ENERGY AUDITING tool to increase ENERGY EFFICIENCY Ing. Bronislava Herdová, PhD. energy auditor En-efekt, s.r.o., Ambrova 35, 831 01 Bratislava, e-mail: [email protected], Tel.: 0904 220 713

Transcript of Energy Audit presentation.pptx

Page 1: Energy Audit presentation.pptx

ENERGY AUDITINGtool to increase

ENERGY EFFICIENCY

Ing. Bronislava Herdová, PhD.

energy auditor

En-efekt, s.r.o., Ambrova 35, 831 01 Bratislava, e-mail: [email protected], Tel.: 0904 220 713

Page 2: Energy Audit presentation.pptx

Why energy efficiency?

Overal EU policy objective:20% GHG emissions – 20% RES – 20% Energy savings (until 2020)

Directive No. 2006/32/ES on on energy end-use efficiency and energy services

New Directive 2012/27/EU of the European Parliament and of the Council of 25 October 2012 on energy efficiency

Tools to increase EE? => energy auditing, energy services

En-efekt, s.r.o., Ambrova 35, 831 01 Bratislava, e-mail: [email protected], Tel.: 0904 220 713

Page 3: Energy Audit presentation.pptx

Why energy efficiency?

cheapest energy is that which is not necessary to produce EE is in the center of economy and political attention EE contributes to fulfilment of main three targets of EU energy policy -

sustainability, security and competitivness EE decreases dependance of economy on non-stabile prices of oil and

gas EE is part of healthy energy and economy policy of state It supports local economy and its growth based on innovations It increase lifetime of objects and technology equipment Decreases operational costs, environmental impact Saves money and time

En-efekt, s.r.o., Ambrova 35, 831 01 Bratislava, e-mail: [email protected], Tel.: 0904 220 713

Page 4: Energy Audit presentation.pptx

WHAT IS AN ENERGY AUDIT (EA)?

pool of activities (systematic procedure) focused on analysis of current energy need and consumption going out of valid technical standards,

analysis of problems (weaknesses and deficiencies), EA identifies and in detail quantifies effective possibilities of energy savings tailored

to the object being analyzed, „field-work“, economy tool having dynamic character, often basis for grant financing

of projects.

En-efekt, s.r.o., Ambrova 35, 831 01 Bratislava, e-mail: [email protected], Tel.: 0904 220 713

Page 5: Energy Audit presentation.pptx

WHAT IS THE AIM OF EA?

to minimize costs for energy to minimize operational costs to minimize costs for repairs and reconstruction increase quality of environment that contributes to increased work productivity

In case of EA as duty (Industrial consumers with annual energy consumption over 5,5 GWh/year) the procedure of EA as well as content of the report is determined by Regulation No. 429/2009.

In case of voluntary EA is the content and focus as well as target given by customers requirement.

En-efekt, s.r.o., Ambrova 35, 831 01 Bratislava, e-mail: [email protected], Tel.: 0904 220 713

Page 6: Energy Audit presentation.pptx

MAIN TOPICS/AREAS OF EA

Subject of energy consumption analysis are energy resources consumed in the industrial area, i.e.:

Electricity Natural gas Steam Coal Wood, wood chips/pellets Fuels (petrol, oil, propane-butane).....

En-efekt, s.r.o., Ambrova 35, 831 01 Bratislava, e-mail: [email protected], Tel.: 0904 220 713

Page 7: Energy Audit presentation.pptx

MAIN TOPICS/AREAS OF EA

• thermal-technical protection of buildings,• heating systems• hot water preparation,• ventilation systems and air-conditioning (buildings and technology)• electric appliances (administrative and technological incl. electrical connection,

transformation, distribution network, el. switchboards, el. compensation)• gas or other energy resources consuming appliances (furnaces, cleaning devices,..)• Indoor/outdoor lighting,• measurement and regulation.

En-efekt, s.r.o., Ambrova 35, 831 01 Bratislava, e-mail: [email protected], Tel.: 0904 220 713

Page 8: Energy Audit presentation.pptx

WHAT OFFERS EA TO THE CUSTOMER?

En-efekt, s.r.o., Ambrova 35, 831 01 Bratislava, e-mail: [email protected], Tel.: 0904 220 713

identifies highest achievable potential of energy and costs savings and its effort, points out on often visible as well as hidden technical/hygienic/safety deficiencies of buildings and building and production technology equipment,... recommends technical parameters of measures, calculates investment needs of measures, their asset - economical, technical, environmental, proposes procedure for realisation of measures, it is very effective technical, economical and management tool for investment decision processes going out of economical modelling, it is solid basement for effective control of energy consumption and herewith also

operational costs

Page 9: Energy Audit presentation.pptx

ENERGY AUDIT - PRACTICE

1. Identification of subject of EA

2. Data collection, analysis and evaluation of current status

3. Proposal of EE and RES measures

4. Economy and environmental evaluation of measures

5. Proposal of at least two variants for implementation of measures and recommendation of optimal variant

6. Drafting of written report from EA

En-efekt, s.r.o., Ambrova 35, 831 01 Bratislava, e-mail: [email protected], Tel.: 0904 220 713

