Energy and Economy

51
Energy and Economy Energy Modelling Lab. Department of Energy Studies, Energy Systems Division, Ajou University Prof. Suduk Kim [email protected]

description

Energy Systems Division, Ajou University. Energy and Economy. Energy Modelling Lab. Department of Energy Studies, Energy Systems Division, Ajou University Prof. Suduk Kim [email protected]. CHP: Existing Model Review. Model Review. RETScreen CHP module Thermoflex – Thermoflow.com - PowerPoint PPT Presentation

Transcript of Energy and Economy

Page 1: Energy and Economy

Energy and Economy

Energy Modelling Lab.Department of Energy Studies,

Energy Systems Division, Ajou University Prof. Suduk Kim

[email protected]

Page 2: Energy and Economy
Page 3: Energy and Economy

33

Model Review

RETScreen CHP module

Thermoflex – Thermoflow.com

Neither of the above model utilizes or attempts to estimate the hourly demand pattern considering the conditions such as regional, sectoral difference of categories in detail.

Even when the research is done on hourly basis, the analysis tends to discuss TLP(Typical Load Profile) instead of considering all the related variables affecting the hourly demand of heat and power.

We will review the above existing models as examples and will try to discuss the importance of modelling CHP with hourly demand pattern with proper selection of operational strategy in its economic feasibility test.

Page 4: Energy and Economy

44

RETScreen: Combined Heat & Power Project Model

Page 5: Energy and Economy

55

RETScreen: Model Flow

Page 6: Energy and Economy

66

RETScreen: Monthly Load Curve Estimation

Page 7: Energy and Economy

77

RETScreen: Equipment Database

Page 8: Energy and Economy

88

RETScreen: Financial Summary

Page 9: Energy and Economy

Thermoflow, Inc.

GT PRO is a highly automated system design tool – a heat balance program specifically intended for design of gas turbine combined cycle power plants and cogeneration systems.

Use GT PRO to explore and design combined cycles, cogeneration systems, and simple cycle gas turbine power plants.

In combination with PEACE (Plant Engineering and Cost Estimator), GT PRO provides engineering details and cost estimation.

GT PRO performs design-point calculations only – use GT MASTER for simulations of part loads or other off-design conditions.

WHAT IS GT PRO?

Page 10: Energy and Economy

1010

The Navigator column displays the major input topics. Topics in GT PRO are arranged vertically, and follow a hierarchy, progressing from top to bottom. Selections made in an upper (earlier) topic will condition the selections available in lower (later) topics.

Tabs are used as necessary to subdivide topics; green tabs include PEACE inputs

The Guidance window includes a description of the presently selected input

Inputs – General Arrangement

Every entry box has been initialized with a reasonable value. You never have to fill an empty box. Instead you edit just those that are of concern to you, trusting the others to have been logically selected.

Page 11: Energy and Economy

1111PEACE Schematics

Select from the list to see dimensioned layouts of the site and of plant equipment.

Page 12: Energy and Economy

1212PEACE Equipment Data

For each of the equipment categories, selectable by the tabs visible here, these tables indicate size, weight, and nameplate specifications.

Page 13: Energy and Economy

1313PEACE Cost Report

Project Summary is shown. Tabs give individual breakdown of costs. Note the two columns: Reference and Estimated Cost.

Click on Cash Flow to see a pro forma financial projection.

Page 14: Energy and Economy

1414PEACE Cash Flow

This Financial Summary table displays the overall results ofthe pro forma Cash Flow projection detailed in the subsequent tab.

In very little time, you can use these results to explore the influenceof design decisions on plant economic performance.

Page 15: Energy and Economy
Page 16: Energy and Economy

1616

Flow Diagram of Analysis

CES or SCG

Hourly Load Forecast

Load Analysis &Estimation

Power,Heat,Cool

Usage, Region (Temperature and Humidity) and other information such as Area width, etc.

Report on Hourly Load Forecast

Peak load of Power, Heat will be estimated !

Equipment Selection

Economic Feasibility Analysis

Information on fixed and variable costs provided!

