ENERGOPROJEKT-KATOWICE SA REFERENCE LIST

Transcript of ENERGOPROJEKT-KATOWICE SA R E F E R E N C E L I S Tepk.com.pl/pobierz/13/0.67533800...

ENERGOPROJEKT-KATOWICE SA

R E F E R E N C E L I S T

1. CONSULTING SERVICES _________________________________________________________ 4

1.1. Bidding management, bidding documents, consulting services for tender organisers _________________________________________________________ 16

1.2. Development plans, business plans _____________________________________ 20

1.3. Investment, pre-feasibility, and feasibility studies _________________________ 21

2. TECHNICAL CONCEPTS AND TECHNICAL ANALYSES __________________________________ 25

2.1. Location studies ____________________________________________________ 25

2.2. Technical concepts and analyses _______________________________________ 27

3. RENEWABLE ENERGY SOURCES __________________________________________________ 38

4. ENGINEERING, PROCUREMENT, CONSTRUCTION ___________________________________ 42

5. THERMAL & POWER MECHANICAL ENGINEERING ___________________________________ 46

5.1. Technical assumptions of heat-, power-, and fuel gas supply projects __________ 63

6. MECHANICAL (BOP) ENGINEERING _______________________________________________ 68

7. CIVIL ENGINEERING ___________________________________________________________ 80

8. ELECTRICAL ENGINEERING ______________________________________________________ 90

9. ENVIRONMENT PROTECTION __________________________________________________ 106

9.1. Environmental impact assessments ____________________________________ 109

9.2. Water quality impact assessments _____________________________________ 112

9.3. IPPC application forms – integrated permits _____________________________ 113

9.4. Water- and wastewater management __________________________________ 116

9.5. HVAC ____________________________________________________________ 121

10. INSTRUMENTATION & CONTROL SYSTEMS ______________________________________ 125

11. DIESEL POWER PLANTS ______________________________________________________ 133

CONSULTING SERVICES 4

ENERGOPROJEKT-KATOWICE SA

1. CONSULTING SERVICES

NO. PURCHASER PROJECT NAME COMPLETED

1. ZGC ANKARA

Owner's engineering services -14,5 MWe biomass power plant in the Bolu Province of the Republic of Turkey. A distinctive feature of this project is the type of biomass – poultry farm litter. The scope of services includes the development of a concept/preliminary design of the unit, bid specification and advice on choosing the unit’s contractor.

in progress

2. Tauron Polska

Energia SA

Technical and formal assessment of a possible relocation of devices and plants of the combined cycle gas and steam unit from Stalowa Wola (Stalowa Wola CHP Plant) to Łagisza, Będzin (Łagisza Power Plant).

in progress

3. Babcock Oberhausen Detail engineering civil works, HVAC, fire fighting, water supply and waste water of

EDF Toruń. in progress

4. Elektrownia Puławy

Sp. z o.o. Update of the building design of the construction of the Puławy Power Plant – Part II (Puławy Power Plant building design – External facilities).

in progress

5. Siemens Warszawa Authorisation of the detailed designs of the construction and installation branches

CCGT Płock 600 MW. in progress

6. Budimex Tecnicas Development of the technical documentation for the investment project:

Construction of a New Power Unit at the Turów Power Plant with Total Net Capacity of 450 MW (total capacity: 2,088 MWe).

in progress

7. PKN Orlen SA Technical consultations during the construction of the combined cycle power plant in Płock.

in progress

8. Dar al-Handasah Review and approval of the documentation, and performance of the author’s supervision on the construction site for the Project: Soyo I 750 MW Combined Cycle Power Plant in Angola.

in progress

9. Foster Wheeler Sofia Designing and consulting services for the fluidised bed boiler package at Deven Power Plant.

in progress

10. Energetyka Sp. z o.o.

Lubin

The development of the documentation titled: 1st Phase of the Implementation of the Project Titled “Construction of Flue Gas Treatment Plant at the EC-1 Department in Lubin” – the development of the Project Feasibility Study, the development of the Terms of Reference and a draft contract for the project implementation on a “turn-key” basis”.

in progress

11. EM&CA SA Warszawa Technical consulting services in the procedure conducted in competitive negotiations with announcement for construction of the gas and steam unit at EC Żerań.

in progress

12. SNC-Lavalin Warszawa

Design works of the construction and installation works for the civil structures at the Combined Cycle Gas-Steam Power Plant with a capacity of 460 MWe in Włocławek.

in progress

13. Polimex-

Mostostal SA

The workshop documentation of the steel structures for the project named: “Construction of the new unit with the capacity of 1075 MWe at ENEA Wytwarzania SA Kozienice Power Plant.”.

in progress

14. Elektrobudowa

Katowice SA

The complex engineering, designing and legal works for the entire investment named: “Construction of the new heating unit with the fluidized bed boiler, the heat and condensation turbine of ca. 50 – 60 MWe including the associated systems at TAURON Ciepło SA ZW Tychy” (total capacity: 290 MWt).

in progress

15. ENERGOINSTAL

The complete design and documentation works enabling comprehensive implementation of the following investment project: “Construction of the Circulating Fluidized Bed CFB with an installed capacity of 75 MWe Gross at Zofiówka Power Plant in the Spółka Energetyczna “Jastrzębie” SA Including the Relationships with the Associated Infrastructure.”

in progress

16. Energomontaż

Wrocław SA The project architect's supervision at the construction site of the cogeneration heat and power generating plant in the Nowa Coking Plant in Częstochowa.

in progress

17. ZE PAK SA

Konin Power Plant Cogeneration design of the combined cycle gas and steam unit with power of ca. 120 MWe and ca. 130 MWt in the Konin Power Plant.

in progress

5

CONSULTING SERVICES

REFERENCE LIST

NO. PURCHASER PROJECT NAME COMPLETED

18. Polimex-

Mostostal SA

The services related to construction on a "turn-key" basis of the supercritical power unit along with the systems and auxiliary facilities with the power of 1,075 MWe gross in ENEA Wytwarzanie S.A. in Kozienice Power Plant.

in progress

19. ZE PAK SA Role of General Designer for ZE PAK SA. in progress

20. Instal Kraków SA

Design documentation and performance of services for the investment project titled Construction, startup, trial operation, and commissioning the external ash removal system and the sorbent system as a part of the reconstruction of the generation capacity at the PKE SA (now Tauron Wytwarzanie SA) – construction of a 50 MW power unit working in the co-generation mode at the ZEC Bielsko Biała CHP-1 (total capacity: 275 MWt).

in progress

21. Instal Kraków SA

Design documentation and author’s supervision for the project: "Design, construction, commissioning, conducting trial run and transfer into operation of the oil management system in terms of recovery of generation capacity in PKE SA (now Tauron Wytwarzanie SA) Construction of the power unit with a capacity of 50 MW in ZEC Bielsko-Biała EC1 (total power: 275 MWt)".

in progress

22. ZE PAK SA Modernisation of the units 1-4 in the Pątnów Power Plant (total capacity: 1600 MWe) in order to provide Safe for the personnel and devices as well as effective operation for next 50-70 ths. hours of exploitation.

in progress

23. Energa SA Gdańsk Report on the energy price curves for the financial plans, the impairment tests, and for the financial institutions – ENERGA Gdańsk.

2016

24. Elektrownia Puławy

Sp. z o.o. Update of the building design of the construction of the Puławy Power Plant – Part I (400 MW CCGSU building design of Puławy Power Plant).

2016

25. Zabrze SA Kombinat

Koksochemiczny

The feasibility study and the Building Design including the formal and legal procedure to obtain a building permit for the following project: “Construction of a Coke-Oven Gas Fired Power Unit and Modernisation of the Benzol Recovery Plant in Radlin Coke Plant.”.

2016

26. PGNiG SA Warszawa

Engineering and technical consulting services in the scope of power engineering. 2016

27. Izba EPIOE Warszawa Development of the forecast of electric energy prices, CO2 emission volumes, and

energy mix for the years 2015 – 2035 using the PLEXOS program. 2015

28. Energotechnika

Engineering Sp. z o.o.

Assessment of the design documentation prepared by the General Designer for the 910 MW power unit at the Jaworzno Power Plant III - Power Plant II.

(total power: 1,345 MWe).

2015

29. Elbis Sp. z o.o.

Advisory and design services in the technical field and cooperation with a legal and commercial advisor in the financial, commercial, and economic area in the process of preparation of the investment project and the selection of the contractor for the construction of the gas and steam power units at the PGE Górnictwo i Energetyka Konwencjonalna SA

2015

30. Energoinstal Katowice SA

Complete design and documentation works enabling comprehensive execution of investment called “Power Unit Construction” including connections with the belonging infrastructure within the framework of a new ca. 70 MW power unit construction supplied with treated coke-oven gas in the Przyjaźń Coke Plant.

2015

31. Chugoku Electric

Power Report on the permits and approvals for investment projects in the Polish power industry.

2015

32. Będzin SA CHP Plant

Multivariate concept of building a biomass delivery system providing fuel distribution to the modernized OP-140 boilers for biomass dust boiler in the Będzin CHP Plant (total capacity: 415 MWt).

2015

33. Babcock

Oberhausen Project Information Card (KIP) for boilers in units 11 and 12 in the Bełchatów Power Plant (total capacity: 4440 MWe).

2015

34. Kopex SA Preliminary basic engineering concerning the modernisation of the power plant owned by YCRT mine in Rio Turbio.

2015

CONSULTING SERVICES 6

ENERGOPROJEKT-KATOWICE SA

NO. PURCHASER PROJECT NAME COMPLETED

35. Valenz Holdings

Consulting services for the project titled: "Open Cycle Power Plant in Omotosho - Phase II". - Acting as a Contract Engineer - Verification of technical documentation for executive - Supervision of the work regulations of all branches - Advisory Services

2015

36. EP Kraków SA Performance of the following services: engineering consultations, development of the analysis and reports, participation in the negotiations in the course of concluding one or more contracts related to the Project: “Extension of Bursztyńska Island.”

2014

37. Alstom Power

Sp. z o.o. Designer's supervision pertaining to architecture, structure, and installation as a part of the Contractor's preparation of the detailed documentation.

2014

38. Babcock Oberhausen Project Data Sheet, and static calculations and expert’s reports for the boiler room condition. Development of the building application for the unit No. 9 and 10 at Bełchatów Power Plant. (total capacity: 4,440 MWe).

2014

39. Azikel Group Consulting services related to preparation of tender materials and selection of an EPC Contractor for Azikel Power Ltd. Combined Cycle Unit 500 MW.

(Bayelsa Project in Nigeria).

2014

40. PGE SA, Turów

Power Plant

Design services and consulting services in the technical, financial, commercial and economic scope for the preparation of the project and selection of the contractor for construction of the power unit in the Turów Power Plant (total capacity: 2088 MWe).

2014

41. EPIOE Warsaw Technical consulting services as a part of formation of an optimum system of support of highly-efficient co-generation process in the Polish conditions.

2014

42. EM&CA Warsaw

Preparation of the Project Information Sheet for the planned adaptation of the existing FGD system and construction of a denitrification system in the K2 boiler at the Siekierki CHP (PGNiG TERMIKA S.A.) so as to meet the requirements of the IED Directive.

2014

43. Hitachi, Mitsubishi Support in the preparation of the bid for the Czeczot Project (Kompania Węglowa) for a bituminous coal-fired 1,000 MW power unit located at the former Czeczot Mine.

2014

44. Alstom Power

Sp. z o.o.

Design services for the WFGD Project at the Rybnik Power Plant (total power: 1,775 MWe):

1. Submission of the full design documentation for the Building Permit at the City Authorities in Rybnik

2. Obtaining from the Municipal Authorities the Building Permit decision.

2014

45. Elbis Sp. z o.o.

Consulting and design services in technical field and cooperation with Ordering Party and other advisors of Ordering Party in financial, commercial and economic terms in the preparation of an investment project involving the construction of the power unit in Puławy site and selection of its contractor.

2014

46. BSiPE

Energoprojekt-Gliwice SA

Entirety of design and documentation works for comprehensive execution of the investment project: "Construction of steam and gas unit with capacity ca. 45 MWe in FGD conditions and thermal capacity ca. 40 MWt gas-fuelled (GZ 41,5) in KGHM Polska Miedź SA in direct proximity of the existing EC-2 Polkowice".

2013

47. BSiPE

Energoprojekt-Gliwice SA

Design and documentation works for the performance of the investment project titled “Construction of the gas and steam power unit with electric power in ISO conditions of approx. 45 MWe and 40 MWt, fired with natural gas, at the KGHM Polska Miedź SA in the immediate vicinity of the existing Głogów CHP-3.

2013

48. Energa Invest SA

Technology and SAles Advisor services for selection of the General Contractor for the project "Construction of the gas-steam Power Plant with an electrical capacity of 900-1200 MWe in Grudziądz." Stage I - Construction of CCGT, with the capacity 450-600 MWe and the necessary infrastructure and connections, and provision of maintenance services.

2013

49. Unipetrol Litvinov Consulting / supporting services concerning purchases of coal for Unipetrol in the Czech Republic.

2013

50. Tauron

Wytwarzanie SA

Stage technical documentation needed for obtaining the building permit for the 135 MW steam and gas power unit at the Katowice Combined Heat and Power Plant (total capacity: 692 MWt).

2013

7

CONSULTING SERVICES

REFERENCE LIST

NO. PURCHASER PROJECT NAME COMPLETED

51. Tauron

Wytwarzanie SA

Contract for the implementation of the multi-stage technical documentation required to obtain building permit for construction of the new 910 MWepower unit in the Blachownia Power Plant.

2013

52. PKN Orlen Płock SA Consulting services concerning: “Modernisation of the Power Management of ANWIL S.A. and Analysis of Possibilities of Extracting Additional Thermal Power of the Combined Cycle Gas and Steam Unit of ANWIL S.A. Plant to Włocławek Town”.

2013

53.

Tauron Wytwarzanie SA.

Stalowa Wola Power Plant

The concept and the basic technical assumptions for the project named: “Modernisation of the boiler K9 and the turbine TG5 in order to increase the power of the RES (renewable energy sources) unit at TAURON Wytwarzanie Spółka Akcyjna – Stalowa Wola Power Plant Branch in Stalowa Wola up to 55 MW.”

2013

54. Tauron

Wytwarzanie SA Siersza Power Plant

Consulting and advisory services concerning the concept of discharge of flue gases from the fluidized bed boiler OFz-425 of the unit No. 2 for the time of renovation of the flue gas stack h-150 n at TAURON Wytwarzanie SA –Siersza Power Plant Branch in Trzebinia and development of the documentation for the said concept in Trzebinia.

2013

55. SE Jastrzębie SA The Preliminary Report of the Technical Adviser concerning the investment project titled: “Construction of the Circulating Fluidized Bed CFB with an installed capacity of 75 MWe Gross at Zofiówka Power Plant in the Spółka Energetyczna “Jastrzębie” SA.

2013

56. Tauron

Wytwarzanie SA Łaziska Power Plant

Development of a charter and investment application of the project of construction of a coal supercritical unit with power of 1,050 MWe at Tauron Wytwarzanie S.A. Łaziska Power Plant Division (total capacity: 1,155 MWe).

2013

57. PWC Warszawa Business consultancy in choosing the best location for the construction of a new source of electricity generation based on gas, including conducting preliminary localization, technical, economic and financial analyses.

2013

58. Energomontaż

Zachód Wrocław Sp. z o.o.

Design documentation for building a 3.0 MWe power generator fueled with coke gas in SEJ SA - ZEK in Częstochowa Nowa Coking Plant in Częstochowa.

2013

59. Tauron

Wytwarzanie SA Function of General Designer for construction of heating unit 50 MW in ZEC Bielsko-Biała - EC1 (total capacity: 275 MWt).

2013

60. Municipal Heat

Supply Company in Białystok

Complete technical documentation with obtaining building permission within the scope of investment: "Building the cogeneration system based on gas engines' set for Municipal heat supply company in Białystok".

2012

61. Tauron

Wytwarzanie SA

Contract for the implementation of the multi-stage technical documentation required to obtain building permit for construction of the new 910 MWe power unit in the Jaworzno III (No. II Power Station) Power Plant.

2012

62. Będzin SA CHP Plant

Complete technical documentation for the performance of the project titled “Construction of gas receipt and natural gas transmission installation from the intake point indicated by the gas supplier to the reconstructed OP-140 boiler.”

2012

63. ETC Tanie Ciepło

Sp. z o.o.

The complete technical documentation for the installation of two cogeneration power generators along with the GZ-50 natural gas-fired top water boilers installed in Piotrków Trybunalski. Location – Piotrków North.

2012

64. ETC Tanie Ciepło

Sp. z o.o.

The complete technical documentation for the installation of two cogeneration power generators along with the GZ-50 natural gas-fired top water boilers installed in Piotrków Trybunalski. Location – Piotrków South.

2012

65. Doosan Babcock

Energy Polska Sp. z o.o.

Technical description for all industries in accordance with the Terms of Reference submitted by the Ordering Party and functional specification for preparation by the Ordering Party of the preliminary (technical) offer for the Investor for the biomass preparation and delivery system in CHP Fortum Zabrze.

2012

66.

Tauron Wytwarzanie SA

Stalowa Wola Power Plant

Detailed engineering together with services required to obtain a construction permit for the combined cycle unit for the Stalowa Wola SA Power Plant or for the special purpose company (in which Stalowa Wola SA Power Plant will participate).

Concepts, studies, expertises, organizational and preparatory work connected with construction of the new power unit.

Consulting services concerning the selection of the Contract Engineer and Contractor of the new power unit.

2012

CONSULTING SERVICES 8

ENERGOPROJEKT-KATOWICE SA

NO. PURCHASER PROJECT NAME COMPLETED

67. Rafako SA Elements of the concept of basic engineering for the high-performance coal-fired power units integrated with the capture of carbon dioxide from flue gases.

2012

68. Kulczyk

Holding SA Consulting services connceted with the design of construction of Power Plant (fired with hard coal) in Zlewa, Belarus.

2012

69. Kozienice II SA

Power Plant Performing the function of the consulting engineer by the contractor selection for the power unit (approx. power = 1000 MW).

2012

70. PGE SA, Opole

Power Plant Technical consulting concerning the contractor selection for modernization of the water demineralizing station in the Opole Power Plant.

2012

71. Budimex

Budownictwo Sp. z o.o.

Study on applications in the Polish energy sector of a power unit with supercritical parameters for the highest achievable performance.

2012

72. Rafako SA Design services within the framework of the preliminary offer preparation for the Północ Power Plant project (2 x 780 – 1050 units) as well as supporting the Orderer during the negotiations with the Customer.

2012

73. Ernst&Young

Warszawa Function of Technical expert for the project "Optimization of energy supply costs for Michelin Polska SA in Olsztyn".

2012

74. Biprostal SA

Engineering and expert services as well as the technical analysis in respect of steel and reinforced concrete construction of the technological flyovers in the Turów Power Plant (total capacity: 2088 MWe) for the new loading conditions resulted by the additional sorbent and cooling water pipelines.

2012

75. PAK Serwis Konin

Sp. z o.o.

Operation instructions for 4 systems in the Konin Power Plant:

pressure reduction and cooling station for the needs of the emergency supply of the collector 7 ata,

system of plants within the area of feeding water tank no. 6,

system of drains and drainages of the unit K12-TG6,

fresh steam pipeline to the distribution-dumping station of the TG6 turbine set.

2012

76. Rybnik SA Power

Plant Code Book for the new unit of the Rybnik Power Plant (total capacity: 1775 MWe) basing of Alstrom company requirements.

2012

77. Babcock

Bełchatów Fire protection and occupational Safety and health audit for the unit no. 8 boiler in the Bełchatów Power Plant (total capacity: 4440 MWe).

2012

78. Rafako SA Verification of specifications and drawings in the "boiler island" scope, due to change in boiler material.

2012

79. Energoprojekt Warszawa SA

Acting as the Technical Advisor in the Investment preparation and selection of Contractor for building CFB70 MW fluidized unit in Spółka Energetyczna Jastrzębie SA – Elektrociepłownia Zofiówka.

2012

80. Energa-Obrót

Gdańsk Database for PLEXOS application of Energy Exemplar Ltd. 2012

81. Tauron Ciepło SA Coordination and advisory work for the BC-35 unit, together with associated infrastructure and WR-40 boiler, in Zakład WytwarzaniaTychy (Tychy CHP Plant).

2012

82. Neyveli Lignite

Corporation Limited

Consulting services for the project entitled: ”Neyveli Lignite Power Plant (power units 2x250MWe) in India”.

2011

83.

Tauron Wytwarzanie SA Łagisza Power

Plant

Preliminary assumptions of coarse bottom ash precipitation from the 460 MW boiler in the Łagisza Power Plant (total capacity: 840 MWe).

2011

84. BSiPE

Energoprojekt-Gliwice SA

Technical consulting concerning comprehensive services connected with construction of two combined cycle units with the capacity of 45 MWe each in KGHM Lubin.

2011

85. PGE SA, Warszawa Rendering technical consulting services for process of building the thermal power station within the area of city Gdańsk.

2011

86. Budimex SA Bills of quantities, initial designs and bills of materials and equipment for chosen objects for 450 MW steam-gas unit.

2011

87. PBG SA

Przeźmierowo Design services for: “The CCCP strategic project” at the PBG SA 2011

9

CONSULTING SERVICES

REFERENCE LIST

NO. PURCHASER PROJECT NAME COMPLETED

88. Tauron

Wytwarzanie SA

Technical documentation for the system of external networks as a part of the reconstruction of the generation capacity at the PKE SA (now Tauron Wytwarzanie SA) – construction of a 50 MW power unit at the ZEC Bielsko Biała CHP-1 (total capacity: 275 MWt).

2011

89. CEZ Polska

Skawina

Application forms:

IPPC application form – integrated permit for the combined cycle unit,

Application form in order to obtain a permission to participate in the European Union Emission Trading Scheme for the combined cycle unit until June 30, 2011 that condition obtaining a free of charge CO2 emission rights, according to the 2009/29/WE directive.

2011

90. H. Cegielski Poznań SA

Documentation for the conceptual and preparatory stage of the project concerning construction of a Power Plant in the area of H. Cegielski Poznań SA.

2011

91. Elbis Sp. z o.o.

Expertise and diagnostic tests allowing assessment of technical condition of unit 3 and 4 equipment, at an angle of their conversion for burning only biomass in PGE Górnictwo i Energetyka Konwencjonalna SA Oddział Zespół Elektrowni Dolna Odra (Dolna Odra Power Plant).

Feasibility study - development of the most optimum conversion technology of units 3 and 4 for burning biomass only.

2011

92. Tauron

Wytwarzanie SA Katowice

Technical documentation for task: "Submitting of the application tendering Polygeneration Power Plant to the competition NER 300" (Polygeneration Power Plant at the premises of ZA Kędzierzyn).

2011

93. PGE EJ 1 Sp. z o.o. Obtaining and listing of data with sources in scope of 20 localisations, where erection of the nuclear Power Plant will be possible.

2011

94.

Tauron Wytwarzanie SA,

Jaworzno III Power Plant No. 2

Power Station

Technical consulting concerning the contractor selection for construction of the main automation system of the generation unit (renewable energy sources) in the Jaworzno III Power Plant - No. 2 Power Station (total capacity: 190 MWe).

2011

95.

Tauron Wytwarzanie SA,

Jaworzno III Power Plant No. 2

Power Station

Technical consulting concerning the contractor selection for the replacement of the TG1 turbine’s generator of the generation unit (renewable energy sources) in the Jaworzno III Power Plant - No. 2 Power Station (total capacity: 190 MWe).

2011

96. PGE SA, Rzeszów

CHP Plant Multi-variant concept for development of the Rzeszów CHP Plant. 2011

97. PGE Energia Jądrowa SA

Design for potential locations, where the nuclear Power Plant could be constructed in the future.

2011

98. ZGH Bolesław SA What-if analysis of power unit with power of approx. 20 MWe in Zakłady Górniczo-Hutnicze "Bolesław".

2011

99. Babcock

Oberhausen Documentation for building application of modernisation unit 8 in Bełchatów Power Plant (total capacity: 4440 MWe).

2011

100. Steinmüller Peitz Documents required for obtaining an acceptance of a building application for modernisation of unit 7 in Bełchatów Power Plant (total capacity: 4440 MWe).

2011

101. Będzin SA CHP Plant

Financial model for the period of 2011-2027 and elaboration of presentation for variations proposed by the Będzin CHP Plant (total capacity: 415 MWt).

2011

102. PGE SA, Rzeszów

CHP Plant

Update of the existing documentation for the change of the basic fuel from plant oil to natural gas in connection with the implementation of the project titled “Construction of the co-generation power unit for production of electric energy and heat based on piston combustion motors fired with natural gas” for the PGE GiEK SA - Rzeszów Combined Heat and Power Plant Branch.

2011

103. Tauron

Wytwarzanie SA

Designer’s supervision for the project of construction of the biomass system at the Katowice Combined Heat and Power Plant as a part of the project titled “Upgrade of buildings and structures at the Katowice Combined Heat and Power Plant (total capacity: 692 MWt) to meet the new fire-safety requirements.”

2011

CONSULTING SERVICES 10

ENERGOPROJEKT-KATOWICE SA

NO. PURCHASER PROJECT NAME COMPLETED

104. Alstom Power

Elbląg

Authorization of as-built documentation developed by Alstom Power Systems GmbH and developing as-built documentation in the commissioned field in implementation of the project to modernize the integrated boiler - turbine system of unit No. 6 in PGE Górnictwo i Energetyka Konwencjonalna SA Oddział Elektrownia Bełchatów (Bełchatów Power Plant, total capacity: 4440 MWe).

2011

105. ZE PAK SA Design engineering concerning reconstruction of the Pątnów I Power Plant as well as new designing work connected with realization of ZE „PAK“ SA investment plan for the year 2010.

2010

106. BSiPE

Energoprojekt-Kraków SA

Technical and environmental examination of the Energa Company. 2010

107. PGE Energia Jądrowa SA

Information concerning legal and administrative requirements for preparation of the investment process in power industry.

2010

108. Tychy SA CHP Plant

Detailed engineering and services necessary to obtain:

construction permit for a BFB 135 boiler (100% biomass-fired),

construction permit for a biomass feed system for the BFB 135 boiler,

construction permit for a new 40 MWt water boiler (WR type) together with flue gas desulphurization system, denitrification system and dust removal system.

2010

109.

Koksoprojekt Consulting

Engineering Company Ltd.

Zabrze

Consulting services for the project entitled: “Construction of the complex of the coke oven battery No. 5 in the Przyjaźń Coking Plant.

2010

110. ZE PAK SA Modification of operation conception of the Pątnów Power Plant as well as the Konin Power Plant.

2010

111. Tauron Polska

Energia SA Consulting services concerning establishing the heating group within the structure of the Energetyka Południe Company for the Silesian Conurbation.

2010

112. PGE SA,

Bełchatów Power Plant

Engineering supervision during the implementation of the connection projects for the 858 MWe power unit in the Bełchatów Power Plant (total capacity: 4440 MWe).

2010

113. PGE SA, Rzeszów

CHP Plant

The complete documentation of the application for funding from the Cohesion Fund within the framework of the Operational Programme - Infrastructure and Environment (IaE OP) for the project: "Construction of the cogeneration power unit (producing thermal and electric energy) based on Diesel engines (vegetable oil fired) in the Rzeszów CHP Plant".

2010

114. Energoprojekt Warszawa SA

Expert opinion on criteria for location of nuclear Power Plants as well as assessment of the so far proposed locations in the range of the following criteria:

demography and cultivation,

local infrastructure,

cultural and historical places (archeology),

legal aspects in the scope of ownership of the land.

2010

115. Kraków SA CHP

Plant Multi-branch detailed engineering for modernization of the internal heating segment.

2010

116. Gaz de France

The EU-DEEP, research project:

integration of the grid and market – determining the current knowledge on DER application in the EU eastern member states (exemplified by Poland and Czech Republic);

concept of the DER training;

research and development of the technology, validation of the technology;

market modelling;

methodology of the DER quick development paths;

curves of investment funds flow;

profitability ratios for final recipients;

business models from the point of view of engineering companies;

project management.

2009

117. Steinmüller Peitz Preparation and execution of the procedure concerning submitting of the construction notification according to the Polish law. the SIK Bełchatów BL. 5-AN 4360 Project.

2009

11

CONSULTING SERVICES

REFERENCE LIST

NO. PURCHASER PROJECT NAME COMPLETED

118. ZE PAK SA Multi-discipline design (together with the assumptions) for reconstruction of the emergency gypsum loading system in the gypsum storage in the Pątnów II Power Plant (total capacity: 1600 MWe).

2009

119. Tauron

Wytwarzanie SA Performing the function of the consulting engineer in the process of preparation by Foster Wheeler the feasibility study for the polygeneration Power Plant.

2009

120.

Tauron Wytwarzanie SA,

Katowice CHP Plant

Preparation of the optimal variant for reconstruction of the production capacity in the Katowice CHP Plant based on expected demand for heat.

2009

121. Tauron

Wytwarzanie SA As-built documentation for the auxiliary systems of the 460 MW power unit with supercritical parameters in the Łagisza Power Plant (total capacity: 840 MWe).

2009

122. PGE SA, Kielce

CHP Plant

Program for adjustment and development of the generation assets of the Kielce CHP Plant to the expected environmental requirements in the perspective of the year 2016 and the next years.

2009

123.

Tauron Wytwarzanie SA

Stalowa Wola Power Plant

Technical documents for the applications submitted to the local office in connectron with the new investments in the Stalowa Wola SA Power Plant.

2009

124. EM&CA SA Warszawa

Technical consulting concerning the contractor selection of the new thermal power unit with the fluidized boiler, backpressure turbine, two peak boilers and with the heat accumulator in the Bielsko-Biała I CHP Plant (total capacity: 275 MWt).

2009

125. AF-Consult Consulting services – feasibility study for the Skawina Power Plant (total capacity: 590 MWe).

2009

126. Tauron

Wytwarzanie SA Update of the IGCC variant for the Blachownia Power Plant. 2009

127.

Tauron Wytwarzanie SA,

Blachownia Power Plant

Optimization (concerning the investment return period) of the implementation schedule for the polygeneration Power Plant.

2009

128. Tauron

Wytwarzanie SA

Documentation necessary to obtain funding for the 50 MW thermal power unit in the Bielsko-Biała I CHP Plant (total capacity: 275 MWt) within the Operational Programme – Infrastructure and Environment 2007-2013.

2009

129. KGHM Polska

Miedź SA

Expert opinion: „Set of technical and economic as well as of the ecological and technological information that are necessary to prepare the applications for funding from the European Union funds for the projects concerning construction of the combined cycle units in the Głogów CHP Plant as well as in the Polkowice CHP Plant”.

2009

130. Energetyka

Sp. z o.o. Lubin

Application for funding from the European Union funds for the project concerning construction of two gas engines in Lublin and in Polkowice together with the concept for construction.

2009

131. JSW Consultancy services for the Project: "1000 MW (8x125 MW) Lignite based Power Plant at Rajasthan in India".

2008

132. Energetyka Cieszyńska Sp. z o.o.

Documentation of the application for funding for the project concerning the construction of the flue gas desulphurization system in the Cieszyn CHP Plant.

2008

133. Skawina SA Power

Plant Technical expertise concerning the construction of the K5 boiler in the Skawina Power Plant (total capacity: 590 MWe).

2008

134. Tauron

Wytwarzanie SA Guidelines for the project of the geological and engineering research for the 50 MW thermal power unit in the “Bielsko-Biała I” CHP Plant (total capacity: 275 MWt).

2008

135.

Koksoprojekt Consulting

Engineering Company Ltd.

Zabrze

The multi-discipline technical documentation for the project: "Modernization of the KS-203 station within a framework of the construction of the coke oven battery No. 1 in the Przyjaźń Coking Plant".

2008

CONSULTING SERVICES 12

ENERGOPROJEKT-KATOWICE SA

NO. PURCHASER PROJECT NAME COMPLETED

136.

Koksoprojekt Consulting

Engineering Company Ltd.

Zabrze

The multi-discipline technical documentation for the task entitled: „The modernization of Coal Derivatives’ Production Department in the Przyjaźń Coking Plant”.

2008

137. Dar Al-Handasah Consulting services for the “RABIGH IPP” Project in the Persian Gulf. 2008

138.

Power Research & Testing Company

Energopomiar Ltd. Gliwice

Design set for the project entitled:

“The modernization of the general power supply in the Jaworzno III Power Plant (total capacity: 1345 MWe) – the reconstruction of the National Power Industry System.

preparation of materials in order to obtain a construction permit;

opinions concerning environmental impact;

detailed engineering – the branch of civil and construction engineering.

2007

139. NDPHC-Nigeria/ Valenz Holdings

Consulting services for construction of the „OMOTOSHO” Gas-Fired Power Plant (8x41.75 MW) in Nigeria.

2007

140. PGE SA, Rzeszów

CHP Plant

Presentation of the investment project entitled: "Construction of the cogeneration power unit based on Diesel engines in the scope of technology, ecology and economic efficiency”.

2007

141. PGE SA, Turów

Power Plant

Engineering supervision over the project entitled: "Power units No. 6 and 8 – services ensuring the proper operation of the Power units No. 6 and 8, engine room of the Power unit No. 7 and the part of the boiler house building of the Power unit No. 7 in connection with the disassembly of the Power unit No. 7".

2007

142. PGE SA,

Bełchatów Power Plant

Design set for the purpose of the administrative procedure connected with the planned modernization of the No. 3 Power unit in the Bełchatów Power Plant (total capacity: 4440 MWe).

2007

143. Tauron

Wytwarzanie SA

Consulting services at the stage of formal proceedings connected with the design of power evacuation from the 460 MWe power unit to the 400 kV line in the Łagisza Power Plant (total capacity: 840 MWe).

2007

144. Tauron

Wytwarzanie SA Project coordination services for the purpose of construction of the 460 MWe Power unit in the Łagisza Power Plant (total capacity: 840 MWe).

2007

145. PGE SA, Rzeszów

CHP Plant

Presentation based on the analysis of technical, ecological and economic conditions of operation of the Rzeszów CHP Plant within the framework of the heat distribution network in the City of Rzeszów.

2007

146. Fichtner Engineering services for the project entitled: “The BARAPUKURIA Power Plant (2x125 MWe, coal-fired) in Bangladesh.

2006

147. ZE PAK SA

The power rehabilitation programme for the Pątnów I Power Plant (total capacity: 1600 MWe). Phase I:

Technical condition assessment for the Power Plant equipment;

Specification of the detailed scope for the power units modernization (4x200 MW each);

Feasibility study.

2006

148. Steinmüller Peitz Consulting services: engineering of the control block diagrams for the No. 3 modernized boiler in the Bełchatów Power Plant (total capacity: 4440 MWe).

2006

149. Tauron

Wytwarzanie SA

Design of the principles of creation and solving the technical reserve for the project entitled: “Construction of the 460 MWe Power unit with supercritical parameters in the Łagisza Power Plant (total capacity: 840 MWe)”.

2006

150. Steinmüller Peitz Design services and consulting services concerning the modernization of the No. 3 Power Unit in the Bełchatów Power Plant (total capacity: 4440 MWe).

2006

151. SNC-Lavalin Selection of the technological option for the “EDMONTON” Project - construction of the Power Plant in Canada.

2006

152. PGE SA,

Bełchatów Power Plant

Design set (detailed engineering, bill of quantities) - the 858 MW Power unit – utilization and adaptation of the existing infrastructure.

2006

153. District Thermal Power Company

in Grudziądz

Multi-discipline technical concept and business plan documents: Increase of the cogenerated power production in the Droga Łąkowa CHP Plant in the district thermal power company in Grudziądz.

2005

13

CONSULTING SERVICES

REFERENCE LIST

NO. PURCHASER PROJECT NAME COMPLETED

154. Tauron

Wytwarzanie SA

Application form in order to obtain a permission to participate in the emission rights trade for: The Łagisza Power Plant (total capacity: 840 MWe), the Siersza Power Plant (total capacity: 786 MWe), the Blachownia Power Plant, and the Bielsko-Biała CHP Plants Complex.

2005

155. MVV Consulting Consulting services for the „Beddawi” and „Zahrani” Power Plants (both 435MWe) in Lebanon.

2005

156. MSP Warszawa Privatisation of the Nadwiślańska Energy Management Company (Nadwiślańska Spółka Energetyczna) in Brzeszcze.

2005

157. VA Tech Hydro Engineering services for project: “The Power Plant 760 MW in Termoli, Italy”.

2005

158. Ateim France Validity of project documents (engineering services), which was prepared by Ateim Company, for the SAint-Gobain Glass Poland – the construction of new production line – flat glass, float type.

2005

159. URE Szczecin Consulting services – an opinion entitled: “Conditions for connecting to the Enea network; the Wind Power Plants System Department in Szczecin of the total output power of 19.25 MW.

2005

160. Kopex SA The Będzin CHP Plant (total capacity: 415 MWt) adaptation in order to meet the requirements of emission standard – gas and dust into the air; for the regulations, which will be in force on February 1st, 2008.

2005

161. Tauron

Wytwarzanie SA

Cost calculation for the additional construction work concerning selection of the fluidized boiler as well as participation in the meetings during the renegotiation process (within a framework of the Project “Delivery of the turbine for the 460 MW power unit”).

2005

162. Tauron

Wytwarzanie SA

Preparatory works concerning due diligence process for the project entitled: “Construction of the 460 MWe power unit in the Łagisza Power Plant (total capacity: 840 MWe).

2005

163. Kopex SA Design services and project supervision services during implementation of the design documents in the Paroseni CHP Plant in Romania.

2005

164. PGE SA, Turów

Power Plant

Technical expertise of the invention project entitled: “Reconstruction of the compressed air systems for the external desulphurization purpose, the control system of the ash removal system (power units 8-10), and dust removal of coal handling system.

2005

165. URE Szczecin Consulting services: Technical conditions of the Wind Power Plant Complex (19.25 MW) the connection to the Enea Network (branch in Szczecin).

2005

166. EVIP Warszawa Evaluation of the technology being used in comparison with the domestic and foreign competition in a report concerning the privatisation process of the thermal power company in Legnica.

2004

167. Rybnik SA Power

Plant Development of a long-term strategy of generating powers regeneration in the Rybnik Power Plant (total capacity: 1775 MWe).

2004

168. Tauron

Wytwarzanie SA

Risk analysis for the construction project of the 460 MWe power unit, performed within the scope of generating powers regeneration procedures in PKE (now Tauron Wytwarzanie SA), in the Łagisza Power Plant (total capacity: 840 MWe).

2004

169. Kędzierzyn SA

Nitric Plant

Stock-taking performance together with an evaluation of the construction works technical condition as well as an expertise of tanks having been constructed by 1999 in the water treatment plant of the Kędzierzyn SA Nitric Plant.

2004

170. European

Commission

Research study entitled “High-parameters, multi-fuel, circulation fluidised bed boiler with advanced steam cycle”.

Topic realised within the 5th Framework Program of the European Union.

2004

171. Starachowice Sp. z o.o. CHP

Plant

Expertise on the impact of the Starachowice CHP Plant (total capacity: 46 MWt) on the national power generation system.

2004

172.

Waste & Wastewater

Municipal Company in

Piekary Śląskie

Developing the Potential Project Card for funding from the Cohesion Fund for the project "Comprehensive improvement of the water and wastewater management in the Community of Piekary Śląskie".

2004

CONSULTING SERVICES 14

ENERGOPROJEKT-KATOWICE SA

NO. PURCHASER PROJECT NAME COMPLETED

173.

Waste & Wastewater

Municipal Company in

Piekary Śląskie

Developing the application for funding from the Cohesion Fund for the project "Comprehensive streamlining of the water and wastewater management in the Community of Piekary Śląskie”.

2004

174. Chorzów ELCHO

Sp. z o.o. CHP Plant

Audit of the power ordered for the year 2004 by the thermal power company in Katowice from the ELCHO CHP Plant (total capacity: 500 MWt).

2004

175. Foster Wheeler High performance multi-fuel CFB with advanced steam cycle. 2004

176. MVV Berlin Consulting services for the conversion of the gas units into the combined cycle units in the Al Nasserieh and Zaayzoon Power Plants.

2004

177. MVV Berlin Consulting services concerning the project called “The Flower of the East”. 2004

178. Białystok SA CHP

Plant Consulting services connected with the start-up of turbine generator set TZ4 in the Białystok CHP Plant.

2004

179. PGE SA, ZE Dolna Odra Pomorzany

CHP Plant

Technical expertise performance for a technical catastrophe of the temporary steel smokestack of the height of H=80m in the Pomorzany CHP Plant (total capacity: 443 MWt).

2004

180. Bugaj Sp. z o.o. Thermal Power

Company

Technical opinion preparation for construction projects developed by other companies within the scope of consistency with the Polish construction law and local conditions resulting from the Building and Land Development Conditions prepared for an investment entitled: Construction of a thermal power unit in Starachowice.

2004

181. The World Bank

Consulting services for the World Bank within a framework of the Global Environmental Facilities (GEF) concerning coal heating conversion to gas heating. (facilities in the following cities: Gdańsk (10,6 MWt), Siemianowice 2x1,96 MWt), Kraków, Tarnów (4-5 MWt), Ostrów Wielkopolski (11,6 MWt), Poznań (3,72 MWt), Września (1,44 MWt), Wyszków (4,1 MWt), Łęczyca (3,54 MWt), Wałbrzych (6,4 MWt), Piekary Śląskie (2,7 MWt), Janów Lubelski (3,6 MWt), and Pruszcz Gdański (1,1 MWt)).

2001 - 2004

182. Toshiba/ Kopex SA

Consulting services, design services, and engineering services for the project entitled: „The modernization of the power unit No. 4 in the „Paroseni” CHP Plant in Romania”.

2003

183. WGK Analysis of the condition and prospects for the Fittings, Press and Pipeline Plant "Chemar" with HQ in Kielce.

2003

184. Katowice SA

Thermal Power Company

Expertise of the following scope: assessment of the technical condition for network and equipment held by the thermal power company in Katowice, assessment of heat losses in transfer – identification of the unnecessary assets to be eliminated.

2003

185. Eko-Brud Preparing the application to the Provincial Fund of Environment Protection and Water Management in Katowice, pursuant to the binding regulations for loan extension.

2003

186. Energoprojekt

Gliwice SA Advisory services for the supervision over implementation of the power generation facilities.

2003

187. Black & Veatch Consulting services for the turn-key implementation of the combined cycle unit in the Starachowice CHP Plant (total capacity: 46 MWt).

2003

188. Kopex SA Consulting and design works as well as engineering services for the project “Modernization of the No. 4 power unit in the Paroseni CHP Plant in Romania”.

2003

189. Tauron

Wytwarzanie SA Consulting services for the implementation of KKS codes system in Power Plants as well as in CHP plants.

2003

190. Tauron

Wytwarzanie SA

Analysis of opportunities and potential for capital relations of PKE (now Tauron Wytwarzanie SA) with the thermal power company in Chrzanów inclusive of the company audit.

2002

191. DG Consult Pre-privatisation analyses: Dolna Odra Power Company, Ostrołęka Power Company, Kozienice Power Plant.

2002

192. Kopex SA Inventory of the existing heating plants in selected mines of Kuzbas (district of Kemerowo - Russia), inclusive of their possible transformation into CHP plants.

2002

193. Tychy SA CHP

Plant

Opinion on the economic analyses developed by Energotechnika Knurów for the projects: "Concept for construction of the BB-2 unit in Radków and for construction of the BU-6/30 unit in Tychy”.

2002

15

CONSULTING SERVICES

REFERENCE LIST

NO. PURCHASER PROJECT NAME COMPLETED

194. Black & Veatch Consulting services within the Polish Building Law, requirements of the Technical Supervision Authorities as well as the new Environment Protection Law, related to the preparation of a bid for construction of the new unit in Żarnowiec.

2002

195. EP Poznań

Pre-privatisation analyses (analysis of generation sources, appraisal of the technologies applied presently, analysis of the assets technical condition) for the following companies: Elbląg Power Company, Energa Gdańsk Power Company, Kalisz Power Company, Koszalin Power Company.

2001

196. Town of Bochnia

Consulting services for the district of Bochnia, covering: development of the application and assistance in obtaining financial resources from the National Fund of Environment Protection and Water Management in Warsaw to finance the following project: “Thermal renovation of the school buildings and Folk Culture Centre in the district of Bochnia”.

2001

197. Polish Energy Partners SA

Consulting services for the bid assessment – co-operation in the I&C design in the Kostrzyn CHP Plant.

2001

198. Będzin SA CHP

Plant

Study of external determinants related to the long-term operation of the Będzin CHP Plant (total capacity: 415 MWt) in the following range: market and environment, competition, SWOT analysis, strategic aspects.

2001

199. Town of Herby

Consulting services in development of the application and assistance in obtaining financial resources from the National Fund of Environment Protection and Water Management in Warsaw for the District of Herby to finance the following projects - development of the mechanical-biological treatment plant in Herby sanitary sewerage in Olszyna and Kalina inclusive of transfer to the central treatment plant in Herby.

2001

200. Tychy SA CHP

Plant Development of the Bidding Documents for construction of the heating unit BC-60 in the Tychy CHP Plant (total capacity: 290 MWt).

2000

201. Rafako SA Development of the technical-financial bid for modernization of the boiler OP-140 for Frantschach-Świecie in the range of civil, electric and thermal-technological engineering scope.

2000

202. Chorzów ELCHO

Sp. z o.o. CHP Plant

Draft of the organisational structure and management model of the ELCHO CHP Plant (total capacity: 500 MWt).

2000

203. PGE SA, Turów

Power Plant Consulting works connected with modernization of units No. 1-6 in the Power Plant. 2000

CONSULTING SERVICES 16

ENERGOPROJEKT-KATOWICE SA

1.1. Bidding management, bidding documents, consulting services for tender organisers

NO. PURCHASER PROJECT NAME COMPLETED

1.

ZW Kryza-Plast Development of content for technical appendices to the preliminary tender bid concerning the project named: Design, installation, start-up, and commissioning of the water supply system intended for implementation of the project to build Capacity in coal technology at TAURON Wytwarzanie S.A. – construction of a supercritical 910 MW power unit at TAURON Wytwarzanie S.A. – Elektrownia Jaworzno III Branch in Jaworzno (total capacity: 1,345 MWe).

in progress

2.

