Energy Audit Monitoring and Verification Requirements 6/27/2010 1 L&S Standard 100 Draft Sections...

8
Energy Audit Monitoring and V erification Requirements 6/2 7/2010 1 L&S Standard 100 Draft Sections 7 & 8 Energy Audit and Monitoring and Verification Requirements Dennis R. Landsberg, PhD, PE Member L & S Energy Services, Inc. [email protected] Energy Services, Inc.

description

Energy Audit Monitoring and Verification Requirements 6/27/ : Energy Audit Requirements 7.1 Energy Audit Requirements for Buildings Without Targets Applicable Audit Cost Caps Industrial and Agricultural buildings Data Centers Commercial Buildings Residential Buildings

Transcript of Energy Audit Monitoring and Verification Requirements 6/27/2010 1 L&S Standard 100 Draft Sections...

Page 1: Energy Audit Monitoring and Verification Requirements 6/27/2010 1 L&S Standard 100 Draft Sections 7…

Energy Audit Monitoring and Verification Requirements 6/27/2010

1

L&S Standard 100 Draft Sections 7 &

8 Energy Audit and

Monitoring and Verification RequirementsDennis R. Landsberg, PhD, PE Member

L & S Energy Services, [email protected]

Energy Services, Inc.

Page 2: Energy Audit Monitoring and Verification Requirements 6/27/2010 1 L&S Standard 100 Draft Sections 7…

Energy Audit Monitoring and Verification Requirements 6/27/2010

2

7: Energy Audit RequirementsSTD 100

Level I Audit

Conduct Audit (Audit Cost-cap at

10% of Annual Energy Cost)

Add Level I EEM’s to meet Target

Energy Use less than Building

Energy Target

Level II Audit

…Section 8

Add Level II EEM’s to meet Target

No

Yes

Has Building

had Audit (within past 3 years)?

…Section 8Yes

No

Building with Target that it has Not Met

Building w/o Target

STD 100

Define bundle of EEM’s that meet cost effectiveness criteria

to reduce energy usage

Page 3: Energy Audit Monitoring and Verification Requirements 6/27/2010 1 L&S Standard 100 Draft Sections 7…

Energy Audit Monitoring and Verification Requirements 6/27/2010

3

7: Energy Audit Requirements7: Energy Audit Requirements

7.1 Energy Audit Requirements for Buildings Without Targets

7.1.1 Applicable Audit Cost Caps7.1.2 Industrial and Agricultural buildings7.1.3 Data Centers7.1.4 Commercial Buildings7.1.5 Residential Buildings

Page 4: Energy Audit Monitoring and Verification Requirements 6/27/2010 1 L&S Standard 100 Draft Sections 7…

Energy Audit Monitoring and Verification Requirements 6/27/2010

4

7: Energy Audit Requirements7.2 Energy Audit Requirements for Buildings that Don’t Meet

Targets

7.2.1 Level one audit7.2.2 Level two audit

7.3 Building Audit Report 7.3.1 Audit Results 7.3.2 Baselines7.3.3 Energy Balance7.3.4 Interactive effects7.3.5 Measure order and Optimized Bundling7.3.6 Financial analysis

Page 5: Energy Audit Monitoring and Verification Requirements 6/27/2010 1 L&S Standard 100 Draft Sections 7…

Energy Audit Monitoring and Verification Requirements 6/27/2010

5

8: Monitoring & Verification 8: Monitoring & Verification RequirementsRequirements STD 100

Develop Implementation

Plan

Use 1 year utility data (post-retrofit) to develop new EUI

Energy Use Less than Building Target

…Section 4 Compliance

forms

No

NoYes

Implement and commission

EEM’s per plan

Yes

Verification

Does Building

have Target?

…Section 7 Audit

Page 6: Energy Audit Monitoring and Verification Requirements 6/27/2010 1 L&S Standard 100 Draft Sections 7…

Energy Audit Monitoring and Verification Requirements 6/27/2010

6

8: Monitoring and Verification Requirements

8.1 Developing and Implementing an Energy Efficiency Plan

8.1.1 Goals8.1.2 Capital Improvement Plan8.1.3 Training of Building Staff8.1.4 Multiple Buildings8.1.5 Energy Efficiency Priorities8.1.6 Implement EEMs

Page 7: Energy Audit Monitoring and Verification Requirements 6/27/2010 1 L&S Standard 100 Draft Sections 7…

Energy Audit Monitoring and Verification Requirements 6/27/2010

7

8: Monitoring and Verification Requirements

8.2 Commissioning of Implementation 8.2.1 Basis of Design8.2.2 Construction Administration8.2.3 Functional Performance Tests

8.3 Verification 8.3.1 Post Completion EUI8.3.2 Verification for Buildings With Targets8.3.3 Verification for Buildings Without Targets

Page 8: Energy Audit Monitoring and Verification Requirements 6/27/2010 1 L&S Standard 100 Draft Sections 7…

Energy Audit Monitoring and Verification Requirements 6/27/2010

8

Questions?

Dennis Landsberg 518-383-9405 x 215 [email protected]