Energy Audit Monitoring and Verification Requirements 6/27/2010
1
L&S Standard 100 Draft Sections 7 &
8 Energy Audit and
Monitoring and Verification RequirementsDennis R. Landsberg, PhD, PE Member
L & S Energy Services, [email protected]
Energy Services, Inc.
Energy Audit Monitoring and Verification Requirements 6/27/2010
2
7: Energy Audit RequirementsSTD 100
Level I Audit
Conduct Audit (Audit Cost-cap at
10% of Annual Energy Cost)
Add Level I EEM’s to meet Target
Energy Use less than Building
Energy Target
Level II Audit
…Section 8
Add Level II EEM’s to meet Target
No
Yes
Has Building
had Audit (within past 3 years)?
…Section 8Yes
No
Building with Target that it has Not Met
Building w/o Target
STD 100
Define bundle of EEM’s that meet cost effectiveness criteria
to reduce energy usage
Energy Audit Monitoring and Verification Requirements 6/27/2010
3
7: Energy Audit Requirements7: Energy Audit Requirements
7.1 Energy Audit Requirements for Buildings Without Targets
7.1.1 Applicable Audit Cost Caps7.1.2 Industrial and Agricultural buildings7.1.3 Data Centers7.1.4 Commercial Buildings7.1.5 Residential Buildings
Energy Audit Monitoring and Verification Requirements 6/27/2010
4
7: Energy Audit Requirements7.2 Energy Audit Requirements for Buildings that Don’t Meet
Targets
7.2.1 Level one audit7.2.2 Level two audit
7.3 Building Audit Report 7.3.1 Audit Results 7.3.2 Baselines7.3.3 Energy Balance7.3.4 Interactive effects7.3.5 Measure order and Optimized Bundling7.3.6 Financial analysis
Energy Audit Monitoring and Verification Requirements 6/27/2010
5
8: Monitoring & Verification 8: Monitoring & Verification RequirementsRequirements STD 100
Develop Implementation
Plan
Use 1 year utility data (post-retrofit) to develop new EUI
Energy Use Less than Building Target
…Section 4 Compliance
forms
No
NoYes
Implement and commission
EEM’s per plan
Yes
Verification
Does Building
have Target?
…Section 7 Audit
Energy Audit Monitoring and Verification Requirements 6/27/2010
6
8: Monitoring and Verification Requirements
8.1 Developing and Implementing an Energy Efficiency Plan
8.1.1 Goals8.1.2 Capital Improvement Plan8.1.3 Training of Building Staff8.1.4 Multiple Buildings8.1.5 Energy Efficiency Priorities8.1.6 Implement EEMs
Energy Audit Monitoring and Verification Requirements 6/27/2010
7
8: Monitoring and Verification Requirements
8.2 Commissioning of Implementation 8.2.1 Basis of Design8.2.2 Construction Administration8.2.3 Functional Performance Tests
8.3 Verification 8.3.1 Post Completion EUI8.3.2 Verification for Buildings With Targets8.3.3 Verification for Buildings Without Targets
Energy Audit Monitoring and Verification Requirements 6/27/2010
8
Questions?
Dennis Landsberg 518-383-9405 x 215 [email protected]