Tauron Wytwarzanie SA

El. Stalowa Wola (en. Stalowa Wola Power

Plant)

The formal and technical consulting services concerning the procedure of a contractor selection in accordance with the Public Procurement Act for the following project: “Extension of the boiler K9 and the turbine TG5 in order to increase the capacity of the RES (renewable energy sources) unit at TAURON Wytwarzanie SA –Stalowa Wola Power Plant up to 55 MW.”

in progress

3.

Tauron Wytwarzanie SA

Jaworzno III Power Plant

Organisation and conduct of the tender procedure for selecting a contractor to construct the external coal feed system of the power unit with a capacity of 910 MWe in Tauron Wytwarzanie SA Jaworzno III Power Plant (total capacity: 1,345 MWe).

in progress

4. Południowy Koncern

Węglowy SA

1. Development of a complete tender documentation in order to select a contractor of a construction and technical design for execution of the investment project named: “Construction of the “Grzegorz” Shaft Along with Construction of the Surface Infrastructure”. 2. Supervision of development of the construction and technical designs, including opinions and verification of the design documentation for the project completion. 3. Development of a complete tender documentation in order to select a general contractor of the aforementioned investment project named.

in progress

5. PKN Orlen Płock SA Development of the technical Terms of Reference and support during the selection of

a contractor to install solar panels on 25 PKN Orlen petrol stations. 2015

6. Elektrownia Puławy

Sp. z o.o. Update of the tender documentation to select the Main Investment Contractor of the construction of the 400 MW CCGSU building design of Puławy Power Plant).

2015

7.

Tauron Wytwarzanie SA.

Jaworzno III Power Plant

Organisation and conduct of the tender procedure for selecting a contractor to construct the ash removal system of the power unit with a capacity of 910 MWe in Tauron Wytwarzanie SA Jaworzno III Power Plant (total capacity: 1,345 MWe).

2015

8. PKN Orlen Płock SA

Terms of Reference for the project "Power engineering - Support". Development of Terms of Reference for the gas-steam Power Plant, located in the Manufacturing Plant in Płock, and assistance and technical advice on the process of selecting a contractor for the gas-steam Power Plant.

2015

9. PKN Orlen SA The consulting services concerning the investment of construction of the combined power plant in Włocławek, including the infrastructure.

2014

10. PKN Orlen Płock SA Terms of Reference – Turbine 7 at Zakład Elektrociepłowni PKN ORLEN in Płock and provision of support during the tendering procedure.

2014

11. PGNiG Termika SA Terms of Reference (ToR for all industries) for public procurement in the EPC formula (engineering, procurement, construction) for the new gas-oil water boiler house in Zeran Power Plant with an oil and gas economy.

2014

12. PGNiG Termika Update of the Terms of Reference for a public tender procedure for a new water gas-oil boiler house at the Żerań CHP.

2014

13. Budimex SA

Technical documentation the bid submitted by the Ordering Party, acting on its own or jointly with other entities, in the tender procedure conducted by EDF Polska S.A. for the construction of a facility / installation of two co-generation gas power units with waste-heat boilers connected to a peak water boiler house, together with oil and gas handling systems and connecting the facility/installation to the existing infrastructure of the Toruń-Grębocin CHP plant.

2014

14. Tauron Ciepło SA

Management and technical consulting services for the public tender concerning execution of the investment project named: Source adaptation of Zakład Wytwarzania Katowice for the needs of the heating market after 2015. (total capacity: 692 MWt).

2014

17

CONSULTING SERVICES

REFERENCE LIST

NO. PURCHASER PROJECT NAME COMPLETED

15. Tauron Ciepło SA Participation in the tender procedure management for development of the technical documentation of the project “Power Supply Execution of the Eastern and Southern Main Conduit from the Łagisza Source.”

2014

16. Tychy SA CHP Plant

Technical services and advice on public tenders related to the performance of the investment project titled “Construction of new cogeneration capacity at the Tychy CHP consisting in construction of the BC-50 power unit (total capacity: 290 MWt).

2013

17. Energoinstal Katowice SA

Tender materials for the task “Construction of the cogeneration fluidized bed unit CFB with gross installed capacity of about 75 MW in Zofiówka CHP Plant in Spółka Energetyczna Jastrzębie SA

2013

18. Zakłady Azotowe

Tarnów

Analyses of comparison and development of recommendations to choose the best offer in the tender for construction of combustion gas desulphurization and denitrification system in EC II Power Plant in Zakłady Azotowe Tarnów.

2013

19. Strabag Pruszków Preliminary and Final Offer for the project SCR-Retrofit in the Rybnik SA Power Plant (total capacity: 1,775 MWe).

2013

20.

Zakłady Azotowe w Tarnowie

– Mościcach SA

Technical Part of Terms of Reference for the supply of flue gas desulphurization and denitrification installation in EC II Power Plant in Azoty Tarnów, which is necessary to submit a tender.

Participation in explaining the content of the Terms of Reference required to submit initial offers.

2012

21. PKN Orlen Płock SA

Bid inquiry concerning the turnkey delivery of the combined cycle unit [based on the instructions to bidders (together with the bid data sheet)] as well as consulting services in the technical and commercial scope for selection of the Power Plant’s supplier.

2012

22. Instal Kraków SA

Technical part of the offer for the following investment: Design, Execution and Commissioning of the Flue Gas Desulphurisation System Based on Wet Lime and Gypsum Method in the Companies of EDF Polska Group – Kraków Power Plant, for the needs of correct assessment of costs of the above investment and correct assessment of the offer price by the Orderer as well as providing technical support in the process of tender evaluation and selection.

2012

23. Polimex-

Mostostal SA Design works for the needs of the tender in the undertaking of Zakład Termicznego Przekształcania Odpadów (ZTPO – Thermal Waste Utilization Plant) in Cracow.

2012

24. Doraco Sp. z o.o. Design documentation, offer documentation: investment's task initial basic design: "Building the Municipal Waste Incineration Plant (ZTPOK) for Bydgosz-Toruń metropolitan area."

2011

25.

Doosan Babcock Energy Polska

Sp. z o.o.

Preparation of data for biomass feeding systems in order for the Ordering Party to prepare a proposal for the Investor for “A system for feeding biomass into the boilers of power units 5-8 by bypassing the coal grinders at the Rybnik Power Plant" (total capacity: 1775 MWe).

2011

26. Będzin SA CHP Plant

Preparation and conduct of the proceedings (negotiation procedure with announcement) concerning reconstruction of the OP-140 boiler to a biomass-fired fluidized bed boiler in the Będzin CHP Plant (total capacity: 415 MWt).

2011

27. Tychy SA CHP Plant

Technical support for bidding procedures concerning the selection of Contract Engineer.

2011

28.

Tauron Wytwarzanie SA

Katowice

Terms of Reference for the needs of non-Limited tender process for selection of contractor for complex start-up works for generating facility SE (sustainable energy) in the Jaworzno III Power Plant - No. 2 Power Station (total capacity: 190 MWe).

2011

29.

Tauron Wytwarzanie SA

Katowice

Offer requirements for investment task regarding realisation, start-up, performing a test-run and commissioning the external oil management for needs of new 50MW heating unit in Zespół Elektrociepłowni Bielsko-Biała.

2011

30. EM&CA SA Warszawa

Participation in organization and conduct of the tender (negotiation procedure with announcement) for selection of contractor(-s) of the external ash removal system and sorbent system in the range of reconstruction of production capacity in PKE (now Tauron Wytwarzanie SA) – construction of the 50 MW power unit (operating in cogeneration) in the Bielsko-Biała I CHP Plant.

2011

CONSULTING SERVICES 18

ENERGOPROJEKT-KATOWICE SA

NO. PURCHASER PROJECT NAME COMPLETED

31. EM&CA SA Warszawa

Participation in organization and conduct of the tender (negotiation procedure with announcement) for selection of contractor(-s) of the external coal handling system in the range of reconstruction of production capacity in PKE (now Tauron Wytwarzanie SA) – construction of the 50 MW power unit (operating in cogeneration) in the Bielsko-Biała I CHP Plant (total capacity: 275 MWt).

2011

32.

Tauron Wytwarzanie SA,

Jaworzno III Power Plant No. 2

Power Station

Offer for the project including designing, delivery, assembly, putting into operation and commissioning of the electrical part for the generation unit (renewable energy sources) in the Jaworzno III Power Plant - No. 2 Power Station (total capacity: 190 MWe).

2011

33.

Tauron Wytwarzanie SA,

Jaworzno III Power Plant No. 2

Power Station

Offer for the project including designing, delivery, assembly, putting into operation and commissioning of the fly and bottom ash transport and storage system for the generation unit (renewable energy sources) in the Jaworzno III Power Plant - No. 2 Power Station (total capacity: 190 MWe).

2011

34. EM&CA SA Warszawa

Participation in the organization and implementation of a tender to select the contractor(s) for the upgrade of the TG1 turbine set for the RES (Renewable Energy Sources) generation unit at the Jaworzno III Power Plant – Power Plant II (total capacity: 190 MWe).

2011

35. ZE PAK SA Letter of inquiry concerning revitalisation of flow-through systems of cooling water pumps in the Central Pumping Station.

2011

36. Rafako SA Technical part for the offer of the Purchaser concerning the construction of the 480 MWe power unit in the Siekierki CHP Plant.

2010

37. PBG SA

Przeźmierowo

Technical documents for the offer concerning the selection of the General Contractor for the project: “Construction of the combined cycle units in the Głogów CHP Plant and Polkowice CHP Plant”.

2010

38.

Tauron Wytwarzanie SA, Thermal Power

Company in Bielsko-Biała

Offer for the project including construction, putting into operation, test run and commissioning of the water management (reverse osmosis technology) in the range of reconstruction of the production capacity in PKE SA (now Tauron Wytwarzanie SA): Construction of the 50 MW power unit in the Bielsko-Biała I CHP Plant (total capacity: 275 MWt).

2010

39. EM&CA SA Warszawa

Instructions to bidders (together with the bid data sheet) in the technical scope together with technical consulting for bidding procedures concerning the contractor selection in accordance with the act: Public Procurement Law for the project: Construction of the biomass-fired boiler in the Jaworzno III Power Plant – No. 2 Power Station (total capacity: 190 MWe) together with the auxiliary equipment as well as with the biomass feed and storage system.

2010

40. Kozienice II SA

Power Plant

Documents for instructions to bidders (together with the bid data sheet) about green technology in proceedings concerning the construction of a new power unit in the Kozienice II Power Plant.

2010

41. Town of Jonkowo Assessment and participation as the consulting engineer in the bidding committee for the modernization of the waste water treatment plant in the MBR technology (biological membrane reactors) in Jonkowo.

2009

42. Kopex-Famago

Sp. z o.o. Technical documents for the bid of Kopex-Famago Sp. z o.o. for construction of the external coal handling system for 4020 MW TPP Stanari in Bosnia.

2009

43. Vattenfall Concept, proposal concerning the construction conditions as well as the instructions to bidders for the slag removal system (closed) from the boilers in the Żerań CHP Plant.

2008

44. Atermon Athens Technical documents required for the bid for the Fieri Power Plant in Albania. 2007

45. Tauron

Wytwarzanie SA

Instructions to bidders (together with the bid data sheet) for bidding procedures concerning the selection of the Contract Engineer - the project: “Construction of the 460 MWe power unit in the Łagisza Power Plant (total capacity: 840 MWe)”.

2006

46. Tauron

Wytwarzanie SA

Instructions to bidders (together with the bid data sheet) for bidding procedures concerning the contractor selection of the power unit transformer – the project: “Construction of the 460 MWe power unit in the Łagisza Power Plant (total capacity: 840 MWe)”.

2005

19

CONSULTING SERVICES

REFERENCE LIST

NO. PURCHASER PROJECT NAME COMPLETED

47. Energoinstal- Katowice SA

Instructions to bidders (together with the bid data sheet) for the project entitled: “Construction of the CHP Plant (with redundant gas utilization) for the Przyjaźń Coking Plant”.

2005

48. Tauron

Wytwarzanie SA

Consulting services related with technical sections of bids for investment projects accompanying repowering of PKE SA (now Tauron Wytwarzanie SA) - the Łagisza Power Plant (total capacity: 840 MWe) in the electrical, I&C, coal and ash handling systems realized based upon Public Procurement Act.

2005

49.

Sydkraft Słupsk Sp. z o.o. CHP Plant

Preparation and supervision over the two-stage tender for development of the technical documentation of the co-generation wood combustion source in Słupsk, of capacity 32 MWt and 12 MWe.

2005

50. Dalkia Łódź SA Developing the technical part of the bidding documentation for modifications of the coal unloading system to coal bunkers in the Łódź 3 CHP Plant.

2004

51. Kopex SA

Consulting services connected with the investment: "Deliveries, assembly and putting into operation the electric part of belt conveyors system " in the following range: participation in the bidding procedure, bid examination, analysis and technical assessment, preparation of technical enclosures to the contract, participation in the delivery completion, verification of the electrical systems in terms of compatibility and completeness.

2004

52. Tauron

Wytwarzanie SA

Engineering services in the scope of tender management for the PKE (now Tauron Wytwarzanie SA) office building reconstruction project:

Participation in the tender proceedings as the Purchaser Technical Advisor;

Analysis and evaluation of offers;

Participation in negotiations;

Bidder selection proposals;

Development and settlement of materials for the contract with the Purchaser.

2004

53. Będzin SA CHP

Plant

Analysis of procedures and development of the Specification of the Essential Ordering Conditions for the order awarding proceedings for the task of “Exchange of the 6kV switching station in the Będzin CHP Plant (total capacity: 415 MWt).

2004

54. PGE SA, Kielce

CHP Plant

Technical analysis for the solution of thermal unit as well as related construction of the district heating network in the relation Kielce CHP Plant (total capacity: 315 MWt) – the Chemar Company.

2003

55. Tychy SA CHP

Plant Bid appraisal for construction of the BC-60 power unit in the Tychy CHP Plant (total capacity: 290 MWt).

2002

56. Zabrze SA CHP Plant

Development of the Bidding Documents for the “turn-key” implementation of the first stage of reconstruction in the Zabrze CHP Plant, "Complete construction of the boiler house with steam boiler KP-20 fired with natural gas together with auxiliary installations and equipment connected with steam and hot water supply."

2002

57. Soluziona Bid documentation (covering mechanical engineering and civil engineering branch) for the MC-S-Barbados Diesel Power Plant in Barbados.

2002

58. EM&CA

Warszawa Organisation and holding of the tender procedure for construction of the combined cycle unit in the Zielona Góra CHP Plant.

2002

59. Dalkia Poznań

ZE SA

Development of the bidding documentation, inclusive of the contract draft, for construction in the “turn-key system” of the process steam source with co-generation of electric energy in the Garbary CHP Plant.

2001

60. Skawina SA Power

Plant Concept for adjusting the turbine generator set TG-6 to the power unit operation in the Skawina Power Plant (total capacity: 590 MWe).

2001

61.

District Thermal Power

Company SA in Legnica

Development of the bidding documentation for holding a tender pursuant to the Act on Public Orders.

2000

62. Tychy SA CHP

Plant Development of the bidding documentation for construction of the production plant of secondary fuel from forest biomass in Kossowo - the district of Radków.

2000

63. Tychy SA CHP

Plant

Development of the bid inquiry for construction of the installation of additional water preparation for the cooling circuit in the Tychy CHP Plant (total capacity: 290 MWt).

2000

CONSULTING SERVICES 20

ENERGOPROJEKT-KATOWICE SA

1.2. Development plans, business plans

NO. PURCHASER PROJECT NAME COMPLETED

1. Nowa Sarzyna CHP

Plant Assessment of the building elements in the Nowa Sarzyna CHP Plant (total capacity: 216 MWt) for the purpose of the tax on real estate.

2007

2. Tauron

Wytwarzanie SA Preparation of Conceptual Design for Strategy, Development and Modernization of PKE after joining in of thermal power company in Bielsko-Biała.

2003

3. Marshall’s Office in

Opole Study for the development of power generation systems in the district of Opole by the year 2015.

2003

4.

Tauron Wytwarzanie SA

Stalowa Wola Power Plant

Business Plan for: “Logistics concept of biomass provision and the supply system functioning in the Stalowa Wola Power Plant”.

2003

5. Eko-Brud Business Plan for the project consisting in recycling of plastic waste in the company "EKO-Brud".

2003

6. Tychy SA CHP Plant Concept for the development strategy of Tychy CHP Plant (total capacity: 290 MWt) by the year 2015.

2002

7. Tauron

Wytwarzanie SA Concept for strategy, development and modernization of the PKE (The Southern Poland Power Company) (now Tauron Wytwarzanie SA).

2002

8. Tauron

Wytwarzanie SA Profitability analysis (business plan) for capital relations of PKE (now Tauron Wytwarzanie SA) with the thermal power company in Tychy.

2002

9. Interplast Business plan for the development of the Production and Trading Company Interplast.

2002

10. Wojkowice Sp. z o.o.

CHP Plant Business plan for construction of the boiler and modernization of power generation equipment in the Wojkowice CHP Plant.

2001

11. Tychy SA CHP Plant Business plan for the delivery of process steam from the Tychy CHP Plant (total capacity: 290 MWt) to the "Danone" Plant in Bieruń.

2001

12. Mielec Sp. z o.o.

CHP Plant Business plan for modernization of the Mielec CHP Plant, technical-economic analysis for the facility heating system.

2000

13. Katowice SA Thermal

Power Company Business plan for the Thermal Energy Company in Katowice for the years 2000- 2013. 2000

14. Provincial Averment

Protection Fund

Appraisal of the business plan for the investment: “Power generation and cooling system in co-generation for needs of the central air conditioning in the Pniówek Coal Mine.”.

2000

21

CONSULTING SERVICES

REFERENCE LIST

1.3. Investment, pre-feasibility, and feasibility studies

NO. PURCHASER PROJECT NAME COMPLETED

1. Paramo A.S. Feasibility study of the steam source capacity to adjust the CHP to the lower steam demand.

in progress

2.

PGE Bełchatów, Turów Power Plant

Branch

Feasibility study of the task of building a reserve power supply for the 110 kV Y0AEA switching station of the Unit 6 at the Turów Power Plant. in progress

3. Tauron Wytwarzanie

SA

Development of a supplement to the investment study of a rail system reconstruction for the 910 MW power-generating unit in Tauron Wytwarzanie S.A. – Jaworzno Power Plant III Branch.

in progress

4. CHP Nowa Sarzyna

The development of the concept concerning the use of the heat energy at Zakłady Chemiczne “Organika-Sarzyna” S.A. (“Organika”) supplied from Elektrownia Nowa Sarzyna Sp. z o.o. (“ENS”) in the newly implemented investment projects of Organika.

in progress

5. PGNiG Termika Feasibility study for construction of the cogeneration source fired with gas fuel supplied by the direct gas pipeline from Kościan-Brońsko mine for the needs of supplying the municipal district heating system of Poznań Town.

in progress

6. Grupa Azoty Puławy

SA The Feasibility Study for the Puławy Power Plant Project in two investment variants: 400 MWe and 250 MWe (the development of two full feasibility studies).

2015

7. ZGH Bolesław SA Update of the “Concept of Energy and Heat Source Construction – Power Station with Two Motors with Power of ca. 10 MWe Each” for Zakłady Górniczo-Hutnicze “Bolesław” S.A.

2015

8. Unipetrol Litvinov "New energy source for the Steamcracker Unit (ISBL) - Feasibility Study". 2014

9.

Chamber of Industrial Power Engineering and

Energy Recipients in Warsaw

Parameter setting of the support system for electricity produced in the high-performance co-generation in the existing sources and the sources built after 1 January 2013, including the specific character of the electricity generation from natural gas, process gas (refinery, high pressure and low pressure, blast furnace, coke) and coal.

2013

10. Tauron Ciepło ZW Katowice

The concept of building the new water boilers fired with heating oil and natural gas to ensure the heat production capacity at ZW Katowice of 250 MWt to supply energy to the Silesian agglomeration and 7 MWt to supply energy to ZW Katowice’s auxiliaries.

2013

11. Budimex Sp. z o.o. The feasibility study concerning construction of the 500MW power unit. 2013

12. PGE SA Dolna Odra Power Plant Group

The preliminary feasibility study for the project of “Power Rehabilitation of the Power Units 1-4 at PGE SA ZE Dolna Odra Branch by installing two duo-units of 460-500 MW class.”

2013

13. EDF Polska Sp. z o.o. The feasibility study of modernisation of the water and wastewater management and preparation of the process water for EDF Toruń / CHP1 in order to supply new cogeneration units and the existing municipal heating system.

2013

14. Tauron Wytwarzanie

SA

1. Preliminary feasibility study of the project related to retrofitting of the existing biomass burning units at Siersza location (total output: 786 MWe). 2. Preliminary feasibility study of the project related to retrofitting of the existing biomass burning units at Stalowa Wola location.

2013

15. Hitachi Duisburg Participation in the feasibility study of construction of unit No. 7 (450 MWe) in Power Plant in Tuzla (Bosnia).

2013

16. Chugoku Electric

Power Tauron Wytwarzanie SA Łaziska Power Plant (total capacity: 1155 MWe). Participation in the development of an optimization study for the Project Łaziska.

2012

17. PGE SA,

ZE Dolna Odra Development study for the Dolna Odra Power Plant. 2012

18. Chugoku Electric

Power

Participation in the preparation of the feasibility study for the construction of a supercritical power unit, with the CCS carbon technology, at the Łaziska Power Plant (total capacity: 1155 MWe).

2012

19. Toshiba Middlesex Contribution to developing a part of BOP (balance of plant) for the feasibility study for Maritza Power Plant in Bulgaria.

2012

CONSULTING SERVICES 22

ENERGOPROJEKT-KATOWICE SA

NO. PURCHASER PROJECT NAME COMPLETED

20. ZGH Bolesław SA Feasibility study of power unit with power of approx. 20MWe - stage II, execution I of concept for building a power and heat source of Zakład Górniczo-Hutniczy "Bolesław", power station with two gas engines with power of 10MW each.

2011

21. ZAK Kędzierzyn SA Power engineering development concept in Zakłady Azotowe Kędzierzyn SA 2011

22.

Tauron Wytwarzanie SA,

Blachownia Power Plant

Feasibility study for construction of the combined cycle unit in the Blachownia Power Plant (approx. power: 1000 MWe).

2011

23. ZE PAK SA,

Pątnów I Power Plant

Feasibility study for the upgrade of power units 1-5 at the Pątnów Power Plant in order to ensure their operation that is efficient and Safe to the staff and the equipment for another 50-70 thousand hours.

2011

24. Nowa Sarzyna

CHP Plant Preliminary feasibility study for the project: “Electric and thermal energy generator operating in cogeneration fired with high-methane natural gas”.

2010

25. Vattenfall Feasibility study concerning construction of the Puławy Power Plant. 2010

26.

Municipal Power Company in Piekary

Ślaskie

Feasibility study concerning the high-performance electric and thermal energy generator.

2010

27. KGHM Polska

Miedź SA Location expertise for a biomass-fired Power Plant with the capacity up to 40 MWe. 2010

28. Eastenergo Ukraine Feasibility study for the Luganskaja CHP Plant in Ukraine (250 MW power units and fluidized bed boilers).

2009

29. Tychy SA, CHP Plant

Feasibility study concerning the power evacuation from the new power unit in the Tychy CHP Plant (total capacity: 290 MWt) together with the cost estimation.

2009

30.

Tauron Wytwarzanie SA,

Stalowa Wola Power Plant

Preparatory study for the project: "Construction of the 400 MW combined cycle unit”:

Feasibility study for the construction of the 400 MW combined cycle unit,

Environmental impact report.

2009

31.

Tauron Wytwarzanie SA,

Jaworzno III Power Plant

Feasibility study of the biomass-fired boiler in the Jaworzno III Power Plant – No. 2 Power Stadion (total capacity: 190 MWe) together with the accompanying infrastructure.

2009

32. ZE PAK SA Study concerning the scope of modernization of K83-86 boilers in the Konin Power Plant.

2009

33. SEJ SA,

Zofiówka CHP Plant Technical-economic-financial study: construction of the 70 MW Power Unit (based on fluidized boiler) in the Zofiówka CHP Plant.

2008

34. SFW Energia

Sp. z o.o. Feasibility study for the construction of the 6 MWe steam turbine set in the “Knurów” CHP Plant.

2008

35. Tauron

Wytwarzanie SA Feasibility study concerning the adjustment of the OP-650 boiler (200 MW power unit) to the reduction of the NOx emission.

2008

36.

Tauron Wytwarzanie SA,

Jaworzno III Power Plant

Feasibility study for the modernization of the water management system - the recovery of the waste water in order to limit the water absorption of the production process in the Jaworzno III Power Plant (total capacity: 1345 MWe) in the scope of the economic assessment and environment protection.

2008

37. Ministry of Economy Feasibility study for the project of the system for producing gaseous and liquid fuels from hard coal.

2008

38. Rybnik SA

Power Plant Feasibility study for the 910 MW Power Unit in the Rybnik Power Plant (total capacity: 1775 MWe).

2008

39. PGE SA, Lublin

Profitability analysis of the construction and further operation of the Ełk-Alytus Line. 2008

40.

Tauron Wytwarzanie SA, Thermal Power

Company in Bielsko-Biała

Feasibility study for modernization (power rehabilitation) of PKE – Construction of the 30-50 MW Power Unit operating in cogeneration in the Bielsko-Biała 1 CHP Plant (total capacity: 275 MWt).

2007

41. Elektrobudowa

Katowice SA Preliminary profitability assessment of the projekt connected with construction of the Kutahya Power Plant in Turkey.

2007

23

CONSULTING SERVICES

REFERENCE LIST

NO. PURCHASER PROJECT NAME COMPLETED

42.

Tauron Wytwarzanie SA, Thermal Power

Company in Bielsko-Biała

Assumptions for the assessment (together with the modernization) of the investment and modernization plans in the PKE Thermal Power Company in Bielsko-Biała.

2007

43. SFW Energia

Sp. z o.o. A study concerning modernization of the heating plant – an aspect of steam turbine construction together with the economic analysis.

2007

44. Police SA

Chemical Works Profitability study concerned the condensate management for the production system network in the Police SA Chemical Works.

2006

45. PGE SA,

Kielce CHP Plant

Feasibility study for the development of the Kielce SA CHP Plant (total capacity: 315 MWt) together with the economic analysis of the project – construction of the electric generator operating in cogeneration.

2005

46. Będzin SA CHP Plant

Adaptation of the Będzin SA CHP Plant (total capacity: 415 MWt) in order to meet the requirements of emission standards, which will be in force after January 1st, 2008:

Feasibility study;

Material schedule and cost summary;

Information necessary to prepare the application for the financial support from the European Union funds.

2005

47. City of Piekary Śląskie

Feasibility study and the application for the financial support from the Cohesion Fund for the project entitled: "Multi-discipline location study for the improvement of the water and waste water management in the Commune of the Town of Piekary Śląskie".

2004

48.

Waste & Wastewater Municipal Company

in Piekary Śląskie

The Feasibility Study for the project "Comprehensive improvement of the water and waste water management in the Commune of the Piekary Śląskie Town".

2004

49. Kopex SA Auxiliary documents for the feasibility study for the project: "SCARP and BUILD" the Halemba Power Plant for the PKE SA (Southern Poland Power Company, now Tauron Wytwarzanie SA).

2004

50. Tauron

Wytwarzanie SA Study for the optimum reconstruction of the Blachownia Power Plant. 2004

51. Tauron

Wytwarzanie SA

The Feasibility Study for the project "Reconstruction of the production capacity in the Southern Power Concern – construction of the power unit 460 MWe of supercritical parameters in the Łagisza Power Plant (total capacity: 840 MWe)".

2004

52. Tauron

Wytwarzanie SA

The Blachownia Power Plant – the pre-feasibility study of the combined cycle unit fired with natural gas, with additional option of renewable energy production from biomass, inclusive of the technical and economic analyses.

2003

53. SFW Energia

Sp. z o.o. Pre-feasibility study for the central heat source based in Piekary Śląskie. 2003

54. BPBK Katowice Feasibility Study for the selected variant of streamlining the water and wastewater management in the Community of Piekary Śląskie.

2003

55. RCEkoenergia

Sp. z o.o. Feasibility study for the investment “Concept of heat supply for the city of Czechowice-Dziedzice”.

2003

56.

Lublin Sp. z o.o. Thermal Power

Company

Feasibility study for “Development and Modernization of municipal district heating system in order to improve the efficiency of heat supply and liquidation of low emission in the city”.

2003

57.

Bytom Sp. z o.o. Thermal Power

Company

Feasibility study for “Development and Modernization of municipal district heating system in order to improve the efficiency of heat supply”.

2003

58.

Dębica Sp. z o.o. Thermal Power

Company

Investment study for modernization of the municipal heating plant with a technical-economic analysis:

Multi-variant technical-economic analysis for modernization of the municipal heating plant;

Feasibility study for variants of the municipal heating plant modernization selected for the heating system ofthe Dębica city.

2003

CONSULTING SERVICES 24

ENERGOPROJEKT-KATOWICE SA

NO. PURCHASER PROJECT NAME COMPLETED

59.

Tauron Wytwarzanie SA,

Łagisza Power Plant

Pre-feasibility study for the investment entitled “Construction of the unit 460 MWe with fluidised bed boiler of supercritical parameters in Łagisza Power Plant (total capacity: 840 MWe)”.

2003

60.

Dębica Sp. z o.o. Thermal Power

Company

Investment study for the municipal heat generating plant modernization together with a technical and economic analysis of the investment.

2001

61. PGE SA,

Kielce CHP Plant

Investment study for expansion of Kielce CHP Plant (total capacity: 315 MWt), inclusive of a technical-economic analysis for the project (construction of the electric energy source operating in co-generation in the Kielce CHP Plant).

2000

62.

Tauron Wytwarzanie SA,

Łagisza Power Plant

Feasibility study for modernization of the Łagisza Power Plant (total capacity: 840 MWe) – gas versus coal variant.

2000

TECHNICAL CONCEPTS AND TECHNICAL ANALYSES 25

ENERGOPROJEKT-KATOWICE SA

2. TECHNICAL CONCEPTS AND TECHNICAL ANALYSES

2.1. Location studies

NO. PURCHASER PROJECT NAME COMPLETED

1. ZE PAK SA Program and spatial concept for building the steam-gas unit ca. 450 MW in the Adamów Power Plant.

2012

2. ZE PAK SA Program and spatial concept for building the cogeneration CCGT in the Konin Power Plant with a capacity of 120 MWe.

2012

3.

Tauron Wytwarzanie SA,

Katowice CHP Plant

Feasibility study for reconstruction of the production capacity in the Katowice CHP Plant (total capacity: 692 MWt) for two variants:

135 MWe combined cycle unit with 88 MWt oil-fired boilers as well as the biomass feed system for the BCF-100 power unit,

New 185 MWt oil-fired boilers as well as the biomass feed system for the BCF-100 power unit.

2010

4.

Tauron Wytwarzanie SA,

Stalowa Wola Power Plant

Update of the economic part for: „The Feasibility Study for construction of 400 MW combined cycle unit in the Stalowa Wola Power Plant”.

2010

5. Będzin SA CHP Plant

Feasibility study for the Status Quo variant (indicated as a reference variant for existing generation units) in the multi-variant concept concerning the construction of the new power unit (this unit will replace the thermal power getting from the Nos. 8 and 9 WP-120 thermal boilers after the year 2016; taking the Nos. 8 and 9 water heaters out of service).

2010

6.

Tauron Wytwarzanie SA,

Łagisza Power Plant

Study concerning the feasibility study for modernization (power rehabilitation) in the Łagisza Power Plant (total capacity: 840 MWe) together with technical expert opinions for several variants.

2010

7. Wybrzeże SA

CHP Plant Preliminary location study for the 900 MW EC Port CHP Plant in Gdańsk. 2010

8. ZE PAK SA The multi-variant location study of the Adamów Power Plant. 2009

9. Foster Wheeler

Warszawa Design services concerning the 3D model using the Plant Design Management System (PDMS) software.

2009

10. PKN Orlen SA Location study together with the statement of expenses for construction of the 08 B1 waste heat boiler at the No. 2 Catalytic Cracking System.

2008

11. Tauron

Wytwarzanie SA The analysis of the thermal and air balance for the engine room of the 460 MWe Power unit in the Łagisza Power Plant (total capacity: 840 MWe).

2007

12. SFW Energia

Sp. z o.o. Design services: 3D model using the PDMS software for the 460 MWe Power unit In the Łagisza Power Plant (total capacity: 840 MWe).

2007

13. Skawina SA Power Plant

Preliminary location concept for the approximately 450 – 500 MWe Power unit based on the fluidized boiler technology.

2006

14. Rybnik SA

Power Plant Location study for construction of the flue gas desulphurization system in the Rybnik Power Plant (total capacity: 1775 MWe).

2004

15.

Koksoprojekt Consulting

Engineering Company Ltd. Zabrze

Location study for modernization of power management system in the Przyjaźń Coking Plant.

2004

16. Town of Piekary

Śląskie

Multi-variant location study concepts for streamlining the water and wastewater management in the Commune of Piekary Śląskie, pursuant to requirements of the Polish and EU funds (economic analyses, accession application).

2003

17. Opole Sp. z o.o. Municipal Plant

Location study for the comprehensive expansion of the Municipal Waste Dumping Yard in Opole by the year 2010.

2001

18. Wyszków Sp. z o.o.

CHP Plant Location study for introduction of the thermal and electric energy co-generation in the Wyszków CHP Plant.

2000

19.

Waste & Wastewater Municipal Company

in Bydgoszcz

Location study for the investments connected with utilization and management of wastewater sludge generated in the area of Bydgoszcz and neighbouring municipalities.

2000

CONSULTING SERVICES 26

ENERGOPROJEKT-KATOWICE SA

NO. PURCHASER PROJECT NAME COMPLETED

20. Zabrze SA CHP Plant

Location study for installation of the heating-condensing unit BCK-130 in the Zabrze CHP Plant.

2000

TECHNICAL CONCEPTS AND TECHNICAL ANALYSES 27

ENERGOPROJEKT-KATOWICE SA

2.2. Technical concepts and analyses

NO. PURCHASER PROJECT NAME COMPLETED

1. PEC Elbląg Multi-variant technical and economic concept of the construction of the primary heat device for the Elbląg Town, and the feasibility study for the selected technology – PEC Elbląg.

in progress

2. CEZ, Skawina Power

Plant Branch Development of the best technical and economic scenario of the heating power restoration at CEZ Skawina.

in progress

3. CHP Będzin Sp. z o.o. Development of the “Technical and Economic Concept of the Ash Sintering Plant Construction at Będzin CHP Plant.”.

in progress

4. Tauron Dystrybucja

SA Concept of MV distribution network development until 2025 within the area of Nowy Sącz Region.

in progress

5.

Tauron Wytwarzanie SA

Technical and economic scenario analyses for the project of adapting the power generating facilities at Tauron Wytwarzanie according to the BAT conclusions in relation to the requirements of safe operation of the national power system.

2016

6. ZE PAK SA Report on energy market in Poland, including energy prices forecast. 2016

7. Ceska Rafinerska Analysis of the possibilities of optimising the production of new heat source at CRC

Kralupy.

2015

8.

ENEA Wytwarzanie SA Kozienice Power

Plant

Technical analysis of the (concepts) possibilities to use a fire water pumping station of the unit No. 11 to feed fire water supply network within the area of ENEA Wytwarzanie in Świerże Górne.

2015

9. Energa Gdańsk SA Development of a report on the evaluation of the auction prices in the RES market. 2015

10. Energoprojekt-

Kraków SA Due diligence of the technical and environmental aspects of PKP Energetyka. 2015

11. Jastrzębska Spółka

Węglowa SA Development of the updated investment outlays for construction of the power generating unit at Radlin coking plant, including power and water connections.

2015

12. Energa Gdańsk SA Development of a report on the energy price curves for the financial plans, the

impairment tests, and for the financial institutions.

2015

13. Energa Gdańsk SA Performance of the variant energy price curves in the PLEXOS program. 2015

14. Schumacher GmbH The Preliminary Multivariate Technical and Economic Analysis of Construction of Own Source of Heat and Electricity.

2014

15.

Tauron Wytwarzanie SA

Stalowa Wola Power Plant

The concept and the basic technical assumptions for the project named: “Environmental Protection Devices for OP120 K-10 boiler (electrofilter + NOx reduction) at Tauron Wytwarzanie SA Elektrownia Stalowa Wola in Stalowa Wola.”

2014

16.

Tauron Wytwarzanie SA

Stalowa Wola Power Plant

The concept and the basic technical assumptions for the project named: “Modernisation of the Water Demineralisation Station at Tauron Wytwarzanie SA Elektrownia Stalowa Wola in Stalowa Wola.”

2014

17. Grupa Azoty Puławy

SA The technical and economic analysis of the concept of electric power extraction from the Puławy Power Plant to Zakłady Azotowe “Puławy” SA.

2013

18. ZE PAK SA Pątnów II

Power Plant

The economic profitability study of the investment project concerning the system intended for collection, storage and loading of ash from the ECO funnel of the boiler K9 at the Pątnów II Power Plant (total capacity: 1,600 MWe).

2013

19. Wartsila Polska

Sp z o.o.

The comparative analysis of the municipal co-generation plants fired with natural gas GZ50 implemented based on the engines or gas turbines. The economic and cost comparisons concern the co-generation sources for which the heating needs transferred to the external heat recipients were co-generated with the electric energy, both for the heating (winter) and summer seasons.

2013

20. PGNiG Termika The technical and economic analysis for the biomass co-generation support. 2013

21. Orlen Lietuva Analysis of possibility of optimization of heat and electrical energy production in Power Plan for Public Company Orlen Lietuva.

2013

22. SE Jastrzębie SA Multi-variant analysis of the development opportunities of the Zofiówka CHP. 2013

TECHNICAL CONCEPTS AND TECHNICAL ANALYSES 28

ENERGOPROJEKT-KATOWICE SA

NO. PURCHASER PROJECT NAME COMPLETED

23.

Tauron Wytwarzanie SA

Blachownia Nowa Power Plant

Technical and economic scenario analysis for the design of the combined cycle gas and steam unit at the Blachownia Nowa Power Plant in Kędzierzyn-Koźle.

2013

24.

Tauron Wytwarzanie SA,

Siersza Power Plant

The concept of a combustion waste recovery system in Tauron Wytwarzanie SA, Siersza Power Plant(total capacity: 786 MWe).

2013

25. EDF Polska Sp. z o.o. Technical expertise in terms of alternative solutions, providing not-worsening of fire protection conditions for Rybnik Power Plant, Kraków CHP Plant, Wrocław CHP Plant, Gdańsk CHP Plant, Gdynia CHP Plant.

2012

26. Katowicki Holding

Węglowy SA Analysis of the possible use of fuels with low calorific value for building sources of electricity in KHW SA mines.

2012

27. Rybnik SA

Power Plant

Updating the concept of building central control room for the surveillance and control of new and existing systems in the Rybnik Power Plant (total capacity: 1775 MWe).

2012

28. Rybnik SA

Power Plant The concept of fiber optic infrastructure to connect facilities of the Rybnik Power Plant (total capacity: 1,775 MWe) to the central control room (CN).

2012

29. Rybnik SA

Power Plant Analysis of feasibility of installation of SCR plant on the boilers K-6, K-7, K-8 in the Rybnik Power Plant (total capacity: 1775 MWe).

2012

30. ZCH Police SA Upgrading the technical concept and feasibility study on the condensates economy for the production facilities network of Z.Ch."Police" SA.

2012

31.

Tauron Wytwarzanie SA,

Stalowa Wola Power Plant

Cost analysis of the investment: Construction of system for the production of electricity from renewable energy sources in Stalowa Wola, taking into account differences in relation to the contract.

2012

32. Energetyka Boruta

Concept concerning selection of size and type of thermal energy generator with the use of gas, biomass, brown coal and alternative fuel formed on the basis of industrial and municipal waste (different from hazardous waste) for the Boruta CHP Plant in order to provide the necessary reserve of thermal power and to maximize the electric energy generation.

2011

33.

PKN Orlen SA, Włocławek Power

Plant

PKN Orlen SA - Project titled “Concept of construction of the boiler house at the Anwil SA plant.”

2011

34. Enion SA Będzin Concept for construction of the control room for the 110/30/20/6kV Station “Będzin” as well as for 20kV switching station for internal requirements.

2011

35. Sefako SA Conception of building a thermal municipal waste utilisation plant. 2011

36. PGE SA Turów Power

Plant Variant technical-economic analysis of increasing the heat source availability with possibility to transferring power to additional receiver.

2011

37. ZE PAK SA Research-concept work: "Analysis of thermal-energetic conditions for co-burning hard coal in OP650b boilers of Pątnów Power Plant.

2011

38.

Tauron Wytwarzanie SA,

Blachownia Power Plant

Elaboration of additional variations for "Erection concept in PKE SA Elektrownia Blachownia (Blachownia Power Plant) a source of generating the electrical power and heat in highly effective cogeneration with usage of coke oven gas and analysis of usage of the coke oven gas and natural gas in steam-gas units.

2011

39. SE Jastrzębie Zdrój Analysis for the potential use of low calorific value fuels; performance improvement and emission reduction in flue gases on the basis of 70 MWe fluidized bed boiler in the Zofiówka CHP Plant.

2011

40. PGE SA Dolna Odra

Power Plant

Conversion of power units 3 and 4 at the PGE GiEK SA Lower Odra Power Plant Branch – supplementary analyses. Update of the economic model and the relevant economic analyses for the possibility of co-firing of biomass in two power units out of power units 5-8.

2011

41. Tauron

Wytwarzanie SA

Supplementary technical and economic analyses for the feasibility study concerning the construction of a gas and steam power unit at the Katowice Combined Heat and Power Plant (total capacity: 692 MWt).

2011

42. ZE PAK SA Technical and economic analysis of the ability and rationality of construction of steam and gas power units for cogeneration as the Konin Power Plant.

2011

43. ZE PAK SA Analysis of waste management of the Pątnów Power Plant and Konin Power Plant. 2011

29

TECHNICAL CONCEPTS AND TECHNICAL ANALYSES

REFERENCE LIST

NO. PURCHASER PROJECT NAME COMPLETED

44. ZE PAK SA Analysis of feasibility of installation of a new winch beam on the dumping tower of the carbonisation system in the Pątnów Power Plant (total capacity: 1600 MWe).

2011

45. Rybnik SA Power

Plant Concept for the coal handling system of the new power unit in the Rybnik Power Plant (total capacity: 1775 MWe).

2010

46. PGE Energia Jądrowa SA

Technical and economic analysis concerning the impact of the cooling conditions on the construction and operation efficiency of the nuclear power unit.

2010

47. PGE SA Turów Power

Plant

Analysis for the potential use of hot air from the boiler house of the Nos.1-6 power units to ventilation of the engine room in the Turów Power Plant (total capacity: 2088 MWe).

2010

48. PGE SA Turów Power

Plant Technical and economic analysis concerning replacement of heavy heating oil (mazout) with light heating oil in the Turów Power Plant (total capacity: 2088 MWe).

2010

49. Tauron

Wytwarzanie SA

Concept for construction of the electric and thermal energy generator operating in high-performance cogeneration with the use of coal gas in the Blachownia Power Plant.

2010

50. PGE SA Rzeszów

CHP Plant

Technical and economic comparative analysis for the project: “Construction of the cogeneration power unit (producing thermal and electric energy) based on Diesel engines (vegetable oil fired)”.

2010

51. Kozienice II Power

Plant

Optimization of the capacity as well as recommendation of the power unit with supercritical parameters with the capacity 850-1100 MWe for the Kozienice II Power Plant.

2010

52. Katowice SA Thermal

Power Company Technical and economic concept concerning the development of the Wieczorek CHP Plant as well as the Szopienice CHP Plant.

2010

53. Kraków SA CHP Plant

Concept for pumping technology of the district water pumps’ system in the Kraków CHP Plant (total capacity: 1237 MWt) for new conditions of co-operation with heat accumulator.

2010

54.

Doosan Babcock Energy Polska

Sp. z o.o.

Concept: Construction of biogas installations as well as the assessment of Engineering, Procurement and Construction for the entire project.

2010

55. Będzin SA CHP Plant

Technical and economic analysis concerning two variants for the repowering (in terms of thermal power) in the Będzin CHP Plant (total capacity: 415 MWt). Forecast concerning the thermal energy makret (thermal energy from the Thermal Power Company in Dąbrowa Górnicza) in the following cities: Sosnowiec, Czeladź, Będzin, Dąbrowa Górnicza in the perspective of the year 2028.

2010

56. Tauron

Wytwarzanie SA

Documents and economic analyses for construction of the generation unit (renewable energy sources) in the Jaworzno III Power Plant - No. 2 Power Station (total capacity: 190 MWe).

2010

57. CEZ Nowa

Skawina SA

Preliminary analysis for the possibility of construction of new power unit (hard coal fired) in the Skawina Power Plant (total capacity: 590 MWe) in terms of accessibility of cooling water and location conditions connected with construction of new combined cycle unit.

2010

58. Rybnik SA Power

Plant Concept for a biomass feed system to the boilers of the Nos. 5-8 power units (omitting coal mills) in the Rybnik Power Plant (total capacity: 1775 MWe).

2010

59. Tauron

Wytwarzanie SA

Concept for installing a waste water treatment plant in the flue gas desulphurization system with the capacity of 70 m3/h in the Jaworzno III Power Plant (total capacity: 1345 MWe).

2010

60.

Tauron Wytwarzanie SA,

Katowice CHP Plant

Concept of the biomass feed system to the BCF-100 boiler with the use of inert material tank in the Katowice CHP Plant (total capacity: 692 MWt).

2010

61.

Tauron Wytwarzanie SA,

Katowice CHP Plant

Technical expertise and design for installation of biomass feeding nozzles to the CFB 134/2 kg/s fluidized bed boiler.

2010

62.

Tauron Wytwarzanie SA,

Halemba Power Plant

Technical and economic analysis concerning the profitability of construction of the system for biomass co-combustion in the OP-215 pulverized-fuel boiler in the Halemba Power Plant (in order to supply thermal energy to the Halemba district in the heating season 2011-2012.

2010

63. PGE SA Bełchatów

Power Plant The multi-variant concept for the project: "Modification of the technology of furnace waste storage for the Bełchatów Power Plant (total capacity: 4440 MWe)".

2009

TECHNICAL CONCEPTS AND TECHNICAL ANALYSES 30

ENERGOPROJEKT-KATOWICE SA

NO. PURCHASER PROJECT NAME COMPLETED

64. Tychy SA CHP Plant Preliminary accessibility assessment of water for the cooling water system. 2009

65. Tychy SA CHP Plant Analysis of the market as well as of the production capacity for the Tychy CHP Plant (total capacity: 290 MWt).