Page 10: Energy Audit presentation.pptx

CASE STUDY – chemical industry

En-efekt, s.r.o., Ambrova 35, 831 01 Bratislava, e-mail: [email protected], Tel.: 0904 220 713

Page 11: Energy Audit presentation.pptx

En-efekt, s.r.o., Ambrova 35, 831 01 Bratislava, e-mail: [email protected], Tel.: 0904 220 713

Name of company: OSPRA Invest, Ltd. Legal status: LtdAddress: Rovinka, BA (Istrochem)Responsible person:Contact:Sector: Chemical industrySubject of EA: -buildings (administrative and

production hall) and their technical equipment

-production technology

Step 1: Identification – EA subjecta) Collection of main data about the customer and basic description:

Page 12: Energy Audit presentation.pptx

En-efekt, s.r.o., Ambrova 35, 831 01 Bratislava, e-mail: [email protected], Tel.: 0904 220 713

Identification of activitiesType of activitiesi (NACE2) 2222

Number of heated buildings:4 (PH – administrative part, administrative building, portable container housing units, building for security)

Site plan:

Purpose of productionProduction of PE and PP folies (Rovinka)Production of re-granulate (BA)

Number of employees 100 (Rovinka) + 30 (BA, Istrochem) Operation regime (days a week) 24 hours/ 7 days

Buidings Heated volume V [m3] Shape factor of building A/V [1/m]

Main building- production hall 26 890,0 0,37Administrative building and Dressing rooms 1 179,36 0,77

Container housing units 164,16 1,55Security building 246,9 1,13

Step 1: Identification – EA subject

Page 13: Energy Audit presentation.pptx

1 STEP: Identification of subject of EA – site plan

En-efekt, s.r.o., Ambrova 35, 831 01 Bratislava, e-mail: [email protected], Tel.: 0904 220 713

Vstup do areálu

1

2 3

4

5

6 7

8

1 – security

2 – AB, dressing rooms, showers

3 – new storage hall

4 – main production hall (offices, social spaces, production hall Bielloni, production hall A, B, welding hall)

5 – storage hall – tent

6 – crusher of waste follies - recycling

7 – container housing units

8 – transformer station - TS 1, TS 2

TS3 – out of the area of the company

b) Description of main activities of EAc) Site pland) List of all buildings and theirs use, description of all energy consumers

Page 14: Energy Audit presentation.pptx

1 STEP: Identification of subject of EA – site plan (ISTROCHEM)

En-efekt, s.r.o., Ambrova 35, 831 01 Bratislava, e-mail: [email protected], Tel.: 0904 220 713

Production of re-granulate

Page 15: Energy Audit presentation.pptx

En-efekt, s.r.o., Ambrova 35, 831 01 Bratislava, e-mail: [email protected], Tel.: 0904 220 713

STEP 2: data collection on energy inputs- Collection of monthly energy

and water consumption of at least of 3 last years!

- Collect data on costs coupled with purchase of energy for relevant 3 years

- Most of the data from INVOICES

- If possible – readings from meters or data collected through e-manager application if available

- Energy consumption that is given by climate conditions should be re-calculated with decree-days!!!

Input – fuels and energy Unit Amount caloric value

Energy content in MWh

Annual costs

EUR excl. VAT

Purchase – electricity MWe 12 147,15 - 12 147 1 405 588Purchase - heat GJ - - - -Natural gas m3 - - - -Brown coal t - - - -Black coal t - - - -Coke t - - - -Other solif fossil fuels t - - - -Heavy heating oil t - - - -Biomass t - - - -Light heating oil t - - - -Diesel t 3,19 11, 66 37 4 250Petrol t 5,73 12,22 70 9 300

Other energy gases (Propane) t 16,03 12,78 205 16 000

Secondary energy devided into not used heat and others - - - -

RES devided into solar, wind, geothermal and others - - - -

Other fuels - - - -

Total fuel and energy input 12 459 1 435 139

External customers 460 53 302

Total consumption of fuels and energy OSPRA INVEST, s.r.o. 11 999 1 381 836

Page 16: Energy Audit presentation.pptx

En-efekt, s.r.o., Ambrova 35, 831 01 Bratislava, e-mail: [email protected], Tel.: 0904 220 713

STEP 2: data collection on energy inputsPriemerné mes. spotreby a ceny elektrickej energie po mesiacoch za roky 2009-2010 v areále Rovinka

300 000

350 000

400 000

450 000

500 000

550 000

600 000

650 000

700 000

janu

ár

febr

uár

mar

ec

aprí

l

máj

jún

júl

augu

st

sept

embe

r

októ

ber

nove

mbe

r

dece

mbe

r

kWh

40 000

50 000

60 000

70 000

80 000

90 000

spotreba cena

Priemerné mes. spotreby a ceny el. energie po mesiacoch za roky 2008-2010 v areále Istrochem

300 000

350 000

400 000

450 000

500 000

550 000

600 000

650 000

700 000

jan

r

feb

ruá

r

ma

rec

ap

ríl

j

jún

júl

au

gu

st

sep

tem

be

r

okt

ób

er

no

vem

be

r

de

cem

be

r

kWh

40 000

50 000

60 000

70 000

80 000

90 000

spotreba cena

OSPRA Invest, Ltd. (Rovinka+BA):- 97,4% of all energy consumed is

ELECTRICITY (57% Rovinka, 43% BA)

