-tau-charm factory» September 26 – 27, 2008, BINP, Novosibirsk, Russia M.N.

General idea of the Compton backscattering approach

• The maximum energy of backscattered photon max is strictly related with the electron energy so if one measured max then the electron energy can be obtained:

where 0 is the laser photon energy. • The max which is measured by High Purity Germanium (HPGe) detector with

ultimately high resolution (~10-3) allows to have statistical accuracy in the beam energy measurement about 10-5.

• The systematic accuracy is mostly defined by absolute calibration of the detector . The accurate calibration could be done in the photon energy range up to 10 MeV by using the active radionuclides.

0max

2max 112

em

Page 6: Energy determination at BEPC-II  Satellite Meeting «On the Need for a super-tau-charm factory» September 26 – 27, 2008, BINP, Novosibirsk, Russia M.N.

Accuracy of the methodThe method was tested using the resonant depolarization technique in experiments at VEPP-4M ( accuracy is about 1 keV.) The comparison of the energy measurements results shows that the Compton backscattering method accuracy is about 40 keV

The mass expected accuracy is about 50 keV

Page 7: Energy determination at BEPC-II  Satellite Meeting «On the Need for a super-tau-charm factory» September 26 – 27, 2008, BINP, Novosibirsk, Russia M.N.

BEPC-II electron-positron collider

Page 8: Energy determination at BEPC-II  Satellite Meeting «On the Need for a super-tau-charm factory» September 26 – 27, 2008, BINP, Novosibirsk, Russia M.N.

Layout of the beam energy calibration system

Page 9: Energy determination at BEPC-II  Satellite Meeting «On the Need for a super-tau-charm factory» September 26 – 27, 2008, BINP, Novosibirsk, Russia M.N.

Deployment place

Page 10: Energy determination at BEPC-II  Satellite Meeting «On the Need for a super-tau-charm factory» September 26 – 27, 2008, BINP, Novosibirsk, Russia M.N.

Components of the system

•Source of photons - CO2 laser with radiation wavelength =10,6m (Univ. of Hawaii, USA)

•Optical system which provide the laser beam transportation to the beams (BINP, Russia).

•Coaxial HPGe detector (50 mm diameter, 50 mm height) with energy resolution 2,5 keV for 6 MeV photons (BINP, Russia).

•Laser to vacuum insertion system (BINP, Russia)

•Sources of for HPGe calibration (IHEP, China)

Page 11: Energy determination at BEPC-II  Satellite Meeting «On the Need for a super-tau-charm factory» September 26 – 27, 2008, BINP, Novosibirsk, Russia M.N.

Optical system

Laser will be here

Page 12: Energy determination at BEPC-II  Satellite Meeting «On the Need for a super-tau-charm factory» September 26 – 27, 2008, BINP, Novosibirsk, Russia M.N.

Design drawing of vacuum box

New Vacuum Chamber

Page 13: Energy determination at BEPC-II  Satellite Meeting «On the Need for a super-tau-charm factory» September 26 – 27, 2008, BINP, Novosibirsk, Russia M.N.

Laser to vacuum insertion system

Short vacuum chamber with copper mirror

Long vacuum chamber

Page 14: Energy determination at BEPC-II  Satellite Meeting «On the Need for a super-tau-charm factory» September 26 – 27, 2008, BINP, Novosibirsk, Russia M.N.

Conclusion

The BEPC-II energy calibration system is in progress now.

We hope to finish its installation and testing in 2009.