2009

66. Będzin SA CHP Plant The multi-variant concept concerning the construction of the new power unit (this unit will replace the thermal power getting from the Nos. 8 and 9 WP-120 thermal boilers after the year 2016).

2009

67. PGE SA Rzeszów

CHP Plant

Analysis for the potential use of biogas from the available municipal waste as well as from the natural gas within a framework of the investment variant – using Diesel engines.

2009

68. Siemens Warszawa Concept for construction of the control room for supervision and control of the existing and new installations operation in the Rybnik Power Plant (total capacity: 1775 MWe).

2009

69.

Tauron Wytwarzanie SA,

Jaworzno III Power Plant

Concept for construction of the biomass-fired or bi-fuel boiler for the 60 MW Power Unit together with the accompanying infrastructure in the Jaworzno III Power Plant – No. 2 Power Station (total capacity: 190 MWe).

2009

70. Technodat Sp. z o.o.

Gliwice Technical concept in the scope of geothermal heat utilization in the area of the Town of Poddębice.

2009

71. Tychy SA CHP Plant The most beneficial variant (with regard to the technical and economic efficiency) for the repowering (in terms of thermal power) of the Tychy CHP Plant (total capacity: 290 MWt).

2009

72. Rybnik SA Power

Plant Analysis for the possibility of the additional thermal power evacuation from the heating plant in the No. 1 power unit.

2009

73. Tauron

Wytwarzanie SA Technical and economic analysis for construction of heat source with the capacity not larger than 60 MWt for the purpose of heating the City of Ruda Śląska.

2009

74. Tychy SA CHP Plant Concept for the construction of the crushers in the Tychy CHP Plant (total capacity: 290 MWt).

2009

75.

Kogeneracja SA Thermal Power

Company in Wrocław Comparative analysis of the fluidal and dust technology for the new BioKo project. 2009

76. Skawina SA Power

Plant Technical concept of the cooling water system for the 400 MW combined cycle unit in the Skawina Power Plant (total capacity: 590 MWe).

2008

77.

PGE SA Thermal Power Company in

Bydgoszcz

Technical and economic concept (min. 3 variants) for the modernization of the compressed air system in the Bydgoszcz II CHP Plant.

2008

78. PGE SA Warszawa Profitability analysis concerning participation of the PGE Group (Polska Grupa Energetyczna SA) in the construction of the nuclear Power Plant in Lithuania.

2008

79.

Kogeneracja SA Thermal Power

Company in Wrocław

Optimization analysis of the new power unit together with the location analysis and with the specification of the preliminary scope of the order for the boiler island and turbine island for the “BioKo” Project.

2008

80. Tauron

Wytwarzanie SA

Technical concept concerning the recovery of the waste water in order to limit the water absorption of the production process in the Jaworzno III Power Plant (total capacity: 1345 MWe).

2008

81. Vattenfall The analysis of the environmental and legal conditions concerning the possibilities for locating Power Plants in the area of the LW "Bogdanka" Mine.

2008

82.

Municipal Power Company in Piekary

Ślaskie

Technical concept: Modernization of the heat distribution network in the Municipal Power Company in Piekary Śląskie.

2008

83. PGE SA Gorzów

CHP Plant Technical concept: compressed air system in the Gorzów CHP Plant. 2008

84.

PGE SA Thermal Power Company in

Bydgoszcz

Budget offer for the turnkey delivery of the combined cycle unit for the Thermal Power Company in Bydgoszcz (two variants).

2008

85. PGE SA Opole Power

Plant Technical concept of heat supply and electricity supply from the Opole Power Plant to the greenhouse complex.

2008

31

TECHNICAL CONCEPTS AND TECHNICAL ANALYSES

REFERENCE LIST

NO. PURCHASER PROJECT NAME COMPLETED

86.

Tauron Wytwarzanie SA,

Łaziska Power Plant

Expertise concerning the options of water supply of water circuit (including cooling circuit) for the new 800 MW Power Unit in the Łaziska Power Plant (total capacity: 1155 MWe).

2008

87. Tauron

Wytwarzanie SA Optimization analysis of the selection of the new power unit in the Halemba Power Plant.

2008

88. Kraków SA CHP Plant

Technical concept: Construction of the new thermal power unit in Tarnobrzeg. 2008

89.

Tauron Wytwarzanie SA -Blachownia Power

Plant

Tracer analysis as well as the comparative analysis concerning the two variants of the repowering of the Blachownia Power Plant.

2008

90. Cergia SA Toruń Technical concept: Modernization of the ash removal system as well as of the slag removal system in the CHP Plant No. 1 of the "Cergia" SA Thermal Power Company in Toruń.

2008

91. Tauron

Wytwarzanie SA Optimization analysis of the selection of the new power unit in the Blachownia Power Plant.

2007

92. Energo-Eko I

Sp. z o.o. Assessment of technology used for dry distillation of municipal waste and industrial waste.

2007

93. Energetyka Sp. z o.o.

Lubin Technical and economic analysis concerning the selection of the combined cycle for the Energetyka Company in Lubin.

2007

94. Tauron

Wytwarzanie SA Inspection of the technical condition concerning the main facility in the Jaworzono II Power Plant.

2007

95. PSE SA Warszawa Feasibility study for the PSE/PGE concerning the construction the new nuclear Power Plant in Ignalin (Lithuania) and concerning the energy partnership between Poland and Lithuania.

2007

96.

Tauron Wytwarzanie SA,

Jaworzno III Power Plant

Technical expertise concerning the supply system of water circuit for the new 1000 MWe power unit in the Jaworzno 2 Power Plant (total capacity: 190 MWe).

2007

97.

Tauron Wytwarzanie SA,

Siersza Power Plant

Technical expertise concerning the supply system of water circuit for the new 500 MWe power unit in the Siersza Power Plant (total capacity: 786 MWe).

2007

98. SFW Energia

Sp. z o.o. Preliminary technical concept of the CHP Plant (biogas-fired) that operates for the Cadbury factory in the Town of Skarbimierz.

2007

99.

Tauron Wytwarzanie SA, Thermal Power

Company in Bielsko-Biała

Technical expertise concerning the supply system of water circuit for the new 50 MW in the Bielsko I CHP Plant (total capacity: 275 MWt).

2007

100. DG Consult Technical analyses in order to select the optimum technologies of CHP Plants engineering together with connecting them with technologies and requirements of the mines and steelworks belonging to the KGHM Polska Miedź SA

2007

101. Benmet Sp. z o.o.

Katowice Estimate of reconstruction after the fire of the electrodes’ production hall and the fire of the part of social and office facilities.

2007

102. PGE SA Turów Power

Plant

Multi-variant technical concept together with the inventory of the existing system as well as the investment estimate for the project: “Coal handling – transfer of control room of coal handling to the BCC facility.

2007

103. Tauron

Wytwarzanie SA

Technical and technological analysis for preliminary treatment of industrial wastewater for the purpose of treatment improvement of the UF Zenon system in the Łagisza Power Plant (total capacity: 840 MWe).

2007

104.

Tauron Wytwarzanie SA,

Halemba Power Plant

Preliminary technical concept concerning the location of the 460 MW power unit with supercritical parameters in the Halemba Power Plant (an area of the protecting pillar).

2007

105.

Tauron Wytwarzanie SA,

Łagisza Power Plant

Technical expertise: Cooling water pump foundation of the No. 6 power unit – construction of the Voith’s hydrokinetic clutch.

2007

TECHNICAL CONCEPTS AND TECHNICAL ANALYSES 32

ENERGOPROJEKT-KATOWICE SA

NO. PURCHASER PROJECT NAME COMPLETED

106. Tauron

Wytwarzanie SA

Technical and economic comparative survey of the project: Slag dewatering system in the Jaworzno III Power Plant (total capacity: 1345 MWe) including the solution applied to the slag dewatering system in the Łaziska Power Plant (total capacity: 1155 MWe).

2007

107.

SBE Swiss Bio Energy AG/ Verbio

AG Leipzig „Due Diligence” Analysis of the Polpharm CHP Plant in Stargard Gdański. 2007

108. Skawina SA Power

Plant

Preliminary technical concept: Location of the power unit (capacity of 450-500 MW) – based on fluidized boiler technology.

2006

109. PGE SA Turów Power

Plant

Analysis of the most important technical and economic conditions that are necessary for taking them into consideration in the future operation conception of the Turów Power Plant (total capacity: 2088 MWe) until the year 2040.

2006

110. ZE PAK SA Technical and economic analysis concerning the installation of the gas turbine for the peak performance in the Adamów Power Plant.

2006

111. ZE PAK SA Expert opinion for the concept of the central control station in the Konin Power Plant and the assessment of the economic efficiency of the project.

2006

112. Police SA Chemical

Works Technical concept of the condensate management for the production system network in the Police SA Chemical Works.

2006

113. Vattenfall Technical concept: Final waste management in the Żerań CHP Plant. 2006

114. Saturn Świecie Development of a concept for boilers OP140 ash removal system modernization in the SAturn Management CHP Plant in Świecie.

2005

115. Przyjaźń Coking Plant

Sp. z o.o.

Technical and technological analysis, and economic evaluation of materials concerning modernization of the waste water treatment plant in the Przyjaźń Coking Plant in Dąbrowa Górnicza.

2005

116.

Vattenfall Heat Poland SA Żerań

CHP Plant

Development of a concept concerning water management customisation in the Żerań CHP Plant.

2005

117. Saint Gobain Investment costs analysis for the Final Products Hall. 2005

118. Tauron

Wytwarzanie SA Technical analysis for water supply from an alternative supply source for a new 460 MWe power unit in the Łagisza Power Plant (total capacity: 840 MWe).

2005

119. Saturn Świecie Technical concept of a new 36 MW turbine set for the existing main switching station in the SAturn Management of CHP in Świecie.

2005

120. Skawina SA Power

Plant

Analysis of air pollution spread concerning the construction of flue gas desulphurization system (the No. 8-11 boilers) in the Skawina Power Plant (total capacity: 590 MWe).

2005

121. Wybrzeże

CHP Plant SA Technical and economic analysis of the Gdańsk CHP Plant adjustment to operation without waste storage.

2004

122. Ostrołeka SA Power

Company

Technical and economic concept as well as specification of the conditions for construction of a steam transmission header connecting the production section of the Ostrołęka B Power Plant with the Ostrołęka CHP Plant.

2004

123. Tauron

Wytwarzanie SA Development of water treatment technology as well as performance of costs analysis for a mixture of waters resulting from various supply sources.

2004

124. ZE PAK SA Analysis of technical conditions for restoration of the Pątnów Power Plant (total capacity: 1600 MWe) power units 1-4.

2004

125. Tauron

Wytwarzanie SA Analysis of options of the industrial water supply from the new sources for the Łaziska Power Plant (total capacity: 1155 MWe).

2004

126. M-Plus Sp. z o.o.

Wałcz Framework assumptions for the investment: “ElektrociepłowniA Wałcz Ecological Energy Generation Enterprise”.

2004

127.

Tauron Wytwarzanie SA,

Jaworzno III Power Plant

Concept of the flue gas desulphurization system for power units 3 and 4 in the Jaworzno III Power Plant (total capacity: 1345 MWe).

2004

128. Skawina SA Power

Plant

Concept of the power generation sludge feed together with comminution from the new coal storage area to the existing conveyor No. 5 in the Skawina Power Plant (total capacity: 590 MWe).

2004

33

TECHNICAL CONCEPTS AND TECHNICAL ANALYSES

REFERENCE LIST

NO. PURCHASER PROJECT NAME COMPLETED

129. Białystok SA CHP

Plant Technical concept regarding I&C systems and modernization of the thermal power output system from CHP Białystok.

2004

130. Petrochemia

Blachownia SA Analysis of high-temperature tar application in power industry. 2004

131. Skawina SA Power

Plant

Technical concept concerning the construction of the new flue gas ducts in order to connect them to the new flue gas desulphurization system in the Skawina Power Plant (total capacity: 590 MWe).

2004

132. Eltur Wapore

Sp. z o.o. Analysis of the technological option for productivity increase of the ash activation installation located within the area of the "Egbud" Company in Bogatynia.

2004

133. Skawina SA Power

Plant Modernization concept for the hydrogen stations of generators of turbines No. 3, 4, 5 and 6 in the Skawina Power Plant (total capacity: 590 MWe).

2004

134. Saint Gobain Building construction and installation performance concept for the SAint Gobain Sekurit HanGlas plant.

2004

135. Skawina SA Power

Plant Development of an enhancement concept for lump power generation sludge transportation in the Skawina Power Plant (total capacity: 590 MWe).

2004

136. Tauron

Wytwarzanie SA Analysis of the optimum operation in the modernization Power Plant in the years 2004 – 2010.

2004

137. Będzin SA CHP Plant Concept for replacement of the 6kVR6 switching station in the Będzin CHP Plant (total capacity: 415 MWt).

2004

138.

Tauron Wytwarzanie SA -

Katowice CHP Plant

Analysis of reasons for inappropriate operation of the Alan Bradley PLC5/40 control unit in the Waste Water Treatment Plant and implementation of the computer control application.

2004

139. Aquanet SA Concept of cooling oil in the air blowers lubrication system DA340 in connection within the investment “Air blowers station – cooling system in the Central Wastewater Treatment Plant“.

2004

140. Chorzów ELCHO

Sp. z o.o. CHP Plant

Development of a concept for connecting buildings and heat distribution networks supplied from the Chorzów Power Plant with the heat distribution system of the ELCHO CHP Plant (total capacity: 500 MWt).

2004

141.

Tauron Wytwarzanie SA,

Łaziska Power Plant

Analysis of options of industrial water supply from new sources for the Łaziska Power Plant (total capacity: 1155 MWe).

2004

142. RCEkoenergia

Sp. z o.o. Analysis of the conditions and possibilities for adjusting the source RCEkoenergia and heat transmission system to the supply with district heating water.

2004

143. Energetyka Rokita

Sp. z o.o. Concept of a CHP modernization with reference to securing heat deliveries to the recipients with regard to the anticipated receipt volumes.

2004

144. Sklejka-Eko SA Technical concept of the Sklejka-Eko heat sinks introduction to CHP system being designed.

2004

145. Redan Sp. z o.o.

Szczecin Concept of management of the hot flue gas from the shaft furnace for the purpose of electric and thermal energy generation.

2004

146. Rybnik SA Power

Plant Development of a long-term strategy of generating powers regeneration in the Rybnik Power Plant (total capacity: 1775 MWe).

2004

147. ZE PAK SA Analysis of technical conditions restoration for the Pątnów Power Plant (total capacity: 1600 MWe) power units No. 1-4.

2004

148. Skawina SA Power

Plant

Concept for the management of coal and coal slurry within the expanded coal storage yard in connection with the existing coal management in the Skawina Power Plant (total capacity: 590 MWe).

2004

149. Alstom Power

Sp. z o.o.

Development of an opinion concerning the oil system technical documentation with reference to meeting the requirements of the health and Safety-at-work and fire protection regulations in the Łódź 2 CHP Plant.

2004

150. NSE Sp. z o.o.

Brzeszcze Reconstruction concept for the thermal centre in the thermal energy source in the NSE Brzeszcze Heat Generating Pant No. 1.

2004

151.

WATER & Wastewater

Company in Opole Sp. z o.o.

Opinion on the investment task “Modernization and expansion of the wastewater treatment plant in Opole”, implemented in the years 1998-2000.

2004

TECHNICAL CONCEPTS AND TECHNICAL ANALYSES 34

ENERGOPROJEKT-KATOWICE SA

NO. PURCHASER PROJECT NAME COMPLETED

152. PGE SA Rzeszów

CHP Plant Concept for the modernization of ventilation in the building of heat recovery boiler in the Rzeszów CHP Plant.

2003

153.

Tauron Wytwarzanie SA,

Łagisza Power Plant

Analysis of the available thermal power in the Łagisza Power Plant (total capacity: 840 MWe).

2003

154. Tauron

Wytwarzanie SA

Technical-economic analysis of the power evacuation from unit No. 6 or 7 to bays of unit No. 1-5 – switchgear 110 kV in the Łagisza Power Plant (total capacity: 840 MWe).

2003

155. PGE SA Turów Power

Plant Concept for modernization of the district heating pumps inclusive of the modernization of switchgear PO-6.

2003

156. Tauron

Wytwarzanie SA Analysis of the cost units for buildings incorporated within the fixed assets in the Jaworzno III Power Plant (total capacity: 1345 MWe).

2003

157. Tauron

Wytwarzanie SA Evaluation of the free-standing buildings, technical equipment and its foundations. 2003

158. Białystok SA CHP

Plant Technical-economic concept for the unloading of coal delivered by road transport at the unloading sequence No. 19 in Białystok CHP Plant.

2003

159. Sydkraft Słupsk

Sp. z o.o. CHP Plant Technical specification and characteristics of the thermal power delivery area in the thermal power company in Ruda Śląska and Carbo Energia.

2003

160. PGE SA Turów Power

Plant Multi-variant, single-branch industry concept for the modernization of boiler drains at unit No. 8-10 and installation of inter-unit drains at units No. 1-10.

2003

161. Tauron

Wytwarzanie SA

Technical minimum requirements analysis in the Łaziska Power Plant (total capacity: 1155 MWe) in the scope of: specification of elements crucial for the Power Plant configuration with one power unit in operation, specification of the required modernization scope for development of conditions for operation with one active power unit in a Power Plant and specification of the modernization costs, preparation of testing procedures programme.

2003

162.

Tauron Wytwarzanie SA,

Łagisza Power Plant

Defining the minimum number of units in operation for the Łagisza Power Plant (total capacity: 840 MWe) in winter and summer conditions.

2003

163. EON Warszawa Concept of steam consumption and transmission from the Cayirhan Power Plant to the Trona Plant in Turkey.

2003

164. PGE SA Kielce CHP

Plant

Development of a technical analysis entailing choice of the thermal centre solution and related to construction of the heat distribution network together with a thermal centre in the relation between the Kielce CHP Plant (total capacity: 315 MWt) and the “Chemar Company”.

2003

165. Kraków SA CHP Plant

Performance of a conceptual analysis for modernization of the cooling water unit – 1st stage with regard to the following branches: technological, heat generation and mechanical, control and measurement equipment and automatic control, electric, building engineering, together with cost calculations.

2003

166. Skawina SA Power

Plant Concept for adjusting Skawina Power Plant (total capacity: 590 MWe) to the emission standards effective after 2005 year.

2003

167. Rafako SA Static analysis and stress analysis of the damaged tanks together with repair guidelines concerning intermediate sorbent tank and a node of the flue gas desulphurization system.

2003

168. Rafako SA Analysis for the potential use of post-process products from the flue gas desulphurization installation in the Łagisza Power Plant (total capacity: 840 MWe) and in the Jaworzno III Power Plant (total capacity: 1345 MWe).

2002

169. Zabrze SA CHP Plant Economic-financial analysis for the system comprising BCK-130 unit, WP-120 and KP-20 boilers in the Zabrze CHP Plant.

2002

170. Siekierki

CHP Plant Technical and economic analysis of regeneration options for concentrated HCl and NaOH storage installation in the water preparation facility.

2002

171. Legnica Copper Plant

Comprehensive technical documentation and cost estimates within the investment “Modernization of HML supply with electric energy - project for the GST station - reduced impact of arc furnaces on the 6kV network at the inflow to the "Legmet" Works in the Legnica Copper Plant.

2002

35

TECHNICAL CONCEPTS AND TECHNICAL ANALYSES

REFERENCE LIST

NO. PURCHASER PROJECT NAME COMPLETED

172. Sydkraft Słupsk

Sp. z o.o. CHP Plant

Technical characteristics and determinants for the region of thermal energy supply in the SEC Company, thermal power company in Tarnowskie Góry, thermal power company in Ostrów Wielkopolski - due diligence process.

2002

173. DG Consult Evaluation of fair and true value for fixed assets, land, intangible and legal values as well as investments for the Group of Bielsko-Biała CHP Plant’s for the purpose of merger with PKE (now Tauron Wytwarzanie SA).

2002

174.

Tauron Wytwarzanie SA,

Siersza Power Plant

Concept for the installation of coal slurry feeding to fluidised bed boilers of units No. 1 and No. 2 (2 x 153 MWe) in the Siersza Power Plant (total capacity: 786 MWe).

2002

175. PGE SA Turów Power

Plant

Cost calculations of the investment expenditure for the project: "Installation for activation and loading of fly ash from the Turów Power Plant (total capacity: 2088 MWe), located in the company Eltur Wapore".

2002

176.

Połaniec Power Plant SA – Electrabel

Group

Concept for modernization of the switchgear 6kV P3AB in the Tadeusz Kościuszko Power Plant in Połaniec.

2002

177. Białystok SA CHP

Plant Concept for the master control system of the TG-4 power unit in Białystok CHP Plant. 2002

178.

Tauron Wytwarzanie SA,

Jaworzno III Power Plant

Technical condition evaluation for the main building - technical condition evaluation for power units No. 1-6 main buildings; support constructions of the ash pipeline trestle

2002

179. Rybnik SA Power

Plant

Analysis to indicate the maximum operational temperature of the steam pipelines from the station RS1 to cold bus in the Rybnik Power Plant (total capacity: 1775 MWe).

2002

180. Chorzów ELCHO

Sp. z o.o. CHP Plant Analysis for operation of the live steam pipelines to the reducing-cooling station as well as design for the protection of crew from a possible steam leakage.

2002

181.

Tauron Wytwarzanie SA,

Jaworzno III Power Plant

Technical analysis for the cooling water pipelines within the modernization of pumping pipelines of 5PC and 6PC pumps to the turbine hall in the Jaworzno III Power Plant (total capacity: 1345 MWe).

2002

182. Chorzów ELCHO

Sp. z o.o. CHP Plant

Concept of necessary additional connections for the ELCHO CHP Plant (total capacity: 500 MWt) in Chorzów to the district heating network of the thermal power company in Katowice in order to maintain the local heat network upon liquidation of the former Chorzów CHP Plant.

2002

183. ZE PAK SA Technical assessment of water pipelines at the route from the pumping house to the turbine hall as well as from the turbine hall to the siphon well.

2002

184. Tychy SA CHP Plant Optimum selection for the new heat generation unit in the Tychy CHP Plant (total capacity: 290 MWt).

2002

185.

Tauron Wytwarzanie SA,

Jaworzno III Power Plant

Concept for the emergency cooling system of the compressor station (multi-variant analysis of the closed compressor cooling system).

2002

186. Kostolec Power Plant Preliminary concept for ash discharge from the Kostolec Power Plant in Yugoslavia (2 x 350 MW) to the storage yard.

2002

187. Kraków SA CHP Plant

Multi-variant concept for the ventilation of elevator shafts as well as staircases No. 2 and 3 in the boiler house of the power unit in the Kraków CHP Plant (total capacity: 1237 MWt).

2002

188. Kraków SA CHP Plant

Analysis of the assets technical condition with an assessment of the presently used technologies:

Power Company in Olszytyn;

Power Company in Płock;

Power Company in Słupsk;

Power Company in Toruń.

2001

189. Zabrze SA CHP Plant Analyses and concepts of the minor heat generation unit for the Zabrze CHP Plant. 2001

190.

PGE SA ZE Dolna Odra Pomorzany

CHP Plant

Concept of a new smokestack construction in the Pomorzany CHP Plant (total capacity: 443 MWt).

2001

TECHNICAL CONCEPTS AND TECHNICAL ANALYSES 36

ENERGOPROJEKT-KATOWICE SA

NO. PURCHASER PROJECT NAME COMPLETED

191. Dalkia Poznań ZE SA Concept for construction of the process steam source with co-generation of electric energy in the Garbary CHP Plant.

2001

192. Healthcare Centre in

Puławy Technical-economic analysis for modernization of the electric and thermal energy source for the Independent Public Healthcare Centre in Puławy.

2001

193. Zielona Góra SA CHP

Plant Concept for connecting the combined cycle unit with the existing infrastructure located in the Zielona Góra CHP Plant.

2001

194. Tauron

Wytwarzanie SA

Concept for adjusting the existing ventilation of the main building of units 200 MWe in the Łaziska Power Plant (total capacity: 1155 MWe) to the modified operational conditions.

2001

195.

Tauron Wytwarzanie SA, Thermal Power

Company in Bielsko-Biała

Concept for the I&C overhaul in the central heating station in the Bielsko-Biała CHP Plant (total capacity: 275 MWt).

2001

196.

PGE SA ZE Dolna Odra Pomorzany

CHP Plant Analysis of the pipeline arrangement for drips from high pressure heat feeding. 2001

197. PSEG Europe Technical characteristics and local determinants for the energy supply from the ELCHO CHP Plant (total capacity: 500 MWt) in Chorzów as well as from the Zabrze CHP Plant.

2001

198.

Tauron Wytwarzanie SA,

Łaziska Power Plant

Comprehensive expertise for the damaged foundation of fixed pipeline to the dumping station of unit No. 9 in the Łaziska Power Plant (total capacity: 1155 MWe), inclusive of repair of the damaged foundation.

2001

199. Kraków SA CHP Plant

Study for potential utilization of exhaust flue gas from the gas turbine for generation of thermal energy in the existing water boilers K5 and K6 as well as pulverised-fuel boilers No. 3-4 in Kraków CHP Plant (total capacity: 1237 MWt).

2001

200. Kraków SA CHP Plant

Concept for modernization of the switchgears (15 kV). 2001

201. Town of Gierałtowice Development strategy for the wastewater management in the Municipality of Gierałtowice.

2001

202. Będzin SA CHP Plant Operational analysis for the district heating network supplied from Będzin CHP Plant (total capacity: 415 MWt) based on the prognosticated expansion of the SAles market within next 20 years.

2000

203.

Tauron Wytwarzanie SA,

Jaworzno III Power Plant

Analysis of the district heating source in the aspect of correct co-operation with the network.

2000

204. Daewoo MP

CHP Plant Preliminary analysis for transmission of thermal energy from the Daewoo MP CHP Plant via the municipal heat network.

2000

205. Energetyka

Cieszyńska Sp. z o.o. Concept of heat supply to Cieszyn in the Czech Republic. 2000

206.

District Thermal Power Company in

Legnica SA

Concept for modernization of the automation systems in the boiler house of the thermal power company in Legnica.

2000

207. PGE SA Turów Power

Plant Concept for vacuuming the Crusher House No. 1 and 2 in the Turów Power Plant (total capacity: 2088 MWe).

2000

208.

Tauron Wytwarzanie SA -

Siersza Power Plant

Concept for revitalisation of the power generation units No. 3-6 in the Siersza Power Plant (total capacity: 786 MWe).

2000

209. Kraków SA CHP Plant

Concept for installation of the co-generated heat source to cover needs of the town of Zduńska Wola.

2000

210.

Tauron Wytwarzanie SA,

Siersza Power Plant

Assessment for selection of the water treatment technology in the boiler cycle in the Siersza Power Plant (total capacity: 786 MWe) of capacity 70 m3/h.

2000

37

TECHNICAL CONCEPTS AND TECHNICAL ANALYSES

REFERENCE LIST

NO. PURCHASER PROJECT NAME COMPLETED

211.

Tauron Wytwarzanie SA,

Jaworzno III Power Plant

Study of the reserve heat source for the city of Jaworzno. 2000

212. Będzin SA CHP Plant Analysis for potential operation of the boiler OP-140 No. 6 and 7 for the station RSH 138/14 after its permanent disconnection from the high pressure header.

2000

213. PGE SA Rzeszów

CHP Plant

Operational analysis for the district heating system in the aspect of observed pressure increased in return pipelines in the Rzeszów CHP Plant (inclusive of the proposed solutions).

2000

214. Zabrze SA CHP Plant Concept of an emergency solution for securing heat deliveries from the Zabrze CHP Plant.

2000

215. Mielec Sp. z o.o.

CHP Plant Assessment of the technical condition for the DN300 pipeline, 1200m long, inclusive of determining its potential use for transmission of steam to the Mielec CHP Plant.

2000

216. Tychy SA CHP Plant Concept of wastewater utilization from the treatment plant in Urbanowice to compensate for losses in the cooling circuits in the Tychy CHP Plant (total capacity: 290 MWt).

2000

217. ZE PAK SA Concept for the master microprocessor system and control station DIR for the electric systems in the Pątnów Power Plant (total capacity: 1600 MWe).

2000

218. Skawina SA Power

Plant

Concept for introducing the digital control, visualisation and protection system for turbine generator set No. 1-7 with switchgears 6kV and 0.4kV of power supply for auxiliaries and switchyards 220kV, 110kV and 10kV in the Skawina Power Plant (total capacity: 590 MWe).

2000

RENEWABLE ENERGY SOURCES 38

ENERGOPROJEKT-KATOWICE SA

3. RENEWABLE ENERGY SOURCES

NO. PURCHASER PROJECT NAME COMPLETED

1. Budimex SA “Construction of Heat Recovery Incineration Plant (HRIP) Located within the Area of

PGE GiE S.A. – Rzeszów Combined Heat and Power Plant Branch”. 2015

2. Foster Wheeler

Warszawa

Detailed engineering connected with construction of the biomass-fired boiler and electrostatic precipitator together with auxiliary installations in the Połaniec Power Plant.

2013

3.

Doosan Babcock Energy Polska

Sp. z o.o.

Documentation with author’s supervision for the commission titled “Biomass feed installation to the boilers of Units 5-8 omitting coal pulverizers in Elektrownia Rybnik SA - Biomax-2".

2013

4.

Energa Ostrołęka Power

Plant

The concept of feeding the torrefacted biomass to the boiler no. 2, type OP 650 adapted for 100% biomass burning.

2013

5.

Tauron Wytwarzanie SA

Stalowa Wola Power Plant

Study titled: “Evaluation of the possibility of converting the boiler OP-150 to biomass boiler in Tauron Wytwarzanie SA, Stalowa Wola Power Plant in Stalowa Wola".

2013

6.

Tauron Wytwarzanie SA

Siersza Power Plant

Study titled: “Evaluation of the possibility of converting the boiler OP-380 to biomass boiler in the location Tauron Wytwarzanie SA Siersza Power Plant".

2013

7. ZE PAK SA

Design engineering for the project: Modernization of the Konin Power Plant in the scope of construction of the high-performance fluidized bed boiler that is dedicated to 100% biomass combustion (the boiler replaced the K-9 boiler for the cooperation with the TG-6 condensing turbine) as well as in the scope of biomass management together with its infrastructure.

2012

8. Tauron

Wytwarzanie SA

Supervision of construction works and assembly in scope of documentation done by "Energoprojekt-Katowice" SA for auxiliary facilities of RES Generation Unit (Renewable Energy Sources) in the Jaworzno III Power Plant – Power Plant II (total capacity: 190 MWe).

2012

9. Tauron

Wytwarzanie SA

The construction design for oil consumption measuring station on K2 and K3 boiler in the Jaworzno Power Plant III – Power Plant II (total capacity: 190 MWe) [RES Generation Unit (Renewable Energy Sources)].

2012

10. Foster Wheeler

Warszawa User and operation manual of the biomass unit facilities in the Konin Power Plant. 2012

11. Tauron

Wytwarzanie SA

Updating of the technical documentation for: Compressor system and compressed air network within the framework of construction of renewable energy source power generating facility in Jaworzno III Power Plant – Power Plant II (total capacity: 190 MWe).

2012

12. Tauron

Wytwarzanie SA Concept of the Renewable Energy Sources (RES) Generation Unit at the Jaworzno III Power Plant – Power Plant II (total capacity: 190 MWe).

2011

13. Foster Wheeler

Warszawa

Update of the building design of the boiler house with the K9 fluidized-bed boiler (station no. K12) with a circulating bed fired with biomass with the capacity of 215 t/h at the Konin Power Plant.

2011

14. Tauron

Wytwarzanie SA

Technical documentation for the external network systems, the external trestle bridges, and the fire-protection pumping stations with tanks, as a part of construction of the Renewable Energy Sources (RES) Generation Unit at the Jaworzno III Power Plant – Power Plant II (total capacity: 190 MWe).

2011

15.

Tauron Wytwarzanie SA,

Katowice CHP Plant

Detailed engineering (including the civil engineering branch) for the biomass feed system in the Katowice CHP Plant (total capacity: 692 MWt).

2011

16.

Doosan Babcock Energy Polska

Sp. z o.o.

Biomass feed system for the project concerning construction of the biomass direct feed system to the No. 2 boiler in the Opole Power Plant.

2011

17. Condix SA Realisation-shop projects for erection of the UKF object (tank and K12 boiler supply room) in external nave construction, acting as a support for line conveyors on the air bag in Konin Power Plant.

2011

39

RENEWABLE ENERGY SOURCES

REFERENCE LIST

NO. PURCHASER PROJECT NAME COMPLETED

18. GDF Suez Fumes discharge concept from the biomass-fired fluid bed boiler (Green Unit) via fumes ducts belonging to unit 8 to the absorber D of the flue gas desulphurisation system in Połaniec Power Plant.

2011

19. GDF Suez

Energia Polska SA Concept for the flue gas removal from the biomass-fired fluidized bed boiler in the Połaniec Power Plant (The Green Power Unit).

2011

20. Elektrobudowa SA As-is technical documentation within the scope of transport, storage and processing systems of biomass in Kraków CHP Plant (total capacity: 1237 MWt).

2011

21. Wumig-Densit Polska

Sp. z o.o. Design works for the pipelines of the biomass feeding boiler system in the Kraków Heat and Power Generating Plant (total capacity: 1237 MWt).

2011

22. Tychy SA CHP Plant

Detailed engineering and services necessary to obtain:

construction permit for a BFB 135 boiler (100% biomass-fired),

construction permit for a biomass feed system for the BFB 135 boiler,

construction permit for a new 40 MWt water boiler (WR type) together with flue gas desulphurization system, denitrification system and dust removal system.

2010

23. Rybnik SA Power

Plant Concept for biomass management in the Rybnik Power Plant (total capacity: 1775 MWe).

2010

24.

Doosan Babcock Energy Polska

Sp. z o.o.

Concept: Construction of biogas installations as well as the assessment of Engineering, Procurement and Construction for the entire project.

2010

25. Będzin SA CHP Plant

Civil engineering design for the biomass feed system as well as for reconstruction of the boiler to a biomass-fired boiler, based on EPK’s project: “Feasibility study concerning reconstruction of the No.6 OP-140 boiler to WP-120 boiler”.

Application form (submitted on behalf of the investor) to obtain a construction permit and approval of the civil engineering design.

2010

26. Rybnik SA Power

Plant Concept for a biomass feed system to the boilers of the Nos. 5-8 power units (omitting coal mills) in the Rybnik Power Plant (total capacity: 1775 MWe).

2010

27.

Tauron Wytwarzanie SA,

Katowice CHP Plant

Concept of the biomass feed system to the BCF-100 boiler with the use of inert material tank in the Katowice CHP Plant (total capacity: 692 MWt).

2010

28.

Tauron Wytwarzanie SA,

Katowice CHP Plant

Technical expertise and design for installation of biomass feeding nozzles to the CFB 134/2 kg/s fluidized bed boiler.

2010

29.

Tauron Wytwarzanie SA,

Jaworzno III Power Plant

Feasibility study of the biomass-fired boiler in the Jaworzno III Power Plant – No. 2 Power Stadion (total capacity: 190 MWe) together with the accompanying infrastructure.

2009

30. Tauron

Wytwarzanie SA

Technical specifications for the deliveries of the basic equipment for the biomass-fired boiler (boiler, dust collector, generator) as well as the technical analysis of the received data and assumptions from the potential suppliers.

2009

31. Tauron

Wytwarzanie SA

Update of design package: Civil design of biomass preparation system and of biomass feed system for the 225 MWe power units in the Łaziska Power Plant (total capacity: 1155 MWe).

2007

32. SFW Energia

Sp. z o.o. Logistics of the biomass acquisition for production of biogas together with the general concept of the electric energy production technological system.

2007

33. Ekoterm Silesia

Company Preliminary technical concept of the CHP Plant (3.5 MWt, biofuel-fired). 2007

34.

Tauron Wytwarzanie SA,

Katowice CHP Plant

Technical concept: the biomass feed system in the Katowice CHP Plant (total capacity: 692 MWt).

2006

35.

Tauron Wytwarzanie SA,

Siersza Power Plant

Detailed design: Biomass feed system in the fluidized boilers (Ofz 425) in the Siersza Power Plant (total capacity: 786 MWe) – ventilation, and smoke removal system of the coal conveyor gallery.

2006

36.

District Thermal Power Company in

Grudziądz

Technical concept: the biomass feed system to the OR-32 boiler (technological variant including the assumptions for the following engineering branches: civil, water&wastewater, electrical and the I&C systems together with the preliminary statement of expenses).

2006

RENEWABLE ENERGY SOURCES 40

ENERGOPROJEKT-KATOWICE SA

NO. PURCHASER PROJECT NAME COMPLETED

37. PKE SA - Jaworzno III

Power Plant Technical concept: Construction of the biomass feed system to boilers of the 200 MWe Power units in the Jaworzno III Power Plant (total capacity: 1345 MWe).

2006

38.

Tauron Wytwarzanie SA,

Blachownia Power Plant

Determining the economic and technical indicators for the new (waste-fired) Power unit in the Blachownia Power Plant.

2006

39.

Tauron Wytwarzanie SA,

Łaziska Power Plant

Biomass feed system to boilers of the 225 MWe power units in the Łaziska Power Plant (total capacity: 1155 MWe).

2005

40.

Tauron Wytwarzanie SA -

Łaziska Power Plant

Utilization and functional plan of biomass feed system for 225MWe power units in the Łaziska Power Plant (total capacity: 1155 MWe).

2005

41. Tauron

Wytwarzanie SA Technical concept: Construction of the biomass feed system to boilers of the 200 MWe power units in the Jaworzno Power Plant (total capacity: 1345 MWe).

2005

42. Rybnik SA Power

Plant Technical assessment: the possibilities of biofuel combustion in the boilers of the Rybnik Power Plant (total capacity: 1775 MWe).

2005

43.

Tauron Wytwarzanie SA,

Siersza Power Plant

Biomass feed system in the fluidized boilers (Ofz 425) in the Siersza Power Plant (total capacity: 786 MWe) – modernization of the chemistry laboratory.

2005

44. Energoprojekt

Gliwice SA Technical calculations: Possibility of the higher glycol concentration in the engine cooling system.

2005

45. Skawina SA Power

Plant Technical concept: Biomass management in the Skawina Power Plant (total capacity: 590 MWe).

2005

46. Tauron

Wytwarzanie SA

Technical assumptions and priorities concerning biomass (related to particular renewable energy sources) as well as the promotion programme of renewable energy production in the PKE (The Southern Poland Power Company, now Tauron Wytwarzanie SA).

2004

47. Rybnik SA Power

Plant

Logistics concept: Fuel acquisition (biomass and RDF), and supply system maintenance for the gasifier purposes in the Rybnik Power Plant (total capacity: 1775 MWe).

2004

48. Rybnik SA Power

Plant

Technical concept: Construction and operation of fuel store place (biomass, RDF) together with its infrastructure. Technical concept covers: delivery of a complete storing, preparing and transporting fuel system to the gasifier.

2004

49.

Thermal Power Company SA in

Ostrów Wielkopolski Civil Design: the cogenerated heat source based on wood waste combustion. 2004

50. Tauron

Wytwarzanie SA Consulting services: International bid on biomass supply for the PKE (The Southern Poland Power Company, now Tauron Wytwarzanie SA).

2004

51. Wojtech Katowice Civil Design: Power output system in the Nowotaniec-Bukowsko wind farm. 2004

52. Power Company

Ostrołęka SA Technical concept: Construction of the biomass store place together with its infrastructure.

2003

53.

Tauron Wytwarzanie SA

Stalowa Wola Power Plant

Technical concept: Biomass acquisition logistics and supply system maintenance in the Stalowa Wola Power Plant.

2003

54.

Thermal Power Company SA in

Ostrów Wielkopolski

Design set: Construction of the cogenerated, waste wood-fired heat source in Ostrów Wielkopolski.

2003

55. Tychy SA CHP Plant Technical concept: Productivity increase in the Biofuel Production Plant in Kossowo. 2003

56. Tauron

Wytwarzanie SA Technical assumption: Logistics of the biomass implementation as a fuel, together with market analysis of supply prices.

2003

57. Tauron

Wytwarzanie SA Logistics concept: Wood waste providing in order to combust it in the fluidized boilers.

2002

58. Rafako SA Possibility analysis for utilization of product waste from the flue gas desulphurization system.

2002

41

RENEWABLE ENERGY SOURCES

REFERENCE LIST

NO. PURCHASER PROJECT NAME COMPLETED

59.

Energa SA Department in

Olsztyn Location study: Wind power station in the area of the Electric Plant in Olsztyn. 2001

60. Soda Mątwy SA Preliminary technical concept: the ecosorbent Production plant in the area of the Soda-Mątwy Chemical Plant.

2001

61. PSE International Introduction of the new promotion system for new technologies of energy generation, especially energy from renewable energy sources for the energy market purposes.

2000

62. Town of Bielawa Design set: Solar heating stations and photovoltaic power stations together with the implementation of the installation in school workshop facilities in the Town of Bielawa.

2000

ENGINEERING, PROCUREMENT, CONSTRUCTION 42

ENERGOPROJEKT-KATOWICE SA

4. ENGINEERING, PROCUREMENT, CONSTRUCTION

NO. PURCHASER PROJECT NAME COMPLETED

1. Soda Polska

Ciech SA Delivery, installation and commissioning of ICA equipment for the deaerator system

at EC Soda Polska Ciech S.A. Combined Heat and Power Plant.

2015

2. Aquanet SA Poznań

Technical documentation and construction of the pumping system of dehydrated sludge from the building of sludge dehydration station to the drying installations located in the Central Waste Water Treatment Plant for the City of Poznań in Koziegłowy.

2011

3. Tauron

Wytwarzanie SA

Delivery, assembly, and startup of the Electronic Data Processing System for recording of data, measurement results, and calculation results to document the production of electric energy and heat from Renewable Energy Sources (RES) at the Katowice Combined Heat and Power Plant (total capacity: 692 MWt).

2011

4. Omega Głogów

Sp. z o.o.

Startup of the flue gas desulphurization system and trial run of the complete flue gas desulphurization and dust removal system in water boilers in heat plant Bogdanka (5xWR-5 and 1xWRp-46/W-28) and assembling the required documentation on the start-up and trial run.

2011

5. Aquanet SA Poznań Additional work - additional branches of dewatered sludge pipeline to enable loading the sludge on the second car in the Central Wastewater Treatment Plant for the city of Poznań in Koziegłowy.

2011

6. Aquanet SA Poznań Construction and technology works: removal of an unforeseen collision of the foundations for sludge pumps with the existing below-floor sewerage system in the Central Wastewater Treatment Plant for the city of Poznań in Koziegłowy.

2011

7. Foster Wheeler

Warszawa List of cables to the electrical part, execution of I&A intermediary and air boxes and update of detailed I&A documentation of a biomass boiler in the Konin Power Plant.

2011

8. Aquanet SA Poznań

Additional work on the task, "Construction of the dehydrated sludge discharge system from the drain building to the drying station building in the Central Wastewater Treatment Plant Koziegłowy" (additional branch of pipelines to the station).

2011

9. PGE SA Opole Power

Plant System for measurement of the fuel chemical energy on the coal handling system. 2010

10. Metso Automation

Reconstruction of the OP-130/K2 boiler at the ZEW Kogeneracja SA Facility, Czechnica CHP in Siechnica to use a bubbling fluidized bed boiler.

Performance of deliveries and services pertaining to the automation and instrumentation system.

2010

11. Instal Kraków SA

Delivery, assembly, and startup of a complete automation and instrumentation system as a part of the project titled “Upgrade of the water management system at the Jaworzno III Power Plant (total capacity: 1345 MWe) – recovery of wastewater to limit the water demand of the production process.”

2010

12. PGE SA Opole Power

Plant

Design, supply, installation and commissioning of an additional mixer and reversible cross conveyor for PB biomass SAmpler provided for in the fuel chemical energy measurement system on coal handling system in PGE SA Opole Power Plant.

2010

13.

DG Consult /Holding Tekstylny

“Yakovlevsky

The turnkey construction of the CHP Plant (17 MWe) in Rodniki, Iwanowski District - Russia".

2009

14. ZE PAK SA Ash removal system of the Pątnów Power Plant (total capacity: 1600 MWe) in the direction of the northern excavation – Phase II – the slag removal system.

2009

15. Mostostal Kraków SA Modernization of the wagon tippler for the 460 MW power unit with supercritical parameters in the Łagisza Power Plant (total capacity: 840 MWe).

2009

16. SFW Energia

Sp. z o.o. Complete flue gas desulphurization system for the Heat Generating Plant in Gliwice. 2009

17. SNC-Lavalin Warszawa

I&C engineering work connected with replacement of two screens produced by the FAM company for two screens produced by the EUREC company.

2009

43

ENGINEERING, PROCUREMENT, CONSTRUCTION

REFERENCE LIST

NO. PURCHASER PROJECT NAME COMPLETED

18. Instal Kraków SA/

Brandl

Delivery and services for the project entitled: Engineering, assembly, delivery, and start-up of the compressed air network together with the compressor room and the auxiliary systems as the part of the project related to the construction of the 460 power unit with supercritical parameters in the Łagisza Power Plant (total capacity: 840 MWe).

2009

19. SNC-Lavalin Warszawa

The I&C system of the coal handling system in the Pątnów II Power Plant (total capacity: 1600 MWe).

2009

20. Megawat Sp. z o.o.

Gliwice

Thermodynamic calculations of the 6 MWe T1930 Siemens Schuckert turbine after the planned adjustment of this turbine to the technological requirements of the Z-2 “Knurów” Plant.

2009

21. Instal Kraków SA/

Brandl Construction of the slag pit in the Jaworzno III Power Plant (total capacity: 1345 MWe).

2008

22. SNC-Lavalin Warszawa

The I&C system of the ash removal in the Pątnów II Power Plant (total capacity: 1600 MWe).

2008

23. RCEkoenergia

Sp. z o.o. External infrastructure for the FAME production – the power engineering branch. 2008

24. Procom-System SA Software for the emergency gypsum dump at the system of suspension in the Pątnów Power Plant (total capacity: 1600 MWe).

2008

25. Energomar-Nord

Sp. z o.o. Connection of the DN100 throttle (before the air reducing station) to the superior control system.