- No Natural gas consumption- 2,6% - fuels

Page 17: Energy Audit presentation.pptx

En-efekt, s.r.o., Ambrova 35, 831 01 Bratislava, e-mail: [email protected], Tel.: 0904 220 713

STEP 2: data collection on transformation and el. distribution- Who is power supplier (ZSE, a.s.),

measurement on NN or VN side- Power supply through 3 TS, 3 x 22 kV line,

transformation from 22 to 420/230 - Data about transformers (type, year of

construction, output, connection, cooling?...- Data about VN and NN distribution lines

(dimensions and lengths of distribution lines, used materials, transmission power, scheme of el. connection, technical state, technical state, equipment with measurement and regulation, control of el. review reports (duty))

- Data about switchboxes in the VN/NN - Control of power factor correction - Control of invoices on technical supply

conditions and tariffs

Page 18: Energy Audit presentation.pptx

En-efekt, s.r.o., Ambrova 35, 831 01 Bratislava, e-mail: [email protected], Tel.: 0904 220 713

STEP 2: data collection about main energy consumersMain energy consumers:A. Buildings B. Production technology

A. In case of buildings (thermal protection, heating, ventilation, air-conditioning): - Purpose and operation - Thermal-technical parameters of buildings- Building technical equipment (HVAC)- Thermal losses- Consumption of energy for operation of buildings

Page 19: Energy Audit presentation.pptx

En-efekt, s.r.o., Ambrova 35, 831 01 Bratislava, e-mail: [email protected], Tel.: 0904 220 713

STEP 2: data collection on main en. consumers - buildings

- Thermal-technical parameters of heated buildings, - check project documentation- check building materials and parameters of all building

envelope components, - measure indoor temperature in heating period (ideally also

in summer)

- Heating/hot water system: - check for type of heating (steam, hot water, electricity),

common system for heating and hot water?- type, characteristics and technical parameters of heat

sources (el. boiler, gas boiler, coal boiler, biomass…)- types of heating bodies (el. convectors, infra-red heaters,

radiators (hot water/steam)...)

Page 20: Energy Audit presentation.pptx

STEP 2: data collection on main en. consumers - buildings

- heat distribution network length and thermal insulation, materials and thickness

- check if consumption of electricity for heating/hot water is measured, - make on site measurement of internal temperature 22oC, - how is the measurement and regulation (equithermic, hydraulic regulation,

thermostatic valves...)- check all relevant documentation – project documentation, revisions, and etc.

En-efekt, s.r.o., Ambrova 35, 831 01 Bratislava, e-mail: [email protected], Tel.: 0904 220 713

Page 21: Energy Audit presentation.pptx

En-efekt, s.r.o., Ambrova 35, 831 01 Bratislava, e-mail: [email protected], Tel.: 0904 220 713

STEP 2: data collection on main en. consumers - buildings- Heating: OSPRA INVEST (Rovinka, BA not analyzed)

- electric heating – el. infra-red heaters in production hall, el. convectors, el. oil radiators

- indoor temperature: 22oC- regulation (according to indoor temperature)

- Hot water: OSPRA INVEST (Rovinka, BA not analyzed)- prepared for dressing rooms (showers) and toilets- el. heaters

NumberOutput

kWEl. heaters FAICO 8 9-14El. convectors Technotherm 19 2,0E. convectors Technotherm 2 0,5El. heater Heler 2 0,7Oil el. radiators 2 2,0

Počet PríkonkW

DHW el. heater 150l 5 2DHW el. heater 200l Tatramat 1 2,2DHW flow el. heater 5l 3 2

Page 22: Energy Audit presentation.pptx

En-efekt, s.r.o., Ambrova 35, 831 01 Bratislava, e-mail: [email protected], Tel.: 0904 220 713

STEP 2: data collection on main en. consumers - buildings

- Cooling and ventilation- Check and collect same data as in case of heating...

characteristic and technical data of source,distribution, measurement&regulation…

- OSPRA INVEST (Rovinka, BA not analysed) - ventilation- No central ventilation system, only ventilators placed in the roof ( 6 x 750 W)

and by ventilation windows- these consumers are not important consumers- However the ventilation – fresh air intake and extraction of waste air was not

satisfacory!