Since there are many commercial software packages for this, we allow this be determined outside of the program!

Final ReportOperational StrategiesLoad Following Strategies based on hourly NB

Page 17: Energy and Economy

1717

Modularizing of System Analysis

Category Contents

Individual Module Development

Hourly Load Pattern Analysis/ Load Forecast Module

Power/Heat/Cool/Load Analysis and ForecastRelated information should be easily manageable.

CES/SCG system Module

CHP equipments, Heat Container, HOB, Pattern of Heat Import from outside of System, etc

Economic Feasibility Test Module

Construction related costs and other O&M cost information InputRevenue, Cashflow Calculation, Calculation of NPV, IRR

DB Module Development

DB Module Design the Current Requirement of System Additional Consideration for Expandability

Page 18: Energy and Economy
Page 19: Energy and Economy

1919

Previous Load Forecast Methods

For the calculation of each load profile, use the area space, usage category information, related Energy use pattern to find the peak load (Heat, Cool, Power)

Example: Heat Load Calculation1. Heating Space Calculation = Space(m2) x Heat Demand Dev.

Rate(%) x Heat area ratio(%)

2. Total Peak Load of Heat Calculated = Heating Space(m2) x Unit Heat Requrement

3. Final Peak Load of Heat expected = Total Peak Load of Heat x prob. Concurrent Load /(1-loss(%))

Page 20: Energy and Economy

2020

Hourly Load Curve Forecast1. Forecast should be made for Hourly basis (8760 Hour data to be generated)2. TLP of Heat and Power – Region(Temperature, Humidity), Usage(23 diff.

Categories), Size(eg. Heating Area)3. 7 different weekdays, holidays, Special Holidays such as New years day, Thanks

giving Holidays, Seasonal Patterns should be considered.

<Data for Heat, Power Load Pattern Estimation>Heat Load Data: Anyang Area (Household: Nov.1, 2003-Sept.30, 2005) -156 points Pucheon (Household: Nov. 30, 2003-Sept. 30, 2005) – 150 points Data with missing information should have been dropped out of analysis

Power Load Data: Data Managed by KDN (Korea Electric Power Data Network) : Typical Load profile for

given usage, region is estimated using 15min. Frequency data Current form of data – 4 separate files for each month. Read 1st file to find a company’s

data and do this for other files consecutively Data matching problems : some missing, Some of arbitrary samples were chosen for

analysis

Page 21: Energy and Economy

2121

Hourly Heat Load Curve Forecast

Dependent Variable : Hourly Heat Load data gathered from 306 different points of machine rooms – Conversion to Typical Household Heat Demand needs special consideration.Explanatory Variables

 ∘ Temperature(C0): -34.7 ~ 35.9  ∘ Humidity(%): 0 ~ 93  ∘ 12 Months x 24 Hour Pattern  ∘ Weekdays with its coincidence of other holidays

Holidays are categorized differently Holiday during weekdays, New Years day, Thanks giving Holidays,

etc.

 ∘ Heating Space

Page 22: Energy and Economy

2222

Hourly Load Curve Forecast: Model

The Multi-level Model or the Hierarchical Model

' ', 1, , 1, , 1 ,

2, 2

i t i t i i t i t

i i i

y z x

X

 [the first level]: the level-1 fixed parameters: the level-1 explanatory variables associated with fixed parameters: the level-1 random parameters (random variation over the households is more important): the level-1 explanatory variables associated with random parameters: the level-1 random error terms

[the second level]: the level-2 fixed parameters: the level-2 explanatory variables: the (subject-specific) level-2 random error terms

22,iX

i

1

1, ,i tx

i1, ,i tz

,i t

<Assumptions for the Model>

Source: C.G.Moon(2006)

Page 23: Energy and Economy

2323

Hourly Load Curve Forecast: Model

the linear mixed-effects model

<Assumptions for the Model>

Page 24: Energy and Economy

2424

Estimation : GLS (MLE)