2008

26. Alstom Power

Sp. z o.o. Elbląg Design package: Construction of the AT1006 vacuum pump in the Kraków CHP Plant (total capacity: 1237 MWt).

2007

27.

Municipal Power Company in Piekary

Ślaskie

The project entitled: “Construction of the Andaluzja II Heating Plant in the City of Piekary Śląskie.”

2007

28.

Municipal Power Company in Piekary

Ślaskie

Repair service of water supply system in the area of the M. Curie-Skłodowska St. in the Town of Piekary Śląskie.

2007

29.

Municipal Power Company in Piekary

Ślaskie

Modernization of the coal storage yard in heating plant located in the town of Piekary Śląskie. The scope of activities:

Modernization of the dewatering system for the site;

Modernization of the site paving in order to improve its dewatering.

2007

30. SFW Energia

Sp. z o.o.

Delivery, assembly, and connection (to the existing control system) of the inverters of the slag removal drive – an option without the utilization of the screened cables that feed the drives.

2007

31. SFW Energia

Sp. z o.o. Software, start-up, and configuration of the control module (Trend Serwer type) for the visualization and control system (Freelance 2000).

2007

32. SFW Energia

Sp. z o.o. Detailed engineering of oxygen system for the industrial laboratory in the Gliwice CHP Plant.

2007

33. Kopex SA Delivery of the recommended spare parts for the I&C systems in the Paroseni CHP Plant.

2007

34. Tauron

Wytwarzanie SA Computer replacement of the operator station in the water purification plant in the Katowice CHP Plant (total capacity: 692 MWt).

2007

35. Alstom Power

Sp. z o.o. Assembly and delivery of the control cabinet for the oil heaters at the tank of the No.3 power unit in the Bełchatów Power Plant (total capacity: 4440 MWe).

2007

36. Saint Gobain Additional work for the building of glass tank furnace in SAint Gobain Glass Polska. 2007

37. Nowa Sarzyna

CHP Plant Construction of the extraction steam desuperheater in the Nowa Sarzyna CHP Plant (total capacity: 216 MWt).

2006

38. Polnord SA Brzezie

Modernization of the boiler house in the Arctic Paper Kostrzyn Company. Detailed engineering and as-built documentation of:

air conditioning and ventilation;

heating system and ventilation of process heat;

fire fighting system;

I&C systems of HVAC.

Delivery, assembly, and start-up of the I&C systems for HVAC.

2006

ENGINEERING, PROCUREMENT, CONSTRUCTION 44

ENERGOPROJEKT-KATOWICE SA

NO. PURCHASER PROJECT NAME COMPLETED

39. OAO

Iwelektronaładka

Delivery of the RELPOL equipment;

relays (R1501014-23-1220 type) – 180 pcs.;

relay bases (GZU14U type) – 400 pcs.;

clamping ring (GZ140737 type) – 400 pcs.

2006

40. Alstom Power

Sp. z o.o. Delivery of bellows valve together with the drive of vacuum pump system (AT1006) in the Kraków CHP Plant (total capacity: 1237 MWt).

2006

41. Fugor Sp. z o.o. Completion of the pneumatic equipment as well as assembly of the pneumatic system of the two servo-motors that are constructed at the discharging ploughs in the area of the coal conveyor.

2006

42.

PPH Pawar/ Municipal Power

Company in Piekary Ślaskie

Additional works in the area of the Andaluzja II Heating Plant in the Town of Piekary Śląskie:

Modification of the flue gas duct for the WR-10 boiler;

Modification of the flue gas duct for the WR-5 boiler.

2006

43. Saint Gobain Detailed engineering together with delivery and assembly of the I&C system for the boost heating installation.

2006

44.

Lotos Serwis Sp. z o.o.

Czechowice-Dziedzice

Assembly of the I&C cabinet and connection to the existing system of the shell and plate heat exchanger (2 MWt) together with the condensate cooler in the room of the existing heating plant in the RCEkoenergia Company.

2006

45. Saint Gobain Modernization of the cooling system for the Magnetron production line. 2006

46. SFW Energia

Sp. z o.o. Washing of the GC-54N x 144 exchanger in the engine cooling system in the Suszec CHP Plant.

2006

47. SFW Energia

Sp. z o.o. Development of visualization system together with data logging system in the Poniatowa Heating Station.

2006

48.

Tauron Wytwarzanie SA, Thermal Power

Company in Bielsko-Biała

Modernization of return pressure control system of the heating network that is feeded from the Bielsko-Biała I CHP Plant (total capacity: 275 MWt).

Delivery of the complete Beckhoff programmer;

Assembly process inside the existing I&C cabinet;

Software developing;

Software start-up.

2005

49. SFW Energia

Sp. z o.o.

The turnkey construction of the power generator in the Suszec CHP Plant with the heat recovery system (gas-fired from the methane removal of the Krupiński Coal Mine).

2005

50. Alstom Power

Sp. z o.o. Construction of the additional condensate extraction pump (electrical branch) in the Thermal Power Company in Bielsko-Biała.

2005

51. RCEkoenergia

Sp. z o.o. Construction of the lattice water preparation and transportation system in the area of the Czechowice Refinery (Stage I).

2005

52. Kraków SA CHP Plant Modernization: the I&C system of the No. 3-4 4VRK compressors (Stage II and III). 2005

53.

Municipal Power Company in Piekary

Ślaskie

Environmental impact assessment for the project entitled: “The Andaluzja II Heating Plant in the City of Piekary Śląskie”.

2005

54. Alstom Power

Sp. z o.o. The power rehabilitation project of the 13UK125/TG2 turbine set in the Kraków CHP Plant (total capacity: 1237 MWt).

2005

55. “Jastrzębie Power

Company SA

Engineering, Procurement and Construction (EPC) services for the project entitled: „Construction of power generator, consisted of TCG V16 gas engine as well as construction of heat recovery system in the „SUSZEC” CHP Plant within a framework of the „Krupiński II” Project.

2005

56. Saint Gobain Delivery and assembly services: Cooling unit of the Magnetron Production Line. 2005

57. Saint Gobain Delivery of control desk, together with the preinstalled software. 2005

58. PGE SA Turów Power

Plant Modernization of electrical switchgears 6 kV and 0.4 kV for the ash removal transfer hoppers – the second stage.

2005

59. Alstom Power

Sp. z o.o. The turbine set overhaul 13UK125/TG2 in the Kraków CHP Plant (total capacity: 1237 MWt).

2004

60. Saint Gobain Cooling system modernization in the SAint-Gobain Glass Poland facility in Dąbrowa Górnicza.

2004

45

ENGINEERING, PROCUREMENT, CONSTRUCTION

REFERENCE LIST

NO. PURCHASER PROJECT NAME COMPLETED

61. Kopex SA Control and measurement equipment and automatic control system deliveries to power unit No. 4 being modernized in the Paroseni CHP Plant in Romania.

2004

62. Nowa Sarzyna CHP

Plant Installation of the low-pressure steam cooler. 2003

63. PGE SA Turów Power

Plant Coal handling - an expansion of the coal handing system in the control centre with control equipment for the coal handling system of unit No. 4.

2003

64. PGE SA Turów Power

Plant Adjusting the protection system for control, interlocks and electrical measurements of the power evacuation to the PSE [Polish Power Grid] requirements – unit No. 8.

2003

65. Kraków SA CHP Plant Modernization of the existing water treatment station. 2003

66. ZE PAK SA Ash removal in the Pątnów Power Plant (total capacity: 1600 MWe) – discharge to the Northern Dumping Yard.

2003

67. PGE SA Turów Power

Plant Coal handling – expansion of the coal handling control centre with control over the equipment of unit No. 5 and gallery No. 3.

2002

68. PGE SA Turów Power

Plant

Coupling for parallel operation on the side of 6 kV transformers BCT 10 and BCT 20.

Adjusting the power supply for switchyard 0.4 kV YOBHC to control from the system SCS 100.

2002

69. PGE SA Turów Power

Plant Adjustment of the protection, control, interlock and electrical measurement systems for power evacuation from unit No. 10 to requirements of the Polish Power Grid.

2001

70. Non-Ferrous Metal Works in Szopienice

Installation of the turbine generator set 3 MW in the CHP Plant of Non-Ferrous Metal Works in Szopienice.

2001

71. Town of Bielawa Execution of the solar heating systems and photo-voltaic energy generation in the Vocational School in Bielawa.

2001

72. PGE SA Turów Power

Plant Modernization of the electrical switchyards 6 kV and 0.4 kV for transfer towers of ash removal.

2001

73. PGE SA Turów Power

Plant Modernization of electrical equipment for the slot bunker and 4th short coal handling gallery.

2001

74. PGE SA Turów Power

Plant Operational field chemical laboratory. 2001

75. Askom Design, delivery, assembly – inclusive of cabling – of the control and measuring instruments in the sanitary wastewater treatment plant in the Turów Power Plant (total capacity: 2088 MWe).

2001

76. PGE SA Turów Power

Plant Modernization of the 6 kV BCB and 0,4 kV BHB electric power switching stations as well as the BHQ direct current system.

2001

77. PGE SA Turów Power

Plant Modernization of the water treatment station for boiler-related purposes in the Turów Power Plant (total capacity: 2088 MWe).

2000

THERMAL & POWER MECHANICAL ENGINEERING 46

ENERGOPROJEKT-KATOWICE SA

5. THERMAL & POWER MECHANICAL ENGINEERING

NO. PURCHASER PROJECT NAME COMPLETED

1. Tauron Wytwarzanie

SA

Design of the modifications of the fasteners of the main steam pipelines of the unit #10 at Tauron Wytwarzanie Spółka Akcyjna – Siersza Power Plant in Łagisza, Będzin, including the author’s supervision.

in progress

2. Zre Katowice SA Designing, as a part of the Unit implementation, the high-pressure pipelines (LBB, LBC, LBA), including the auxiliary systems, and also a selection of the primary fasteners at the JAWORZNO III Power Plant.

in progress

3. ZRE Katowice SA Detailed design documentation of the pipelines with fasteners – for the incineration plants located in Margam, Templeborough, and Teesside.

in progress

4. AMEC FOSTER Sp. Z

O.O. Zabrze CHP Plant, CFB BOILER – 75kg/s, 536 St.C, 92 bar, 203MW Contract For Design Of HP Small And LP Piping.

in progress

5. Tauron Wytwarzanie

SA

Assessment of the technical condition, including a forecast of the life of the boiler and the main steam pipelines of the unit #1 at TAURON Wytwarzanie Spółka Akcyjna – Siersza Power Plant in Trzebinia.

in progress

6. CEZ, Skawina Power

Plant Branch Design of a partial removal of the live steam pipelines from the K3, K4, K5, and K7 boilers related to a removal of the TG-4 turbine set.

in progress

7. PGNIG Zielona Góra Design, and formal and legal work for an investment task named “Modernisation of the Fastener System of the Pipelines Connecting the Boiler with the Steam Turbine for the Power Generating Unit at PMG Wierzchowice.”

in progress

8. GE Power Warszawa Multi-branch technical design of modifications to a cleaning system of the heat recovery system modules of the 858 MW unit at the Bełchatów Power Plant.

in progress

9.

Chemar Rurociągi Sp. z o.o.

Workshop and assembly documentation intended for implementation of the main project concerning “Manufacture and Delivery of the Main Live Steam Pipelines for the OP-650 Boiler #3 at ENERGA Elektrownie Ostrołęka S.A.”

in progress

10. Siemens Warszawa The detailed design of the pipelines (BOP) – Gorzów EKG-01. in progress

11.

Soda Mątwy S.A. Inowrocław Chemical

Plant

Technical documentation and registration of steam pipelines connecting boilers K1, K2, K3, and K4 in the header system with turbogenerators of the CHP II at the SODA MĄTWY Production Plant in Inowrocław.

in progress

12. Energomontaż

Północ SA

The complex design and documentation works for the investment named: “Modernisation of the pipeline system to the secondary superheating of the units Nos. 9-12 at PGE GiEK SA, Bełchatów Power Plant " (total capacity: 4,440 MWe).

in progress

13. Turbocare Sp. z o.o. Design works for the investment named: “Turn-Key Modernisation of the HP and MP parts of the turbine sets with the auxiliary equipment and the pipeline systems of the units 1 and 2 at Pątnów Power Plant (total capacity: 1,600 MWe).

in progress

14. PGE SA Opole Power

Plant The design documentation for the project of steam process delivery from PGE SA – El. Opole Branch to the Knauf Bełchatów Sp. z o. o. in Brzezie near Opole.

in progress

15. Alstom Power

Sp. z o.o. Elbląg

Design set concerning the steel structure of the WP8-1 and WP8-2 heaters together with the platforms for the No. 6 power unit in the Bełchatów Power Plant (total capacity: 4440 MWe).

in progress

16. Polimex-

Mostostal SA

Complex design for modernization of the main steam and water pipeline system of the Nos. 7-12 power units in the Bełchatów Power Plant (total capacity: 4440 MWe).

in progress

17. Alstom Power

Sp. z o.o. Elbląg Execution and delivery of the modification design for live steam piping for units No. 2-6 in the Połaniec Power Plant.

in progress

18. GDF Suez Comprehensive tests of live and reheated steam pipes for EP650 secondary for power units No. 1 to No. 7 in the Połaniec Power Plant.

in progress

19.

ZE PAK SA El. Pątnów II (En. Pątnów II

Power Plant)

Detailed design concerning retrofit of the steam heater along with the condensate discharge system on the boiler # 9 at Pątnów Power Plant II

2016

20. Foster Wheeler Sofia Technical specifications for the designs of the small diameter high-pressure pipelines

(Assembly-Workshop) Deven.

2016

47

THERMAL & POWER MECHANICAL ENGINEERING

REFERENCE LIST

NO. PURCHASER PROJECT NAME COMPLETED

21.

ZE PAK SA Pątnów II Power Plant)

Development of the hydraulic test manual of the primary system (ECO, combustion chamber, and SH) and the secondary system (RG) for the boiler BB 1345 in accordance with the applicable regulations of the UDT (Office of Technical Inspection), including the UDT approval at Pątnów II Power Plant.

2016

22. Soda-Mątwy SA Technical design of modernisation of the EC and DEMI unit to increase capacity of soda production by 200,000 tons per year.

2016

23.

Tauron Wytwarzanie SA

Assessment of the possibility of further operation of the live and re-superheated steam pipelines of the unit No. 7 at Tauron Wytwarzanie Spółka Akcyjna – Łagisza Power Plant Branch in Będzin (total capacity: 840 MWe).

2015

24. EDF Toruń SA Revision of the technical project “Calculations of distribution node pipelines

compensation” at EDF Toruń. 2015

25.

EC Stalowa Wola SA Variant analysis of routing the cooling water pipeline between the San River power station and the existing inflow chamber at TAURON Wytwarzanie Spółka Akcyjna – Oddział Elektrownia Stalowa Wola w Stalowej Woli (En. Stalowa Wola Power Plant Branch in Stalowa Wola).

2015

26. PZRE Bestal Tychy Design works on the main steam pipelines of the unit # 6 at Jaworzno III Power Plant

(total capacity: 1,345 MWe). 2015

27.

Amiantit Poland Sp. z o.o.

Design documentation of the cooling water GRP pipelines for the power generating unit with the electrical power of 910 MW at Tauron Wytwarzanie S.A., Jaworzno Power Plant Branch – pipelines of the main cooling water system (total capacity: 1,345 MWe).

2015

28. ZRE Katowice SA Pipeline as-built documentation. 2015

29.

PZRE Bestal Tychy Performance of the diagnostic tests of the main steam pipeline of the BC35 unit at Tychy CHP Plant, including the assessment of the technical condition (total capacity: 290 MWt).

2015

30. ZRE Katowice SA Workshop documentation of the pipelines for the VIRIDOR PETERBOROUGH waste incineration plant in the United Kingdom.

2015

31. SNC-Lavalin Warszawa

Tashkent Project – the development of pipeline designs. 2015

32. SE Jastrzębie SA Construction of the new cooling water pipeline for the new compressor room at “Pniówek” CHP.

2015

33. ZRE Katowice SA Design documentation for pipelines as a part of the project titled "Construction of power units no. 5 and 6 at the PGE Elektrownia Opole S.A." (2x900 MW).

2014

34. GDF Suez The project of changes of condensate pipeline route from XW2 in the Połaniec Power Plant.

2014

35. Nowa Sarzyna CHP A design of the system for flue gas discharge from a Jenbacher engine in the section from the exhaust collector of the engine to the flue gas damper at the Nowa Sarzyna CHP plant.

2014

36. EDF Polska Sp. z o.o. Conceptual design and detailed designs for the upgrade of the supply system of the 1.7 MPW and 0.6 MPA steam headers for power unit no. 3 at EDF Polska S.A., Rybnik Branch. (total power: 1,775 MWe).

2014

37. PEP-Projekty

Sp z o.o. Technical concept for installation of hot bypass stacks for gas turbines GT11 and GT12, type PG6551E, at Elektrociepłownia Nowa Sarzyna Sp. z o.o.

2014

38. ZE PAK SA

El. Pątnów II Analysis of the technological solutions pertaining to the supply of process water to the gypsum dewatering and storage system. (total power: 1,600 MWe).

2014

39. European Silicon

Sp z o.o.

Designer's supervision pertaining to the technical design of pipelines, mounting, and support structures and, optionally, discipline-specific designer's supervision at the Łaziska Steel Mill.

2014

40. Michelin Olsztyn Preliminary concept of upgrade of the coal-gas heat plant taking into account the environmental solutions for the Michelin Tire Factory in Olsztyn.

2014

41. Omega Głogów

Sp. z o.o.

Engineering services in the process discipline at the construction of the flue gas desulfurization system at the Heat Plant at the Krasnystaw Sugar Factory, a branch of the Krajowa Spółka Cukrowa S.A. in Toruń.

2014

THERMAL & POWER MECHANICAL ENGINEERING 48

ENERGOPROJEKT-KATOWICE SA

NO. PURCHASER PROJECT NAME COMPLETED

42. SBB Energy SA

Inspection of the detailed documentation for the process discipline for the OP650B boiler at the Pątnów Power Plant for the project titled: "Turnkey" upgrade of boilers K1 and K2 at the Pątnów Power Plant together with construction of systems reducing NOx emissions for those boilers in the scope pertaining to the pressure part of boiler no. 2 covering platen superheaters and the furnace chamber.

(total power: 1,600 MWe)

2014

43.

Alstom Power Sp. z o.o. Branch in

Elbląg

Verifying compensation calculations for the fresh and resuperheated steam pipelines, option 2/ full calculations at Nikola Tesla A3 Power Plant. 2014

44. Posteor Sp. z o.o.

SOPOT

Detailed designs covering the strength and compensation calculation as well as selection of the fastenings for the system of steam supply and extraction to/from the gland of the turbines No. 1 and 2 at Pątnów Power Plant. (total capacity: 1,600 MWe).

2014

45.

Alstom Power Sp. z o.o. Branch in

Elbląg

Design works for installation of two RS stations – the HP by-pass part and the discharge part for the 120MWe unit at Elektrownia Morava. 2014

46.

Górnośląskie Przedsiębiorstwo Wodociągów SA

w Katowicach

The design documentation as a part of modernisation of the correlative pump systems of Górnośląskie Przedsiębiorstwo Wodociągów SA to optimise selection of the pump systems with regard to the existing operating conditions of the pumping station and to achieve the highest savings in the energy consumption basing of the concept chosen by the Ordering Party, divided into 6 parts, as follows: PART 6: MACZKI WATER TREATMENT PLANT, PUMPING STATION II, PART NO. 5 – CZANIEC WATER TREATMENT PLANT, RAW WATER PUMPS, PART 4 – URBANOWICE PUMPING STATION, PART III – WATER MAIN NETWORK BRANCH MIKOŁÓW – PUMPING STATION, PART 2 – PAPROCANY PUMPING STATION – TOWARDS MURCKI, PART 1 – PAPROCANY PUMPING STATION – TOWARDS MIKOŁÓW.

2013

47.

Tauron Wytwarzanie SA

Jaworzno III Power Plant

Evaluation of the technical condition of the boiler drum and the main pipeline connecting the boiler with the turbine, including the start-up pipeline of the unit No. 3 at Tauron Wytwarzanie SA –Jaworzno III Power Plant Branch in Jaworzno, Jaworzno II (total capacity: 1,345 MWe).

2013

48.

Tauron Wytwarzanie SA

Łaziska Power Plant

The study determining suitability for continued exploitation of the outlet chambers of the primary steam superheater of the third-degree boiler of the Unit no. 1 at TAURON Wytwarzanie Spółka Akcyjna - Łaziska Power Plant Division Łaziska Górne (total output: 1,155 MWe).

2013

49. Unipetrol Litvinov UNIPETROL – LITVINOW heating management optimisation. 2013

50. PAK Serwis Konin Sp

z o.o.

Detailed designs together with as-built documentation for the project concerning the auxiliary pipeline system connecting the K12 boiler with the TG6 turbine and auxiliary distribution header system in the Konin Power Plant (II stage).

2013

51.

Zespół Elektrociepłowni

Wrocławskich Kogeneracja SA

Designation system according to the KKS standard for CHP Muchobór. 2013

52. GDF Suez

Construction documentation for the temporary blowing installation including: temporary installation connecting live steam pipeline with the "French flaps" fitted on the cold bus, temporary installation led from the re-superheated steam pipe to sound attenuators located outside the engine room, as well as piping drainage systems supplying steam to noise attenuator in Połaniec Power Plant.

2013

53. GDF Suez Basic engineering for live steam pipeline for power units No. 1-7 in GDF Suez Energia Polska Połaniec Power Plant SA.

2013

54. PGE SA Bełchatów

Power Plant

Detailed design documentation for "Steam supply system from behind superheater P1B of the inter-unit collector 1.7 MPa" for boiler No. 3, 4, 5, 10, 11 at PGE Belchatow Power Plant.

2013

55. Polimex-

Mostostal SA Full workshop and assembly documentation for boiler piping and support structure (primary and secondary steel) for boiler piping (package 1-4) in Voimala Power Plant.

2012

49

THERMAL & POWER MECHANICAL ENGINEERING

REFERENCE LIST

NO. PURCHASER PROJECT NAME COMPLETED

56. GDF Suez

Połaniec Power Plant. Project documentation for upgrading exhaust channels, consisting of sealing the existing cut-offs on the connection of units to the boot collector, in conjunction with the launch of the "Green Unit" and the resulting change in pressure in the boot collector excluding boot collector and flue gas ducts from the collector to the chimney.

2012

57. Turbocare Sp. z o.o. Engineering-designing works for reconstruction of TG-6 turbine set with auxiliary equipment and its adaptation for unit operation with circulating fluidised bed boiler, biomass-fired with performance ratio of 215 t/h in Konin Power Plant.

2012

58. Babcock Oberhausen Complete detailed design for boilers 3-5, PO superheater drainage system design in Bełchatów Power Plant (total power: 4440 MWe).

2012

59. PAK Serwis Konin

Sp. z o.o. Construction and as-built documentation for replacement of cooling water pump units in Konin Power Plant.

2012

60. PAK Serwis Konin Sp

z o.o.

Detailed design together with the as-built documentation for the project concerning reconstruction of the live steam and feed water distribution headers’ function (II stage) after separation of the K12-TG6 power unit in the Konin Power Plant.

2012

61. PAK Serwis Konin

Sp. z o.o.

Detailed and as-built designs for the thermal process and construction discipline for:

the reduction and cooling station for supplying the 7 ata boiler;

the systems in the area of the feedwater tank no. 6;

the systems of discharges and drains of the K12 – TG6 power unit at the Konin Power Plant.

2012

62. Sefako SA Engineering and design works on the compressed air system in the electric generation and heat recovery from electric and arc resistance furnaces at the Łaziska Steel Mill.

2012

63. Chemar Rurociągi

Sp. z o.o. Engineering services for the high-pressure and high-temperature pipeline system connecting the K12 boiler with the TG6 turbine in the Konin Power Plant.

2012

64. PAK Serwis Konin

Sp. z o.o.

Engineering-designing works for adaptation the service water system for cooperation of K12 boiler with a TG6 turbine and reconstruction of service water collectors in the area of engine rooms and boiler rooms of the Konin Power Plant.

2012

65. Polimex-

Mostostal SA Executive documentation for piping for waste combustion plant in Landskrona (Sweden).

2012

66. Chorzów ELCHO

Sp. z o.o. CHP Plant

Concept of use of waste heat from the power devices of the Orderer’s unit for the following systems:

service water system for DEMI water heating,

flue gas removal system from the boiler for heating return water from the heating system.

2012

67. GDF Suez The verifying analysis of the correctness of compensation calculations, locations and types of fixing for steam and feeding water pipelines in the unit no. 9 in the Połaniec Power Plant.

2012

68. GDF Suez The geodetic measurements of steam pipeline in cold and hot state in the power units nos. 2 and 4 in the Połaniec Power Plant GDF Suez Energia Polska.

2012

69. Polimex-

Mostostal SA Full basic design documentation for turbine piping (package 1-3) for Filborna project – waste combustion plant in Helsingborg (Sweden).

2012

70. ZRE Katowice SA Technical documentation for the needs of FORUS 2 Norway project - detailed design and as-built inventory documentation of moderate- and low-pressure pipelines.

2012

71. PGE SA Turów Power

Plant

Execution through adaptation of the detailed design of the secondary steam Safety valves exchange from the unit no. 1 for the investment titled “Unit No. 2 – Modernisation of the Boiler in Respect of the Secondary Steam Safety Valves Exchange (“Cold and Hot Busbar”)”.

2012

72. Tauron

Wytwarzanie SA

Updating of the technical documentation for: Compressor system and compressed air network within the framework of construction of renewable energy source power generating facility in Jaworzno III Power Plant – Power Plant II (total capacity: 190 MWe).

2012

73.

Alstom Power Sp. z o.o. Oddział

w Elblągu

Bypass piping and drain piping for WP hull. Foundation for the development of the tender. Project: Morava - Serbia.

2012

THERMAL & POWER MECHANICAL ENGINEERING 50

ENERGOPROJEKT-KATOWICE SA

NO. PURCHASER PROJECT NAME COMPLETED

74.

Tauron Wytwarzanie SA

Łagisza Power Plant

Documentation: Retrofitting 3MPa collector for startup steam systems for 120 MW units using auxiliary steam piping for 460 MW unit.

2012

75. GDF Suez Surveying of steam piping in cold and hot state on the power units No. 7 in Elektrownia (Power Plant) GDF Suez Energia Polska with its seat in Zawada.

2012

76. Polimex-

Mostostal SA Detailed documentation for the pipelines for the waste incineration plant – Helsingborg, Sweden.

2011

77. Tauron

Wytwarzanie SA Concept of the Renewable Energy Sources (RES) Generation Unit at the Jaworzno III Power Plant – Power Plant II (total capacity: 190 MWe).

2011

78. Foster Wheeler

Warszawa Design documentation for pipelines from the BPO scope for Bielsko project. 2011

79.

Połaniec SA Power Plant – EDF Suez

Energia Polska Group

The concept of the method of heating of the feedwater at the “Green Power Unit” for heating of the catalytic converter at the Połaniec Power Plant, GDF Suez.

2011

80. SE Jastrzębie SA Concept of upgrade of the feedwater pump system at the Spółka Energetyczna “Jastrzębie” SA

2011

81. Tauron

Wytwarzanie SA

Technical documentation for the collective trestle bridges with pipelines as a part of the reconstruction of the generation capacity at the PKE SA (now Tauron Wytwarzanie SA) - construction of a 50 MW power unit at the ZEC Bielsko Biała CHP-1 (total capacity: 275 MWt).

2011

82. GDF Suez Design of the additional steam supply system of the 17ata steam distribution header (with the steam from the extraction of the 13K215 turbine) for 8 power units in the Połaniec Power Plant together with the engineering supervision.

2011

83. EDF Polska Sp. z o.o.

Design of the designation system concerning installations, equipment and its elements according to the KKS standard for two companies belonging to the EDF Group in Poland: EC "Zielona Góra" SA (Zielona Góra CHP Plant) and ZEC Wrocławskich Kogeneracja SA Term-Hydral in Zawidów.

2011

84.

Politechnika Śląska (Silesian University

of Technology) Gliwice

Review of construction and exploitation parameters of big cogeneration facilities, fired with solid and gas fuels, build in Europe and USA between 2005 and 2010 and planned to be build up to 2020.

2011

85.

Tauron Wytwarzanie SA

Stalowa Wola Power Plant

Detailed design for the cooling water system feeding the TG6 turbine from the pumping station by the River SAn in the Stalowa Wola Power Plant.

2011

86. Ventor Sp. z o.o. Design documentation of ventilation equipment supporting constructions with operating platforms in the UHA boiler room's building and UHN10 ventilators building of the Konin power station.

2011

87.

Tauron Wytwarzanie SA,

Katowice CHP Plant

Main steam pipeline stress calculations created due to dislocation. Pipeline exploitation Safety assessment in present condition and delivery of recommendations regarding scope of maintenance works of the pipeline in unit stand-by mode.

2011

88.

Polimex-Mostostal SA ZRE

Kraków

Working plans and specifications of connecting the NC DN 800 by-pass pumps pipeline with DN 1600 lattice water return collector in Kraków CHP Plant (total capacity: 1237 MWt).

2011

89. Babcock Esbjerg Strength calculations for 3rd group of pipelines – Landskrone Project – Sweden. 2011

90. Babcock Esbjerg Strength calculations for 3rd group of pipelines – Filborna. 2011

91. Tychy SA CHP Plant Detailed designs of the connections for the WR-40 boiler on the existing district heating system pipelines at the Tychy Combined Heat and Power Plant (total capacity: 290 MWt).

2011

92. Politechnika Śląska

Gliwice Process design of automation for combination system furnace – turbine unit for Huta Łaziska (Łaziska Steel Works).

2011

93. ZE PAK SA Delivery Technical Conditions of pumping engine installation (in the heating station) and part of fittings and pipelines.

2011

94. ZE PAK SA Detailed design of pumping engine installation (in the heating station) as well as parts and pipelines.

2011

51

THERMAL & POWER MECHANICAL ENGINEERING

REFERENCE LIST

NO. PURCHASER PROJECT NAME COMPLETED

95.

Tauron Wytwarzanie SA

Siersza Power Plant

Technical designs for adaptation of the heating stations to the exploitation requirements of the Siersza Power Plant (total capacity: 786 MWe).

2011

96. CPP Gliwice Technological design and detailed engineering for the 50 MW thermal power unit in the Bielsko-Biała 1 CHP Plant (total capacity: 275 MWt).

2010

97. PGE SA Turów Power

Plant No. 1 power unit – design set concerning replacement of secondary steam Safety valves (cold and hot bus).

2010

98. ZE PAK SA Design for replacement of the Safety valves system on the EKM boiler in the Konin Power Plant.

2010

99. Energa Elektrownie

Ostrołęka SA Design set for repair of the R3 reducing station in No. 2 power unit in the Energa Ostrołęka Power Plant.

2010

100. Chemar SA Kielce Modernization of the main steam and water pipeline system of the power unit No. 4 in the Bełchatów Power Plant (total capacity: 4440 MWe).

2010

101. GDF Suez Additional design of the supply system for the OXC, D exchangers from the distribution header of the extraction as well as from the 13K215 turbine of the No. 8 power unit in the Połaniec Power Plant.

2010

102. Steinmüller Peitz

Confirmation of the compatibility of constructional applications used in modernization of Nos. 5 and 6 power units’ cold air ducts in the Bełchatów Power Plant (total capacity: 4440 MWe) with Polish standards in respect of stability together with confirmation of the bottom structure repair for the existing access structure in the top part of the duct.

2010

103. Alstom Stuttgart Authorisation and verification of the static and resistance calculations for steel structures of the boiler house of the power unit with a capacity of 858 MW in the Bełchatów Power Plant (total capacity: 4440 MWe).

2010

104. Uniserv SA Flow calculations and selection of smokestack pipes’ diameters for the flue gas desulphurization system in the ZA Puławy SA (Nitrogen Plants in Puławy).

2010

105. PGE SA Turów Power

Plant

Design set for the project: No. 4 power unit – modernization of the starting line in the supply centre (modification of the fittings and mountings as well as of the location) in the scope of:

detailed engineering,

bill of quantities,

investor’s cost calculation,

for each of the Nos. 4-6 power units.

2010

106. PGE SA Turów Power

Plant

Adjustment of the detailed engineering concerning reconstruction of the soot blowers’ steam conditioning station from the No. 1 power unit to the project: “No. 1 power unit – reconstruction of the soot blowers’ steam conditioning station”.

2010

107.

Tauron Wytwarzanie SA,

Jaworzno III Power Plant

Jaworzno III Power Plant - No. II Power Station (total capacity: 190 MWe):

design of the repair cut-offs, TG-2 and TG-3 heat exchangers together with cost analysis,

design connected with elimination of vibration of the condensate pipeline from the high-pressure feed recovery to the feed water tanks of the boiler in the No. 2 power unit.

2010

108. Foster Wheeler Detailed engineering of the high pressure pipelines for the boiler house with the CFB boiler for Fortum in Częstochowa.

2009

109. Foster Wheeler Design of the small bore pipelines for the boiler house with the CFB boiler for Fortum in Częstochowa.

2009

110. Nowa Sarzyna CHP

Plant Design for construction of the HP/IP reducing-cooling station in the medium-pressure steam system.

2009

111. Alstom Stuttgart Re-count of the mountings system for the No. 6 power unit in the Bełchatów Power Plant (total capacity: 4440 MWe).

2009

112. Steinmüller Peitz

Static calculations, establishing the required profiles, detailed design together with workshop drawings for the supports/hangers of the new ABL-2 pipelines (burnt air pipelines -2) on the platforms +45,90 and +54,00 m. in the Bełchatów Power Plant (total capacity: 4440 MWe).

2009

113. Tauron

Wytwarzanie SA

Design set for development of the 10LBG40 auxiliary steam pipeline’s drainage installation of the 460 MW power unit with supercritical parameters in the Łagisza Power Plant (total capacity: 840 MWe).

2009

THERMAL & POWER MECHANICAL ENGINEERING 52

ENERGOPROJEKT-KATOWICE SA

NO. PURCHASER PROJECT NAME COMPLETED

114. Envi Con Medium- and low pressure pipelines, laying out the pipeline routes, participation in preparing basic and detailed designs.

2009

115. Doosan Babcock Detailed engineering concerning the flue gas ducts of the biomass combustion system in Odense (Denmark).

2009

116. Nowa Sarzyna CHP

Plant Design set including the planned modifications in the SP steam supply system to the “Organika-Sarzyna” Chemical Plant.

2009

117. Foster Wheeler

Warszawa Design of the small diameter pipelines for the Lukoil Energy and Gas Romania S.R.L. 2009

118. Alstom Power

Sp. z o.o. Elbląg Material specifications for the heating system of the 13K215 turbine. 2009

119. Motor Energy

Sp. z o.o. Design of the construction of the RS1 and RS2 reducing and cooling stations for the No. 8 power unit in the Połaniec Power Plant.

2008

120. Foster Wheeler Detailed engineering of the high pressure pipelines for the CFB Boiler Plant – the „ŁUKOIL” Project, Romania.

2008

121. Rybnik SA Power

Plant Designs for the construction of the new 6PZ3 feed water pumping engine on the spot of the one damaged in the consequence of the failure.

2008

122. Tauron

Wytwarzanie SA Basic design of the thermal power unit in the Bielsko-Biała 1 CHP Plant (total capacity: 275 MWt) - the turbine and boiler part.

2008

123. Tauron

Wytwarzanie SA

Detailed designs of the pipeline relocation (2 x DN 500 – modification of the supports, 2 x DN 150-200 – modification of the route as well as modification of the supports) in the area of the No. 1 wagon tippler (modernized during the construction of the 460 MW Power Unit in the Łagisza Power Plant (total capacity: 840 MWe)).

2008

124. PGE SA Turów Power

Plant

Design set for the projects entitled:

"No. 1 Power Unit - modernization of the live steam pipelines hangers",

"No. 3 Power Unit - modernization of the live steam pipelines hangers".

2008

125. Foster Wheeler Designs of the small diameter pipelines for the “DEVEN” Project in Bulgaria. 2008

126.

Koksoprojekt Consulting

Engineering Company Ltd. Zabrze

Project supervision for the project entitled: “Construction of the complex of coke oven battery (No. 5) in the Przyjaźń Coking Plant.

2008

127. H. Cegielski Poznań SA

Technical assumptions of the I&C systems for the Emdem Power Plant (Germany). 2008

128. Axima France Working drawings concerning the cooling system pipelines of the uranium enrichment system’s refrigerating units.

2008

129. Doosan Babcock

Technical design of the ducts together with supports or mountings and required platforms between:

the sedimentation chamber and the filter together with a compensator and two access door;

the filter and the fan with a compensator and a manhole together with the suction chamber of the fan (equipped with the access door);

the fan and the smokestack together with a compensator and an access door.

2008

130. Electrabel

Połaniec SA Design package: Modernization of the RS1 and RS2 reducing and cooling stations for the No. 1 power unit - thermal and mechanical engineering.

2008

131. Foster Wheeler

Warszawa Calculations of the protection setpoints for the 800 kW, 6kV main etching pump. 2008

132. PGE SA Bełchatów

Power Plant

Steam supply system (from behind the P1B) of the 1.7 MPa steam distribution header located between the power units of the No. 8 power unit to the No. 12 power unit.

2008

133. Tauron

Wytwarzanie SA

Design of the heat distribution network as well as of the steam network together with the trestles for the 460 MWe power unit in the Łagisza Power Plant (total capacity: 840 MWe).

2008

134. Skawina SA Power

Plant Designing work concerning the replacement of the live steam distribution header in the Skawina Power Plant (total capacity: 590 MWe).

2008

135. Energomontaż

Południe SA

Design of the replacement of the live steam pipeline in the section from the steam damper of the No. 9 power unit to the three-way pipe of the No. 4 steam distribution header, OP-140 boiler, No. 9 Energetyka Dwory Sp. z o.o.

2008

53

THERMAL & POWER MECHANICAL ENGINEERING

REFERENCE LIST

NO. PURCHASER PROJECT NAME COMPLETED

136. Alstom Power

Warszawa

Basic engineering and detailed engineering (civil engineering branch) as well as design of the network for the 858 MWe power unit in the Bełchatów Power Plant (total capacity: 4440 MWe). Detailed design of the cooling water pipelines in the engine room.

2008

137. Rafako SA Design set concerning the connection of the heat distribution network for the objects in the Pątnów Power Plant (total capacity: 1600 MWe).

2008

138. Dalkia Poznań ZE SA Design set: Modernization of the heat distribution network within a framework of the strategy for limiting complete standstills in the Karolin CHP Plant (total capacity: 844 MWt).

2007

139. PGE SA Bełchatów

Power Plant Superheated steam (from behind the P1B superheater) supply system of the 1.7 MPa steam distribution header located between the Power Units.

2007

140. Essener Supervision concerning the design set based on the 3D PDMS model for the HP pipelines – Lingen, Germany.

2007

141. Motor Energy

Sp. z o.o. Detailed engineering: Modernization of the RS-2 station at the No. 5 power unit together with the injection water system.

2007

142. Tauron

Wytwarzanie SA

Detailed designs for the airflow system from the engine room to the boiler house of the 460 MWe Power unit with supercritical parameters in the Łagisza Power Plant (total capacity: 840 MWe).

2007

143. Dalkia Poznań ZE SA

Design services connected with the modernization of the heating water pump of the BK100 Power unit, including:

Dynamic control calculations of the Fu-2 foundation for the new load;

Site inspection together with the technical condition assessment of the foundations;

Detailed design for the adaptation of the foundation.

2007

144. Alstom Power

Sp. z o.o. Design package: the steam pipelines in the area of the 13K215 turbine of the No. 7 power unit in the Dolna Odra Power Plant.

2007

145. PGE SA Turów Power

Plant Detailed engineering: the No. 3 power unit – modernization of the soot blowers’ steam conditioning station in the Turów Power Plant (total capacity: 2088 MWe).

2007

146. PGE SA Turów Power

Plant Detailed design together with the bill of quantities for the project entitled: “Power unit No. 2 – reconstruction of the hangers on the live steam pipelines”.

2007

147. Finow GmbH Eberswalde

Detailed engineering of pipeline systems in the Hokawe (20 MWe) CHP Plant. 2007

148. Kronopan Szczecinek

Sp. z o.o.

Design of the pipeline connecting the air discharge channels of the “VITS” drying room’s process lines as well as the varnishing lines’ discharge channels to the No. 2 “LOOS” boiler at the outlet of the No. 2 drying room.

2007

149.

Energomontaż Południe SA Łaziska/

PGE SA ZE Dolna Odra

Licensing documentation for the 07R245.16 steam pipeline of the gland supply system (from the busbar) for the No. 7 Power unit in the Dolna Odra Power Plant.

2007

150. Arcelor Mittal

Kraków Design set for the live steam distribution header (the “A” main conduit in the axes 16-25).

2007

151. ZE PAK SA Strength calculations of the feed water tanks together with the degasifiers for the Konin Power Plant.

2007

152. Kiefer & Voss GmbH Detailed engineering of pipeline systems of the „Olkiluoto” Nuclear Power Plant in Finland.

2006

153. Energomontaż

Południe SA Detailed engineering of pipelines in the area of the 13K215 turbine set of the power unit No. 7 in the Dolna Odra Power Plant.

2006

154. Alstom Power

Sp. z o.o. Modernization of the TZ2 turbine set in the Łódź CHP Plant. 2006

155. Łęczyńska

Energetyka Sp. z o.o.

Modernization and development of the Heat Plant in Bogdanka (to be constructed: the new CHP Plant, together with fluidised boiler and turbine set - 65 MWt and 40 MWe).

2006

156. Energomontaż

Południe SA Detailed engineering of the steam pipelines in the area of 13K215 turbine set of the power unit No. 2 in the Dolna Odra Power Plant.

2006

157. Atermon Athens High pressure pipelines stress calculation for the 5.5 MW turbine in the "Hellenic Petroleum" in Thessaloniki.

2006

THERMAL & POWER MECHANICAL ENGINEERING 54

ENERGOPROJEKT-KATOWICE SA

NO. PURCHASER PROJECT NAME COMPLETED

158.

Thermal Power Company Sp. z o.o in

Biała Podlaska

Technical documentation: the project of modernization of the K-1 Heat Plant, located in Town of Biała Podlaska. Technical documentation also includes a project for the construction of the new WR-8 water heater.

2006

159. Alstom Vaxjo Engineering services connected with the relocation of pipelines systems for the “Elektrenai” Project in Lithuania.

2006

160.

Tauron Wytwarzanie SA,

Jaworzno III Power Plant

Design of repair of the hot water pipelines feeding boiler No. 4 in the Jaworzno II Power Plant (total capacity: 190 MWe).

2006

161.

Kogeneracja SA Thermal Power

Company in Wrocław

Preparation and implementation of Power Plant classification system (in accordance with the KKS standard) in the Kogeneracja SA Complex of the CHP Plants.

2006

162. Foster Wheeler Detailed engineering of the high pressure pipelines for the “Alcoa” Project. 2006

163. PGE SA Rzeszów

CHP Plant Design of the pressure and flow protection setpoints in the heat exchanger HK 2000/1995/2/1 type (steam and water) on the combined cycle unit.

2006

164.

Tauron Wytwarzanie SA,

Jaworzno III Power Plant

Project modernization: the No. 3 Power unit’s main steam pipeline as well as the K4/T1 main steam pipeline in the No. 2 Power Plant (total capacity: 190 MWe).

2006

165. Chemar SA Kielce Compensation calculations of the pipelines in the Skawina Power Plant (total capacity: 590 MWe).

2006

166. Alstom Vaxjo Designing services concerning the pipelines of the neutralization system – the “Elektrenai” Project.

2006

167. Alstom Power

Sp. z o.o. Compensation calculations: Steam dumping pipelines to condenser.

2006

168. ZRE Lublin SA Strength calculations and detailed engineering of the blow down tank (the Garp Project).

2006

169. PGE SA Turów Power

Plant Detailed design of the project entitled: “Modernization of Safety valves (section of live steam system) – power units 1-3”.

2006

170. Energomontaż

Południe SA Łaziska Detailed engineering of dehydration pipelines in the area of 13K215 turbine set of the power unit No. 8 in the Dolna Odra Power Plant.

2006

171. Energo-Inwest

Rybnik Sp. z o.o. Workshop drawings of pipelines for the Sundsvall Project. 2006

172. Foster Wheeler Complex design services for the 460 MWe Power unit in the Łagisza Power Plant (total capacity: 840 MWe) - thermal & power mechanical engineering scope.

2006

173. Alstom Power

Sp. z o.o.

Designing services including basic and detailed designs of the 460 MWe Power unit in the Łagisza Power Plant (total capacity: 840 MWe) - thermal & power mechanical scope.

2006

174. Steinmüller Peitz Detailed design as well as the static and control calculations for the connecting pipelines in the area of the No. 3 boiler in the Bełchatów Power Plant (total capacity: 4440 MWe).

2006

175. Dalkia Poznań ZE SA Technical documentation (mechanical and civil engineering branch) concerning the modification of the mode of supply of the sub-turbine exchanger.

2006

176. Aquanet SA Performance project: “Oil cooling unit in the lubrication system of 12 air blowing fans operating in the blowing fans station of the waste water treatment plant in Koziegłowy”.

2005

177. Energomontaż

Południe SA Łaziska Detailed engineering: Pipeline dewatering in the area of turbine 13K217 (power unit No. 8) in the Dolna Odra Power Plant.

2005

178. Electrabel

Połaniec SA Modernization design of reduction and cooling stations RS1 and RS2 in the power unit No. 6.

2005

179. PGE SA Turów Power

Plant

Detailed design for the project entitled: “The Power units 1-10 – modernization of the bottom outlet system as well as the dehydration system (located between the power units), achieved by the construction of the tank located in the area of the No. 1 power unit.

2005

180. Energomontaż

Południe SA Detailed engineering of the steam pipelines in the area of 13K215 turbine of the power unit No. 8 in the Dolna Odra Power Plant.

2005

55

THERMAL & POWER MECHANICAL ENGINEERING

REFERENCE LIST

NO. PURCHASER PROJECT NAME COMPLETED

181. Electrabel

Połaniec SA Modernization design of reduction and cooling stations 4RS1 and 4RS2. 2005

182. Polimex-

Mostostal SA Static calculations and working drawings of the flue gas ducts for LAB Company (the Sundsvall facility).