- OSPRA INVEST (Rovinka, BA not analysed) – cooling/air-conditioning system- No central cooling system, only 2 adiabatic evaporative chillers installed on the

roof

Page 23: Energy Audit presentation.pptx

En-efekt, s.r.o., Ambrova 35, 831 01 Bratislava, e-mail: [email protected], Tel.: 0904 220 713

STEP 2: data collection on main en. consumers - buildings

- OSPRA INVEST (Rovinka, BA not analysed) – coolling- No central cooling system, only 2 adiabatic evaporative chillers installed on

the roof for 2 production halls

Number of adiabatic evaporative chillers: 2 Type: evaporative chillers JH 30Parameters of chiller: Qvzd. = 30 000 m3/hod. x 2

= 60 000 m3/hod.El. input power: 3,0 x 2= 6,0 kW, 3 x 380V, 50Hz.Coolling output (tout 30 °C and relative humidity 45%): Qch = 100 kW.Assumed average water consumption: 0,16 m3/hod / pH 5-7 / Regulation: according to indoor temperatureMeasurement: no separate measurement

Page 24: Energy Audit presentation.pptx

En-efekt, s.r.o., Ambrova 35, 831 01 Bratislava, e-mail: [email protected], Tel.: 0904 220 713

STEP 2: data collection on main en. consumers - buildings- Indoor lighting

- Check for lighting system characteristics and parameters – type of lamps, lighting sources, input power, type of ballast/driver and etc.

- Check way of operation and regulation - Check consumption if measured, otherwise check all necessary inputs to

calculate lighting electricity consumption- Check if lighting-technical conditions are observed

Page 25: Energy Audit presentation.pptx

En-efekt, s.r.o., Ambrova 35, 831 01 Bratislava, e-mail: [email protected], Tel.: 0904 220 713

STEP 2: data collection on main en. consumers - buildings- Indoor lighting – OSPRA Invest (Rovinka)

- Administrative spaces – associated lighting combined with daylight in-built lamps with linear fluoresenc lighting sources type T8 (1 x 18W, 2 x 36W) with conventional ballast, in some technical places are conventional incandescent lamps 60W- Production hall – ceilling lamps with IP65, hang down in high of 4,5 m, linear fluorescent lighting sources type T8 with input power 3x36W, conventional ballast.......

number

Number of functional

Power input (W)

Pinšt(W) Preal (W)t

(h/year)

W (kWh/year)

W (kWh/rok)

Main object Administrative spaces 14 14 86 1 204 1 204 1 560 1 878,24 1 878,24

Toilet 3 3 60 180 180 520 93,60 93,60

Wellding hall 176 176 139 24 464 24 464 8 640 211 368,96 211 368,96

Toilet 4 4 60 240 240 1 620 388,80 388,80

Office 2 2 86 172 172 8 640 1 486,08 1 486,08

Hall B 134 134 139 18 626 18 626 8 640 160 928,64 160 928,64

Hall B 135 135 139 18 765 18 765 8 640 162 129,60 162 129,60

Page 26: Energy Audit presentation.pptx

En-efekt, s.r.o., Ambrova 35, 831 01 Bratislava, e-mail: [email protected], Tel.: 0904 220 713

STEP 2: data collection on en. consumers – production processes

In case of technology consumption- collection of technical data on electric

appliances/devices from documentation and /or from labels (input power, voltage, output)

- operating mode and time of processes/devices operation during year,

- check for technological schemes- control of technical documentation - notes from operation- measured energy consumption of individual

devices or production sections (if measured and processed)

- level of control of energy consumption and regulation

Page 27: Energy Audit presentation.pptx

En-efekt, s.r.o., Ambrova 35, 831 01 Bratislava, e-mail: [email protected], Tel.: 0904 220 713

STEP 2: data collection electricity consumers - productionWellding hall Name Input power

kWOutput

kW Number

-Voltage

VYear of

construction

Production of PP and PE bags M19 18 n.a. 1 230/400 n.a.

Production of PE bags BSM 1300 28 1 230/400 2009

Production of bags – welding of bags ROLO 3 16 n.a. 1 230/400 n.a.

Production of bags – welding of bags ROLO2 n.a. n.a. n.a.

COEMTER BETA 1 28 n.a. 1 230/400 n.a. COEMTER BETA 2 n.a. n.a. 1 n.a. COEMTER BETA 3 n.a. n.a. 1 n.a.Production of bags STIEGLER - 1 28 n.a. 1 230/400 n.a.

Production of bags STIEGLER - 2 28 n.a. 1 230/400 n.a.

Dehumidification MAHLA 3 n.a. 1 230/400 new

Production of bags GUNTER 28 n.a. 1 230/400 n.a.

ROLLOMAT - 2 20 n.a. 1 230/400 n.a.

Production of bags ROLLOMAT - 850-1 15 n.a. 1 230/400 n.a.

Packing – heating of shrink foil BRUCHER 18 n.a. 1 230/400 n.a.

Page 28: Energy Audit presentation.pptx

En-efekt, s.r.o., Ambrova 35, 831 01 Bratislava, e-mail: [email protected], Tel.: 0904 220 713

STEP 2: data collection electricity consumers - productionExcept directly technology consumers, it is necessary to focus also on energy carriers that are input for the production processes – OFTEN BIGGEST POTENTIAL FOR PROPOSAL OF MEASURES:

- Compressed air- Heat / Hot water / steam for technology purposes- Cooling of technology devices- Water treatment - Waste water treatment- and etc....