Theoretical Estimation Method

Page 25: Energy and Economy

2525

Problems Encountered in Estimation Process

For KDN data analysis, the data has 15 min. frequencies. For the analysis of such panel data, we need a workstation size computer system. We used a computer equipped with Windows XP Home Edition (32 bit) with 4Gb RAM. Additional Hard Drive of 1 terra byte has been provided for data matching.For our econometric analysis, we use GAUSS. Gauss Engine is also used for Foreign language interface with C++.GAUSS (Windows version) used here cannot utilize virtual memory. It only utilized extended or expanded memory which is only a part of physical RAM. (Before 1999, GAUSS could use virtual memory and it was possible to analyze big data set.)Due to the system limitation, we had to select some samples arbitrarily, therefore, the result could not be argued to have a characteristics representative for all such cases.

Page 26: Energy and Economy

2626

Hourly Heat Load Curve Estimated

Page 27: Energy and Economy

2727

Load Forecast Window

Page 28: Energy and Economy

2828

Choice of System after Load Forecast

Cogeneration Types, C1: Engine, C2: Steam TBN, C3: Gas TBN

Page 29: Energy and Economy
Page 30: Energy and Economy

3030

System Application Types

Source: Y.C.Hong (2006)

CES SCGPower Plants

G.T. CombinedSteam Turbine Gas Engine Gas Turbine

Hospital, SchoolIndividual Industry: Car, Paper, Chemical, Food.

Power PlantsHousing ComplexIndustry Complex

Page 31: Energy and Economy

3131

Example of Equipment Selection: Gas Engine CES

Information on Load and Related Power and Heat Production

Information of Unit, Flag to show usage, Capacity, Cost for Each of GE, HOB, HC, Heat Import Source such as incinerator, etc.

Information on the schedule of Investment which will be used for Load & Financial Analysis

Page 32: Energy and Economy

3232

Example: Sales Price Schedule of Power to Grid by CES

Time Table for Power PricingNext Page!

•Household•Commercial•Educational•Road Light•Spec. Contract Power Price •CES Power Sales Price•Heat Sales Price

Page 33: Energy and Economy

3333

Time Table Adjustment for Power Price

Base load

Intermediate load

Peak load

Page 34: Energy and Economy
Page 35: Energy and Economy

3535

Power Load Following Strategy

CHP is being operated to meet the power demand after considering the input conditions such as power & heat import pattern.Compare the heat produced in this process, determine how much more heat is required to be produced using Heat Only Boiler even after Heat Container is considered.Cost of Heat & Power import, Fuel cost of CHP, HOB with Benefits from Power & Heat Sales will be calculated to get Hourly Net Benefit.

Page 36: Energy and Economy

3636

Heat Load Following Strategy

CHP is being operated to meet the Heat demand after considering the input conditions such as heat import pattern & Heat Container.Compare the power produced in this process, determine how much more power is required to be imported additionally. Additional consideration on the possibility of power sales via grid is also examined.Cost for Heat & Power import, Fuel cost for CHP, HOB with Benefits from Power & Heat Sales will be calculated to get Hourly Net Benefit.

Page 37: Energy and Economy

3737

Combined Strategy

Utilizing Hourly Net Benefit obtained from Power & Heat Load Following strategies, we can determine our hourly operation strategies.Net Benefit will be maximized by optimizing hourly strategies.

Page 38: Energy and Economy
Page 39: Energy and Economy

3939

Economic Feasibility Analysis

Utilizing the above equation, we can find a way to calculate competitive market price for Heat, Power, etc, since with all the other information given.Various regulations on the Heat, Power transaction could be reviewed using our hourly base operation model.With more detailed information on expected CES/SCG, we would be able to predict or forecast possible future market size.