2005

183. Stalbud Tarnów

Sp. z o.o. Technical documentation for air ducts and flue gas ducts – the Sundsvall Project. 2005

184. Energomontaż

Południe SA Łaziska As-built documentation: the steam pipelines – the section from the steam boiler to the turbine generator in the powerhouse.

2005

185. Finow GmbH Eberswalde

Detailed engineering: Feed water pipelines in the Sipat Power Plant in India. 2005

186. Energo-Inwest

Rybnik Sp. z o.o. Detailed design of the air ducts and the flue gas ducts – the Kolding Project. 2005

187. Sefako SA Design of the flue gas ducts and platforms for the H.C.Orsted Project, Denmark. 2005

188.

Thermal Power Company Sp. z o.o. in

Biała Podlaska

Technical documentation for modernization of the K-1 CHP Plant in Orzechowa Street in Biała Podlaska together with an assembly project for a new WR-8 water heater.

2005

189. Energetyka

Cieszyńska Sp. z o.o. As-built documentation: Thermal power unit in the Cieszyn CHP Plant. 2005

190. Lurgie Lentjes Additional designs related to the turbine overhaul in the Rzeszów CHP Plant (5 MWe).

2005

191. Tauron

Wytwarzanie SA Design set: Construction of the guillotine damper on the flue gas ducts (in the desulphurization lines).

2005

192. Polimex-

Mostostal SA The Sundsvall project. Static calculations and as-built documentation of the flue gas ducts.

2005

193. R&M Mainserv

Sp. z o.o. Detailed design and as-built documentation: Modernization of two mechanical-draught cooling towers (boiler Ofz A) in the Żerań CHP Plant.

2005

194. Mega-Rem Sp. z o.o. Control calculations for the RS4 and RS5 Station. 2005

195.

Tauron Wytwarzanie SA,

Siersza Power Plant

Detailed design: Modernization of heating station No. 2 in the Siersza Power Plant (total capacity: 786 MWe).

2004

196.

Tauron Wytwarzanie SA,

Siersza Power Plant

Modernization of injection to live steam installation for boilers 1 and 2 in the Siersza Power Plant (total capacity: 786 MWe).

2004

197. NSE Sp. z o.o.

Brzeszcze Technical draft entitled: “Reconstruction of the thermal centre in the thermal energy source in the NSE Brzeszcze CHP Plant No. 1”.

2004

198. Skawina SA Power

Plant Performance project for the reconstruction of a live steam pipeline from K3 to TG2 in the Skawina Power Plant (total capacity: 590 MWe).

2004

199. Polimex Sices Polska

Sp. z o.o. Workshop documentation of chemical equipment together with calculations. 2004

200. Atermon Athens Design of the HP and LP pipeline system for the unit operating in co-generation, of capacity 400 MW in Thessaloniki.

2004

201.

Tauron Wytwarzanie SA,

Siersza Power Plant

Performance project for the reconstruction of heat generating station No. 2 in the Siersza Power Plant (total capacity: 786 MWe).

2004

202. Pronovum Sp. z o.o. Licensing documentation for the main steam pipelines of the B-12 power unit in the Łaziska Power Plant (total capacity: 1155 MWe).

2004

203. Skawina SA Power

Plant Technical documentation for the pipelines of live and start-up steam as well as feed water in the Skawina Power Plant (total capacity: 590 MWe).

2004

204. Tauron

Wytwarzanie SA

Modernization of the district heating system in the Łagisza Power Plant (total capacity: 840 MWe): installation of the new heat exchangers water-water in the boiler house, of total thermal power 20MWt, to replace the old heating stations No. 1, 2 and 3, inclusive of the heating water pipelines arrangement on the gallery; installation of the system to reduce the minimum technical requirements for the by-turbine exchangers UP-10 (adjustments for operation in summer conditions) at units No. 6 and 7.

2004

THERMAL & POWER MECHANICAL ENGINEERING 56

ENERGOPROJEKT-KATOWICE SA

NO. PURCHASER PROJECT NAME COMPLETED

205. Energetyka

Cieszyńska Sp. z o.o. Technical documentation for the reducing-cooling station of reheated steam from the oil-fired boiler ED 6 to the thermal degasifier with connecting pipelines.

2004

206. Kraftanlagen

München GmbH Workshop documentation for the pipelines and mountings in the Ai Jubail Power Plant.

2004

207. Ostrołęka SA Power

Company Detailed design for the installation of the reducing-cooling station 2RS-1 in the No. 2 power unit in the Ostrołęka Power Plant.

2004

208. Electrabel

Połaniec SA Designs for the modernization of the start-up and discharge stations RS1 and RS2 – thermal and mechanical engineering.

2004

209. Energetyka

Cieszyńska Sp. z o.o. Throttle replacement for the live steam pipeline from the OR35N boiler. 2004

210.

Tauron Wytwarzanie SA,

Łaziska Power Plant

Licensing documentation of the main steam pipelines of the 9-11 power unit in the Łaziska Power Plant (total capacity: 1155 MWe).

2003

211. Zabrze SA CHP Plant

Assembly of the natural gas fired KP-20 steam boiler together with auxiliary installations and devices connected functionally with the boiler operation in the Gliwice CHP Plant. Basic Design and Performance Drafts in the scope of:

management of a boiler house appliances;

gas and water pipelines from a boiler house building;

feed and condensation water pumps;

assembly of a steam – water heat exchanger;

thermal, mechanical and lifting crane auxiliary equipment and installations;

heating water output pipelines with a network summer season water pumps unit;

steam output pipelines to the external recipients for the CHP Plant’s internal purposes.

2004

212. Dalkia Poznań ZE SA Documentation for the overhaul of live steam pipelines from boiler OP430 within T-connection at level of 18.5m.

2003

213.

Tauron Wytwarzanie SA,

Jaworzno III Power Plant

Documentation for the live steam pipelines, boilers K-2 and K-3, turbines TG-2 and TG-3 as well as working drawings for the replacement of high-pressures Safety valves 1 and 2 at units No. 2 and 3 in the Jaworzno III Power Plant (total capacity: 1345 MWe).

2003

214.

Tauron Wytwarzanie SA,

Jaworzno III Power Plant

Technical documentation for the cut- off of boilers No. 5 and No. 6 as well as turbines No. 4 and No. 6 in the Jaworzno III Power Plant (total capacity: 1345 MWe).

2003

215. ZE PAK SA Pątnów

Power Plant Detailed documentation for the HP and LP pipelines for the order package L01-BATCH A4 and A6 – the Pątnów Power Plant (total capacity: 1600 MWe).

2003

216.

Tauron Wytwarzanie SA

Stalowa Wola Power Plant

Detailed documentation for the installation of return flap valves on secondary reheat pipelines to the reducing-cooling stations 3.0/1.5MPa at the units No. 1 and No. 2.

2003

217. PGE SA Bełchatów

Power Plant

Detailed documentation for the live and the secondary steam pipelines of unit 360 MWe – the variant in P91 material for units No. 1 and No. 2 in the Bełchatów Power Plant (total capacity: 4440 MWe):

detailed designs for the high pressure and the secondary steam pipelines at units No. 1 and No. 2;

specification of investment expenditure for the replacement of live steam pipelines at units No. 1 and No. 2;

isometric drawings for high pressure and secondary steam pipelines at units No. 1 and No. 2 inclusive of stress calculations and compensation.

2003

218. Energomontaż

Południe SA

Steel structures for the project Stendal. Detailed engineering of:

flue gas ducts (working and assembly drawings);

flue gas ducts from cyclone to electrostatic precipitator (working and assembly documentation);

downcomer pipes and chute (working and assembly documentation).

2003

219. Zabrze SA CHP Plant Resistance calculations for the high pressure gas pipe design and measuring station of the Zabrze CHP Plant units.

2003

57

THERMAL & POWER MECHANICAL ENGINEERING

REFERENCE LIST

NO. PURCHASER PROJECT NAME COMPLETED

220.

Tauron Wytwarzanie SA,

Łagisza Power Plant

Design works for the technological connection of the boiler and turbine at power generation unit 460 MWe in the Łagisza Power Plant (total capacity: 840 MWe).

2003

221. Babcock & Wilcox

Volund Esbjerg

Design for Hogdalen:

basic design for the primary and secondary air chambers as well as the flue gas chambers;

working drawings for the primary and secondary air ducts as well as the flue gas ducts.

2003

222. Rem-En Sp. z o.o. Technical design for the drainage installation of the turbine steam pipelines. 2003

223. Kraków SA CHP Plant

Technical design for the pipeline connecting two existing pipelines of cooling water (DN 2000 and DN 1600).

2003

224. Nowa Sarzyna CHP

Plant Technical design for the installation of low pressure steam cooler in the Nowa Sarzyna CHP Plant (total capacity: 216 MWt).

2003

225.

Tauron Wytwarzanie SA,

Katowice CHP Plant

Detailed design for the exchange and relocation of admission point for dewatering pipelines 1LCM03 and 1LCM05 of the live steam screens at the route from screens to the turbine expansion tank 1LCM30BB001 at unit BCF100 in the Katowice CHP Plant (total capacity: 692 MWt).

2003

226. Ostrołęka SA Power

Company

Detailed design for installation of the station RS1 and R3 at unit No. 1 based on the modifications applied at unit No. 3 in the Ostrołęka Power Plant. Detailed designs of:

installation of the station RS1 for admission pipeline to the station and steam discharge pipeline from the station to cold bus;

installation of the station RS1 for admission pipeline to the station and connecting the steam pipeline from the station to the process steam header in the area of the station;

steam pipelines in the area of the station RS1;

spray water pipelines in the area of the station RS1.

2003

227. Dalkia Poznań ZE SA Detailed design for the installation of leakage-proof cut-off ball valves at pipelines NQA and NQA 30 of unit No. 3 – thermal and mechanical engineering.

2003

228. ZE PAK SA Detailed design for cooling water pipelines in the turbine hall in the Power Plant. 2003

229.

Połaniec SA Power Plant - Electrabel

Group

Designs for modernization of the start-up &discharge stations 7RS1 and RS2 – thermal and mechanical engineering. Detailed designs for:

live steam pipelines to the station RS1 and RS2 inclusive of steam pipelines from the station to the secondary reheat pipelines;

pipelines to the station RS1 and RS2;

Installation of the reducing-cooling station RS1 and RS2.

2003

230. Białystok SA CHP

Plant Designs for the installation of a new extraction condensing turbine generator set of 20 MW inclusive of auxiliary equipment.

2003

231. PGE SA Turów Power

Plant

Boiler reconstruction at units No. 4-6 in the Turów Power Plant (total capacity: 2088 MWe). Detailed designs of:

steam reheat pipelines;

de-sludging, de-watering and de-aeration pipelines;

continuous blowdown tank;

hot service water pipelines at unit No. 4;

cooling water pipelines for the ash transport system at units No. 4 and No. 6;

cooling water pipelines for the ventilation and air conditioning at unit No. 4;

cooling water pipelines for fans and rotary air heater at units No. 4 and No. 6.

2003

232.

Tauron Wytwarzanie SA,

Łagisza Power Plant Technical documentation and design services for the turbine part of unit 460 MW. 2003

233. Dalkia Poznań ZE SA Calculations for suspending the live steam pipeline from boiler "2K" upon removing the T-connection towards the reducing station.

2003

THERMAL & POWER MECHANICAL ENGINEERING 58

ENERGOPROJEKT-KATOWICE SA

NO. PURCHASER PROJECT NAME COMPLETED

234. Zielona Góra SA CHP

Plant

Construction of the combined cycle unit in the Zielona Góra CHP Plant. Detailed designs:

construction of the cooling water pipelines with related installations;

distribution pipelines of cooling water in the area of the cooling station;

return pipelines to the fan cooling station;

construction of the cut-off fittings at suction ducts of the cooling water pumps;

service water pipelines to the existing Power Plant;

hot service water pipelines to and from the new turbine generator set at the gallery;

hot service water pipelines to and from the new turbine generator set in the existing boiler house and turbine hall;

pumping pipelines to the turbine hall.

2003

235.

Tauron Wytwarzanie SA,

Jaworzno III Power Plant

Concession documentation for the existing system of steam pipelines from extractions of TG1, units No. 4 and No. 6 – for the Technical Supervision Authorities.

2002

236.

Tauron Wytwarzanie SA,

Jaworzno III Power Plant

As-built documentation for the live steam pipelines to the station RS1 inclusive of spray water pipelines to the station RS1 and piping of oil unit, servo-motors of the station RS1 with oil drip installation.

2002

237.

Tauron Wytwarzanie SA,

Jaworzno III Power Plant

Technical documentation for modernization of the 13K225 turbine drains at unit No. 6 in the Jaworzno III Power Plant (total capacity: 1345 MWe).

2002

238.

Tauron Wytwarzanie SA,

Siersza Power Plant

Design of steam header 15 bar from units No. 1-6 in the Siersza Power Plant (total capacity: 786 MWe) to supply the fuel management and the old mazout header from the district heating header.

Design for the installation of measuring stub pipes for the system of production process management at units No. 1 and No. 2 in the Siersza Power Plant.

2002

239.

PGE SA ZE Dolna Odra Pomorzany

CHP Plant

Technical design for "The industrial-demo flue gas desulphurization system with use of electron beam" in the Pomorzany CHP Plant (total capacity: 443 MWt) in Szczecin with modification of the damping column and flue gas inlet channel.

2002

240.

Tauron Wytwarzanie SA,

Siersza Power Plant

Technical draft: 15 bar steam pipeline from the “56” cooling stations for defrosting wagons

Performance projects: DN200 cooled steam collector for defrosting wagons and leading pipelines to a wagons defrosting and return condensate hall.

2002

241.

Tauron Wytwarzanie SA,

Jaworzno III Power Plant

Detailed design for the steam pipeline 1.7 MPa to the mazout station in the Jaworzno III Power Plant (total capacity: 1345 MWe).

2002

242. Alstom Power

Sp. z o.o. Basic detailed design for the installation of steam preparation for glands of turbine TK-120 MW at the Maritsa Power Plant in Bulgaria.

2002

243. Tauron

Wytwarzanie SA Technical and detailed designs for modernization of the control point of feed water at unit No. 2 in the Łaziska Power Plant (total capacity: 1155 MWe).

2002

59

THERMAL & POWER MECHANICAL ENGINEERING

REFERENCE LIST

NO. PURCHASER PROJECT NAME COMPLETED

244. Będzin SA CHP Plant

Modernization of the heat transmission system from Thermal Power Plant in order to adjust the flow-through system of the Będzin CHP Plant (total capacity: 415 MWt) to variable flow in the district heating system pursuant to the requirements of Thermal Power Company in Dąbrowa Górnicza. Basic design for the modernization of heat transmission system in the Będzin CHP Plant. Detailed designs for:

installation of the hydrophore system for service water addition to the network;

installation of the modernized set of service water pumps;

installation of the modernized pumps PS7 and PS8 (35W50);

pipelines connecting the suction header of pumps PS7 and PS8 with the pipelines supplying the boiler WP-120 No. 8;

installation of the set of service water pumps PS2 and PS3 for operation in the summer season;

pipeline connecting the suction and pumping header of summer season pumps.

2002

245.

Tauron Wytwarzanie SA,

Jaworzno III Power Plant

Technical design and author’s supervision over the assembly of RS1 station as well as steam and spray water pipelines to RS1 station at unit No. 6 in the Jaworzno III Power Plant (total capacity: 1345 MWe).

2002

246. Kraków

CHP Plant SA Technical design for the installation of drains within turbine 13UK-125 in the Kraków CHP Plant (total capacity: 1237 MWt).

2002

247. Cieszyn

CHP Plant Technical and detailed designs for the installation of 4.5 MWe unit in the Cieszyn CHP Plant.

2002

248. Będzin SA CHP Plant Technical and detailed designs for the heat transmission from the Będzin CHP Plant (total capacity: 415 MWt).

2002

249. PGE SA Turów Power

Plant Detailed designs for the boiler reconstruction at units No. 4-6 in the scope of the HP, MP and LP pipelines, the flue gas and the air ducts.

2002

250. Dalkia Poznań ZE SA Detailed designs for the installation of throttling valve at steam header 1.0 MPa to reserve and start-up heater 2LBH40 in the Karolin II CHP Plant (total capacity: 844 MWt).

2002

251. Chorzów ELCHO

Sp. z o.o. CHP Plant

Detailed designs for pipelines and fastenings, computer models of pipelines installations and fastenings, concession documentation for the Technical Supervision Authorities, approval and as-built documentation for HP, MP and LP pipelines at units No. 1 and No. 2.

2002

252.

Tauron Wytwarzanie SA,

Łaziska Power Plant

Detailed designs for installation of the HP and LP discharge stations at unit No. 10 in the Łaziska Power Plant (total capacity: 1155 MWe).

2002

253.

Tauron Wytwarzanie SA,

Łagisza Power Plant

Technical documentation for auxiliary installations and documentation of the boiler house and turbine house as well as auxiliary equipment of the Power Plant.

2002

254.

Połaniec Power Plant SA – Electrabel

Group Designs for modernization of the start-up and dumping stations RS 1 and RS 2. 2002

255. Chorzów ELCHO

Sp. z o.o. CHP Plant

Verification of strength calculations for the thermal network 4xDn800 implemented in Chorzów within the following project: ELCHO CHP Plant Project, Poland 2x102MW/180MW, on the basis of the delivered design.

2002

256.

Tauron Wytwarzanie SA,

Jaworzno III Power Plant

Concession documentation for the existing cooling water system of TG1. 2001

257.

Tauron Wytwarzanie SA,

Jaworzno III Power Plant

Concession documentation for live steam pipelines to the reducing station as well as for installation of the heat exchanger for cooling systems of the boiler No. 2 and No. 3 in Power Plant II (total capacity: 190 MWe).

2001

258.

Tauron Wytwarzanie SA,

Jaworzno III Power Plant

Documentation for drains of the turbine 13K215 together with expansion tanks at unit No. 4, holding the author’s supervision over assembly and developing the as-built documentation in the Jaworzno III Power Plant (total capacity: 1345 MWe).

2001

THERMAL & POWER MECHANICAL ENGINEERING 60

ENERGOPROJEKT-KATOWICE SA

NO. PURCHASER PROJECT NAME COMPLETED

259. Sidmar-Norm

Germany Workshop documentation for the flue gas ducts and supporting structures. 2001

260.

Tauron Wytwarzanie SA -

Siersza Power Plant

Workshop and assembly documentation for feed water pipelines in the scope assigned to Elektrim Megadex within reconstruction of units No. 1 and No. 2 in the Siersza Power Plant (total capacity: 786 MWe).

2001

261. Non-Ferrous Metal

Works Szopienice SA Installation of the turbine generator set 3 MW in the CHP Plant of the Non-Ferrous Metalworks – all the documentation stages.

2001

262. Lindacorp Turkey Strength and compensation calculations for the process steam pipeline. 2001

263.

Tauron Wytwarzanie SA,

Jaworzno III Power Plant

Calculations for the Safety valves of degasifiers No. 1 and No. 2 in the Jaworzno II Power Plant (total capacity: 190 MWe).

2001

264. Skawina SA Power

Plant

Calculation of flue gas flow capacity for the stack No. 1 in the Skawina Power Plant (total capacity: 590 MWe), based on thermal and dynamic conditions per different variants of the stack operation.

2001

265. Komořany Power

Plant Design works connected with the pro-environmental reconstruction of boilers K6-K10 in the Komořany Power Plant.

2001

266. Lindacorp Technical design for installing two boilers, two turbine generator sets and related equipment of the CHP Plant in the Kayseri sugar plant in Turkey.

2001

267.

Tauron Wytwarzanie SA,

Jaworzno III Power Plant

Technical design for modernization of the reducing-cooling station RS1 together with the oil stand and pipelines as well as design for installation of control valves replaced within the modernization of automation systems at unit No. 4 in the Jaworzno III Power Plant (total capacity: 1345 MWe).

2001

268.

PGE SA ZE Dolna Odra Pomorzany

CHP Plant Technical design for pipelines of drips from the HP heat recovery. 2001

269.

Tauron Wytwarzanie SA,

Jaworzno III Power Plant

Detailed design for modernization of the pipeline installations in the area of the degasifing station of make-up water for the heating cycle 0.12 MPa No. 1 and No. 2 and pre-heater of softened water – the thermal power branch.

2001

270. Zduńska Wola

Sp. z o.o. CHP Plant Detailed design for the reducing-cooling station with installation of VLB valve within thermal engineering and I&C.

2001

271. Kraków SA CHP Plant Detailed design for the cooling water pipeline system within connection of the existing pipelines with the newly-designed water distribution point for the No. 2 cooling tower in the Kraków CHP Plant (total capacity: 1237 MWt).

2001

272. Dalkia Poznań ZE SA Detailed design for replacement of the pump OS-200 with the pump PŁ-300, with frequency converter in the pumping station of raw water intake on the Warta river in the Poznań II Karolin CHP Plant (total capacity: 844 MWt).

2001

273.

Tauron Wytwarzanie SA,

Siersza Power Plant

Technical designs for the high-pressure and high-temperature steam pipelines of unit No. 1 in the Siersza Power Plant (total capacity: 786 MWe).

2001

274. Dalkia Poznań ZE SA Detailed designs for installation of the service water pumping aggregate No. 6 in the cooling water pumping station in the Poznań II Karolin CHP Plant (total capacity: 844 MWt).

2001

275.

Tauron Wytwarzanie SA,

Łagisza Power Plant Re-design for hangers of the live steam bypass pipelines of the No. 1 power unit. 2001

276. Kraków SA CHP Plant Designating with KKS code the equipment in the Kraków CHP Plant (total capacity: 1237 MWt) for purposes of the Information System.

2001

277. Rybnik SA Power

Plant Adaptation of the documentation for station RS-1 from unit No. 6 to unit No. 8. 2000

278.

Tauron Wytwarzanie SA,

Jaworzno III Power Plant

Concession documentation for the main drains header in the Jaworzno III Power Plant (total capacity: 1345 MWe).

2000

61

THERMAL & POWER MECHANICAL ENGINEERING

REFERENCE LIST

NO. PURCHASER PROJECT NAME COMPLETED

279.

Tauron Wytwarzanie SA -

Jaworzno III Power Plant

Concession documentation for the start-up of steam header in the Jaworzno III Power Plant (total capacity: 1345 MWe).

2000

280.

Tauron Wytwarzanie SA,

Jaworzno III Power Plant

Design documentation for relocating the drains system of TG1,4,6 (division of drains between the lower drains header and tanks V=6, V=50 m) in the Jaworzno III Power Plant – Power Plant II (total capacity: 190 MWe).

2000

281.

Tauron Wytwarzanie SA,

Jaworzno III Power Plant

Design documentation for installation of the reducing station that connects the dump of steam from boilers K-2 and K-3 with header of 0.15 MPa in the Jaworzno III Power Plant (total capacity: 1345 MWe).

2000

282. Skawina SA Power

Plant Technical documentation for supplementary designs of thermal power evacuation from the turbine generator set TG-3.

2000

283. ZRE Warszawa SA Design documentation for installation of the stations RS1 and R3 in Power Plant Ostrołęka "B" at unit No. 1.

2000

284. Skawina SA Power

Plant Technical documentation for complementary projects for thermal power output from a TG-3 turbine set.

2000

285.

Tauron Wytwarzanie SA,

Jaworzno III Power Plant

Technical documentation for drains of turbine 13K225 at unit No. 1 in the Jaworzno III Power Plant - Power Plant III (total capacity: 1345 MWe).

2000

286. Polish Steel Works SA Technical documentation for installation of the automatic turbine generator set No. 6, inclusive of the author’s supervision, in the Power Plant in the Tadeusz Sendzimir Steel Works.

2000

287. Rudniki SA Cement

Plant Workshop documentation for supporting structures of the flue gas and the air ducts in the Rudniki Cement Plant inclusive of strength calculations.

2000

288. Sefako SA Workshop documentation for the flue gas and the air ducts inclusive of the steel structure for 2 oil boilers in the Meiderich Heating Plant.

2000

289. Sud Zucker AG -

Germany Workshop documentation for flue gas ducts, inclusive of strength calculations for Sud Zucker, Gross Gerau.

2000

290. Varta Batterie AG -

Germany Workshop documentation for the flue gas ducts, inclusive of strength calculations for the company "Varta" Batterie.

2000

291. UZ -Nordstemmen -

Germany Workshop documentation for the flue gas ducts, inclusive of strength calculations for UZ-Nordstemmen.

2000

292. Bukowa Cement

Plant Workshop documentation for supporting structures of the equipment, the flue gas ducts in the Bukowa Plant, including the strength calculations.

2000

293. Skawina SA Power

Plant

Workshop documentation for the noise silencer of air blowouts from the compressors’ Safety valves and the supporting structure for setting the above-mentioned silencer in the Skawina Power Plant (total capacity: 590 MWe).

2000

294.

Tauron Wytwarzanie SA,

Jaworzno III Power Plant

Detailed documentation for the modified arrangement of drains headers in the area of turbine generators sets TG-1, TG-2.

2000

295. Będzin SA CHP Plant Comprehensive modernization of the turbine generator set TG1 in the Będzin CHP Plant (total capacity: 415 MWt).

2000

296. Dalkia Poznań ZE SA Modernization and completing the construction of fan cooling towers PAD 42 and 43 in the Poznań Karolin CHP Plant (total capacity: 844 MWt) – detailed engineering.

2000

297.

Thermal Power Company in Włocławek

Hydraulic calculations for the district heating system operated by thermal power company in Włocławek.

2000

298.

Tauron Wytwarzanie SA,

Łaziska Power Plant

Calculation of pressure drop on the model system at connecting both the flue gas ducts of the flue gas desulphurization installation at units 225 MWe in the Łaziska Power Plant (total capacity: 1155 MWe).

2000

299.

Tauron Wytwarzanie SA,

Siersza Power Plant

Developing the documentation for reconstruction of unit No. 1 and No. 2 in the following scope: thermal, technological, mechanical, civil, and for auxiliary equipment of the turbine house at units No. 1 and No. 2.

2000

THERMAL & POWER MECHANICAL ENGINEERING 62

ENERGOPROJEKT-KATOWICE SA

NO. PURCHASER PROJECT NAME COMPLETED

300.

Tauron Wytwarzanie SA,

Katowice CHP Plant

Holding the function of the Chief Designer and providing the ordering party with design works connected with the newly-constructed heat and power unit BCF-100 No. 1 in the Katowice CHP Plant (total capacity: 692 MWt).

2000

301.

Tauron Wytwarzanie SA,

Katowice CHP Plant

Design of the district heating pipeline running from the Katowice CHP Plant (total capacity: 692 MWt) to Steel Works Jedność.

2000

302. Będzin SA CHP Plant Technical design of the installation to blow out the live steam pipeline for turbine generator set in the Będzin CHP Plant (total capacity: 415 MWt).

2000

303.

Tauron Wytwarzanie SA,

Jaworzno III Power Plant

Technical design for modernization of the reducing-cooling station with oil stand and pipelines as well as design for installation of control valves replaced within the modernization of automation systems at unit No. 1 in the Jaworzno III Power Plant (total capacity: 1345 MWe).

2000

304.

Tauron Wytwarzanie SA,

Jaworzno III Power Plant

Technological design for modifying the arrangement of feed water pipelines in the turbine house in the Jaworzno Power Plant III - Jaworzno Power Plant II (total capacity: 190 MWe).

2000

305. PGE SA ZE Dolna

Odra

Detailed design for adjusting the existing "economic bus bar” in the Pomorzany CHP Plant (total capacity: 443 MWt) to changes deriving from it being supplied from the reducing stations R4A and R4B and revised method of extension compensation.

2000

306.

Tauron Wytwarzanie SA,

Jaworzno III Power Plant

Detailed design for connecting the live steam pipeline from boiler K 6 to the main steam header in the Jaworzno Power Plant III - Jaworzno Power Plant II (total capacity: 190 MWe).

2000

307.

Tauron Wytwarzanie SA,

Jaworzno III Power Plant

Detailed design for connecting in the header and unit arrangement the feed pump EP-9 with high-pressure feed recovery of the turbine generator set TG1.

2000

308. Polish Steel Works SA Detailed design for replacing the pumping header EPZ inclusive of capacity measurement for individual feed pumps.

2000

309.

PGE SA ZE Dolna Odra Pomorzany

CHP Plant

Technical designs for the flue gas treatment installations in the Pomorzany CHP Plant (total capacity: 443 MWt).

2000

310.

Tauron Wytwarzanie SA,

Łaziska Power Plant

Detailed designs for the installation of heat intake from the air chamber of turbine TK 120 in the Łaziska Power Plant (total capacity: 1155 MWe).

2000

311. Chorzów ELCHO

Sp. z o.o. CHP Plant

Proposed route for the district heating pipelines from the ELCHO CHP Plant (total capacity: 500 MWt) to be incorporated in the network of the thermal power company.

2000

312.

Tauron Wytwarzanie SA,

Łagisza Power Plant

Reconstruction of the district heating stations No. 1-3, internal central heating cycle as well as modernization of the reducing-cooling stations RS 1, RS 2.

2000

313. PGE SA Turów Power

Plant Removal and reconstruction of an operational chemical laboratory – performance projects.

2000

314.

Tauron Wytwarzanie SA,

Siersza Power Plant

Reconstruction of power units No. 1 and No. 2 in the Siersza Power Plant (total capacity: 786 MWe) in the scope of two turbine sets of 145 MWe of power each.

2000

315. Będzin SA CHP Plant Development of documentation and settlements with the Office of Technical Inspection concerning live steam pipeline components for the Będzin CHP Plant (total capacity: 415 MWt).

2000

316.

Tauron Wytwarzanie SA,

Jaworzno III Power Plant

Preparation of licensing documentation for the hot feed header. 2000

63

THERMAL & POWER MECHANICAL ENGINEERING

REFERENCE LIST

5.1. Technical assumptions of heat-, power-, and fuel gas supply projects

NO. PURCHASER PROJECT NAME COMPLETED

1. Przemyśl

Municipality

Updating of the project of assumption of the heat, electric energy, and gas fuel supply plan for the Przemyśl Municipality for the years 2016-2030.

UP/2016/0040 5.1

in progress

2. Świebodzin Municipality

Updating of the draft assumptions of the heat, electric energy, and gas fuel supply plan for the Świebodzin Municipality for the years 2016-2028.

in progress

3. Zgorzelec

Municipality Updating of the draft assumptions of the heat, electric energy and gas fuel supply plan for Zgorzelec Town.

in progress

4. Krzeszowice Municipality

Updating of the “Assumptions of the Heat, Electric Energy, and Gas Fuel Supply Plan for Krzeszowice Municipality”.

in progress

5. Lubin Town Council Updating of the particulars of the heat, electric energy, and gas fuel supply plan for

Lubin Municipality. 2015

6. Radlin Municipality Update of the draft assumptions for the heating, electricity, and gas fuels supply plan for the Radlin Municipality.

2015

7. Kielce Municipality “Updating of the assumptions of the heat, electric energy and gas fuel supply plan for Kielce Town”.

2015

8. Jelenia Góra Town Updating of the project of assumption of the heat, electric energy and gas fuel supply plan for Jelenia Góra Town.

2014

9. Katowice Town Updating of the project of assumption of the heat, electric energy and gas fuel supply plan for Katowice Town.

2014

10. Zgorzelec Town Updating of the draft assumptions of the heat, electric energy and gas fuel supply plan for Zgorzelec Town.

2013

11. PGE SA Turów Power

Plant

Updating of the design documentation for the investment project named “Heat Engineering – Execution of Connections Enabling Media (Heat, Electric Energy and Water) Supply to the Horticultural Farm of TOMATEX company”.

2013

12. Świebodzin Municipality

Updating of the draft assumptions of the heat, electric energy and gas fuel supply plan for Świebodzin Municipality for the years 2013-2028.

2013

13. Strzelce Opolskie

Municipality Updating of the draft assumptions of the heat, electric energy and gas fuel supply plan for Strzelce Opolskie Municipality.

2013

14. Opalenica

Municipality Updating of the project of assumption of the heat, electric energy and gas fuel supply plan for Opalenica municipality.

2013

15. City of Zabrze Update of guidelines for the plan of heat, electricity and gas fuel delivery in the city of Zabrze.

2013

16. Municipality Prudnik Update of the draft assumptions for the heat, electricity and gas supply plan in the municipality Prudnik.

2013

17. Municipality

Przemyśl Update of the draft assumptions for the heat, electricity and gas supply plan in Municipality Przemyśl.

2013

18. The City of Nowy

Sącz Updating guidelines for the plan of heat, electricity and fuel gas supply for the city of Nowy Sącz.

2012

19. Ciechanów Town

Municipality Updating of the project of assumption of the heat, electric energy and gas fuel supply plan for Ciechanów town municipality.

2012

20. City of Krzeszowice Design assumptions for the plan to supply heat, electricity and gas fuels for Krzeszowice Municipality for the years 2012-2030.

2012

21. Buk Town and

Municipality Council Updating of the document titled: “Assumption of the Heat, Electric Energy and Gas Fuel Supply Plan for Buk Town and Municipality”.

2012

22. PGE SA Turów Power

Plant

Design documentation for the investment named “Heat Engineering – Execution of Connections Enabling Media (Heat, Electric Energy and Water) Supply to the Horticultural Farm of Tomatex company in the Turów Power Plant (total capacity: 2088 MWe)”.

2012

23. Lubin Municipality Update of the assumptions of the district heat, electricity, and gas fuel supply plan for the Lubin Municipality.

2012

THERMAL & POWER MECHANICAL ENGINEERING 64

ENERGOPROJEKT-KATOWICE SA

NO. PURCHASER PROJECT NAME COMPLETED

24. Nowa Wieś Wielka

Commune Draft of the assumptions for the district heat, electricity, and gas fuel supply plan of the Nowa Wieś Wielka Commune for the years 2011-2030.

2011

25. City of Kielce Update of assumptions for heat, electric energy and gas fuel distribution plan for city of Kielce.

2011

26. City of Poznań Update of the technical assumptions for the heat-, power-, and fuel gas supply project for the City of Poznań.

2010

27. Będzin SA CHP Plant

Technical and economic analysis concerning two variants for the repowering (in terms of thermal power) in the Będzin CHP Plant (total capacity: 415 MWt). Forecast concerning the thermal energy makret (thermal energy from the Thermal Power Company in Dąbrowa Górnicza) in the following cities: Sosnowiec, Czeladź, Będzin, Dąbrowa Górnicza in the perspective of the year 2028.

2010

28.

Municipal Power Company in Piekary

Ślaskie Selection of basic equipment for the central heat source in the City of Piekary Śląskie. 2010

29.

Municipal Power Company in Piekary

Ślaskie

Functional program concerning connection of buildings located in the Wieczorka II residential to the heat distribution network.

2010

30.

Thermal Power Company Sp. z o.o.

Biała Podlaska

Development plan for the Thermal Power Company in Biała Podlaska in the scope of meeting present and future demand for heat for the years 2009-2015 for the City of Biała Podlaska;

Technical assumptions: Heat-, power-, and fuel gas supply project for the City of Biała Podlaska for the years 2009-2015.

2009

31. City of Wolbrom Technical and economic assumptions concerning the construction of the local boiler houses in the City of Wolbrom.

2009

32. Town of Strzelce

Opolskie Update of the technical assumptions for the heat-, power-, and fuel gas supply project for the borough of Strzelce Opolskie.

2009

33. Grupa Lotos SA Energy audit of the heating in the Lotos Jasło Company. 2008

34.

Thermal Power Company Sp. z o.o.

Wyszków

Development plan for the Thermal Power Company in Wyszków in the scope of meeting present and future demand for heat.

2007

35. City of Kielce Update of the technical assumptions for the heat-, power-, and fuel gas supply project for the City of Kielce.

2007

36. Zielona Góra SA CHP

Plant The investigation into the thermal energy market in Zielona Góra. 2007

37. Dalkia Poznań ZE SA Concept of the new heat source for the heat distribution network in the City of Poznań.

2007

38. City of Żagań Technical assumptions: Heat-, power-, and fuel gas supply project for the City of Żagań.

2006

39. City of Wolbrom Technical assumptions: Heat-, power-, and fuel gas supply project for the City of Wolbrom.

2006

40. Town of Skarbimierz Technical assumptions: Heat-, power-, and fuel gas supply project for the Town of Skarbimierz.

2006

41. City of Piekary Śląskie Technical assumptions: Heat-, power-, and fuel gas supply project for the City

of Piekary Śląskie.

Heat-, power, and fuel gas supply for the City of Piekary Śląskie.

2006

42. City of Racibórz Modernization of the technical assumptions: Heat-, power-, and fuel gas supply project for the City of Racibórz.

2006

43. SFW Energia

Sp. z o.o. Heat market assessment for the region of Chrzanów, Trzebinia, and Libiąż. 2005

44. EPC SA Warszawa Heat market assessment for the area of Katowice and Kraków. 2005

45. City of Rzeszów Technical assumptions: Heat-, power-, and fuel gas supply project for the City of Rzeszów (until 2015 year).

2005

46. Town of Ujazd Technical assumptions: Heat-, power-, and fuel gas supply project for the Town of Ujazd.

2005

65

THERMAL & POWER MECHANICAL ENGINEERING

REFERENCE LIST

NO. PURCHASER PROJECT NAME COMPLETED

47. City of Mysłowice Technical concept: Modernization of water supply (for the purposes of central heating and domestic hot water) in the City of Mysłowice (the Reja and Boczna streets).

2005

48. City of Czernichów Technical assumptions: Heat-, power-, and fuel gas supply project for the Town of Czernichów.

2004

49. City of Gdańsk Technical assumptions: Heat-, power-, and fuel gas supply project for the City of Gdańsk.

2004

50. City of Kielce Technical assumptions: Heat-, power-, and fuel gas supply project for the City of Kielce.

2004

51. City of Nowy Sącz Technical assumptions: Heat-, power-, and fuel gas supply project for the City of Nowy Sącz.

2004

52. Town of Korfantów Technical assumptions: Heat-, power-, and fuel gas supply project for the Town of Korfantów.

2004

53. Town of Leśnica Technical assumptions: Heat-, power-, and fuel gas supply project for the Town of Leśnica.

2004

54. Town

of Zdzieszowice Technical assumptions: Heat-, power-, and fuel gas supply project for the Town of Zdzieszowice.

2004

55. City of Sosnowiec Technical assumptions: Heat-, power-, and fuel gas supply project for the City of Sosnowiec.

2004

56. Town of Libiąż Technical assumptions: Heat-, power-, and fuel gas supply project for the following Towns: Chrzanów, Trzebinia, Libiąż.

2003

57. Town of Koło Heat supply project for the Town of Koło. 2003

58. City of Ostrów Wielkopolski

Technical assumptions: Heat-, power-, and fuel gas supply project for the City of Ostrów Wielkopolski.

2003

59. Town of Prudnik Technical assumptions: Heat-, power-, and fuel gas supply project for the Town of Prudnik.

2002

60. City of Przemyśl Technical assumptions: Heat-, power-, and fuel gas supply project for the City of Przemyśl.

2002

61. City of Mysłowice Technical assumptions: Heat-, power-, and fuel gas supply project for the City of Mysłowice.

2002

62. Town of Lipowa Technical assumptions: Heat-, power-, and fuel gas supply project for the Town of Lipowa.

2002

63. Town of Sieroszewice Technical assumptions: Heat-, power-, and fuel gas supply project for the Town of Sieroszowice.

2002

64. Town of Bledzew Technical assumptions: Heat-, power-, and fuel gas supply project for the Town of Bledzew.

2002

65. Town of Głubczyce Technical assumptions: Heat-, power-, and fuel gas supply project for the Town of Głubczyce.

2002

66. Town of Inowrocław Technical assumptions: Heat-, power-, and fuel gas supply project for the Town of Inowrocław.

2002

67. Town of Łask Technical assumptions: Heat-, power-, and fuel gas supply project for the Town of Łask.

2002

68. Town of Odolanów Technical assumptions: Heat-, power-, and fuel gas supply project for the Town of Odolanów.

2002

69. Town of Opalenica Technical assumptions: Heat-, power-, and fuel gas supply project for the Town of Opalenica.

2002

70. Town of Przytoczna Technical assumptions: Heat-, power-, and fuel gas supply project for the Town of Przytoczna.

2002

71. Town of Pszczew Technical assumptions: Heat-, power-, and fuel gas supply project for the Town of Pszczew.

2002

72. Town of Raszków Technical assumptions: Heat-, power-, and fuel gas supply project for the Town of Raszków.

2002

73. Town of Trzciel Technical assumptions: Heat-, power-, and fuel gas supply project for the Town of Trzciel.

2002

THERMAL & POWER MECHANICAL ENGINEERING 66

ENERGOPROJEKT-KATOWICE SA

NO. PURCHASER PROJECT NAME COMPLETED

74. ECO

Technical assumptions: Heat-, power-, and fuel gas supply project – the contract signed between the Eco Company and the following Cities/Towns: Brzeg, Byczyna, Głogówek, Grodków, Głuchołazy, Kluczbork, Krapkowice, Lewin Brzeski, Opole, Strzelce Opolskie, Wołczyn.

2002

75. Town of Gierałtowice Technical assumptions: Heat-, power-, and fuel gas supply project for the Town of Gierałtowice.

2001

76. Town of Ciechanów Technical assumptions: Heat-, power-, and fuel gas supply project for the Town of Ciechanów.

2001

77. Town of Sieradz Technical assumptions: Heat-, power-, and fuel gas supply project for the Town of Sieradz.

2001

78. Town of Włocławek Technical assumptions: Heat-, power-, and fuel gas supply project for the Town of Włocławek.

2001

79. City of Oświęcim Technical assumptions: Heat-, power-, and fuel gas supply project for the City of Oświęcim.

2001

80. Town of Bieruń Technical assumptions: Heat-, power-, and fuel gas supply project for the Town of Bieruń.

2001

81. Town of Jarocin Technical assumptions: Heat-, power-, and fuel gas supply project for the Town of Jarocin.

2001

82. Town of Barlinek Technical assumptions: Heat-, power-, and fuel gas supply project for the Town of Barlinek.

2001

83. Town of Brzozów Technical assumptions: Heat-, power-, and fuel gas supply project for the Town of Brzozów.

2001

84. City of Chorzów Technical assumptions: Heat-, power-, and fuel gas supply project for the City of Chorzów.

2001

85. Town of Końskie Technical assumptions: Heat-, power-, and fuel gas supply project for the Town of Końskie.

2001

86. Town of Oława Technical assumptions: Heat-, power-, and fuel gas supply project for the Town of Oława.

2001

87. City of Piekary Śląskie Technical assumptions: Heat-, power-, and fuel gas supply project for the City of Piekary Śląskie.

2001

88. Town of Zambrów Technical assumptions: Heat-, power-, and fuel gas supply project for the Town of Zambrów.

2001

89. Town of Police Technical assumptions: Heat-, power-, and fuel gas supply project for the Town of Police.

2001

90. Zabrze CHP Plant SA Technical assumptions: Heat-, power-, and fuel gas supply project for the City of Katowice.

2001

91. City of Tarnów Technical assumptions: Heat-, power-, and fuel gas supply project for the City of Tarnów.

2000

92. Town of Bielawa Technical assumptions: Heat-, power-, and fuel gas supply project for the Town of Bielawa.

2000

93. Town of Buczkowice Technical assumptions: Heat-, power-, and fuel gas supply project for the Town of Buczkowice.

2000

94. Town of Ciechanów Technical assumptions: Heat-, power-, and fuel gas supply project for the Town of Ciechanów.

2000

95. Town of Konin Technical assumptions: Heat-, power-, and fuel gas supply project for the Town of Konin.

2000

96. City of Sanok Technical assumptions: Heat-, power-, and fuel gas supply project for the City of SAnok.

2000

97. Town of Szczecinek Technical assumptions: Heat-, power-, and fuel gas supply project for the Town of Szczecinek.

2000

98. Town of Szprotawa Technical assumptions: Heat-, power-, and fuel gas supply project for the Town of Szprotawa.

2000

99.

Municipal Power Companies in

Chorzów

Technical assumptions: Heat-, power-, and fuel gas supply project for the following Towns: Chrzanów, Libiąż, and Trzebinia.

2000

67

THERMAL & POWER MECHANICAL ENGINEERING

REFERENCE LIST

NO. PURCHASER PROJECT NAME COMPLETED

100. Town of Śrem Technical assumptions: Heat supply project for the Town of Śrem. 2000

101. City of Cieszyn Technical assumptions: Heat-, power-, and fuel gas supply project for the City of Cieszyn.

2000

102. Town of Dębica Technical assumptions: Heat-, power-, and fuel gas supply project for the Town of Dębica.

2000

103. Town of Głogów Technical assumptions: Heat-, power-, and fuel gas supply project for the Town of Głogów.

2000

104. Town of Kłodzko Technical assumptions: Heat-, power-, and fuel gas supply project for the Town of Kłodzko.

2000

105. Town of Nysa Technical assumptions: Heat-, power-, and fuel gas supply project for the Town of Nysa.

2000

106. Town of Świdnik Technical assumptions: Heat-, power-, and fuel gas supply project for the Town of Świdnik.

2000

107. Town of Zduńska

Wola Technical assumptions: Heat-, power-, and fuel gas supply project for the Town of Zduńska Wola.

2000

MECHANICAL (BOP) ENGINEERING 68

ENERGOPROJEKT-KATOWICE SA

6. MECHANICAL (BOP) ENGINEERING

NO. PURCHASER PROJECT NAME COMPLETED

1. SBB Energy SA The construction of the flue gas desulfurisation and denitrification plant at Będzin Power Plant.

in progress

2. Alstom Power

Sp. z o.o. The design works for the Dust Removal and Fire-Fighting System for the design of the boiler of the units 5 and 6 at Opole Power Plant.

in progress

3.

Tauron Wytwarzanie SA – Jaworzno Power Plant III Branch

Design services for the construction of an external coal handling system of the supercritical 910 MW power unit at TAURON Wytwarzanie S.A. - Jaworzno Power Plant III Branch in Jaworzno."(total power: 1,345 MWe).

in progress

4. Energotechnika

Engineering Sp. z o.o.

Documentation for the designed Flue Gas Desulfurization (FGD) System of the 910 MW power unit at the Jaworzno Power Plant III - Power Plant II.

(total power: 1,345 MWe).

in progress

5. PGE SA Turów Power

Plant

Design documentation for the investment task "Unit 6 - desulphurisation-modernization of limestone dosing system transport lines for boiler in Turów Power Plant".

in progress

6. Energo-Eko-System Provision of design services related to the test ash removal plant of the 858 MW unit at the Bełchatów Power Plant.

2016

7.

Controltec Wrocław Sp z o.o.