Page 29: Energy Audit presentation.pptx

En-efekt, s.r.o., Ambrova 35, 831 01 Bratislava, e-mail: [email protected], Tel.: 0904 220 713

STEP 2: data collection – main el. consumers - productionCompressed air – OSPRA Invest (Rovinka) – pneumatic driverIs the most expensive energy carrier!!!!!- 3 compressed air production stations – delivery to 2 central

compressed air distribution networks - Type of compressors – screw compressors- mater/slave – switch every 24 hours, regulation – according to

pressure in the network 7/8,5 atm.- no continuous control of compressors (by inverter)- no regular measurement of pressure decrease in the distribution

network - no heat recovery

kW bar m3/min ks

Hall A power input Pepower output number

Year of production

Screw compressor 37 8 5,9 2 n.a.

Hala Bielloni

BELT 55-8 60 n.a. n.a. 1 2011

Zvarovňa

Kaeser AS 35 22 7,5 n.a. 1 1986

Page 30: Energy Audit presentation.pptx

En-efekt, s.r.o., Ambrova 35, 831 01 Bratislava, e-mail: [email protected], Tel.: 0904 220 713

STEP 2: data collection – main el. consumers - production

Cooling – technology purposes – OSPRA INVEST (Rovinka)

- FRIGOSYSTEM – placed in hall B – producing of cooling water for extruder (16oC)

- Hall Bielony – chiller - cool for central distribution system – only production purposes

- Welding hall – chiller - cool for central distribution system – only production purposes

- Cooling tower – cooling of recycling device REMA only (already ordered new cooling device)

- Regulation – operation according to needed temperature in the cooling system

- use of excess heat – in winter for heating, in summer – is exhausted out of the building

Page 31: Energy Audit presentation.pptx

En-efekt, s.r.o., Ambrova 35, 831 01 Bratislava, e-mail: [email protected], Tel.: 0904 220 713

STEP 2: data collection – main el. consumers - productionCooling – technology purposes – OSPRA INVEST (Rovinka)

Device NumberOutput Cooling

output VoltageYear of

productionkW kW V

Hall B

Coolling device RACA AIR 80 - R1 1 10 28 400 2009

Hall Bielloni

FRIGOSYSTEM RACA2 1 47 140 400 2009

Water treatment EUROWATER 1 2 n.a. n.a. 2000

Welding hall

Cooling device ERS SC64V, 1 2274

(pri 15°C)230/400 2003

Water treatment EUROWATER 1 2 n.a. n.a. 2000

Coolling for regranulation device REMA

Old coolling tower – out of operation

New coolling device EVK 324/09 Cofely 1 3 n.a. 400 2011

New water treatment - EUROWATER 1 n.a. n.a. n.a. n.a.

Page 32: Energy Audit presentation.pptx

En-efekt, s.r.o., Ambrova 35, 831 01 Bratislava, e-mail: [email protected], Tel.: 0904 220 713

STEP 2: data collection – main el. consumers - production

Administrative appliances Input power Number

Name kW -PC 0,3 9Printer 0,2 3electric kettle 2 1Copy maschines 0,5 2Mikrovawe owen 1,2 1Fax maschine 0,1 1

Cooling – technology purposes – OSPRA INVEST

At least for the purpose of preparing energy balance, it is necessary to check also small electric appliances – as their are not significant consumers further analysis were not necessary

Page 33: Energy Audit presentation.pptx

En-efekt, s.r.o., Ambrova 35, 831 01 Bratislava, e-mail: [email protected], Tel.: 0904 220 713

STEP 2: analysis and evaluation of current stateOSPRA INVEST - compiling basic energy balance (Rovinka+BA)Row Indicator MWh/r tisíc eur/r1 Input of fuels and energy 12 459 1 435 1392 Change in stocks of fuel - -3 Consumption of fuels and energy 11 999 1 381 8364 Sale of energy to other customer 460 53 3025 Final consumption of fuels and energy

(row 3 – row 4) – according to need devide other types of fuels and energy

Electricity 11 687 1 352 286Heat - -Diesel 37 4 250Petrol 70 9 300Propane 205 16 000

6 Losses in own sources and distribution(from value given in row 5) – according needs devide into other types of fuels and energy

Electricity 12 1 389Heat - -Others - -

7 Energy consumption for heating and DHW(from value given in row 5) – according needs devide into other types of fuels and energy

ElectricityHeating 366 42 349ElectricityDHW 34 3 934

Others- -

8 Energy consumption for technology purposes and other processes(from value given in row 5) – according needs devide into other types of fuels and energy

Electricity 11 275 1 304 614

Heat- -

Others - -

Rovinka

Page 34: Energy Audit presentation.pptx

En-efekt, s.r.o., Ambrova 35, 831 01 Bratislava, e-mail: [email protected], Tel.: 0904 220 713

2 STEP: analysis and evaluation of current stateOSPRA INVEST – analysis of electricity consumptionAnalysis and evaluation of supply tarrifs 3 delivery points with reserved and max. reserved capacity (Rovinka)

Rok 2009 2010Number of delivery point: 3106043653 3108116420 3108132200 3106043653 3108116420 310813220

0Reservedcapacity [kW]

250 340 700 250 340 700

Max. reservedcapacity [kW]

300 360* 880 300 360 880

Month 1/4h max. 1/4h max. 1/4h max. 1/4h max. 1/4h max. 1/4h max.kW kW kW kW kW kW