- ith Period Benefit : Usually revenue from energy services- ith Period Green House Gas Reduction Credit - Initial Fixed Cost for energy service projects- Operation and Management Costs- Discount Rate- Project Life

0 0

( ) ( ) ( ) ( )

(1 ) (1 )( ) ( )

n n

i ii i

B i GHG i C i OM iNPV

r r

( )

( )

( )

( )

B i

GHG i

C i

OM i

r

n

( ) ( )B i PQ i

Page 40: Energy and Economy

4040

Inputs for Financial Analysis (1)

1

2

3 4

1: Basic Intput Condition, 2: Efficiency, Price Info., 3: O&M, etc., 4: Equipment Related Info.

Page 41: Energy and Economy

4141

Inputs for Financial Analysis (2)

1

2

4 6

3

5

1: General Intput Condition, 2: Initial Costs, 3: Periodic Costs, 4: Price Increase Rate, 5: Indirect Costs, 6: Financing Debt

Page 42: Energy and Economy

4242

Calculation Process for Financial Analysis

Page 43: Energy and Economy
Page 44: Energy and Economy

4444

Financial Statement

Auxiliary calculation is done outside of the main page.But ‘Financial Summary’ takes the input values from separately prepared ‘Input conditions’ worksheet.When a person wants to have some additional analysis on financial feasibility, input values may be changed so that its impact on financial statements can be reflected in Excel file.Especially for SCG model, economic feasibility test is done by comparing the existing system and newly implemented one.

Page 45: Energy and Economy
Page 46: Energy and Economy

4646

Power Load Forecast & CHP Power Production

Page 47: Energy and Economy

4747

Monthly Heat Load Pattern

Page 48: Energy and Economy

4848

Monthly Power Load Pattern

Page 49: Energy and Economy

4949

Heat Load Duration Curve

Page 50: Energy and Economy

5050

Expected Applications of the Model

Major energy saving in primary energy sector can be achieved through the recycled heat energy from industrial sector and waste incineration.Energy Efficiency Improvement on national level can be achieved through identifying the potential of un-used energy and potential energy savings.Economic feasibility, energy saving, environmental improvement effect can be obtained by localized distributed community energy service It is estimated that 4.5% of electricity transmission loss can be avoided by localized power

supply Active response to Kyoto protocol Large scale energy service complex which needs social concession can be avoided Many advantages obtainable through the promotion of community energy services such as the

prevention of large scale power black out, etc.

Lessen the grid burden of national power supply via localized cool energy and power supply Improvement of power reserve rate through taking care of cool load via CES Efficient energy utilization in energy supply

Various regulatory problems can be identified through the selection of operation strategies. Power import and sales back to grid and related problems Heat import and relevant regulations required

Page 51: Energy and Economy

5151

ReferencesFrees, Edward W., 2004, “Longitudinal and Panel Data”, Cambridge: Cambridge University Press Hox, Joop, 1995, “Applied Multilevel Analysis, Amsterdam: TT-Publikaties” Hox, Joop, 2002, “Multilevel Analysis: Techniques and Applications, Mahwah”, New Jersey: Lawrence Erlbaum Associates Publishers Kang, J.S., 2006, “On the Recent Issues of Community Energy Services”, Energy FocusKEMCO Homepage, “http://www.kemco.or.kr/chp/index.asp” Lee, K.D. et al., 2005, A Research CES on Master Plan, KEEI MOCIE, 2004, Cogeneration and Policy Implementation MOCIE, 2002, CES Energy Supply PlanNatural Resources Canada, Combined Heat & Power Project Model, RETScreen Software Online User Manual, “http://retscreen.net/” Petrill, E., 2004, “A Framework for Developing Collaborative DER Programs: Working Tools for Stakeholders” Rawson, M., 2004, “Distributed generation costs and benefits issue paper“, Staff Paper  Shim, S.R., 2002, Restructuring of Energy Industry and Economic Feasibility of Cogeneration, KEEI Verbeke, Geert and Geert Molenberghs, 2000, “Linear Mixed Models for Longitudinal Data”, New York: Springer Weber, C., 2005, “Decentralized energy production and electricity market structures“ Yoo, S.J. et al., 2005, A Research on Energy Supply by Cogeneration, KEEIYun, H.C., CES and Cogeneration, Seminar at Ajou Univ., 2006.4