Assessment of risk related to formation of explosive atmosphere for the heavy oil pumping station, the heavy oil trap, and the heavy oil feeding system over a distance from the heavy oil plant to the cut-off valves downstream of the A trestle bridge.

2015

8.

Tauron Wydobycie SA

Development of “Concept of Connecting the Planned Coal Main Line from TAURON Wydobycie S.A. ZG Sobieski with the Planned Coal Handling System of the 910 MW Power Unit at TAURON Wytwarzanie S.A., Jaworzno III Power Plant Branch, Including Economic Comparative Analysis of the Investment Implementation at the TAURON Polska Energia S.A. Capital Group”.

2015

9.

PGE SA El. Opole (En. Opole Power Plant)

Development of the documentation for the investment project titled: “Determination of Ex-Zones, Update of Potentially Explosive Zones for the Machinery House of the Units 1 – 4 at PGE GiEK S.A. Elektrownia Opole Branch”.

2015

10.

GE Power SA Warszawa

Materials intended for notifying of an intent to perform the civil works not requiring a building permit for the project titled “Renovation of the Storage Tank along with the Infrastructure, and Installation of Urea Dosing System Equipment”.

2015

11.

PGE SA El. Bełchatów (En. Bełchatów Power Plant)

Documentation for the investment project titled: “Design Services Related to SNCR Plant for the Units # 4 and 5” (total capacity: 4,440 MWe).

2015

12. Omega Głogów

Sp. z o.o. Completion of the as-built documentation for the project titled “Construction of Flue Gas Desulfurisation and Dust Removal Plant for EC Pniówek SEJ S.A.”

2015

13. Omega Głogów

Sp. z o.o. Documentation concerning: Erection of the flue gas desulfurisation plant of the boiler WP-70 No. 5 at “Zofiówka” CHP Plant.

2015

14.

Eltur-Serwis Sp. z o.o.

Documentation for the investment project titled: “Construction of the Coal-Handling System Facilities of the New Power Unit at Turów Power Plant – Design Documentation.”

2015

15. Omega Głogów

Sp. z o.o. Design documentation for “Flue Gas Desulfurisation Plant of the Boiler WR40 TC of the Tychy CHP Plant (total capacity: 290 MWt).

2015

16. Omega Głogów

Sp. z o.o. Engineering infrastructure of the construction of the water boiler flue gas treatment plant at “Pniówek” Power Plant.

2015

17.

PGE SA Bełchatów Power

Plant

“As-built documentation for the investment project titled: “Change of the Furnace Waste Storage Technology Solution at the Target Lubień Landfill System”. 2015

18. PAK Infrastruktura The project of the third GEHO pump installation intended for transport of ash suspensions at Pątnów-Power Plant.

2015

19. PGE SA, Bełchatów

Power Plant

Comprehensive technical documentation for the construction of the ash transport system and the suspension production and transport system of the 858 MW power unit.

2015

69

MECHANICAL (BOP) ENGINEERING

REFERENCE LIST

NO. PURCHASER PROJECT NAME COMPLETED

20. ZE PAK SA El. Pątnów Comprehensive detailed and as-built documentation for the upgrade of the machinery house of power unit no. 1 and the machinery house of power unit no. 2 at the Pątnów Power Plant. (total power: 1,600 MWe).

2015

21. PGE SA Bełchatów

Power Plant

Supervision for the project "Changing the manner of furnace waste disposal at the landfill Lubień in the target system - suspension" at PGE Bełchatow Power Plant (total capacity: 4440 MWe).

2015

22.

Ekoterma Sp. z o.o. Poznań

Technical design of the Flue Gas Desulfurisation Plant in accordance with the DEEMIS technology for Chwałowice CHP Plant as a part of the investment project named “Chwałowice CHP Plant Modernisation”.

2015

23. SE Jastrzębie SA Designer's supervision over the performance of works connected with the project titled "Construction of the 2nd stage of the compressed air production system at the Pniówek CHP Plant.".

2015

24. Alstom Power

Sp. z o.o. Firefighting Engineering Services Rybnik WFGD Plant (total power: 1,775 MWe). 2015

25. EDF Polska Sp. z o.o. Technical documentation and the building permit for execution of the fire-fighting recommendations in the power unit building in EDF Polska S.A. Rybnik Branch.

2015

26. Kozienice Power

Plant SA A concept of upgrade of the lines for transport of furnace waste to the existing storage area in increased run conditions.

2015

27. Alstom Power

Sp. z o.o.

Consulting services in the framework of technical cooperation at the execution of the coal handling, slag removal, and ash removal packages for the Opole project (2x900 MW).

2014

28. Controltec Wrocław Evaluation of risk related to the possible formation of an explosive atmosphere in the mazout pumping station at the Opole Power Plant.

2014

29. EDF Polska,

Kraków CHP Branch

Building and detailed design and obtaining the building permit decision for implementation of the fire-safety recommendations in the building of the district heating units at EDF Kraków S.A., Branch no. 1 in Kraków.

2014

30. PGE SA Opole Power

Plant

Update of the explosion protection document:

Stage I - Update of the explosion hazard zone in the chemicals store room of the FGD system at the Opole Power Plant Branch;

Stage II - Update of the explosion hazard zone in the fuel gas handling facilities - the mazout room at the Opole Power Plant Branch.

2014

31. PGE SA Opole Power

Plant

Update of the explosion hazard zones at the PGE GiEK S.A. Opole Power Plant Branch and preparation of documentation concerning explosion protection for each group of equipment and facilities in designated zones for the engine house of power units no. 1-4.

2014

32. Controltec Wrocław

Sp z o.o.

Evaluation of the risk associated with the possibility of formation of explosive atmosphere in the area of mazout tanks and in the area of the unloading ramp at the PGE Elektrownia Opole S.A.

2014

33. EDF Polska Sp. z o.o. Fire-fighting expert’s report for the project called “Construction of the New Peak Load/Reserve Boiler Room Including infrastructure in EDF Kraków S.A. – Branch No. 1 in Kraków.” (total capacity: 1,237 MWt).

2014

34.

Alstom Power Sp. z o.o. Branch in

Elbląg

Updating of the document specifying the ex-zones surrounding the gas station at Opole Power Plant. 2014

35. EDF Polska Sp. z o.o. Building Design to obtain a building permit for the Wet Flue Gas Desulfurisation Plant (IMOS II) at EDF Polska SA Rybnik Branch for the power units 1, 5, 6, and 8.

2014

36. Spółka Energetyczna

Jastrzębie SA Design documentation for modernization of the existing compressor room in Elektrociepłownia Zofiówka in all branches and stages of design.

2013

37.

Doosan Babcock Energy Polska

Sp. z o.o.

Documentation with author’s supervision for the commission titled “Biomass feed installation to the boilers of Units 5-8 omitting coal pulverizers in Elektrownia Rybnik SA - Biomax-2".

2013

MECHANICAL (BOP) ENGINEERING 70

ENERGOPROJEKT-KATOWICE SA

NO. PURCHASER PROJECT NAME COMPLETED

38. SE Jastrzębie SA

Updating of the design documentation for the 2nd stage of the new compressor hall construction, including the after-construction modifications after completion of the 1st construction stage at “Pniówek” Power Plant as well as development of the bill of quantities and the investor cost estimate for the 2nd stage of construction.

2013

39. SE Jastrzębie SA

The complete building design for the 2nd stage of the reserve compressed air pipeline for the new compressor room at CHP Pniówek over a distance from the previous compressor station to the KWK Pniówek Coal Mine shaft, including the necessary opinions to obtain a building permit.

2013

40.

Konsorcjum Przedsiębiorstw

Robót Górniczych i Budowy Szybów SA

Mysłowice

The concept of a pilot coal-water slurry plant. 2013

41. SE Jastrzębie SA The complete construction documentation of a reserve compressed air pipeline for a new compressor room in the “Pniówek” Power Plant.

2013

42. PGE SA Turów Power

Plant

Design documentation for the investment named “Above-Ground Tank of Heavy Oil D – Modernisation of Heating Oil Unloading Ramp” in the Turów Power Plant.” (total output: 2,088 MWe).

2013

43. PGE SA Turów Power

Plant

Design documentation for the investment named: “Cooling Water – Modernisation of the Water System for the Needs of Ash Removal” in PGE GiEK, Turów Power Plant Division (total output: 2,088 MWe).

2013

44. Mostostal

Warszawa SA

Installation of scraper conveyors in place of T-17 and T-18 belt conveyors included in the modernization of biomass transport system in the carbonizing nave executed in scope of installation, i.e. biomass delivery installation to the rebuilt of-135 boiler for the Tychy SA CHP Plant (total capacity: 290 MWt).

2013

45. PGE SA Gorzów CHP

Plant Technical documentation for demolition of buildings and installation relaying for the task: "Construction of a new CCGT - site preparation" in the Gorzów CHP Plant.

2013

46. El. Rybnik SA The feasibility study of the flue gas desulfurisation system in EDF Rybnik. (total output: 1,775 MWe).

2013

47. Foster Wheeler

Warszawa

Design concerning the relocation of existing pipelines as well as the equipment of the ash loading station that collide with the new electrostatic precipitator in the Połaniec Power Plant.

2013

48. Kozienice Power

Plant SA

Assessment of explosion hazard and the LSCB for boiler house cleaning installation and horizontal coal handling gallery of units 200 MWe 1-8 in Kozienice Power Plant SA.

2012

49. PGE SA Opole Power

Plant Updating explosion protection documentation for the carburizing system at PGE SA. Opole Power Plant

2012

50.

Tauron Wytwarzanie SA

Stalowa Wola Power Plant

Preliminary concept of ash transmission, storage and loading installation from the combustion of biomass in Power Plant Stalowa Wola.

2012

51. Alstom Power

Warszawa

Design services, including consultation with supervision at construction site in upgrading dredging pumping system in the 858 MWe unit in Bełchatów Power Plant (total capacity: 4440 MWe).

2012

52.

Tauron Wytwarzanie SA

Łagisza Power Plant

Functional specification for the project: "Product manufacturing system from the bottom ash from 460 MWe unit" in the Power Plant Łagisza in Bedzin (total capacity: 840 MWe).

2012

53. Energomontaż

Północ SA Collaboration on design and construction of the SCR system in Rybnik Power Plant (total capacity: 1775 MWe).

2012

54. Sefako SA Construction documentation for the compressed air system for the second warranty test of a gas turbine in Łaziska Ironworks.

2012

71

MECHANICAL (BOP) ENGINEERING

REFERENCE LIST

NO. PURCHASER PROJECT NAME COMPLETED

55.

Połaniec SA Power Plant – EDF Suez

Energia Polska Group

Design documentation for the system of fly ash transport from below the storage bunkers of the fly ash loading station to the inert material buffer bunker of the CFB boiler using the existing ash pumps from power unit no. 8.

As-built documentation for the project titled “Construction of the central compressor room supplying equipment and facilities of the Power Plant with compressed air” with regards to all the disciplines.

2012

56.

Doosan Babcock Energy Polska

Sp. z o.o.

Documentation for the modernization of sprinklers installation of unit, auxiliary transformers, and the general auxiliaries of Rybnik Power Plant (total capacity: 1775 MWe) in mechanical, electrical and fire protection parts.

2012

57.

Tauron Wytwarzanie SA

Łagisza Power Plant

Updating of the “Explosion Protection Document” in Tauron Wytwarzanie SA, Łagisza Power Plant Branch in Będzin (total capacity: 840 MWe).

2012

58. Remak-Rozruch SA Technical documentation within task of "Turn-key modernisation of brown coal-fired pulverised boilers OP650b of units 5, 4, 3 in Pątnów I power station, in order to limit NOx emissions to the level below 200 mg/Nm3".

2012

59. ZE PAK SA Pątnów II

Power Plant Documentation for the upgrade of the process lines of the Water Conditioning Station at the Pątnów II Power Plant (total capacity: 1600 MWe).

2012

60. GDF Suez

The design documentation of the fly ash damping generated during biomass combustion in the fluid boiler CFB made by Foster Wheeler along with execution of the construction design within the scope necessary to obtain the building permit (if required), Połaniec Power Plant.

2012

61. SE Jastrzębie Zdrój Complex realisation of project: Erection of new compressors' room building with equipment and auxiliary systems for needs of supply compressed air to Kopalnia Węgla Kamiennego Dniówek. Author's controls.

2012

62. PAK Serwis Konin

Sp. z o.o.

Engineering and design works for the project titled “Turnkey construction of the fuel oil unloading, storage, and transport system for the K12 biomass boiler and the existing K4-K8 boilers at the Konin Power Plant.

2012

63. Alstom Power

Warszawa

Consultancy services as well as the design supervision in order to facilitate the operation of the slurry pumping station of the new 858 MW unit in the Bełchatów Power Plant:

Consulting concerning the implemented modifications.

Preparation of guidelines for the purchase of necessary devices.

Preparation of designs / output materials.

2012

64. Babcock Oberhausen Construction work associated with fire protection on unit No. 7 in the Bełchatów Power Plant (total capacity: 4440 MWe).

2012

65. Rafako SA Documentation of limestone powder unloading system in Ostrołęka Power Plant for approval of the Transport Technical Supervision.

2011

66. Kozienice SA Power

Plant

Documents concerning work station protection against explosion of the facilities of Kozienice SA Power Plant as well as assessment of risk of explosive atmosphere occurrence at the work stations.

2011

67. Rafako SA Flue gas desulphurization system of the 858 MWe power unit in the Bełchatów Power Plant (total capacity: 4440 MWe).

2011

68. PGNiG Termika Detailed engineering for the modernization of the slag removal system of the boilers in the Żerań CHP Plant as well as the engineering supervision over the project.

2011

69. Omega Głogów

Sp. z o.o.

Engineering services for construction of the flue gas desulphurization system for WR-5/1, WR-10/2, WR-10/3, WRm-30/6 type boilers in the Piast Heating Station in Bieruń.

Detailed engineering of the flue gas desulphurization system for the WR-10 boiler in Janina Heating Station in Libiąż.

2011

70.

Połaniec SA Power Plant – EDF Suez

Energia Polska Group

Concepts of technical solutions in all the disciplines for the modular dust-removal systems in the buffer silo, the selected chutes for the biomass belt conveyors, the selected chutes for the coal handling belt conveyors, and the coaling boiler bunkers at power units 1-7 at the Połaniec Power Plant.

2011

71. PGE SA Turów Power

Plant The concept of location of the new source of transport air for the upgraded system for removal of bottom ash from power units 1 and 2.

2011

MECHANICAL (BOP) ENGINEERING 72

ENERGOPROJEKT-KATOWICE SA

NO. PURCHASER PROJECT NAME COMPLETED

72. Tauron

Wytwarzanie SA

Technical documentation for the external network systems, the external trestle bridges, and the fire-protection pumping stations with tanks, as a part of construction of the Renewable Energy Sources (RES) Generation Unit at the Jaworzno III Power Plant – Power Plant II (total capacity: 190 MWe).

2011

73. Tauron

Wytwarzanie SA

Technical documentation for the collective trestle bridges with pipelines as a part of the reconstruction of the generation capacity at the PKE SA (now Tauron Wytwarzanie SA) - construction of a 50 MW power unit at the ZEC Bielsko Biała CHP-1 (total capacity: 275 MWt).

2011

74.

Doosan Babcock Energy Polska

Sp. z o.o.

Biomass feed system for the project concerning construction of the biomass direct feed system to the No. 2 boiler in the Opole Power Plant.

2011

75. Kozienice SA Power

Plant Estimation of the explosion hazard of objects and area adjacent to the Kozienice SA power station, according to valid regulations.

2011

76. ZE PAK SA Fog system and central dedusting system in the coal handling equipment in the Pątnów-Konin Power Plant and Adamów Power Plant.

2011

77. EDF Polska Sp. z o.o. Concept for modernization of the compressed air system in the Wrocław CHP Plant. 2011

78. GIG Katowice Initial process design of transportation and forcing of carbon dioxide emitted by fumes for permanent geological storage.

2011

79. Tauron

Wytwarzanie SA

Technical documentation for the compressor room system and the compressed air system as a part of construction of the Renewable Energy Sources (RES) Generation Unit at the Jaworzno III Power Plant – Power Plant II (total capacity: 190 MWe).

2011

80. Vattenfall Detailed design for the water supplied from the water management system for throttling and cooling the return water pumps and the slurry pumps in the upgraded slag removal system at the Żerań Combined Heat and Power Plant.

2011

81. PGE SA Opole Power

Plant Detailed documentation of explosion hazard zones near generators and their auxiliaries in Opole Power Plant.

2011

82. ZE PAK SA Extinguishing system on the coal feeders in the Adamów Power Plant – concept. 2011

83. ZE PAK SA Delivery Technical Conditions of slag grinder for the scrapers in the Adamów Power Plant.

2011

84. ZE PAK SA Delivery Technical Conditions of the Safe defrosting device of coal loading machine buckets in the Pątnów Power Plant and the Adamów Power Plant.

2011

85. ZE PAK SA

System of dust extraction from the space of storage bins and carbonisation dumping systems in the Adamów Power Plant:

concept,

civil engineering design,

detailed design.

2011

86. ZE PAK SA Delivery Technical Conditions of the mechanical scraper of pollutants from cooling water surface in the Konin Power Plant.

2011

87. ZE PAK SA Detailed design of the support construction of the winch travelling beam (Q=3.2mg) in the Wieruszew pumping station.

2011

88. ZE PAK SA

Construction of fire water pumping station in Pątnów Power Plant (total capacity: 1600 MWe) along with the modernisation / reconstruction of the accompanying facilities:

basic design,

civil engineering design,

detailed design.

2011

89. ZE PAK SA Detailed design of the extinguishing system on the coal feeders in the Adamów Power Plant – technological part.

2011

73

MECHANICAL (BOP) ENGINEERING

REFERENCE LIST

NO. PURCHASER PROJECT NAME COMPLETED

90. ZE PAK SA

Detailed design: engine room and bunker bay within the area of TG-6 in C-G1/27-33 axes in the Konin Power Plant – construction part:

service platforms, routes in the engine room, deaerator bay and bunker bay,

engine room: repairs of ceilings, floors, foundation of the technological devices (excluding the turbine),

deaerator bay: repairs of ceilings, floors, dewatering, roof lanterns,

bunker bay: repairs of ceilings, floors, dewatering,

engine room longitudinal wall in C axis – repair of the supporting construction,

engine room bus bar to the 6kV switching station – repairs,

staircase at 33 axis – modernisation,

top wall of the staircase at 33 axis – modernisation.

2011

91. Kraków SA CHP Plant

Detailed design of the combustion waste storage yard dewatering with the surrounding drainage ditches to the culvert under S-7 road and next through the sewers to the background tanks as well as the design assumptions for the siphon trap under the S-7 express road along with the necessary updating of application for the integrated permit.

2011

92.

Tauron Wytwarzanie SA

Katowice CHP Plant

Assessment of the explosion hazard and the explosion protection documents for the carbonisation facilities in the Katowice Heat and Power Generating Plant (total capacity: 692 MWt).

2011

93. Uniserv Jarosław

Sp. z o.o.

Relocation of the ash loading station to tanks in the Połaniec Power Plant. As-built documentation (all branches) concerning:

reconstruction of the dry ash loading station together with the accompanying instruction,

reconstruction of the loading station’s roads and sites.

2010

94.

Tauron Wytwarzanie SA,

Jaworzno III Power Plant

Analysis for the potential reconstruction of the ash removal system from the electro-filter ash hoppers of the OP650k boiler in the Jaworzno III Power Plant (total capacity: 1345 MWe).

2010

95. Kozienice SA Power

Plant

Verification concerning the condition of the fire and explosion protection system of the biomass co-combustion system constructed in the range of the I and II stage in the Kozienice Power Plant.

2010

96.

Tauron Wytwarzanie SA,

Jaworzno III Power Plant

Inspection concerning the condition (in terms of fire and explosion hazard) of the coal handling system and basic equipment of the power unit in the Jaworzno III Power Plant (total capacity: 1345 MWe), especially in scope of the biomass co-combustion.

2010

97.

Tauron Wytwarzanie SA, Thermal Power

Company in Bielsko-Biała

Offer for the project including construction, putting into operation, test run and commissioning of the compressor room together with the external compressed air network in the range of reconstruction of the production capacity in PKE SA (now Tauron Wytwarzanie SA): Construction of the 50 MW power unit in the Bielsko-Biała I CHP Plant (total capacity: 275 MWt).

2010

98. Mostostal Kraków SA Additional design services in the range of the project: „Modernization of the unloading knot together with disk-wheel take-out cars in the Jaworzno III Power Plant (total capacity: 1345 MWe).

2010

99. PGE SA Opole Power

Plant

Update of explosion hazard areas in the Opole Power Plant together with documentation concerning explosion protection for each group of equipment and facilities located in specified areas.

2010

100. GDF Suez Design set concerning preparation of the building site for construction of the K9 boiler in the Połaniec Power Plant.

2010

101.

Tauron Wytwarzanie SA,

Łagisza Power Plant

Design package of the external ash removal system and of sorbent system for the 460 MWe power unit in the Łagisza Power Plant (total capacity: 840 MWe).

2010

102. Tauron

Wytwarzanie SA

Design set for the construction of the second car scales together with the registration system for two car scales of the modernized facility within a framework of the construction of the 460 MW power unit in the Łagisza Power Plant (total capacity: 840 MWe).

2010

MECHANICAL (BOP) ENGINEERING 74

ENERGOPROJEKT-KATOWICE SA

NO. PURCHASER PROJECT NAME COMPLETED

103. Tauron

Wytwarzanie SA

Basic engineering for the ash removal system, coal handling system, water management, wastewater treatment together with the accompanying installations (I&C, electrical, telecommunication engineering system) in the Bielsko-Biała I CHP Plant (total capacity: 275 MWt).

2010

104. Energoprojekt Warszawa SA

Civil engineering design of the 480 MW power unit in the Siekierki CHP Plant in Warszawa in the scope of the boiler house, electro-filter, coal handling system, slag removal system as well as of the fire-fighting water tank and fire-fighting water pumping station.

2010

105. Kozienice SA Power

Plant Inspection of the technical condition of the fire protection system of the biomass feed system in the Kozienice Power Plant.

2010

106. Condix SA Basic engineering design of fixed fire fighting equipment for unloading, storage, preparation and transportation systems of biomass to the biomass-fired CFB 154 MWt boiler in Konin Power Plant.

2010

107. Omega Głogów

Sp. z o.o. Engineering services related to construction of flue gas desulphurization and dust removal system in the CHP Plant in Bogdanka.

2010

108. Tauron

Wytwarzanie SA

Designs of the potable water network as well as the fire-fighting water network for the 460 MWe Power unit with supercritical parameters in the Łagisza Power Plant (total capacity: 840 MWe).

2009

109. Tauron

Wytwarzanie SA Designs of the starting oil system for the 460 MWe Power unit with supercritical parameters in the Łagisza Power Plant (total capacity: 840 MWe).

2009

110.

Tauron Wytwarzanie SA,

Jaworzno III Power Plant

Design set for the modernization of the unloading knot in the Jaworzno III Power Plant (total capacity: 1345 MWe).

2009

111. PGE SA Bełchatów

Power Plant Design for the modernization of the compressed air dryer system (I&C branch). 2009

112. Rafako SA Design set for the offer of the Purchaser concerning the boiler island (the offer of SNC Lavalin Polska (SLP) for construction of the 420 MW TPP Stanari in Bosnia).

2009

113. Omega Głogów Design set for the construction of the flue gas desulphurization system in the Heat-Generating Plants of the NSE Sp. z o.o. in Lędziny and in Wola.

2009

114. Nowa Sarzyna CHP

Plant Detailed design of the fire protection in two gas turbines in the Nowa Sarzyna CHP Plant (total capacity: 216 MWt).

2009

115. Przyjaźń Sp. z o.o.

Coking Plant

Working drawing of the hydrogen sulfide scrubber and ammonia scrubber (I and II) together with the as-built documentation, preparation of the DTR including service manuals, instructions for repairs, maintenance and instructions for use.

2008

116. Tauron

Wytwarzanie SA

Detailed engineering for the unloading chute from the No. 1 ash silo to the motor truck in the civil engineering, mechanical, electrical and I&C branch within a framework of the construction of the 460 MW power unit in the Łagisza Power Plant (total capacity: 840 MWe).

2008

117. Skawina SA Power

Plant Design package: Technical concept of the multi-variant dry slag removal from the Skawina Power Plant (total capacity: 590 MWe) - mechanical engineering branch.

2008

118. Zduńska Wola

Sp. z o.o. CHP Plant Audit concerning the flue gas desulphurization system in the “Zduńska Wola” CHP Plant.

2008

119. PGE SA Turów Power

Plant Design package: Construction of the discharging ploughs at the coal conveyors in the Turów Power Plant (total capacity: 2088 MWe).

2008

120. PGE SA Bełchatów

Power Plant

Detailed design of the compressed air preparation system for the 858 MWe Power Unit (in the D-2 compressor room).

Adaptation of the detailed design of the transmission pipeline to the supply limits in connection with the modification of the transferred air parameters.

2008

121. Energetyka Sp. z o.o.

Lubin Test run of the mobile DEEMIS flue gas desulphurization system in the Polkowice CHP Plant.

2008

122. Omega Głogów As-built documentation of the temporary flue gas desulphurization system for the OP-380 boiler in the Stalowa Wola Power Plant.

2008

75

MECHANICAL (BOP) ENGINEERING

REFERENCE LIST

NO. PURCHASER PROJECT NAME COMPLETED

123.

Koksoprojekt Consulting

Engineering Company Ltd. Zabrze

Project supervision for the project entitled: “Construction of the complex of coke oven battery (No. 5) in the Przyjaźń Coking Plant.

2008

124. Kozienice SA Power

Plant

Design package: Explosion hazard analysis together with the specification of the explosion hazard areas for the coal handling equipment in which the biomass (combined with the coal) is loaded and transported.

2008

125. PGE SA Opole Power

Plant Specification of the explosion hazard areas for all of the coal handling facilities (from the wagon tippler to the coal bunkers) together with the biomass feed system.

2008

126. Zduńska Wola

Sp. z o.o. CHP Plant Technical koncept: Flue gas desulphurization system for the boilers in the Zduńska Wola CHP Plant.

2008

127. Rafako SA Design set: Implementation of the FGDS construction in the Ostrołęka Power Plant. 2007

128. PGE SA Bełchatów

Power Plant The multi-variant location study of the compressed air dryer for the 858 MW power unit.

2007

129. Tauron

Wytwarzanie SA

Bid requirements (technical part) concering the modernization of the wagon tippler in the Łagisza Power Plant (total capacity: 840 MWe) - the 460 MWe power unit with supercritical parameters.

2007

130.

PGE SA Bełchatów Power Plant/

Rafako SA

Control calculations of the powdered limestone silos for the flue gas desulphurization system of the 858 MWe Power Unit in the Bełchatów Power Plant (total capacity: 4440 MWe).

2007

131. PGE SA Opole Power

Plant

Design package: Foundation and connection of the TA-9000(50)(1875/100) compressor – the closed cooling water system and design of the chemical treatment system of the cooling water.

2007

132. PGE SA Turów Power

Plant Civil Design and detailed design of the building of the engine room – smoke removal system and hydrogen removal system.

2007

133. Kraków SA CHP Plant Design services and technical concept of the sprinklers located in the coal handling equipment.

2007

134. PGE SA Turów Power

Plant

Multi-variant technical concept together with the inventory of the existing system as well as the investment estimate for the project: “Coal handling – transfer of control room of coal handling to the BCC facility.

2007

135.

Tauron Wytwarzanie SA,

Jaworzno III Power Plant

The Assessment of the basic design for the project entitled: “The Modernization of the flue gas desulphurization system – construction of the 3rd desulphurization duct in the Jaworzno III Power Plant (total capacity: 1345 MWe).

2007

136. Nowa Sarzyna CHP

Plant Design of the sprinkler and fire protection system for the steam turbine in the Nowa Sarzyna CHP Plant (total capacity: 216 MWt).

2007

137. Citec SA Technical concept concerning the connection process of the 1-8 Power units to the

existing Flue Gas Desulphurization system.

Technical concept concerning the flue gas removal to the new smokestack.

2007

138. Energo-Eko System

Sp. z o.o. Design: fly ash and sorbent recirculation system in the area of the boiler house in the Łagisza Power Plant (total capacity: 840 MWe).

2007

139. NSE Sp. z o.o.

Brzeszcze Detailed design of the air suction ducts for the WR-25 boilers in the Heat-Generating Plant No. 1 in Brzeszcze.

2007

140. Kraków SA CHP Plant Engineering supervision of the assembly of the retention trays as well as preparation of the as-built documentation.

2006

141.

Tauron Wytwarzanie SA,

Siersza Power Plant

Technical analysis: Replacement of the starting fuel from mazout to light heating oil together with the preliminary cost estimation of the modernization for the Siersza Power Plant (total capacity: 786 MWe).

2006

142. Energo-Inwest

Rybnik Sp. z o.o. Design package of the No. 2 wagon tippler in the Kozienice Power Plant. 2006

143. Tauron

Wytwarzanie SA

Technical concept, basic engineering, and Civil Design of the compressor room – a part of the complex engineering related to the gas network and the compressed air network (the 460 MWe Power unit in the Łagisza Power Plant (total capacity: 840 MWe)).

2006

MECHANICAL (BOP) ENGINEERING 76

ENERGOPROJEKT-KATOWICE SA

NO. PURCHASER PROJECT NAME COMPLETED

144. Kraków SA CHP Plant Modernization of water source (for the fire fighting purposes) in the area of engine room and boiler room – detailed design of the water pumping station together with the water supply pipelines.

2006

145. Kraków SA CHP Plant Technical analysis: Coal dust of coal handling equipment in the Kraków CHP Plant (total capacity: 1237 MWt).

2006

146. Rafako SA Engineering supervision of the design package of the powdered limestone dumping system and of the powdered limestone storage system for the a boiler in the Pątnów Power Plant (total capacity: 1600 MWe).

2006

147. Skawina SA Power

Plant

Adjustment process of the oil-immersed transformer points in order to meet the environmental protection requirements and the fire fighting requirements in the Skawina Power Plant (total capacity: 590 MWe).

2006

148. R&M Mainserv

Sp. z o.o. Technical documentation concerning the modernization of the coal handling system in the Żerań CHP Plant.

2006

149. R&M Mainserv

Sp. z o.o. Design package together with the technical specification for the coal handling system in the Żerań CHP Plant.

2006

150. Electrabel

Połaniec SA

Designs connected with the explosion hazard conditions for the concept concerning the development of the biomass system as well as the conversion of the No. 8 Power unit from coal into biomass.

2006

151.

Tauron Wytwarzanie SA,

Łagisza Power Plant

Technical analysis: change of the starting fuel from mazout to light heating oil in the Łagisza Power Plant (total capacity: 840 MWe).

2006

152.

Tauron Wytwarzanie SA,

Jaworzno III Power Plant

Design of the emergency slag removal from three boilers in case of the lack of water for the technological transport.

2006

153. Rafako SA Emission calculations concerning the minimal height of the new smokestack that removes flue gas from the FDS absorber.

2006

154. ZE PAK SA Installation technical draft for carrying out belt scales legalisation in the Konin Power Plant with relation to shared combustion of biomass.

2005

155. Procom-System SA As-built documentation for the modernized slag hydrotransport system (the power units No. 1-6) in the Pątnów Power Plant (total capacity: 1600 MWe).

2005

156. Electrabel

Połaniec SA Technical expertise concerning industrial Safety, environmental protection, and technology of biomass production system in the Połaniec Power Plant.

2005

157. Tauron

Wytwarzanie SA Technical concept: Modernization of slag removal system in the Jaworzno III Power Plant (total capacity: 1345 MWe).

2005

158.

Tauron Wytwarzanie SA,

Siersza Power Plant

Civil design: Coal crushing system of fluidized boilers No. 1-2 in the Siersza Power Plant (total capacity: 786 MWe).

2005

159. R&M Mainserv

Sp. z o.o. Technical documentation: Modernization of coal handling system in the Żerań CHP Plant.

2005

160. Electrabel

Połaniec SA Fire protection related classification of buildings and compartments for the Połaniec Power Plant together with specification of fire hazard and explosion hazard areas.

2005

161. PGE SA Bełchatów

Power Plant

Reconstructions and separators assembly draft for the ash carrying pipeline from ash silos No. 1 and No. 2 for the purpose of adjusting them to limestone dust storage for the flue gas desulphurization system of power units No. 3 and No. 4.

2005

162. PGE SA Turów Power

Plant

Performance project – ash removal: availability improvement for storage reservoir No. 3 through enabling ash storage from power units No. 1 and 2 in the Turów Power Plant (total capacity: 2088 MWe).

2004

163. PGE SA Bełchatów

Power Plant Technical expertise: Explosion hazard area of the coal handling equipment No. PI/4 and PIII/4.

2004

164.

Tauron Wytwarzanie SA

Stalowa Wola Power Plant

Basic draft of the technological section of the temporary flue gas desulphurization system by means of the “DE-EMIS” method in the Stalowa Wola Power Plant.

2004

165. Energetyka

Cieszyńska Sp. z o.o. Technical documentation of the overheated steam reducing-cooling station from the oil fired boiler to the thermal degasifier together with connecting pipelines.

2004

77

MECHANICAL (BOP) ENGINEERING

REFERENCE LIST

NO. PURCHASER PROJECT NAME COMPLETED

166. PGE SA Bełchatów

Power Plant Project supervision over the task entitled: “Fire protection system modernization for the coking plant units No. 3-6”.

2004

167. Tauron

Wytwarzanie SA Development of the preliminary modernization draft for mazout management in the Jaworzno III Power Plant (total capacity: 1345 MWe).

2004

168. Kraków SA CHP Plant Technical draft of the transmission oil dehydration installation for the feed water pumps (PZ) in the Kraków CHP Plant (total capacity: 1237 MWt).

2004

169. Kraków SA CHP Plant Transmission oil dehydration installation for the feed water pumps. 2004

170.

Tauron Wytwarzanie SA,

Siersza Power Plant

Detailed design: Modernization of the compressor cooling system in the Siersza Power Plant (total capacity: 786 MWe).

2004

171. ZE PAK SA Pątnów

Power Plant

Construction of the new unit “A” of capacity 460 MW.

Design of the compressor room for needs of the new unit with external networks of the compressed air;

Design of the pumping station of process water with external pipelines;

Design of the fire protections of buildings.

2003

172. Białystok SA CHP

Plant Installation for the unloading of coal delivered by road transport at the unloading sequence No. 19 in the Białystok CHP Plant.

2003

173. Kraków SA CHP Plant Technical design for the retention trays under the main oil tanks at units No. 1-4. 2003

174. Zielona Góra SA CHP

Plant Construction of the new combined cycle unit 190 MW in the Zielona Góra CHP Plant: installation of gas supply to the turbine (with the station of gas reheat and filtration).

2003

175. Zabrze SA CHP Plant

Construction of the new steam boiler KP-20, fired with natural gas:

installation of gas supply to the boiler;

installation of light fuel oil supply to the boiler (with the unloading station and oil pumping station).

2003

176. Tauron

Wytwarzanie SA

Construction of the unit 460 MWe with fluidised bed boiler of supercritical parameters in the Łagisza Power Plant (total capacity: 840 MWe):

basic designs for the auxiliary installations;

coal handling installation for the new unit inclusive of modernization of the existing coal management facilities;

installation of fly and bottom ash with retention tanks as well as loading stations for cars and rail cars;

sorbent management installation;

light-up oil installation;

auxiliary media installation (compressed air, hydrogen, nitrogen);

basic design for the fire protection as well as fire protection requirements for the boiler house and turbine hall.

2003

177. PGE SA Bełchatów

Power Plant

Documentation for the modernization of air ducts sections to the powdered fuel burners at boilers No. 1 and 2 (cooling air ducts, stoker air duct, ash discharge from the air box downstream LUVO).

2003

178. PGE SA Bełchatów

Power Plant

Qualification protocols of the explosion danger zones for:

coal handling facilities;

technical gas as well as paint and lacquer store rooms.

2003

179. ZE PAK SA Pątnów

Power Plant Design for the new slag management system in Pątnów Power Plant (total capacity: 1600 MWe) for the existing units 6x230 MWe and the new 460 MWe unit.

2003

180. Dalkia Łódź SA

Łódź 4 CHP Plant

Detailed design of the technological installation of the flue gas desulphurization system for the unit BC 100 in the Łódź 4 CHP Plant - technology by Rafako (semi-dry method).

2003

181. PGE SA Turów Power

Plant Adjusting the coal handling gallery at units No. 1-6 for the mechanical coal Sampling in the Turów Power Plant (total capacity: 2088 MWe).

2003

182.

Dalkia Poznań ZE SA Poznań – Karolin SA

CHP Plant

Detailed design for the modernization of the fuel oil management system in the Poznań-Karolin CHP Plant (total capacity: 844 MWt).

2003

183.

Połaniec Power Plant SA – Electrabel

Group

Network of control compressed air for all the units No. 1-8 with the drying installation and filtration station.

2003

MECHANICAL (BOP) ENGINEERING 78

ENERGOPROJEKT-KATOWICE SA

NO. PURCHASER PROJECT NAME COMPLETED

184. Skawina SA Power

Plant The coal mixing station in the Skawina Power Plant (total capacity: 590 MWe): technical concept, civil engineering design, detailed design.

2003

185. PGE SA Rzeszów

CHP Plant

The combined cycle unit (50 MW).

Installations for preparation and supply of natural gas to turbine;

Installations for preparation and supply of fuel oil to turbine;

Installation of light-up gas;

Installation for fire protection of the turbine and all the related facilities.

2002

186. Chorzów ELCHO

Sp. z o.o. CHP Plant

Construction of two units with fluidised bed boilers 2 x 150 MW.

Detailed designs for retention tanks of: sorbent (2x1700m3), fly ash (4x3000m3), bottom ash (2 x 1900m3);

Installation of fuel oil;

Designs for fire protection of all the new units.

2002

187.

Tauron Wytwarzanie SA,

Siersza Power Plant

Reconstruction of unit No. 1 and 2 (2 x 225 MW) with installation of new fluidised bed boilers;

Installation of reception and pneumatic transport of fly ash together with the intermediary station and new retention tank V= 2000 m3;

Bottom ash management with retention tanks (2 x 1500m3);

Installation of the sorbent storage tanks with pneumatic transport to the boiler tanks;

Modernization of the coal handling installations for needs of the new boilers;

Modernization of the fuel oil management;

Designs for fire protection of the new units;

Designs for repair works of the new units;

Installation of compressed air (with expansion of the compressor room) for needs of the pneumatic transport and I&C.

2002

188. ZE PAK SA Pątnów

Power Plant

The flue gas desulphurization system for the new unit “A”.

Basic design for pipelines in FGD facilities.

Detailed designs for sorbent tanks (x 2000) with the unloading station.

2002

189. Kraków SA CHP Plant Modernization of the turbine oil installation for power units No. 1-4 together with a new loading and unloading station.

2002

190. Dalkia Poznań ZE SA

Modernization of the coal handling unit in the Poznań II Karolin CHP Plant (total capacity: 844 MWt).

Construction of the new unloading path, inclusive of coal transport from the storage yard.

2002

191. PGE SA Bełchatów

Power Plant Designs for fire fighting installations of the existing facilities. 2002

192. PGE SA Turów Power

Plant

Rehabilitation of the of units No. 4-6 in the Turów Power Plant (total capacity: 2088 MWe).

Designs for fire protection of the turbine house facilities at units No. 4-6 (electrical rooms, unit control centres, cable tunnels, transformers, oil stands of the turbine generator sets);

Designs for fire protection of the coal handling course;

Designs for routes of the pneumatic transport pipelines for fly and bottom ash from units No. 4-6 to the retention tanks;

Designs for the pipeline of mazout and light-up gas;

Primary and secondary air ducts;

Installation of sorbent supply from the storage tanks to the boiler tanks.

2002

193.

Tauron Wytwarzanie SA,

Łaziska Power Plant

Modernization of the central compressor room – installation of centrifugal compressors (4 x 10000Nm3/h).

2001

194. PGE SA Bełchatów

Power Plant

Flue Gas Desulphurization System in the Bełchatów Power Plant (total capacity: 4440 MWe) for units No. 7 and 9.

Detailed designs of technological pipelines in the building of sorbent preparation, the gypsum dewatering station and in the main pumping station.

Technical designs for the transport of gypsum to the gypsum storage house with use of belt conveyors.

2001

79

MECHANICAL (BOP) ENGINEERING

REFERENCE LIST

NO. PURCHASER PROJECT NAME COMPLETED

195. WARTA WATER

Company

Designs for the Central Wastewater Treatment Plant in Częstochowa.

Design for expansion of the compressed air blowers and pipelines to biological reactors.

Design for overhaul of the installation of biogas discharge from digestion chambers.

2001

196.

PGE SA ZE Dolna Odra Pomorzany

CHP Plant

The Flue Gas Desulphurization System.

Installation for unloading, storage and dosage of ammonia water;

Post-reaction product management;

Flue gas damping column with related installations;

Installation of compressed air.

2000

197. ZE PAK SA Pątnów

Power Plant

Installation for removing from the Power Plan the waste products of electrical energy generation (ash, slag, gypsum) to the storage yard in the form of suspension.

Installation for preparation, generation and pumping of suspension.

Storage tank V= 10 000m3.

External route of pipelines with suspension discharge to the storage yard.

2000

198. Komořany Power

Plant

Modernization of the boilers K6- K10 in Komořany Power Plant:

Design for the new compressor station;

Compressed air networks;

Supply of gas to the burner installation;

Basic designs for the ash removal system;

Analysis of the compressed air networks;

Expansion of the existing compressor station.

2000

199. PGE SA Turów Power

Plant Modernization of the gas systems for generators at units No. 8 and 9.

Installations of hydrogen supply to the generator. 2000

CIVIL ENGINEERING 80

ENERGOPROJEKT-KATOWICE SA

7. CIVIL ENGINEERING

NO. PURCHASER PROJECT NAME COMPLETED

1. ZGC ANKARA

Owner's engineering services -14,5 MWe biomass power plant in the Bolu Province of the Republic of Turkey. A distinctive feature of this project is the type of biomass – poultry farm litter. The scope of services includes the development of a concept/preliminary design of the unit, bid specification and advice on choosing the unit’s contractor.

in progress

2. Amec Foster Wheeler

Warszawa Modernisation of CFB-670 boilers, units 1-3, boilers No. 1-3

Contract For Design Of Steel Structure For CFB 670 Boilers. in progress

3.

Tauron Wytwarzanie Power Plant

Jaworzno III – Power Plant II

Development of Replacement Building Design (2nd edition) intended for the construction of a supercritical 910 MW power unit at TAURON Wytwarzanie S.A. – Elektrownia Jaworzno III Branch in Jaworzno (total capacity: 1,345 MWe).

in progress

4. Alstom Power

Sp. z o.o. Engineering designs of steel structures of the boiler houses for power units no. 5 and 6 at the PGE, Opole Power Plant Branch (2x900 MW).

in progress

5. Alstom Power

Sp. z o.o. Development of the replacement construction design. Opole 2 x 900 MW project.

in progress

6. Foster Wheeler

Warszawa

The design documentation for the steel structure of the main boiler room building, required for execution of the following project: “Construction of the New Heating Unit with the Fluidized Bed Boiler at Tychy Heat and Power Generating Plant” (total capacity: 290 MWt).

in progress

7. PGE SA Turów Power

Plant Updating of the building design for the investment named: Construction of a New Power Unit at the Turów Power Plant (total capacity: 2,088 MWe).

in progress

8. Babcock Esbjerg Supply of stress calculation and basic engineering design for WTF in Peterborough. in progress

9. Eltur-Serwis Sp. Z

O.O. Design assumptions for a designer of a coal handling system related to the process trestle bridge loads.

2016

10. Tauron Ciepło SA Construction design including obtainment of the valid building permit for the investment project named: Source adaptation of Zakład Wytwarzania Katowice for the needs of the heating market after 2015. (total capacity: 692 MWt).

2016

11.

PKN Orlen Płock SA Comprehensive civil works expert’s report the Zakład Produkcyjny Płock (EN. Płock Manufacturing Plant), including: – Detailed design of the infrastructure reinforcements and reconstruction. – Detailed design of relocation of collisions along the pipelines from the CCGT to the existing CHP Plant within the area of Płock Manufacturing Plant – Calculations to verify the process equipment inside the CHP Plant and the necessary licence documentation.

2016

12. Babcock Oberhausen Bill of quantities for the complete civil works part to start the negotiations concerning

the civil works of a peak-load boiler house in the central Poland. 2016

13. Energomedia

Sp. z o.o. Preparation of the building design and obtaining the administrative permits for the new CHP in Trzebinia.

2016

14. Babcock Oberhausen The building permit and the preliminary basic design for the construction works at EDF Toruń.

2015

15. SNC-Lavalin Warszawa

Design work for construction works of steam-gas unit with capacity of 370 MWe in Tashkent Power Plant (Uzbekistan).

2015

16. Siemens Warszawa The verification of the building documentation for BPG at Gorzów Power Plant. 2015

17. Hitachi Authorisation of the boiler supporting structure for the 1075 unit at Kozienice Power Plant.

2015

18. Hitachi MHPSE Basic design and authorization of the steel structure of the startup boiler house and the support structure of the ducts in the area of the ID Fan at the Kozienice Power Plant.

2015

19. Polimex-

Mostostal SA Design of the steel construction for the project named “Toy Manufacturing Plant PP Polesie in Kobryń” in Belarus.

2014

81

CIVIL ENGINEERING

REFERENCE LIST

NO. PURCHASER PROJECT NAME COMPLETED

20. SNC-Lavalin Warsaw Second edition of the substitute building design for the building permit for the 463 MWe net Steam and Gas Power Unit in Włocławek.

2014

21. PGE SA Bełchatów

Power Plant The building documentation including the valid building permit for the project named: “Heat Recovery Incineration Plant” at PGE GiEK SA (total capacity: 4,440 MWe).

2014

22. EDF Polska Sp. z o.o. The building design for the 1st stage of construction of the GT50 in Toruń, including obtaining a building permit decision.

2014

23. PKN Orlen Płock SA The building design necessary to obtain a building permit for the following investment project: “Construction of the combined cycle gas and steam unit with a power of 400-600 MW in Płock”.

2014

24. Foster Wheeler

Warszawa

Technical materials for updating the heating unit's civil engineering design in the EC1 Bielsko-Biała Combined Heat and Power Plant (total capacity: 275 MWt) within the framework of the boiler room building steel construction.