January 226 351 593 227 376 631February 231 359 603 219 371 619March 230 348 609 225 354 588April 223 277 571 229 294 574May 219 267 565 206 282 589June 225 266 572 234 273 592July 225 249 558 219 260 559August 217 268 568 207 273 564September 207 263 574 201 308 510October 218 321 591 241 313 418November 204 319 579 226 321 581December 207 336 652 236 393 623

Red – overrunning od ¼ max.Blue - overrunning of reserved capacity- Delivery point 3108116420 is

overrunning these values (winter - el. heating, external consumer)

- Delivery point 3108132200 – possible measure – lowering of reserved cap. to 660 kW event. max. res. cap. to 700 kW

- Electric distribution network and main electric devices are according to measurements and revisions in good technical state

- el. distribution lines are currently over dimensioned – reason: reserve for connection of new devices/ retain variability for shifting of existing technology devices

Page 35: Energy Audit presentation.pptx

En-efekt, s.r.o., Ambrova 35, 831 01 Bratislava, e-mail: [email protected], Tel.: 0904 220 713

2 STEP: analysis and evaluation of current stateOSPRA INVEST – analysis of electricity consumption – production technology (Rovinka)

- Assessment of energy consumption going out from operational hours, power input and load factors,

- Division of consumption according technological areas- Technical state – satisfactory even most of the production

devices are old and energy intensive- Motors with input power up to 100 kW are replaced by

asynchrony motors with inverter, large motors – larger investments – up to 50% of savings per device

Suma Hala A

14%

Suma Hala B + Bialloni

56%

Stl. vzduch3%

Regranulačná linka

13%

Zvarovňa10%

Chladenie4%

Suma Hala A

17%

Suma Hala B + Bialloni

67%

Chladenie2%

Stl. vzduch1%

Zvarovňa4%

Regranulačná linka

9%

Total installed power input and el. consumption

A417%

A517%

A713%

A218%

A123%

A312%

A414%

A514%

A77%

A223%

A128%

A314%

Hall A – input power and assumed consumption.

B514%

B627%

B727%

B823%

B32%

B22% B4

2%Bialloni

3%

B524%

B650%

B710%

B89%

B31%

B22%Bialloni

2% B42%

Hall B – input power and assumed consumption.

Page 36: Energy Audit presentation.pptx

En-efekt, s.r.o., Ambrova 35, 831 01 Bratislava, e-mail: [email protected], Tel.: 0904 220 713

STEP 2: analysis and evaluation of current stateOSPRA INVEST – analysis of electricity consumption – production technologyMeasurement and regulation - Production technology:- Full automatic regime of most of the devices- Way of operation is putted manually by employees- Measurement is not provided for large consumers!- Operation is given by order and type of foils ordered – in case of

Rovinka is not evaluated specific energy consumption of electricity given by amount of produced foils (too many different processes – individual processes are not monitored)

- In operation in BA – specific energy consumption has been evaluated

Compressed air and cooling:- Consumption of el. for compressed air and cooling presents from

total electricity for production only 3%- Evaluated as effective – new investments already planned- No measurement, only regulation – T/p- No use of heat recovery

Page 37: Energy Audit presentation.pptx

En-efekt, s.r.o., Ambrova 35, 831 01 Bratislava, e-mail: [email protected], Tel.: 0904 220 713

2 STEP: analysis and evaluation of current stateOSPRA INVEST – heating and hot waterEvaluation of thermal-technical properties of heated buildings (no measurement):- Calculation of heat need for heated buildings

(720540-2)- Estimation of heat gains - Estimation of consumption of electricity for

heating- Technical state – satisfactory, regulation

according internal temperature- Hot water – only teoretical calculation (no

measurement) – going out of normative calculation

BUDOVA

Internal temperatur

eHeat need for

heatingThermal

gains from technology

Consumption of

electricty for heating

°C kWh/rok kWh/rok kWh/rokProduction hall A,B 22 908 360 630 465 277 895Administrative building and dressing rooms

20 52 320 - 52 848

Container buildings 20 18 173 - 18 356Security building 20 16 464 - 16 630Total 995 317 630 465 365 729

Výpočtová potreba tepla na vykurovanie

Výrobná ha la A,B; 908 360 kWh/r; 91%

Vrátnica ; 16 464 kWh/r;

2%Budova

adminis tratívy a šatne;

52 320 kWh/r; 5%

Unimo bunky; 18 173 kWh/r;

2%

El. energia - vykurovanie

277 895 kWh/r; 31%

Tepelný zisk z techn.; 630 465

kWh/r; 69%

Spotreba leto - zima

3 000 000

3 100 000

3 200 000

3 300 000

3 400 000

3 500 000

3 600 000

3 700 000

3 800 000

3 900 000

4 000 000

apr - sept okt - mar apr - sept okt - mar

leto 2009 zima 2009 - 2010 leto 2010 zima 2010 - 2011

kWh

334 272

397 185

Page 38: Energy Audit presentation.pptx

En-efekt, s.r.o., Ambrova 35, 831 01 Bratislava, e-mail: [email protected], Tel.: 0904 220 713

2 STEP: analysis and evaluation of current stateOSPRA INVEST – indoor lighting

Calculation of consumption (no measurement) – Rovinka:- Calculation of electricity consumption going out of input power, operation hours and

efficiency of lighting sources and type of ballast – 638,32 MWh/year- Lighting is under-dimensioned on places with permanent stay of persons- No regulation of lighting system that would switch or dim according to need –

currently manual- Partly obsolete lighting – low efficiency of optical system, missing covers of lamps,

used linear fluorescent lamps with low specific output with classical ballast (20% consumption of power input of lighting source)

- In part of production hall was made reconstruction with appropriate lamps, but some of new lamps have classical ballast...

Page 39: Energy Audit presentation.pptx

En-efekt, s.r.o., Ambrova 35, 831 01 Bratislava, e-mail: [email protected], Tel.: 0904 220 713

3. STEP: Proposal of EE and RES measures Type of measures:

a) According to size of investment- no cost measures (mostly organizational measures)- low cost measures (coupled with low investments and quick payback)- iinvestment measures (coupled with large investments and longer payback

b) According to achievable savings and economic return- measuers with short payback period (up to 5 years)- measures with long payback or without payback period

Page 40: Energy Audit presentation.pptx

En-efekt, s.r.o., Ambrova 35, 831 01 Bratislava, e-mail: [email protected], Tel.: 0904 220 713

OSPRA Invest - Rovinka

NON-COST Measures:-Monitoring and evaluation of energy consumption on monthly basis-Monitor and decrease internal temperature especially in administrative part were was measured temperature higher by 2,2°C in comparison to normative requirements!-Lower the reserved capacity to 660 kW eventually max. reserved capacity to 700 kW in case of el. delivery point 3108116420

3. STEP: Proposal of EE and RES measures

Page 41: Energy Audit presentation.pptx

En-efekt, s.r.o., Ambrova 35, 831 01 Bratislava, e-mail: [email protected], Tel.: 0904 220 713

OSPRA Invest - Rovinka

LOW-COST Measures:- Connect heaters (DHW) through thermostats with timer in order to provide for

setback mode 3 hours before end of shift. - Connect el. convectors (heating) through thermostats with timer in order to provide

setback mode of heating in administrative spaces (8 hours working time).- Provide for monitoring and measurement of el. consumption of biggest el.

consumers

3. STEP: Proposal of EE and RES measures

Page 42: Energy Audit presentation.pptx

En-efekt, s.r.o., Ambrova 35, 831 01 Bratislava, e-mail: [email protected], Tel.: 0904 220 713

OSPRA Invest - Rovinka

Investment measures – production technology- Replacement of main driver of the production line line B5 with input power 160 kW

with new el. motor with with frequency speed control.

Investment costsTotal in EUR EUR 36 500Energy consumption per unit:Average el. price EUR/kWh 0,11Energy savings:Achievable electricity savings MWh/year 150Cost savings (electricity) EUR/year 16 474Simple payback period year 2,2

3. STEP: Proposal of EE and RES measures

Page 43: Energy Audit presentation.pptx

En-efekt, s.r.o., Ambrova 35, 831 01 Bratislava, e-mail: [email protected], Tel.: 0904 220 713

OSPRA Invest - Rovinka

Investment measures – production technology, i.e.:- Replacement of main driver of the production line B6 with total input power 337 kW.

The main driver input power is 160 kW, replacement with new el. motor with frequency speed control.

Investment costsTotal in EUR EUR 24 000Energy consumption per unit:Average el. price EUR/kWh 0,11Energy savings:Achievable electricity savings MWh/year 80Cost savings (electricity) EUR/year 8 750Simple payback period year 2,8

3. STEP: Proposal of EE and RES measures

Page 44: Energy Audit presentation.pptx

En-efekt, s.r.o., Ambrova 35, 831 01 Bratislava, e-mail: [email protected], Tel.: 0904 220 713

OSPRA Invest - Rovinka

Investment measures – buildings – thermal protection of buildings, i.e.:- Building for administrative purposes with dressing rooms – thermal insulation,

replacement of windows, instalation of thermotat with timers on heating bodies

MeasureInvestment costsThermal insulation EUR 8 496Roof – thermal insulation EUR 3 297Replacement of windows EUR 4 665Installation of thermotats with timers EUR 291Total costs in EUR EUR 16 749Unit price of energy:Average price of electricity/heat EUR/kWh 0,11Energy savings:Achievable electricity savings MWh/rok 25,82Cost savings (electricity) EUR/rok 2 840Simple payback period rok 7,5

3. STEP: Proposal of EE and RES measures

Page 45: Energy Audit presentation.pptx

En-efekt, s.r.o., Ambrova 35, 831 01 Bratislava, e-mail: [email protected], Tel.: 0904 220 713

3. STEP: Proposal of EE and RES measures OSPRA Invest - Rovinka

Investment measures – buildings – indoor lighting, i.e.:- Replacement of existing lamps with lamps with IP65, high efficient optical system –

reflector, linear fluorescent lamps type Master TL5 HE ECO 45W and electronic ballast.