2013

25. PGE SA Bełchatów

Power Plant

Adaptation of the design documentation concerning the air obstacles of the Bełchatów Power Plant to the requirements of the Civil Aviation Authority. (total capacity: 4,440 MWe).

2014

26. Foster Wheeler

Warszawa Technical documentation of the facility part of ICA for construction of the fluid boiler for EC1 Bielsko-Biała Combined Heat and Power Plant (total capacity: 275 MWt).

2013

27. PGE SA. Turów Power

Plant The concept for the investment project named Engine room building – adaptation following shut-down of the units Nos. 8-10.”(total capacity: 2,088 MWe).

2013

28.

Tauron Wytwarzanie SA ZEC Bielsko-Biała

The as built documentation for the external network system for the collective trestle bridges of the new heating unit at Bielsko-Biała EC1 (total capacity: 172 MWt).

2013

29. PGE SA Bełchatów

Power Plant The technical documentation for the investment project named: “Modernisation of the accelerator Ac – 1.1.” (total capacity: 4,440 MWe).

2013

30. EDF Polska Sp. z o.o. The land development project for the wet flue gas desulphurisation plant of EDF Polska SA, Rybnik Branch and the guidelines for the project of geological studies for the wet flue gas desulphurisation plant facilities of EDF Polska SA, Rybnik Branch.

2013

31. ANWIL Włocławek SA Development of a medium-pressure steam boiler room consisting of the boilers 2 x 30 T of 4 MPa steam together with the auxiliary systems at Zakłady Azotowe ANWIL SA in Włoclawek – construction documentation.

2013

32. Babcock Oberhausen Documentation for the construction notification of the boiler no. 12 modernisation in Bełchatów Power Plant (total output: 4,440 MWe).

2013

33. SNC-Lavalin Warszawa

Up-dating of the building permit design for construction of the combined cycle gas and steam unit in Włocławek.

2013

34. Babcock Oberhausen Documentation required to obtain a construction notification of modernisation of the unit no. 11 in the Bełchatów Power Plant (total output: 4,440 MWe).

2013

35. Babcock Esbjerg Basic engineering for steel structure of waste incinerator Amager in Copenhagen, Denmark.

2013

36. Foster Wheeler

Warszawa

Technical documentation concerning steel construction adaptation of the boiler room building in the EC1 Bielsko-Biała Combined Heat and Power Plant (total capacity: 275 MWt), ceiling at the level of +9,45m for the needs of the transformer transport.

2013

37. Rybnik SA Power

Plant The civil engineering design for the building permit for construction of the 900 MW unit in the Rybnik Power Plant (total capacity: 1775 MWe).

2013

38. Alstom Stuttgart Checking the documentation for the boiler room - 900 MW unit for the Project Ruda - Elektrownia Węglowa with supercritical parameters in the Rybnik Power Plant (total capacity: 1,775 MWe).

2013

39. EDF Polska Sp. z o.o. The technical documentation necessary to prepare a technical expert’s report concerning the alternative solutions assuring no deterioration of the fire protection conditions for CHP Gdańsk and CHP Gdynia.

2013

40. Babcock Oberhausen The detailed design of the steel constructions for the unit no. 2 in the Bitola Power Plant (Macedonia).

2013

CIVIL ENGINEERING 82

ENERGOPROJEKT-KATOWICE SA

NO. PURCHASER PROJECT NAME COMPLETED

41. Metso Power Update of the documentation needed to obtain the building permit for the concrete and steel structures in the boiler house at the Tychy Combined Heat and Power Plant (total capacity: 290 MWt).

2013

42. ZGH Bolesław SA The civil engineering design for the investment named: Construction of the ca. 20 MWe power unit equipped with two 10 MWe gas power generators located in ZGH Bolesław – Bukowno.

2012

43. Tauron Ciepło SA Updating a construction project to build a biomass feeding system for rebuilt boiler of 135 "CYMIC" for the biomass boiler in CHP Tychy.

2012

44. Energomontaż

Północ SA Collaboration on design and construction of the SCR system in Rybnik Power Plant (total capacity: 1775 MWe).

2012

45. Energomontaż

Południe SA Flue gas ducts for the Westfalen Power Plant in Germany. 2012

46. GDF Suez

Technical expert’s report of the ceiling construction at the level of +27,90m along with the construction of the pillars and stools supporting the ceiling in the axes F-G and 3-6, 11-14, 23-26 and 31-34 in the units no, 1, 3, 6 and 8 in the Połaniec Power Plant.

2012

47. Babcock Oberhausen Detailed design of additional steel structures for units 7 and 8 in the Bełchatów Power Plant (total capacity: 4440 MWe).

2012

48. ZE PAK SA Pątnów II

Power Plant Documentation for the upgrade of the process lines of the Water Conditioning Station at the Pątnów II Power Plant (total capacity: 1600 MWe).

2012

49. Babcock Oberhausen The detailed design of the steel constructions for the unit no. 3 in the Bitola Power Plant in Macedonia.

2012

50. PGE SA Bełchatów

Power Plant

Civil engineering design, detailed designs together with the bill of quantities, investor’s cost calculations and the preliminary instructions for use for the project: “Modification of the technology of furnace waste storage for the Bełchatów Power Plant (total capacity: 4440 MWe)”.

2012

51. Alstom Stuttgart Consulting services concerning design of the steel structure of the boiler house of the supercritical power unit fired with hard coal, with the capacity of 900 MW, to be built in Poland, at the Rybnik Power Plant (total power: 1775 MWe).

2012

52. Babcock Oberhausen Detailed designs of the steel structure for power unit no. 7 – Bełchatów Power Plant (total power: 4440 MWe).

2012

53.

Połaniec SA Power Plant – EDF Suez

Energia Polska Group

Technical expert study of the structure of the floor at the +27.90 m level, including the structure of the posts and stools supporting the floor at the Połaniec Power Plant.

2012

54. Tauron

Wytwarzanie SA

Updating of the civil engineering design of the renewable energy source power generating facility in Tauron Wytwarzanie SA, Jaworzno III Power Plant – Power Plant II Branch (total capacity: 190 MWe).

2012

55. ZE PAK SA Detailed design: reconstruction of the wall, roof and ceilings of the Main Building within the area of biomass system in Adamów Power Plant.

2011

56. Foster Wheeler

Warszawa

Update of the building design of the boiler house with the K9 fluidized-bed boiler (station no. K12) with a circulating bed fired with biomass with the capacity of 215 t/h at the Konin Power Plant.

2011

57. Rafako SA The flue gas desulphurization system of the 858 MWe power unit in the Bełchatów Power Plant (total capacity: 4440 MWe).

2011

58. Tauron

Wytwarzanie SA

Technical documentation for the external network systems, the external trestle bridges, and the fire-protection pumping stations with tanks, as a part of construction of the Renewable Energy Sources (RES) Generation Unit at the Jaworzno III Power Plant – Power Plant II (total capacity: 190 MWe).

2011

59. Tauron

Wytwarzanie SA

Technical documentation for the collective trestle bridges with pipelines as a part of the reconstruction of the generation capacity at the PKE SA (now Tauron Wytwarzanie SA) - construction of a 50 MW power unit at the ZEC Bielsko Biała CHP-1 (total capacity: 275 MWt).

2011

60. Foster Wheeler

Warszawa

Civil engineering design together with obtaining the construction permit for construction of the biomass-fired boiler as well as the electrostatic precipitator together with the auxiliary installations in the Połaniec Power Plant.

2011

83

CIVIL ENGINEERING

REFERENCE LIST

NO. PURCHASER PROJECT NAME COMPLETED

61.

Tauron Wytwarzanie SA,

Katowice CHP Plant

Detailed engineering (including the civil engineering branch) for the biomass feed system in the Katowice CHP Plant (total capacity: 692 MWt).

2011

62. PKN Orlen Płock SA Civil engineering design necessary to obtain the construction permit for construction of the 420-500 MWe combined cycle unit in Włocławek.

2011

63. GDF Suez Technical expertise of a ceiling at the level of +27,90 m with poles construction supporting ceiling in axis F-G and 3-6 and 7-10 in units 1 and 2 in Połaniec Power Plant.

2011

64. Rybnik SA Power

Plant Design for the internal access roads in the Rybnik Power Plant (total capacity: 1775 MWe).

2011

65. Alstom Stuttgart Basic engineering, detailed engineering for the Bełchatów Power Plant (total capacity: 4440 MWe) – No. 6 power unit. Basic engineering as well as working drawing for the main steel structure of the service level.

2011

66. Babcock Esbjerg Preliminary basic design of the steel structures for the Amagerforbreanding Waste Processing Waste Plant in Copenhagen, Denmark.

2011

67. Babcock Oberhausen Verification of the construction aspects of the as-built documentation – Bełchatów Power Plant, Power Unit no. 5 (total capacity: 4440 MWe).

2011

68. BSiPE Energoprojekt-

Gliwice SA Technical materials for the construction and installation discipline for the construction of a power unit with the electric power of 1000 MWe.

2011

69. PGE SA Bełchatów

Power Plant Technical documentation for the investment project titled “Upgrade of the Ac 1.2 accelerator.”

2011

70. Energomontaż

Południe SA Design documentation of steel structure for the project executed for GKM9 Power Plant in Mannheim (Germany).

2011

71. ZE PAK SA Civil engineering design of water and wastewater network execution according to the detailed designs.

2011

72. Foster Wheeler

Warszawa

Updating of the civil engineering design of the boiler room with the K9 fluid boiler (K12 station number) with biomass-fired circulating bed for the capacity of 215 t/h in the Konin Power Plant.

2011

73. Kraków SA CHP Plant

Civil engineering design together with obtaining the building permit and detailed designs in the technological (pulverized-coal pipes), electrical, I&C and civil engineering branch together with the static calculations for the boiler biomass system.

2010

74. Alstom Power Elbląg Detailed designs for the modernization of the No. 6 power unit’s foundation in the Bełchatów Power Plant (total capacity: 4440 MWe).

2010

75. Steinmüller Berlin Detailed engineering of the steel structure together with static calculations, workshop documentation, assembly documentation with material lists for the Bełchatów Power Plant (total capacity: 4440 MWe).

2010

76. Tauron

Wytwarzanie SA Building site and construction camp organization plan for contractors of the 50 MW thermal power unit in the Bielsko-Biała I CHP Plant (total capacity: 275 MWt).

2010

77. Tauron

Wytwarzanie SA

Civil engineering design together with obtaining the construction permit as well as basic engineering for construction of the generation unit (renewable energy sources) in the Jaworzno III Power Plant - No. 2 Power Station (total capacity: 190 MWe).

2010

78. Babcock Oberhausen

Detailed engineering for the civil engineering work, for the I&C branch as well as authorization of documents for the detailed engineering concerning modernization of the flue gas preheating system in the Bełchatów Power Plant (total capacity: 4440 MWe), Nos. 5 and 6 power units.

2010

79. Energoprojekt Warszawa SA

Civil engineering design of the 480 MW power unit in the Siekierki CHP Plant in Warszawa in the scope of the boiler house, electro-filter, coal handling system, slag removal system as well as of the fire-fighting water tank and fire-fighting water pumping station.

2010

80. Steinmüller Peitz Detailed engineering: adjustment of the detailed design of the No. 4 power unit’s original steel construction to the No. 5 power unit in the Bełchatów Power Plant (total capacity: 4440 MWe).

2010

CIVIL ENGINEERING 84

ENERGOPROJEKT-KATOWICE SA

NO. PURCHASER PROJECT NAME COMPLETED

81. Babcock Oberhausen

Bełchatów Power Plant (total capacity: 4440 MWe), Nos. 5 and 6 power units:

documentation for the construction notification,

information card of the project,

authorization of the basic engineering.

2010

82. PGE SA Rzeszów

CHP Plant

Static and resistance calculations for steel structure of main building’s roof connected with modernization of the air intake for the gas turbine installed in the combined cycle unit in the Rzeszów CHP Plant.

2010

83. Będzin SA CHP Plant

Civil engineering design for the biomass feed system as well as for reconstruction of the boiler to a biomass-fired boiler, based on EPK’s project: “Feasibility study concerning reconstruction of the No.6 OP-140 boiler to WP-120 boiler”.

Application form (submitted on behalf of the investor) to obtain a construction permit and approval of the civil engineering design.

2010

84. Alstom Power

Sp. z o.o. Elbląg

Expert opinion (civil engineering branch) concerning the foundations of forced draft fans and induced draft fans together with the air heaters’ concrete platform in the Bełchatów Power Plant (total capacity: 4440 MWe); No. 6 power unit.

2010

85. Alstom Power

Warszawa

Modernization of the No. 6 power unit in the Bełchatów Power Plant (total capacity: 4440 MWe): complete documentation required for notification of the building work in the Polish office in order to start the work.

2010

86. Tauron Polska

Energia SA Static analysis of the „B” building roof’s support structure (23, Lwowska Street, Katowice) due to an additional burden with a light screen.

2010

87. Vattenfall Architectural and location visualization of the 2 x 800 MW Power Plant in Opalenie. 2010

88. Steinmüller Peitz Design services concerning a steel structure for the load points of the pipelines in the Bełchatów Power Plant (total capacity: 4440 MWe).

2010

89.

Tauron Wytwarzanie SA,

Jaworzno III Power Plant

Construction project to obtain a demolition permit for demolition and documentation for demolition, disassembly and displacement of inactive parts of the boiler room in Power Plant Jaworzno III - Power Plant II (total power: 190 MWe).

2010

90. ELPOREM Sp. z o.o. Design works associated with installing noise mufflers on the exhaust ducts from absorbers C and D of flue gas desulphurization installations in Połaniec Power Plant.

2009

91. Tychy SA CHP Plant Structural detailed designs of the K11 crusher in the Tychy CHP Plant (total capacity: 290 MWt) based on the concept for construction.

2009

92. Foster Wheeler

Warszawa Preliminary Calculations of Foundations for Fluidized Bed Boiler in Połaniec Power Plant.

2009

93. Rafako SA Cleanout of the detailed engineering of the roofs over the bunker house (right and left side) in the Bełchatów Power Plant (total capacity: 4440 MWe).

2009

94. PGE SA Rzeszów

CHP Plant

Complete design set (civil engineering branch) together with the necessary agreements for the planned project: “Construction of the cogeneration power unit (producing thermal and electric energy) based on Diesel engines (vegetable oil fired)” as well as obtaining the construction permit for this project.

2009

95. ZE PAK SA Pątnów II

Power Plant

Civil engineering design and detailed engineering for the connecting platform together with the lighting and ventilation systems on the G2 technological trestle in the Pątnów II Power Plant (total capacity: 1600 MWe) in the engineering branches: civil, water&wastewater and electrical together with the bill of quantities.

2009

96. Tauron

Wytwarzanie SA As-built documentation for the social- and technical building of the 460 MW Power Unit in the Łagisza Power Plant (total capacity: 840 MWe).

2009

97. Elektrobudowa

Katowice SA Design package for the mountings of the construction for the cable routes in the Bełchatów Power Plant (total capacity: 4440 MWe) - 858 MW power unit.

2009

98. Tauron

Wytwarzanie SA Civil engineering design for the project: Construction of the new thermal power unit in the Bielsko-Biała I CHP Plant (total capacity: 275 MWt).

2009

99. Saint Gobain Basic engineering for the following facilities: furnace bay, glass tank furnace, glass cooling tank.

2009

100. Steinmüller Peitz Design set of the steel structure for the No. 4 power unit in the Bełchatów Power Plant (total capacity: 4440 MWe).

2009

101. Lotos Asfalt Sp. z o.o.

Gdańsk Detailed design for construction of the platforms between S6 and S7 as well as between S8 and S11 asphalt containers.

2009

85

CIVIL ENGINEERING

REFERENCE LIST

NO. PURCHASER PROJECT NAME COMPLETED

102. Foster Wheeler Detailed engineering: Reinforced concrete structure of the 460 MWe power unit in the Łagisza Power Plant (total capacity: 840 MWe).

2008

103. PGE SA Turów Power

Plant

Building objects - adjustment of the PGE Turów Power Plant (total capacity: 2088 MWe) infrastructure to the future operating requirements of the biomass co-combustion system in the Nos. 5 and 6 boilers.

2008

104. Elektrobudowa

Katowice SA

“Łagisza” Power Plant (total capacity: 840 MWe). 460 MWe Power Unit. Detailed design (civil engineering branch) entitled: “Steel structures for the cable routes in the boiler house”.

2008

105. Tauron

Wytwarzanie SA Update of the Civil Design of the compressor room for the 460 MW power unit with supercritical parameters in the Łagisza Power Plant (total capacity: 840 MWe).

2008

106.

Koksoprojekt Consulting

Engineering Company Ltd. Zabrze

Project supervision: “Construction of the complex of the coke oven battery No. 5 in the Przyjaźń Coking Plant.

2008

107. Steinmüller Peitz Basic engineering and detailed engineering of steel structures for the No. 3 power unit in the Bełchatów Power Plant (total capacity: 4440 MWe).

2007

108. Rybnik SA Power

Plant Designs for reconstruction of the pipelines in the area of the PZ3 feed water pump (the No. 6 Power Unit in the Rybnik Power Plant (total capacity: 1775 MWe)).

2007

109.

Tauron Wytwarzanie SA,

Jaworzno III Power Plant/ Rafako SA

Design services connected with construction of the new tanks in the existing absorber building of the No. 1 and 2 Power Units In the Jaworzno III Power Plant (total capacity: 1345 MWe).

2007

110.

ZE PAK SA Pątnów Power Plant/

Rafako SA

Design services connected with the technological modifications at the level of +13.80 m in the S2 sorbent pumping station of the 466 MWe Power Unit’s flue gas desulphurization system in the Pątnów Power Plant (total capacity: 1600 MWe).

2007

111.

PGE SA Bełchatów Power Plant/

Rafako SA

Control calculations of the powdered limestone silos for the flue gas desulphurization system of the 858 MWe Power Unit in the Bełchatów Power Plant (total capacity: 4440 MWe).

2007

112.

Tauron Wytwarzanie SA,

Jaworzno III Power Plant/ Rafako SA

Detailed engineering of the No. 1 and 2 absorber building reinforcements connected with construction of the emergency flue gas cooling tanks in the Jaworzno III Power Plant (total capacity: 1345 MWe).

2007

113. Alstom Vaxjo Design package concerning the steel structures, the platforms, the staircases, and the flue gas ducts – the Elektrenai project in Lithuania.

2007

114. PGE SA Turów Power

Plant

Civil Design and detailed engineering for the project entitled: “The engine room. Hydrogen removal system and smoke removal system. Stage III – the 8-10 Power units.

2007

115. Mitsui Babcock Working drawings for the BODEN project – delivery and assembly. 2007

116. Tauron

Wytwarzanie SA Detailed design and civil design of the 2xDN500 “Bory Malinowskie” heating networks’ distance piece from the trestle in the area of the hydrogen station.

2007

117. Electrabel

Połaniec SA

Civil design for the project entitled: “The installation of connecting the No. 1-8 Power units to the existing flue gas desulphurization system and to the flue gas removal to the new smokestack”.

2007

118. Agro-Eko-Energia

Sp. z o.o. Civil design of the biofuel the CHP Plant in Elbląg – the “ECB” project. 2006

119. Kopex SA Design set of wagon tippler No. 2 in the Kozienice Power Plant – branches: architectural, civil, construction.

2006

120. Energo-Inwest

Rybnik Sp. z o.o. Design package concerning the additional platforms for the SUNDSVALL project. 2006

121. Łęczyńska

Energetyka Sp. z o.o.

Modernization and development of the Heating Plant in Bogdanka – construction of new CHP Plant, together with the fluidized boiler and extraction condensing turbine set (65MWt and 40 MWe).

2006

122.

Tauron Wytwarzanie SA,

Łagisza Power Plant

Technical expertise: Cooling water pump of power unit No. 7 – construction of hydrokinetic clutch on the pump.

2006

CIVIL ENGINEERING 86

ENERGOPROJEKT-KATOWICE SA

NO. PURCHASER PROJECT NAME COMPLETED

123. Tauron

Wytwarzanie SA

Detailed design of the social- and technical building – design is related to the construction of the 460 MWe Power unit in the Łagisza Power Plant (total capacity: 840 MWe).

2006

124. Energo-Inwest

Rybnik Sp. z o.o.

The Kolding Project.

Basic engineering: platforms, and air ducts.

Working drawings and as-built documentation: boiler support structure, platforms, and air ducts.

2006

125. Mittal Steel Design package of the mountings, together with the steel structures, for the pipelines in the section of the steel continuous casting (No. 3) in Katowice Steel Works.

2006

126. Tauron

Wytwarzanie SA

Technical concept, basic engineering, and Civil Design of the compressor room – a part of the complex engineering related to the gas network and the compressed air network (the 460 MWe Power unit in the Łagisza Power Plant (total capacity: 840 MWe)).

2006

127. Energo-Inwest

Rybnik Sp. z o.o. Working drawing of the support structure for the pipelines - the Sundsvall project. 2006

128. Rafako SA

Design set: Modernization of the levels +25.00 m (the power units 1-2) in the Siersza Power Plant (total capacity: 786 MWe).

Floor calculations (level +25.00 m) for the new load (biomass silos – 2x2.5 tons);

Technical documentation for the new scope of the load.

2006

129. Skawina SA Power

Plant

Design set: Adjustment of oil-immersed transformers (in accordance with environmental protection requirements and fire protection requirements) in the Skawina Power Plant (total capacity: 590 MWe).

2006

130. Alstom Power

Sp. z o.o. Civil design of the 858 MWe power unit in the Bełchatów Power Plant (total capacity: 4440 MWe).

2006

131. PGE SA Turów Power

Plant Civil Design and detailed engineering: Turbine hall – hydrogen removal system, and smoke removal system – the phase II (power units 1-3).

2005

132. Polimex –

Mostostal SA Workshop drawings of the smokestack platform steel construction. 2005

133. Energo-Inwest

Rybnik Sp. z o.o.

Basic design of the platforms as well as working drawings of support steel structure (boiler and boiler house). Workshop drawings of the platforms – the Sundsvall Project.

2005

134.

Tauron Wytwarzanie SA,

Siersza Power Plant

Civil design of coal crushing system for fluidized boiler No. 1-2 in the Siersza Power Plant (total capacity: 786 MWe).

2005

135. Polimex-

Mostostal SA Detailed design for drying room of chips for the „Kronopan Egorievsk” in Russia. 2005

136. Kraków SA CHP Plant Detailed design: Overhaul of wagon trippler coal tank No. 2 in the Kraków CHP Plant (total capacity: 1237 MWt).

2005

137. Przyjaźń Sp. z o.o.

Coking Plant

Civil Design for the project: „Productivity increase of the „Przyjaźń” Coking Plant to 1.4 million tons of coke per year” in the scope of the construction of coke oven battery No. 5 and its surrounding facilities”.

2005

138. PGE SA Bełchatów

Power Plant Civil design of the 858 MWe Power unit – the 858 MWe power unit connection management, infrastructure management.

2005

139. Przyjaźń Sp. z o.o.

Coking Plant

Construction draft for the task entitled: “Productivity improvement of the Przyjaźń Coking Plant by 1.4 million tones of coke per year” in the scope of construction of coke-oven battery No. 5 together with affiliated buildings.

2005

140. Energo-Inwest

Rybnik Sp. z o.o. Basic engineering for the Garp Project. 2005

141. Saint Gobain Drawings update of the Civil Design – the constructed glass production line “Float 2” in the SAint-Gobain Glass Poland.

2005

142. Polimex-

Mostostal SA Preliminary measurement of the steel structure Weight for the Heimdal Line 3 Project in Norway.

2005

143. Polimex-

Mostostal SA Detailed design of steel structure for the Sebes Company in Romania. 2005

87

CIVIL ENGINEERING

REFERENCE LIST

NO. PURCHASER PROJECT NAME COMPLETED

144. PGE SA Turów Power

Plant Design set of area management in the Turów Power Plant (total capacity: 2088 MWe) - power units No. 4-7.

2005

145. Tauron

Wytwarzanie SA Design set: Structural reinforcement of conveyor gallery inclined belt in the Jaworzno III Power Plant (total capacity: 1345 MWe).

2005

146. Sefako SA Designs of the flue gas ducts, the support structure, and the platforms for the H.C.Orsted-Copenhagen in Denmark.

2005

147. Polimex-

Mostostal SA Detailed design: Steel structure of drying room of chips for the Kronospan in Szczecinek.

2005

148. Tauron

Wytwarzanie SA Design documents concerning the change of the architectural concept of the PKE (now Tauron Wytwarzanie SA) main office building (Lwowska Street, 23).

2005

149.

Thermal Power Company Sp. z o.o. in

Biała Podlaska

Basic design of modernization project of the K1 Heat Plant in Biała Podlaska, together with the construction of the new water heater (WR-8).

2005

150.

PGE SA ZE Dolna Odra Pomorzany

CHP Plant

Project documentation preparation with the purpose of obtaining construction permit for the “The flue gas ducts reconstruction on the Benson boilers’ side in the Pomorzany CHP Plant (total capacity: 443 MWt)”.

2004

151. Tauron

Wytwarzanie SA PKE’s (now Tauron Wytwarzanie SA) office building reconstruction engineering project.

2004

152. Energorozwój

Warszawa

Construction engineering project of the straw-fired Power Plant control room in Nowy Dwór Gdański in accordance with the requirements of the act of July 7th, 1994, Construction Law with subsequent amendments.

2004

153. Owens Illinois

Poland SA Design set for the production plant – the Antoninek Glass Works. 2004

154. Tauron

Wytwarzanie SA Civil design: Reconstruction of PKE’s (now Tauron Wytwarzanie SA) main office building.

2004

155. Energo-Inwest

Rybnik Sp. z o.o. Working drawings of the crane beams – DDP Odense. 2004

156. Energo-Inwest

Rybnik Sp. z o.o.

Basic design of platforms as well as the air and the flue gas ducts.

Workshop documentation for the boiler and the economiser support steel structure, the platforms, the air and the flue gas ducts for the project Skovde Varmeverk AB.

2004

157. Energo-Inwest

Rybnik Sp. z o.o. Workshop documentation of the boiler and building support structure, platforms, stairs and air ducts for the project Reno Nord.

2004

158. Mostostal Stalowa

Wola SA Workshop and assembly documentation for the steel structure of bridges and ladders for the smokestack construction in Voerde, Germany.

2004

159. Mostostal Siedlce SA Workshop drawings of steel structures for the company Binder. 2004

160. Mostostal Siedlce SA Workshop drawings of steel structures for the company Statoil. 2004

161. Mostostal Stalowa

Wola SA Workshop drawings of the hall steel structure for the company nutricia. 2004

162. Energo-Inwest

Rybnik Sp. z o.o.

Basic design of platforms and ducts as well as working drawings and as-built documentation, of the boiler support steel structure, air ducts and hoppers for the project Fasan.

2004

163. Energo-Inwest

Rybnik Sp. z o.o. Workshop documentation of the steel support structure on the drilling platform for the company Promecon, Denmark.

2004

164. Instal Rzeszów SA The support steel structures, the flue gas ducts and the reactor structure in the KVA Trimmis in Switzerland.

2004

165. FLS Milio Workshop documentation for the steel structures (ducts, supports, chutes, pipes) for Mondi Paper.

2004

166. Energo-Inwest

Rybnik Sp. z o.o. Workshop documentation of ducts for the project ICDI Charleroi. 2003

167. Skawina SA Power

Plant

Construction draft development with the purpose of obtaining construction permit for “Modernization of boiler No. 11 in the Skawina Power Plant (total capacity: 590 MWe)”.

2004

168. Kędzierzyn SA Nitric

Plant Construction draft with the purpose of obtaining construction permit for the investment performance: waste water treatment in the Kędzierzyn SA Nitric Plant.

2004

CIVIL ENGINEERING 88

ENERGOPROJEKT-KATOWICE SA

NO. PURCHASER PROJECT NAME COMPLETED

169.

PGE SA ZE Dolna Odra Pomorzany

CHP Plant

Construction draft: “Reconstruction of the flue gas ducts on the Benson boilers’ side in the Pomorzany CHP Plant (total capacity: 443 MWt)”.

2004

170.

PGE SA ZE Dolna Odra Pomorzany

CHP Plant

Construction draft for the flue gas desulphurization system electro-filter reconstruction in the Pomorzany CHP Plant (total capacity: 443 MWt).

2004

171.

PGE SA ZE Dolna Odra Pomorzany

CHP Plant

Preparation of the project documentation entitled: Modernization of the flue gas duct for emergency by-product removal in the area of the P-10 support construction of the flue gas desulphurization system in the Pomorzany CHP Plant (total capacity: 443 MWt).

2004

172. Energo-Inwest

Rybnik Sp. z o.o. Workshop documentation of the chute hatch and compensator for the Hogdalen project.

2003

173. Mostostal Stalowa

Wola SA Workshop documentation of steel structures for the drying plant in SAndebeck. 2003

174. Energo-Inwest

Rybnik Sp. z o.o. Workshop documentation of the boiler and economizer support structure, platforms, stairs as well as steel elements for the project Finspang.

2003

175. Chorzów ELCHO

Sp. z o.o. CHP Plant CHP Plant of capacity 2 x 102 MWe / 180 MWt. Civil engineering design to obtain the building permit and detailed designs.

2003

176. Skawina SA Power

Plant

Civil engineering design to obtain the building permit for "Modernization and overhaul of the steam boiler No. 10 type OP-210 in the Skawina Power Plant (total capacity: 590 MWe)”.

2003

177.

Dalkia Poznań ZE SA Poznań- Karolin SA

CHP Plant

Civil engineering design for the second unloading pass with coal intake from the storage yard.

2003

178. ZE PAK SA Reconstruction of the Pątnów Power Plant (total capacity: 1600 MWe). Civil engineering design for the ash removal and at unit “A” 460 MWe.

2003

179. ZE PAK SA Reconstruction of the Pątnów Power Plant (total capacity: 1600 MWe). Civil engineering design and detailed designs for Slag and ash removal from the Pątnów Power Plant to the northern storage yard.

2003

180. PGE SA Lublin-

Wrotków CHP Plant

The combined cycle unit of power 239 MW in the Lublin-Wrotków CHP Plant (total capacity: 628 MWt).

Civil engineering design and detailed designs covering the main building of the new combined cycle unit with related facilities.

2002

181. Kraków SA CHP Plant

Assembly of the oil transportation system to and from the main turbine sets and ZS1 and ZS2 emergency tanks together with the oil filtration shunt systems in the Kraków CHP Plant (total capacity: 1237 MWt).

Construction draft of the oil loading and unloading station.

2002

182. PGE SA Rzeszów

CHP Plant

The combined cycle unit:

Main building – RC and structures steel, architecture;

Electrical building, RC structures, architecture;

Sludge drainage building – architecture;

Cooling water pumping station C1a and fan cooling station C2 – architecture;

The combined cycle unit – foundations, steel structure, architecture;

Construction of the gas pre-heater and filtration as well as oil pressure stabilisation station;

Fuel preparation station (A5) – architecture;

Staircase B6 in the main building;

Oil management building (A1) – architecture.

2002

183. PGE SA Turów Power

Plant Rehabilitation of units No. 1-6 (6 x 240 MWe) in the Turów Power Plant (total capacity: 2088 MWe) - Civil design and detailed engineering.

2002

184. Nowa Sarzyna CHP

Plant Civil design for the Nowa Sarzyna CHP Plant (total capacity: 216 MWt) with the two gas turbines and the one steam turbine.

2002

185. Białystok SA CHP

Plant Civil design for installation of the new bleeding-condensing turbine generator set of electric power 20MW with the auxiliary installations and equipment.

2002

186. PGE SA Turów Power

Plant

Rehabilitation of unit No. 4 civil design and detailed designs within the structural, architectonic and civil engineering for unit No. 4: boiler house, electrostatic precipitator.

2002

89

CIVIL ENGINEERING

REFERENCE LIST

NO. PURCHASER PROJECT NAME COMPLETED

187. PGE SA Turów Power

Plant Rehabilitation of unit No. 6 - civil design and detailed designs within the structural, architectonic and civil engineering for unit No. 6.

2002

188. ZE PAK SA Pątnów II

Power Plant

Reconstruction of the Pątnów Power Plant (total capacity: 1600 MWe). Boiler house for the new unit “A” of power 460 MWe.

Basic and detailed designs for the steel structure of the new boiler house for unit “A” of power 460 MWe. Total tonnage of the structure – approximately 5 000 tons.

2002

189. Kraków SA CHP Plant Preparation of guidelines for the construction of the dehydration ducts covers – level 0.0 m in the unit and peak boiler house in the Kraków CHP Plant (total capacity: 1237 MWt).

2002

190.

Tauron Wytwarzanie SA,

Łagisza Power Plant

Industrial and rain wastewater treatment plant - civil engineering design to obtain the building permit and detailed designs.

2001

191. Kraków SA CHP Plant Performance project of readjustment of the centrifuges hall in the oil management building to the lubrication system storeroom in the Kraków CHP Plant (total capacity: 1237 MWt) – building engineering section.

2001

192. PGE SA Turów Power

Plant

Construction and performance projects related to modernization of the electric section of the external ash removal system in the scope of switching station buildings No. 1 and 2.

2001

193. Kraków SA CHP Plant Performance projects of the floors and staircases repairs in the unit boiler house in the Kraków CHP Plant (total capacity: 1237 MWt).

2001

194.

Tauron Wytwarzanie SA,

Siersza Power Plant

Reconstruction of units No. 1 and 2.

Civil engineering design and detailed designs covering the bunker house and boiler house of unit No. 1 and 2 with the development of unit forebay.

Total cubature of facilities – 172 000 m3. Total tonnage of the steel structure – 1 900 Mg.

2001

195. Kraków SA CHP Plant

Overhaul of the secondary excitation system - performance project:

Main building – level 0.0m;

Secondary excitation compartments – the construction and architectural branch.

2001

196.

Tauron Wytwarzanie SA,

Siersza Power Plant

Adjustment of the coal yards to supply for units No. 1 and 2. Civil engineering design and detailed designs for adjusting the coal yards to supply units No. 1 and 2 in the following scope:

Steel structure;

Foundations and civil structures.

2000

197. Kraków SA CHP Plant Performance project for the peak boiler house façade in the Kraków CHP Plant (total capacity: 1237 MWt).

2000

198. PGE SA Turów Power

Plant Rehabilitation of unit No. 5 - civil engineering design and detailed designs within the structural, architectonic and civil engineering for unit No. 5.

2000

ELECTRICAL ENGINEERING 90

ENERGOPROJEKT-KATOWICE SA

8. ELECTRICAL ENGINEERING

NO. PURCHASER PROJECT NAME COMPLETED

1. Racibórz Revision of the design documentation, including the change of the technological solution of erecting the Electric and Auxiliary Equipment Bay building – A0UBA at the JAWORZNO Power Plant III.

in progress

2. Emerson Warszawa Development of the technical documentation for the electrical works of EFW Allerton (UK).

in progress

3. Elektrobudowa SA

Katowice Design documentation of the entire task of the replacement of the 6 kV auxiliary switching station of the unit # 1 at EDF Cracow.

in progress

4.

Arcelormittal Polska SA, Dąbrowa

Górnicza Branch

Analysis of the 110kV power network and determination of the technical conditions of a ring operation in AMP/Dąbrowa Górnicza, stage I. in progress

5. Elektrobudowa SA

Katowice As-built documentation of the gypsum storage plant for the FGD of the units 4 – 6 of the Turów Power Plant.

in progress

6.

Arcelormittal Polska SA, Dąbrowa

Górnicza Branch

Development of the protection settings of the SN6 switching station and the 20kV switching station of the GST 6 station. in progress

7.

KGHM Cuprum Sp. z o.o. – Research and

Development Centre

Expert’s report on power security of KGHM Polska Miedź S.A. and determination of the available connection power of each power station.

in progress

8.

Biuro Projektów Koksoprojekt

Sp. z o.o.

Electrical branch designs related to the reconstruction of the electrical management under the investment project titled: “Retrofit of the Light-Oil Recovery Plant along with the Associated Facilities” at Koksownia Radlin (En. Radlin Coke Plant).

in progress

9.

Elektrownia Puławy Sp. z o.o.

Development of the electrical power evacuation concept from the CCGSU, and update of the building design of the construction of the Puławy Power Plant – Part II (Puławy Power Plant building design – External facilities: HV power networks).

in progress

10.

Elektrobudowa Katowice SA

Additional design works concerning the system of power extraction for the GSER1-GSER2 switching station on the TG1-TG3 installation including the transition systems necessary for proper work of the electrical systems of Huta Miedzi copper mills in Głogów.

in progress

11. Elektrobudowa RWE

Katowice SA

Analysis and design works in the electrical discipline for installation of IS LIMITERS in the electrical power supply system of the Copper Mill in Głogów in order to limit the short-circuit power.

in progress

12. Energoserwis

Kleszczów Sp. z o.o

Technical documentation for the electrical part of the project titled "BCT10 30 110/6 kV auxiliary transformers - upgrade of protections" at the PGE GiEK, Turów Power Plant Branch. (total power: 2,088 MWe).

in progress

13. Alstom Power

Sp. z o.o. Lightning protection system and detailed designs for buildings in the PXM scope and buildings in the MWA scope at the Opole Power Plant.

in progress

14. Alstom Power

Sp. z o.o.

Project Opole 5&6 (2x900 MW):

Lighting and power outlet system

- process and outdoor lighting facilities (buildings in the PMX scope);

- process and outdoor lighting facilities (buildings in the MWA scope).

in progress

15. Emerson France Parc Design documentation of the electrical works for conversion of the coal power plant to the biomass-fired power plant – Provence 4, Gardanne, France.

in progress

16. EDF Polska Sp. z o.o. Analysis of dynamic stability of GT50 units at EDF Toruń. 2016

17. Elektrobudowa

Katowice SA

Technical documentation for the electrical discipline for the task titled: Construction of a system for reduction of emission of sulfur oxides in power units 4-6 at the PGE GiEK S.A., Turów Power Plant Branch in Bogatynia. (total power: 2,088 MWe).

2016

18.

ABB Warszawa Development of design documentation concerning “Restoration of Electrical Protections of BAT10 and BBT10 Transformers of the Units 4 and 5” – Turów Power Plant (total capacity: 2,088 MWe).

2016

91

ELECTRICAL ENGINEERING

REFERENCE LIST

NO. PURCHASER PROJECT NAME COMPLETED

19.

Elektrobudowa SA Technical documentation for the electrical works (general purpose building systems) for the following investment project: “Construction of the Supercritical 910 MWe Power Unit at Jaworzno III Power Plant – Power Plant II (total capacity: 1,345 MWe). The scope of the project includes, as follows: – Basic Engineering – Detailed Designs – Development of technical specifications of the Technical Conditions of Deliveries – Acting as a General Designer – Update of the Unit 3D model.

2016

20. EP Kraków SA Expert’s report on the impact of connecting the Poniatowa Wind Farm to the HV

network. 2016

21.

EP Kraków SA Analysis of the power system operation in the event of a failure at the intersection of the planned 400 KV lines of PKN ORLEN SA with the 110 kV lines of ENERGA OPERATOR SA.

2015

22.

Tauron Dystrybucja SA

Expert’s report on impact of connecting 2 wind farms of FW Przyrów – Zarębice and FW Przyrów – Staropole to the power system for TAURON Dystrybucja S.A., Częstochowa Branch.

2015

23. IDOM Update of the expert’s report on impact of FW Złotoryja on the power network

performance. 2015

24.

Elektrobudowa Katowice SA

Development of the documentation concerning delivery, installation, and commissioning of the new basic power supply 6 kV switching station of the oil boilers at EDF Polska.

2015

25. ZE PAK SA Development of the operating manual for operation of the electrical part of the Units

No. 1 and 2 at Pątnów Power Plant (total capacity: 1,600 MWe).

2015

26. PGE SA Bełchatów

Power Plant Detailed Design of the auxiliary electrical system of the unit No. 3 to adapt the unit to operate in a dedicated system. (total capacity: 4,440 MWe).

2015

27. EP Kraków SA The documentation of the secondary circuits of the unit #5 in relation to the replacement of the apparatus at the foreground of the unit #5 of Połaniec Power Plant.

2015

28. Elektrobudowa

Katowice SA

Detailed designs and the as built documentation for the electrical works and input for the operation instructions for the project named: "Construction of the plant to reduce emissions of sulphur oxides for the units No. 4 – 6 at Turów Power Plant.”

2015

29. Elektrobudowa

Katowice SA The basic, detailed and as-built designs for the electrical works for the wet flue gas desulphurisation plant at EDF Kraków SA (total capacity: 1,237 MWt).

2015

30.

Energoserwis Kleszczów Sp. z o.o

Documentation concerning: “Modernisation of the Electrical Protections of the BAT10 and BBT10 transformers on the Unit No. 6” at PGE GiE S.A., Turów Power Plant branch (total capacity: 2,088 MWe).

2015

31.

Elektrobudowa Katowice SA

Development of the technical documentation for the electrical works for the following investment project: “Construction of the Plant to Reduce Emissions of Sulphur Oxides for the Units No. 4 – 6 at Turów Power Plant.”

2015

32. EDF Polska Sp. z o.o. The technical documentation and the building permit for execution of the fire-fighting instructions in the power unit building at EDF Polska S.A. Rybnik Branch (TRANSFORMERS).

2015

33. Elektrobudowa RWE

Katowice Modernization of power output busbars on six power units No.: 2, 3, 4, 5, 6, 7 in the Połaniec Power Plant.

2015

34. Elektrobudowa

Katowice SA

Technical design for the electrical works for the project “Designing, construction, starting up and commissioning (on a turn-key basis) the flue gas nitrogen removal system at EDF Kraków – stage I (K3, K4, reagent unloading and storage station. (total capacity: 1,237 MWt).

2014

35. Elektrobudowa RWE

Katowice

Technical documentation for the task: "Execution and launch of the DeNOx with replacement of auxiliary transformers 6/0,4 kV for power units 2, 3, 4, 5, 6, 7 in the Połaniec Power Plant ".

2014

36. Elporem Sp. z o.o.

The technical as-built documentation and the as-built design for control, mapping and security of the on-load tap changers as well as the cooling system and the unit transformers no. 2, 3, 4, 5, 6 and 7 in the Połaniec Power Plant within a so-called "Phoenix" program.

2014

ELECTRICAL ENGINEERING 92

ENERGOPROJEKT-KATOWICE SA

NO. PURCHASER PROJECT NAME COMPLETED

37. Elektrobudowa

Katowice SA

The basic, detailed and as-built designs for the electrical works, including E-control system, teletechnical and fire systems as a part of modernisation of the flue gas desulphurisation plant of the units 5 and 6 at PGE, Bełchatów Power Plant (total capacity: 4,440 MWe).

2014

38. Elektrobudowa

Katowice SA

Design of the electrical works for the system of power extraction for the GSER1-GSER2 switching station on the TG1-TG3 installation including the transition systems necessary for proper work of the electrical systems of Huta Miedzi in Głogów, including the short-circuit calculations.

2014

39. Energoserwis

Kleszczów Sp. z o.o Adaptation of the premise and the infrastructure for installation of the simulation of operation of a power unit at the PGE GiEK, Bełchatów Power Plant Branch.

2014

40. ZE PAK Konin Technical designs for the cable distribution cabinets for the project named: Modernisation of the electrical system for the units No. 1 and 2 at Pątnów Power Plant. (total capacity: 1,600 MWe).

2014

41. Alstom Power

Sp. z o.o. Detailed design for Opole 2 x 900 MW project. Power supply system for the construction site.

2014

42. Elektrobudowa SA –

Konin

As-built documentation for the MV switchgears of the gas and steam turbine generator, and 200-MVS-001 and 300-MVS-001 turbo-expander for PMG Wierzchowice.

2014

43. Elporem Sp. z o.o. The as-built technical documentation of the electrical part of the renovation of devices and secondary circuits of the unit No. 3 at Elektrownia Połaniec S.A. – GDF Suez Energia Polska S.A. Group.

2014

44. Askom Sp. z o.o.

Gliwice Detailed designs of prefabrication of two switching stations and four transformer stations for the Nagarnar coke complex being built in India.

2014

45. Elporem Sp. z o.o. The technical documentation of the electrical part of the renovation of devices and secondary circuits of the unit no. 2 at the Połaniec Power Plant GDF SUEZ Energia Polska SA Group.

2013

46. Energotest Sp. z o.o. The technical documentation of the electric protections modernisation of the unit no. 6 operating at Połaniec Power Plant).

2013

47. Elektrobudowa RWE

Katowice Stalowa Wola Power Plant – retrofitting of OP 120 boiler. Electrical executive designs for facilities of Stalowa Wola Power Plant.

2013

48. PGE SA Turów Power

Plant Design documentation for the investment named “Unit No. 3 – Adjustment of the Power Extraction Circuits to the PSE’s Requirements”.

2013

49. PGE SA Opole Power

Plant

Design for connection of equipotential connection installation of devices in carburization to an existing installation of area grounding in PGE Opole Power Plant SA.

2012

50. Foster Wheeler

Warszawa Design for power and distribution of cables for sprinkler system and heating piping for water fed to sprinklers for the biomass boiler in Połaniec Power Plant.

2012

51. ZE PAK SA Operating Instructions for the task, "Electrical work within the turbine set TG6 in Konin Power Plant.".

2012

52.

Tauron Wytwarzanie SA

Katowice

Developing objectives and input data needed to design the master automation system for the RES manufacturing unit in Jaworzno III Power Plant – Elektrownia II (total capacity: 190 MWe) for the range of the turbine.

2012

53. Elektrobudowa SA

Design, construction, test operation, and commissioning of auxiliary and general power electric equipment and systems as a part of the project titled “Construction of the RES (Renewable Energy Sources) Generation Unit at the Jaworzno III Power Plant – Power Plant II (total capacity: 190 MWe).

2012

54. ZRE Katowice SA Technical design of electrical branch including the electrical circuits, in terms of modernization of the TG1 in Jaworzno III Power Plant – Power Plant II (total capacity: 190 MWe).

2012

93

ELECTRICAL ENGINEERING

REFERENCE LIST

NO. PURCHASER PROJECT NAME COMPLETED

55. Elektrobudowa SA

Upgrade of the distribution station and the pumping station at the Kraków Combined Heat and Power Plant (total capacity: 1237 MWt).

Upgrade of the PWCH cooling water pumping station, replacement of the OBA 6 kV switchboard, replacement of the OCA 0.4 kV switchboard, replacement of the ODA1-8 0.4 kV sub-switchboard.