Investment costsTotal in EUR EUR 47 000Energy consumption per unit:Average el. price EUR/kWh 0,11Energy savings:Achievable electricity savings MWh/year 208Cost savings (electricity) EUR/year 22 880Simple payback period year 2,1

Page 46: Energy Audit presentation.pptx

En-efekt, s.r.o., Ambrova 35, 831 01 Bratislava, e-mail: [email protected], Tel.: 0904 220 713

3. STEP: Proposal of at least 2 variants of EE measuresOSPRA Invest - Rovinka i.e. - proposal of 2 variants

MeasureEnergy savings

Costs savings (energy) Investment

Simple payback

MWh/rok EUR/rok EUR rokFrequency speed control of main driver of extruder A1+replacement of snail, gearbox and extrusion head (Rovinka)

150 16 517 160 000 16,7

Frequency speed control of main driver of extruder B5 (Rovinka) 150 16 474 36 500 2,2

Frequency speed control of main driver of extruder B6 (Rovinka) 80 8 752 24 000 2,8

Frequency speed control of main driver of re-granulation line (BA) 210 23 123 48 000 2,1

Frequency speed control of main driver of automatic mill KUNG (BA) 58 6 412 25 000 4,3

Main production hall in Rovinka – replacement of gates, thermal barriers, copilits and thermotats 66 7 216 14 280 2,0

Administrative and dressing building – thermal insulation, replacement of windows, thermostats - Rovinka

26 2 840 16 749 7,5

Indoor lighting reconstruction - Rovinka 208 22 880 47 000 2,1Total 947 104 213 371 529 3,9

Page 47: Energy Audit presentation.pptx

En-efekt, s.r.o., Ambrova 35, 831 01 Bratislava, e-mail: [email protected], Tel.: 0904 220 713

3. STEP: Proposal of at least 2 variants of EE measuresOSPRA Invest - Rovinka i.e. – energy balance after realization for each variant

R. IndicatorBefore After

GJ/year thousand EUR/year GJ/year EUR/year

1 Inputs – fuels and energy 12 459 1 435 138 11 512 1 330 9252 Changed state of resources - - - -3 Consumption of fuels and energy 11 999 1 381 836 11 052 1 277 6234 Sale of energy to external consumer 460 53 302 460 53 3025 Final consumption of fuels and energy 11 999 1 381 836 11 052 1 277 6236 Losses in el. distribution network 12 1 389 12 1 389

7 Losses in production and distribution of heat from NG - - - -

8 Consumption of electricity for heating and DHW 400 46 283 309 36 227

9 Consumption of NG for heating and DHW - - - -10 Consumption of el. for technology purposes 11 275 1 304 614 10 419 1 210 457

Page 48: Energy Audit presentation.pptx

En-efekt, s.r.o., Ambrova 35, 831 01 Bratislava, e-mail: [email protected], Tel.: 0904 220 713

4. STEP: Economy evaluation- Simple payback periodIN = investmentCF – cash-flow

- Real payback period by considering discount rate TSD

CFt = annual savings (changes of cash flow after realisation of measures)r – dsicount factor(1 + r)-t – odúročiteľ

- Net present valueCFt - Cash - Flow of the project in year tr - discountt – evaluated timeframe (1 to n years)Tž – lifetime of equipment

- Internal Rate of Return

Page 49: Energy Audit presentation.pptx

En-efekt, s.r.o., Ambrova 35, 831 01 Bratislava, e-mail: [email protected], Tel.: 0904 220 713

5. STEP: Environmental evaluation

Emisssions Electricity

kg/MWhSolid particles 0,28

SO2 1,87NOx 2,88CO 2,33CO2 1084

Page 50: Energy Audit presentation.pptx

En-efekt, s.r.o., Ambrova 35, 831 01 Bratislava, e-mail: [email protected], Tel.: 0904 220 713

5. STEP: Selection of variant

Indicator Value Unit

Total costs 371 529 EURChange of costs for energy (– decrease/+ increase) -104 213 EURChange of personal costs, i.e. slaries, insurance, ... (–/+) 0 0Changes of other operational costs, i.e repairs and maintenance, services,insurance of property, ... (–/+) 0 0Change of other individually given costs, i.e emissions, waste and others (–/+) 0 0Change of sales, i.e. of heat, electricity, used wastes, ... (–/+) 0 0Benefits from realisation total -104 213 EURTimeframe of evaluation 20 yearDiscount factor 5 %Simple payback (Ts) 3,9 yearReal payback (Tsd) 6,1 yearNet present value (NPV) 756 666 EURInternal rate of return (IRR) 23,63 %

- Economy evaluation

Page 51: Energy Audit presentation.pptx

En-efekt, s.r.o., Ambrova 35, 831 01 Bratislava, e-mail: [email protected], Tel.: 0904 220 713

5. STEP: Selection of variant

Emissions Before t/year

after t/year

Difference t/year

Variant 2Solid partcles 3,3 3,0 0,3

SO2 6,1 5,6 0,5NOx 33,7 30,9 2,7CO 27,2 25,0 2,2CO2 12 668,7 11 641,7 1 027,0

Selection criterias: - Economy and environmental benefits- Technical – lifetime of variants- Operational – costs/changes of costs on maintenance and operation- Legislative – if variants can bring from legislative pouint of view any complications

- Environmental evaluation