Upgrade of the OBW 6 kV switchboard.

As-built documentation for the electric part of the primary and secondary circuits of the OBW 6 kV switchboard.

As-built documentation for the electric part of the primary and secondary circuits of the upgraded PWCH pumping station.

2012

56. BSiPE Energoprojekt-

Kraków SA

Documentation for the secondary loops of power units 7 and 8, connected with the upgrade of the equipment in the foreground of power units 7 and 8 at the Połaniec Power Plant.

2012

57. Elektrobudowa SA Technical documentation - prefabrication of switchgears D12P - PR4, PO5 type in Bełchatów Power Plant (total capacity: 4440 MWe).

2012

58. Koksownia Przyjaźń

Sp. z o.o.

Technical documentation for the investment project titled: Modernisation of protections of transformers TR1 and TR2 220/6kV in KGST-1 station and transformer TR3 110/6 kV in KGST-2 station, in scope of complex digital protection, replacement of instruments in control and protection circuits, and commissioning of a computer station for full operation, visualization and registration of interference from new devices.

2012

59. Energotest Sp. z o.o. The technical documentation of the electric protections modernisation of the unit no. 7 operating in duo-unit in the Połaniec Power Plant.

2012

60. Elektrobudowa SA The detailed design and as-built documentation of the secondary circuits of the current and voltage transformers exchange for power extraction from the unit no. 9 (former 8) generator in the Połaniec Power Plant.

2012

61. EC Nowa Sp. z o.o. Concept of connection of the 50 MW unit to the plant grid 110kV EC Nowa. 2012

62.

Biuro Projektów Koksoprojekt

Sp. z o.o. Zabrze

As built documentation of the electric systems of the modernised KS-203 station executed within the framework of coke-oven battery modernisation no. 1 in the Przyjaźń Coke Plant.

2012

63. Elporem Sp. z o.o. The technical documentation adapting the secondary circuits of the new transformers TB, TZ of the unit no. 9 in the Połaniec Power Plant GDF Suez Energia Polska SA Group.

2012

64. ZRE Katowice SA The technical design for the TG1 generator of the renewable energy source power generating facility in Tauron – Jaworzno III Power Plant – Power Plant II (total capacity: 190 MWe).

2012

65. Tauron

Wytwarzanie SA

Technical documentation for: “Project of adaptation of the present flyovers to run cable routes supplying the compressor room and connected with relocation of the compressor room control desk from the dust removal signal cabin to the carbonisation signal cabin within the framework of construction of the renewable energy source power generating facility in Jaworzno II Power Plant – Power Plant II (total capacity: 190 MWe).

2012

66. ETC Plus SA Detailed and as-built documentation for the guaranteed voltage and direct current systems for the biomass boiler at the Połaniec Power Plant – GDF Suez Energia Polska SA

2011

67. Alstom Power Boiler

Electrical system of the afterburning grate in the Bełchatów Power Plant (total capacity: 4440 MWe):

detailed design,

deliveries, assembly, tests and post-assembly measurements, start-up,

deliveries and assembly of cables and cable supporting constructions,

power cables for frequency converters cabinets.

2011

68. ABB Warszawa Design (electrical branch) for the project concerning the conversion of the No. 1 (K1) OP140 boiler into the biomass-fired BFB boiler in the Karolin CHP Plant (total capacity: 844 MWt).

2011

69. Foster Wheeler

Warszawa

Update of the building design of the boiler house with the K9 fluidized-bed boiler (station no. K12) with a circulating bed fired with biomass with the capacity of 215 t/h at the Konin Power Plant.

2011

ELECTRICAL ENGINEERING 94

ENERGOPROJEKT-KATOWICE SA

NO. PURCHASER PROJECT NAME COMPLETED

70. Gasoil Basic design as well as detailed designs for construction of the PMG Wierzchowice (the underground gas storage).

2011

71. Elektrobudowa RWE

Katowice

Detailed engineering together with the as-built documentation for construction of the 6 kV PO6 switching station in the Bełchatów Power Plant (total capacity: 4440 MWe).

2011

72. Elporem Sp. z o.o. Modernisation of TB1 unit transformer secondary circuits in Połaniec Power Plant. 2011

73. ABB Warszawa Technical documentation for the control circuits (drives and binary closing components) for the No.1 power unit in the Karolin CHP Plant (total capacity: 844 MWt).

2011

74. Almaprojekt Detailed design of the road lighting system at the ZEC Bielsko-Biała CHP1 (total capacity: 275 MWt).

2011

75. Babcock Oberhausen As-built documentation for the design of the electric part of power unit no. 6 at the Bełchatów Power Plant (total capacity: 4440 MWe).

2011

76. JTC SA Będzin Basic design for the electric discipline for the ash removal system and the sorbent system at the ZEC Bielsko-Biała CHP-1 (total capacity: 275 MWt).

2011

77. SE Jastrzębie SA Application for connection to the power grid of the proposed 70 MWe fluidized-bed boiler power unit at the “Zofiówka” Combined Heat and Power Plant.

2011

78. Emerson Warszawa Design of the electric part for upgrade and repair of the control and monitoring systems, together with the electric systems in power units 7-12 at the PGE Elektrownia Bełchatów SA (total capacity: 4440 MWe).

2011

79. ZE PAK SA

Detailed design of auxiliary systems and lines of K-12-TG6 unit with regard to electrical and ICA branches including technological connections with individual system in the Konin Power Plant:

adaptation of cooling and service water systems for interaction of K-12 boiler with TG-6 turbine as well as reconstruction of service water collectors within the area of the engine room and the boiler room,

auxiliary pipelines connecting K-12 boiler with TG-6 turbine,

reconstruction of fresh steam and feeding water collector functions,

cooling water system,

steam, water and condensate Sampling system of the new unit,

boiler blowing system.

2011

80. Rybnik SA Power

Plant

Concept for modernization of the sprinkler system of the unit transformer, tap transformer and station-service transformer in the Rybnik Power Plant (total capacity: 1775 MWe).

2010

81. Elektrobudowa

Katowice SA Detailed engineering for the medium voltage switchgear of the gas and steam turbine generator (5 bays) in Wierzchowice.

2010

82. GDF Suez As-built documentation concerning the secondary circuits of the Nos. 2, 3, 5, 6, 7 power units’ electrical part after the implementation of teleprotections in the scope of connections with the high-voltage substation in the Połaniec Power Plant.

2010

83. Elektrobudowa

Katowice SA

Detailed design together with the as-built documentation of the electrical part in the scope of modernization of the 6kV PW1A and PW1B bay (of a substation) supplying A11 and A21 belt conveyors in the Bełchatów Power Plant (total capacity: 4440 MWe).

2010

84. Przyjaźń Coking Plant

Sp. z o.o. Designs concerning the lightning protection of the pipelines placed on routes of the trestles: A, A1÷A5, B, B1÷B5, B7, L, E, E1÷E5.

2010

85. Elpoautomatyka

Sp. z o.o. Technical documentation for repair of the power evacuation system of the No. 3 power unit in the Połaniec Power Plant (GDF Suez Energia Polska Group).

2010

86. Emerson Warszawa Modernization of the control and supervision system together with the electrical system of the No. 3 and 4 Power units in the PGE Bełchatów Power Plant (total capacity: 4440 MWe).

2010

87. Elektrobudowa SA Update of the detailed designs of the 0,4kV and 690V switchgears for the 858 MW power unit in the Bełchatów Power Plant (total capacity: 4440 MWe).

2010

88. GDF Suez As-built documentation concerning the secondary circuits of the No. 6 power unit’s forebay after replacement of the 400 kV disconnecting switches in the Połaniec Power Plant.

2010

95

ELECTRICAL ENGINEERING

REFERENCE LIST

NO. PURCHASER PROJECT NAME COMPLETED

89.

ZE PAK SA Pątnów II SA Power

Plant

Detailed engineering (electrical engineering branch) of the primary and secondary circuits connected with reconstruction of the G1 compressor room in the Pątnów II Power Plant (total capacity: 1600 MWe).

2010

90. Elektrobudowa

Katowice SA Modernization of the 0,4 kV RS11-12, RN025-26, RPS021, UPS switching station – No. 2 chimney flue in the Połaniec Power Plant.

2010

91. Elektrobudowa

Katowice SA Detailed engineering for the A1BKJ and AJBKK switchgears in the Bełchatów Power Plant (total capacity: 4440 MWe).

2010

92. Elektrobudowa

Katowice SA

Necessary design modifications, designs for new outflows in specified 0,4kV and 690kV switchgears for the 858 MW power unit in the Bełchatów Power Plant (total capacity: 4440 MWe).

2010

93. Rybnik SA Power

Plant

Design of power evacuation from the No. 8 Power Unit in the Rybnik Power Plant (total capacity: 1775 MWe) to the local consumers in the Katowice Special Economic Zone in Rybnik.

2009

94. Elektrobudowa SA Detailed engineering of the installation in the PIII/2 building in the Bełchatów Power Plant (total capacity: 4440 MWe).

2009

95. EP Kraków SA Secondary circuits in the No. 6 power unit in connection with replacement of the 400kV disconnecting switch in the Połaniec Power Plant – Electrabel Group.

2009

96. Tauron

Wytwarzanie SA

Modernization of the circumferential circuits’ supply system of the 6kV 3BB switching station in the Jaworzno III Power Plant – No. 2 Power Station (total capacity: 190 MWe) – design set.

2009

97. Kraków SA CHP Plant

Analysis of the new fire-fighting technical solutions for the fire flaps system in the 6,3 kV and 0,4 kV switching stations together with the analysis concerning the possibility of controlling them using the CERBERUS system in the Kraków CHP Plant (total capacity: 1237 MWt).

2009

98. ELOROS As-built documentation of the multi-discipline construction of the transformer station in the vicinity of the liquefied gas plant in the Economic Zone in Rybnik.

2009

99. GDF Suez Detailed engineering for the modernization of the secondary circuits for power evacuation and electrical protection of the No. 8 power unit.

2009

100. Elektrobudowa

Katowice SA Design set of the 31708627.VD; 30708626.VD; 30708670.A1 switchgears. 2009

101. KNAUF Bełchatów

Sp. z o.o.

Design set concerning the power supply system of the Knauf Bełchatów Ltd from the PGE Bełchatów Power Plant (total capacity: 4440 MWe) - from the 6 MW each PR1 and PR3 switching stations.

2009

102. Elektrobudowa

Katowice SA Design package of the 0.4kV and 690V switchgears for Mondi Packaging Paper Świecie SA

2009

103. Energotechnika-

Energorozruch SA Electrical design for the construction of the flue gas fan for the No. 2 power unit in the Jaworzno II Power Plant (total capacity: 190 MWe).

2009

104. Kraków SA CHP Plant Analysis of the existing gas systems technical solutions in order to estimate explosion hazard of the TGH-120 power generators in the Kraków CHP Plant (total capacity: 1237 MWt) – technical application forms.

2009

105. Elektrobudowa

Katowice SA Design package for the 690V A1BFE01 and A1BFF01 switchgears in the “Bełchatów” Power Plant (total capacity: 4440 MWe).

2008

106. PGE SA Bełchatów

Power Plant Modernization of the accelator Ac 1.3. 2008

107. Przyjaźń Coking Plant

Sp. z o.o. Detailed engineering for the projekt: „The SCO I&C system in the 6kV grid”. 2008

108. Przyjaźń Coking Plant

Sp. z o.o.

Detailed engineering for the project: “Modernization of the HV and MV system in the scope of adjusting it to the operation including the connection of new facilities within a framework of the development of the Przyjaźń Coking Plant”.

2008

109. Elektrobudowa

Katowice SA Detailed design and as-built documentation: Modernization of the switchgear 6kV (04BBA, 04BBB type) in the Kraków CHP Plant (total capacity: 1237 MWt).

2008

110. Elektrobudowa

Katowice SA

Detailed engineering and as-built documentation:

primary and secondary circuits together with the external connections of the D-12P "PO3" 6kV switching station;

lighting, heating and air conditioners supplying circuits of the PO3 switching station in the PGE Bełchatów Power Plant (total capacity: 4440 MWe).

2008

ELECTRICAL ENGINEERING 96

ENERGOPROJEKT-KATOWICE SA

NO. PURCHASER PROJECT NAME COMPLETED

111. Elektrobudowa

Katowice SA Detailed engineering of the 0.4 kV and 690 V switchgears for the 858 MWe Power Unit in the Bełchatów Power Plant (total capacity: 4440 MWe).

2008

112. Messer Group GmbH Multi-branch detailed engineering: Construction of the transformer station in the vicinity of the liquefied gas plant.

2008

113. Electrabel

Połaniec SA Detailed engineering: Modernization of the secondary circuits for power evacuation, electrical protection, and excitation system (the No. 1 power unit).

2008

114. Elektrobudowa

Katowice SA Detailed designs and as-built documentation for the Thermal Power Company in Suwałki (electrical engineering branch).

2008

115. Elektrobudowa

Katowice SA Detailed engineering: Electrical potential equalization at the engine room in the Kraków CHP Plant (total capacity: 1237 MWt).

2008

116. H. Cegielski Poznań SA

Design of the assumptions for the I&C systems for the Emdem Power Plant (Germany).

2008

117. Elektrobudowa

Katowice SA Design of the power generator together with its circuits for the 460 MW power unit in the Łagisza Power Plant (total capacity: 840 MWe).

2008

118. Electrabel

Połaniec SA Detailed design: modernization of the 0.4kV NOBI and RNO21-22 switchgears, back-up supply of the biomass system in the Połaniec Power Plant.

2007

119.

Katowice Steel Works – Batory Sp. z o.o.

Plate Mill

Design package: Modernization of the SRT-14 electrical (transformer and switching) station and modernization of power supply for the No. VIII machine hall.

2007

120. PGE SA Bełchatów

Power Plant Design set concerning the earthing system of the No. 3 Power Unit’s tanks.

Instruction for preparation of the repairs in the tanks. 2007

121. Elpoautomatyka

Sp. z o.o.

Design set: Modernization of the power evacuation secondary circuits, excitation system and electrical Safety devices of the No. 5 Power unit in the Połaniec Power Plant, Electrabel Group.

2007

122. PGE SA Bełchatów

Power Plant Design package: Ground grid of the 3TB and 3TZ1 transformer substation and of the line earthing switches.

2007

123. Elektrobudowa

Katowice SA

The electric potential equalization system between the area of the hydrogen station and the pipelines system feeding the engine rooms of the Power units in the Kraków CHP Plant (total capacity: 1237 MWt).

2007

124. PGE SA Turów Power

Plant

Modernization of the detailed engineering together with the bill of quantities and the investor’s cost calculation for the project entitled: “The Power unit No. 2 – adaptation of the protection and control system, the interlocks and the electrical measurements of the power evacuation system for the requirements of the PSE (Polish Power Grid) in the scope of secondary circuits”.

2007

125.

Elektrobudowa Bełchatów/ PGE SA Bełchatów Power

Plant

Design package: Modernization of the FGD electric drives in the area of absorbers (the 10-12 power units) in the Bełchatów Power Plant (total capacity: 4440 MWe).

2007

126. Elektrobudowa

Katowice SA Modernization of the switchgear (PROPEL type) in the Rzeszów CHP Plant. 2006

127. Kopex SA Technical documentation of the No. 2 wagon tippler in the Kozienice Power Plant – the electrical engineering.

2006

128. PGE SA Bełchatów

Power Plant

Design package concerning the power supply system for the Knauf Company (the power supply system is provided from the Bełchatów Power Plant (total capacity: 4440 MWe)).

2006

129. Tauron

Wytwarzanie SA Expert opinion concerning the connection of the transformer (from 460 MWe Power unit in Łagisza Power Plant (total capacity: 840 MWe) to the Enion SA grid (110 kV)).

2006

130. Elektrobudowa

Katowice SA

The TR1 25MVA 110/6 kV transformer in the Będzin CHP Plant (total capacity: 415 MWt):

main circuits and secondary circuits;

replacement of the disconnector switch and of the earthing switch together with the cable distribution box;

replacement of the differential protection system.

2006

97

ELECTRICAL ENGINEERING

REFERENCE LIST

NO. PURCHASER PROJECT NAME COMPLETED

131. Pokój SA Steel Works

Design set: Construction of emergency stop switches for the power tools (drills, grinders, and compressors) as well as for the transport equipment (belt conveyors, scraper belt conveyors, platform augers) in the Power & Electrical Department of the Pokój Steel Works.

2006

132. PGE SA Bełchatów

Power Plant

Modernization of the lighting system for the main building and of the obstruction lights for the following smokestacks: Ż1/1 and Ż1/2 and for the following cooling towers: W2/1, W2/2, W2/3, W2/4, W2/5 and W2/6.

2006

133. Elektrobudowa

Katowice SA Detailed design and as-built documentation: Modernization of the switchgear 6kV (03BBA and 03BBB type) in the Kraków CHP Plant (total capacity: 1237 MWt).

2006

134.

Tauron Wytwarzanie SA,

Łagisza Power Plant

Power supply system of the building site in the Łagisza Power Plant (total capacity: 840 MWe) - during the construction of the 460 MWe Power unit.

2006

135.

PGE SA Thermal Power Company in

Bydgoszcz

Modernization of the network water pumps together with the I&C network system in the Bydgoszcz CHP Plant.

2006

136.

Mittal Steel Poland SA Katowice

Steel Works

Design package of the electrical system:

administrative building;

straightening machine;

roller tables;

cable transfer.

2006

137.

Mittal Steel Poland SA Katowice

Steel Works

Design package concerning the electrical system (0.4 kV and 0.5 kV) in order to provide the power supply for the equipment and lighting system in the VII BIS facility.

2006

138. PGE SA Turów Power

Plant

Detailed design of the secondary circuits in the scope of the investment entitled: “Adjustment process of the electrical protection system, of the guard control system, and of the power evacuation measurement system (according to the requirements of PSE) for the No. 1 Power unit in the Turów Power Plant (total capacity: 2088 MWe).

2006

139. PGE SA Turów Power

Plant Design package related to the connection of the two power unit (creating the dual unit system) together with the power evacuation system at level of 400 kV.

2006

140. Skawina SA Power

Plant

Design set: Adaptation of the oil immersed transformer stands in order to meet the requirements of environmental protection and fire protection regulation in the Skawina Power Plant (total capacity: 590 MWe).

2006

141. Elpoautomatyka

Sp. z o.o.

Design set: Modernization of the power evacuation secondary circuits, static excitation system and electrical Safety devices of the No. 4 Power unit in the Połaniec Power Plant, Electrabel Group.

2006

142.

Tauron Wytwarzanie SA,

Jaworzno III Power Plant

Overhaul supervision: Lightning protection system of the fuel station in the Jaworzno II (total capacity: 190 MWe) and Jaworzno III (total capacity: 1345 MWe) Power Plants – explosion hazard analysis.

2006

143. Elektrobudowa

Katowice SA Detailed engineering: the electrical section for the Flue Gas Desulphurization System (Power unit No. 8) in the PGE Bełchatów Power Plant (total capacity: 4440 MWe).

2006

144. Polish Energy Partners SA

Technical concept: Modernization of the power supply system in the Jeziorna CHP Plant.

2006

145. PGE SA Turów Power

Plant

Detailed design (both electrical engineering branch and telecommunication branch) of hydrogen removal system and smoke removal system for the 1-3 Power units in the Turów Power Plant (total capacity: 2088 MWe). Design package is a part of the project entitled: the engine room. Hydrogen removal system and smoke removal system. Stage II – the 1-3 Power units.

2006

146. Electrabel

Połaniec SA

Modernization of the power outlet secondary circuits, excitation system and electrical Safety devices in power unit No. 6 in the Połaniec Power Plant, Electrabel Group.

2005

147. Electrabel

Połaniec SA Technical concept: Modernization of the power unit No. 4 electrical protection in the Połaniec Power Plant.

2005

148. PGE SA Bełchatów

Power Plant Design set: “Modernization of the accelator Ac 1.4”. 2005

ELECTRICAL ENGINEERING 98

ENERGOPROJEKT-KATOWICE SA

NO. PURCHASER PROJECT NAME COMPLETED

149. PGE SA Bełchatów

Power Plant Design set: the electrical section of the Flue Gas Desulphurization System (the power units 3-4).

2005

150. Elektrobudowa /RWE As-built documentation of the RG 15 switching station in the area of the Teksid Aluminium Company and of the RG 2 switching station in the area of the Fenice Bielsko Company

2005

151. Elektrobudowa /RWE Design set: Replacement of the transformers 15/0.4 KV in the Fenice Tychy. 2005

152. Tauron

Wytwarzanie SA Detailed design: Power supply 24V DC and 230 V AC for boiler system cabinet in the Jaworzno III Power Plant (total capacity: 1345 MWe).

2005

153.

Jelenia Góra Sp. z o.o. Hydro

Power Plant

Design set: Modernization of switching station and control station in the Pilchowice I Hydro Power Plant.

2005

154. Elektrobudowa /RWE Detailed engineering: Modernization of switching station (6kV, Propel type) in the Rzeszów CHP Plant.

2005

155. Rybnik SA Power

Plant Technical concept and design: Subvoltage and subfrequency protection of the power units 1-8 in the Rybnik Power Plant (total capacity: 1775 MWe).

2005

156. Kraków SA CHP Plant Design set: Modernization of the chimney’s obstruction lights (No. 1-2) in the Kraków CHP Plant (total capacity: 1237 MWt).

2005

157. Elektrobudowa Detailed engineering: Switching station 6kV, together with dual unit system BC-50 (design set covered electrical- and civil branches).

2005

158. Fenice Poland

Sp. z o.o. As-built documentation: Switching station (15 KV) in Fiat Auto Poland in Tychy (section „C”).

2005

159. Kraków SA CHP Plant Performance projects for the water treatment plant building overhaul in the Kraków CHP Plant (total capacity: 1237 MWt) – performance project for electrical supply system of the heat exchanger centre.

2005

160. Tauron

Wytwarzanie SA

Modernization of the 2Dk and 3DK switchgear for the internal requirements of boilers No. 2 and 3 improving the reliability of the boilers fuel supply systems (the Jaworzno II Power Plant (total capacity: 190 MWe)) – design package.

2005

161. Fenice Poland

Sp. z o.o. As-built documentation: Switching station (15 KV) in Fiat Auto Poland in Bielsko-Biała (section „A”).

2005

162. Tauron

Wytwarzanie SA Technical analysis: Power output variants from the 460 MWe power unit in the Łagisza Power Plant (total capacity: 840 MWe) – selection of the optimal variant.

2005

163. Fenice Poland

Sp. z o.o. Modernization of the 15 kV RG switching station in the Fiat Auto Poland facilities in Bielsko Biała.

2004

164.

Tauron Wytwarzanie SA,

Katowice CHP Plant

Modernization of the power supply and control systems for a loading-stacking machine in the Katowice CHP Plant (total capacity: 692 MWt).

2004

165. Fenice Poland

Sp. z o.o. Technical draft for new cable lines of the connection between the RG2 switching station in J.O. Bielsko and the 15 kV Teksid Aluminium switching station.

2004

166. Elektrobudowa

Katowice SA Technical design for the protections at unit No. 4 in the Łódź 3 CHP Plant. 2004

167. PGE SA Turów Power

Plant

Performance project for adjustment of power output protection systems, control systems, locks and electric measurement systems in the Turów Power Plant (total capacity: 2088 MWe) power unit No. 2 to the requirements of PSE.

2004

168. Alstom Power

Sp. z o.o.

Complete overhaul of the 13UK125/TG2 turbine set in the Kraków CHP Plant (total capacity: 1237 MWt).

Design package – construction of lubricating oil pump starter, control oil position, vapour fans, lubricating oil, sealing oil – the reconstruction process of the No. 2 power unit in the Kraków CHP Plant.

2004

169. Elpoautomatyka

Sp. z o.o.

Documentation of secondary circuits for the power evacuation and electrical protections at unit No. 2 as well as technical documentation of power and control circuits for the overhaul of transformer TB4.

2004

170. Tauron

Wytwarzanie SA

Modernization of the 2DK and 3DK switchgear for the internal requirements of boilers No. 2 and 3 improving the reliability of the boilers fuel supply systems – technical draft.

2004

171. Wojtech - Simplex Design package: Power evacuation from the windmill farm Nowotaniec-Bukowsko. 2004

99

ELECTRICAL ENGINEERING

REFERENCE LIST

NO. PURCHASER PROJECT NAME COMPLETED

172. Kraków SA CHP Plant Draft of setting procedures and SPAM-150C protective card for the 6 kV Sh400H4Bm/400kW/1490min type engine manufactured by Emit Żychlin.

2004

173. Fenice Poland

Sp. z o.o. Technical design for the new cable lines between switchyards RG-RG1, RG-RG2 and RG2-OST21 in Bielsko-Biała.

2004

174. Celsa “Ostrowiec

Steel Works Sp. z o.o. Technical draft for adjustment of a parallel running set of 75 MVA 110/30 kV P4 and P6 transformers in CELSA Ostrowiec Steel Works.

2004

175. PKP Energetyka

Sp. z o.o. Technical design for the modernization of the transformer station ST1 in Sławków Południowy – adaptation to the increased power intake.

2004

176. Dalkia Łódź SA Technical design for the installation of switches 10.5kV at generators No. 2 and 4 in the Łódź 3 CHP Plant.

2004

177.

Mittal Steel Poland SA Katowice

Steel Works

Performance project for reconstruction of the electrical power network of 0.4/0.23 kV voltage.

2004

178. Kraków SA CHP Plant

Performance project for control and signaling units of the rotational air heaters in power unit No. 2 with adjustment of the set to the requirements of the SYMPHONY system by ABB company, application of the KKS labelling system, and adjustment of the air heaters power supply fields from the switching station.

2004

179. Electrabel

Połaniec SA

Preparation of the secondary circuits documentation of the output and electric protection systems of power unit No. 2 as well as the technical documentation of power and control circuits for the TB4 transformer repair.

2004

180. Chorzów ELCHO

Sp. z o.o. CHP Plant Supply of the new water pumping station in the ELCHO CHP Plant (total capacity: 500 MWt).

2004

181. ABB Sp. z o.o.

Implementation of fire fighting recommendations and the Investor’s guidelines of 24.10.2003 to the electric systems with the purpose of improvement of the building fire protection in the event of terrorist attack in the Uni Centrum building in Katowice.

2003

182.

Połaniec Power Plant SA – Electrabel

Group

Secondary circuits documentation in the scope of adjustment of the existing electric system to the general needs of the Power Plant related to the Ovation control system.

2003

183. Chorzów ELCHO

Sp. z o.o. CHP Plant AS-built documentation for the electrical branch of construction of the ELCHO CHP Plant in Chorzów of capacity 2 x 102 MWe/180MWt.

2003

184. Zabrze SA CHP Plant

Assembly of the GZ50 natural gas fired KP-20 steam boiler together with auxiliary installations and devices connected functionally with the boiler operation in the Gliwice CHP Plant. Design set:

electric supply systems of pumps and electric heating system of oil pipelines;

boiler switching station together with the technological equipment for power supply system;

lighting and earthing system of the boiler house and its equipment;

communication systems in the boiler house;

network summer season water supply, control system and pumps locking mechanisms;

supply water correction system – electrical branch;

lighting system, earthing and lightning protection installations.

2003

185.

Mittal Steel Poland SA Katowice

Steel Works

Detailed design for the reconstruction of the power generation grid of voltage 0.4/0.23 kV.

2003

186.

PKW SA Mining and Power Generation

Sobieski Jaworzno III

Detailed and as-built documentation for the low voltage switchgear 500V of type RNM-2 for the Mining and Power Generation Sobieski Jaworzno III.

2003

187. PGE SA Bełchatów

Power Plant Operation and maintenance manual for electrical installations and I&C in the explosion hazard zones.

2003

188. Tauron

Wytwarzanie SA

Technical materials for obtaining the decision on site development for the investment – construction of the unit 460MW with boiler of supercritical parameters.

2003

189. PGE SA Bełchatów

Power Plant Modernization of the fire and protection system of the DIRE control station - the electrical branch.

2003

ELECTRICAL ENGINEERING 100

ENERGOPROJEKT-KATOWICE SA

NO. PURCHASER PROJECT NAME COMPLETED

190. Saturn Management

Sp. z o.o.

Modernization of the transformers protection systems in the 110/6kV switching station and the automatic voltage regulation system of Rg 6kV in the SAturn Management CHP Plant in Świecie.

2003

191.

Tauron Wytwarzanie SA,

Jaworzno III Power Plant

Technical documentation for the earthing and lightening arrester installations as well as electric shock hazard of equipment over 1KV in the Jaworzno III Power Plant (total capacity: 1345 MWe).

2003

192.

PGE SA ZE Dolna Odra Pomorzany

CHP Plant

Performance project for the platform connecting the flue gas moistening tower of the flue gas desulphurization system with the operational platforms of the a unit electro-filter – the electrical engineering.

2003

193. PGE SA Bełchatów

Power Plant Technical designs of the lighting installation for coal handling facilities. 2003

194. Zielona Góra SA CHP

Plant

Electric industry performance projects concerning the fan cooling plant in the Zielona Góra CHP Plant: earthing and lightning protection systems, lighting system and maintenance points.

2003

195. Zielona Góra SA CHP

Plant Detailed designs for the electrical branch of the combined cycle unit in the Zielona Góra CHP Plant.

2003

196. Janinia Coal Mine in

Libiąż

Expansion of the switchgear 6kV at the Main Feeding Station GSZ-1 with the 11-bay, 2-system section, inclusive of modified feeding with the ELPO bus bar in the Janina Coal Mine.

2003

197.

Połaniec Power Plant SA – Electrabel

Group

Documentation of secondary circuits for the power evacuation system and electrical protections for unit No. 7 in the Połaniec Power Plant.

2003

198. Skawina SA Power

Plant Performance of electric diagrams of the 0.4kV switching station of the compressor hall power supply in the Skawina Power Plant (total capacity: 590 MWe).

2003

199. Tauron

Wytwarzanie SA Summary cost specification for the investment and related tasks aimed at reconstructing the generation power of PKE SA (now Tauron Wytwarzanie SA).

2003

200. Rybnik SA Power

Plant

Detailed designs for primary and secondary circuits of the excitation system and voltage control for the unit generator No. 2 in the Rybnik Power Plant (total capacity: 1775 MWe).

2002

201. PGE SA Rzeszów

CHP Plant Concession documentation for the scope of Ansaldo – oil and gas system.

Basic design for the installation of gas, oil, light-up oil – electrical branch. 2002

202. Będzin SA CHP Plant

Heat output documentation for the Będzin CHP Plant (total capacity: 415 MWt). Design set:

driving unit with frequency converters of the network water pumps of 200 kW of power;

compact hydrophore set for automatic water complementation of the heating system;

emergency static pressure maintenance system in the heat distribution network with application of the FAT system in case of “black out”;

partial modernization of the fire protection main 0.4kV switching station with application of modern switching segments of large scale of integration – solution for finding the space in the existing switching stations of older types.

2002

203. Rybnik SA Power

Plant

Design set: Connections of secondary circuits at units No. 1-8 and general needs transformers 110/6kV TR1- TR3 with teleprotection equipment RFL, responsible for data transmission between the auxiliary systems in the Power Plant and the network station 110kV.

2002

204. PGE SA Turów Power

Plant

Design set for power rehabilitation of the unit No. 6. Detailed engineering of:

power evacuation from generator;

system of control, regulation, signaling, measurements and protections for the turbine generator set;

switchgears 6kV for the unit auxiliaries;

transformer stands of substantial capacity;

specifications of electrical equipment and materials;

control algorithms and displays on monitors of the unit electrical engineering system.

2002

101

ELECTRICAL ENGINEERING

REFERENCE LIST

NO. PURCHASER PROJECT NAME COMPLETED

205. Soluziona Electrical engineering design for the set 12K80MC-S in the Diesel Power Plant for the following project: “48 CCI Baja California Sur” located in Baja California Sur in Mexico.

2002

206. PGE SA Rzeszów

CHP Plant Design of the electrical branch for the combined cycle unit 110 MW. 2002

207. Zabrze SA CHP Plant Electrical engineering for the civil design – Construction of the heating-condensing unit BCK-130 in the Zabrze CHP Plant.

2002

208. Chorzów ELCHO

Sp. z o.o. CHP Plant

Development of electrical designs for expansion of the railway siding Chorzów Stary and construction of the railway line Chorzów Stary – the ELCHO CHP Plant (total capacity: 500 MWt). Detailed design for:

Container transformer station 6-0.4kV with the clearing measurement of electrical energy.

Track scales. Installation of power supply and lighting.

Installation for heating the turnouts.

Railway control centre CS. Switchyard 230-400, electrical installations.

Railway siding Chorzów Stary and access track to the ELCHO. Installations of external lighting.

Relocation of power and teletype cables.

Cable management.

2002

209. PGE SA Dolna Odra

Power Plant Design set for extension of the system Econtrol for needs of the flue gas desulphurization installation at units No. 7 and 8 in the Dolna Odra Power Plant.

2002

210. Dalkia Poznań ZE SA Electrical engineering for the civil design – the second unloading route with coal uptake from the storage yard in the Poznań Karolin CHP Plant (total capacity: 844 MWt).

2002

211. Będzin SA CHP Plant Basic design of the electrical branch for the modernization of heat transmission from the Będzin CHP Plant (total capacity: 415 MWt).

2002

212. Lindacorp Technical design for installing in the sugar plant Kayseri, two turbine generator sets as well as related equipment of the CHP Plant.

2002

213. ZE PAK SA Design for the system of electrical power evacuation from generator to unit transformer as well as power supply for general and auxiliary needs of unit a in the Pątnów II Power Plant (total capacity: 1600 MWe).

2002

214. Chorzów ELCHO

Sp. z o.o. CHP Plant Detailed electrical engineering: Construction of the ELCHO CHP Plant in Chorzów of capacity 2 x 102 MWe/180MWt.

2002

215. Elbląg Sp. z o.o. CHP

Plant Detailed design for modernization of electrical systems in the Elbląg CHP Plant. 2002

216. PGE SA Turów Power

Plant Detailed design for the overhaul of lighting installation of the external ash removal system in the Turów Power Plant (total capacity: 2088 MWe).

2002

217.

PGE SA ZE Dolna Odra Pomorzany

CHP Plant

Detailed design for the replacement of transformer T1 110/6kV at the Pomorzany CHP Plant (total capacity: 443 MWt) – primary and secondary circuits.

2002

218.

Połaniec Power Plant SA – Electrabel

Group

Detailed design of assumptions for the monitor displays, control algorithms for unit No. 3 in the Połaniec Power Plant - the electrical engineering branch.

2002

219. Cieszyn III CHP Plant Detail Designs of the electrical engineering branch for the technological modernization in the Cieszyn CHP Plant.

2002

220. Białystok SA CHP

Plant Designs for installing the new bleeding-condensing turbine generator set of electric power 20 MW with auxiliary installations and equipment in the Białystok CHP Plant.

2002

221.

Połaniec Power Plant SA – Electrabel

Group

Documentation for secondary circuits of the power evacuation and electrical protections of unit No. 3 in the Połaniec Power Plant.

2002

222. Zabrze SA CHP Plant Technical documentation for construction of the boiler house with steam boiler KP-20 fired with natural gas as well as the auxiliary installations and the equipment functionally related to the boiler operation in the Zabrze CHP Plant.

2002

223. Zielona Góra SA

CHP Plant Construction of the combined cycle unit in the Zielona Góra CHP Plant - studies, documentation, preparatory tasks covering the electrical branch.

2002

ELECTRICAL ENGINEERING 102

ENERGOPROJEKT-KATOWICE SA

NO. PURCHASER PROJECT NAME COMPLETED

224. PGE SA Turów Power

Plant Engineering connected with leading the signals from the chemical laboratory to the ETHERNET industrial information system bus.

2001

225. PGE SA Rzeszów

CHP Plant Construction of the combined cycle unit in the Rzeszów CHP Plant - earthing and lightening arrester installations.

2001

226. PGE SA Turów Power

Plant Electrical engineering documentation for power rehabilitation of units No. 4-6 in the Turów Power Plant (total capacity: 2088 MWe).

2001

227.

Chorzów ELCHO Sp. z o.o. CHP Plant

Documentation of the site preparation for the ELCHO CHP Plant (total capacity: 500 MWt). Detailed designs for:

switchgear for the water treatment station with control and measuring instruments;

transfer of the switchgears in the ELCHO CHP Plant that supply the existing technological equipment: coal handling, oil management, water pumping station, auxiliary switchyard of the lighting system, telephone network, cable management for the aforementioned equipment;

electrical power supply for the construction site.

2001

228.

Połaniec Power Plant SA – Electrabel

Group

Delivery, software and putting into operations the microprocessor controller OMRON for the by-product management in the Pomorzany CHP Plant (total capacity: 443 MWt).

2001

229. Komořany Power

Plant

Pro-environmental reconstruction of boilers K6-K10 in the Komořany Power Plant. Detailed designs of:

power and lighting installations; cable management; relocation of general installations of the Power Plant; modernization of bays for the existing switchyard 6 kV for needs of the boiler K10; switchyard 6kV “R6B” for boilers K6-K9;

basic design for the boiler main switchyard 0.4kV together with assumptions for the sub-switchyard 4kV;

system of equipment designation for the boiler K10.

2001

230. Rybnik SA Power

Plant Modernization of the excitation system at unit No. 8 and rectifier at unit No. 7 in the Rybnik Power Plant (total capacity: 1775 MWe).

2001

231.

Połaniec Power Plant SA – Electrabel

Group

Modernization of the excitation system and voltage control for generator No. 8 in the Połaniec Power Plant.

2001

232.

Tauron Wytwarzanie SA

Stalowa Wola Power Plant

Technical design for modernization for the bi-system main switchyard 6 kV, R1, R2 for auxiliaries due to liquidation of the old par of switchyard R2 a the Stalowa Wola Power Plant.

2001

233. Non-Ferrous Metal Works in Szopienice

Installation of the turbine generator set 3 MW in the CHP in the Szopienice Non-Ferrous Metal Works. Detailed designs for:

power evacuation – main circuits, control, protections, measurements and signaling;

main and auxiliary circuits of the excitation system;

synchronisation and registration circuits;

switchyard 6kV, power evacuation – main and auxiliary circuits;

control centre – equipment for control panels and auxiliary circuit cabinets;

installations of electrical power supply for the technological equipment;

installations of electrical power supply for the non-technological equipment; lighting system,

cable management.

2001

234.

Mittal Steel Poland SA Cedler

Steel Works

Co-ordination and analysis of protections for the electrical engineering system of the Cedler Steel Works.

2001

235. PGE SA Turów Power

Plant

Modernization of electrical equipment for the external ash removal system in the Turów Power Plant (total capacity: 2088 MWe), within buildings of the switchyard No. 1 and 2.

2001

236. Dalkia Poznań ZE SA Detailed design for replacing the pump OS-200 with pump PŁ-300 with frequency converter in the pumping station of raw water intake on the Warta river for the Poznań II Karolin CHP Plant (total capacity: 844 MWt) – the electrical engineering.

2001

103

ELECTRICAL ENGINEERING

REFERENCE LIST

NO. PURCHASER PROJECT NAME COMPLETED

237.

Tauron Wytwarzanie SA,

Siersza Power Plant

Basic design for the comprehensive protections system at unit No. 1 in the Siersza Power Plant (total capacity: 786 MWe).

2001

238. PGE SA Turów Power

Plant

Detailed design of coal handling – expansion of the coal handling control centre with control system for the coal handling equipment of unit No. 5 and gallery No. 3 as well as visualisation of the sorbent transport system to the boiler tank at unit No. 5.

2001

239. PGE SA Turów Power

Plant

Detailed design for the following investment task: “Adjusting the systems of protection, control, interlock and electrical measurements for power evacuation at unit No. 8 in the Turów Power Plant (total capacity: 2088 MWe) in order to meet the requirements of the Polish Power Grid”.

2001

240. Bogatynia

Power Plant Detailed design of electrical installations – as-built documentation and author’s supervision for the Business Centre in Katowice.

2001

241.

Tauron Wytwarzanie SA

Stalowa Wola Power Plant

Detailed design for modernization of the boiler K9: replacement of 9 engine fields and 1 field of voltage measurement at switchyard kV, new power supply and control system for 6 dust feeders.

2001

242. Dalkia Poznań ZE SA

Software, putting into operation and on-site tests for the controller Omron pursuant to the design “Replacement of the pump OS-200 with PŁ-300 with frequency converter in the pumping station of raw water instate on the Warta river in the Poznań Karolin CHP II (total capacity: 844 MWt)”.

2001

243. PGE SA Turów Power

Plant

Rehabilitation of units No. 4-6 in the Turów Power Plant (total capacity: 2088 MWe):

Technical documentation for rehabilitation of unit No. 6.

Detailed designs of: power evacuation from generator; control system, regulation, signalling, measurements and protections of the turbine generator set; switchgears 6kV for the unit auxiliaries; stands of high-capacity transformers.

Specifications of electrical equipment and materials.

Control algorithms and monitor displays of the unit electrical engineering system.

2001

244.

Połaniec Power Plant SA – Electrabel

Group

Documentation for the overhaul of secondary circuits of power evacuation and electrical protections at unit No. 8.

2001

245.

Tauron Wytwarzanie SA

Stalowa Wola Power Plant

Software for the microprocessor controller and putting into operation the control system for coal dust feeders of the boiler K-10 in the Stalowa Wola Power Plant.

2001

246.

Tauron Wytwarzanie SA,

Łagisza Power Plant

Technical documentation for the industrial wastewater treatment plant in the Łagisza Power Plant (total capacity: 840 MWe).

Switchyard 0.4kV – structural, basic and internal connection diagrams.

Installation of external lighting and lightening arrester. Electric (technological and non-technological) and lighting installations.

Detailed design for the cable management.

Design of electrical assumptions for the controller software.

2001

247.

Tauron Wytwarzanie SA,

Siersza Power Plant

Reconstruction of units No. 1-2 – modernization of the electrical equipment – the technical documentation.

Power evacuation from the generator;

Unit transformers;

Tap transformers;

Switchgears 6 kV for auxiliaries at unit No. 1-2 with automatic reserve;

Excitation systems;

Switchgears 0.4 kV for auxiliaries of units No. 1 and 2 with automatic reserve;

LV switchgears for the boiler auxiliaries;

LV switchgears for the turbine house auxiliaries;

Switchgears DC 220V with the loading system;

Auxiliary electrical installations;

Circuits of control, signaling and unit protections, synchronisation and external control circuits;

Cable management.

2001

ELECTRICAL ENGINEERING 104

ENERGOPROJEKT-KATOWICE SA

NO. PURCHASER PROJECT NAME COMPLETED

248. Jarosław SA Glass-

Works

Design documentation for facilities related to the installation of centrifugal compressor in the Jarosław Glass Works.

Detailed design for the installation of transformer 15/6 kV with the measurement system and cable management.

2000

249. Polish Steel Works SA Technical documentation for overhaul of the main switchyard in the Power Plant of the Tadeusz Sendzimir Steel Works.

2000

250. Dalkia Poznań ZE SA Delivery, software and putting into operation the controller for switchyard 6 kV in the pumping station on the Warta river in the Karolin II CHP Plant (total capacity: 844 MWt).

2000

251. Będzin SA CHP Plant Modernization of the power supply for auxiliaries in the Będzin CHP Plant (total capacity: 415 MWt).

2000

252. ZE PAK SA Pątnów

Power Plant

Concept for the master microprocessor system and DIR control centre for the Pątnów Power Plant (total capacity: 1600 MWe) for general and auxiliary needs of the Power Plant and connections with the unit electrical systems.

2000

253. Chorzów ELCHO

Sp. z o.o. CHP Plant

Civil engineering design for the ELCHO CHP Plant in Chorzów of capacity 2 x 102 MWe/180MWt. Design of the site development. Additions to cable routes in the area of the ELCHO CHP Plant.

2000

254.

PGE SA ZE Dolna Odra Pomorzany

CHP Plant

Electrical engineering designs for the flue gas desulphurization systems in the Pomorzany CHP Plant (total capacity: 443 MWt).

2000

255. Skawina SA Power

Plant

One-stage technical design for digital protections, registration system, synchronisation and signaling as well as systems constituting an integral part of power evacuation process for the system generator – transformer No. 5 in the Skawina Power Plant (total capacity: 590 MWe).

2000

256.

Tauron Wytwarzanie SA,

Katowice CHP Plant

Holding the function of General Designer and rendering for the Ordering Party the design works connected with the newly-constructed heat and power unit BCF-100 No. 1 in the Katowice CHP Plant (total capacity: 692 MWt).

Power evacuation from the generator;

Unit transformer;

Tap transformer;

Switchgears 6 kV for the unit auxiliaries with automatic reserve;

Excitation system;

Switchgears 0.4 kV for auxiliaries of units No. 1 and 2 with automatic reserve;

LV switchgears for the boiler auxiliaries;

LV switchgears of the turbine house auxiliaries;

switchgears DC 220V with the loading system;

Auxiliary electrical installations;

Circuits of control, signaling and unit protections;

Expansion and adaptation of the existing switchgears as well as electrical engineering system and technological systems of CHP Plant for needs of the new unit;

Cable management – internal and in the area of CHP Plant.

2000

257. PGE SA Turów Power

Plant

Detailed designs concerning adjustment the systems of protections, control, interlocks and electrical measurements for the power evacuation at unit No. 10 in the Turów Power Plant (total capacity: 2088 MWe) in order to meet the requirements of the Polish Power Grid.

2000

258. PGE SA Turów Power

Plant

Detailed designs for the chemical-operational laboratory covering: switchgear 0.4kV with necessary prefabrication diagrams for the prefabrication purposes, installations of general civil type: installations of basic and emergency lighting, ventilation and air conditioning, fire signaling and protections, etc., cable management.

2000

259. Polish Steel Works SA Detailed design for overhaul of the reducing-cooling station URO 2A with connections for 9 MPa steam supply in the turbine generator hall – electrical engineering.

2000

260.

Połaniec Power Plant SA – Electrabel

Group

Documentation for modernization of the auxiliary circuits at unit No. 1 in the T. Kościuszko Power Plant in Połaniec.

2000

105

ELECTRICAL ENGINEERING

REFERENCE LIST

NO. PURCHASER PROJECT NAME COMPLETED

261. Rybnik SA Power

Plant

Design and technical documentation for the primary and secondary circuits of the excitation system and voltage control of generator No. 7 in the Rybnik Power Plant (total capacity: 1775 MWe).

2000

262. Zofiówka

Hard Coal Mine Technical design for the station 110/6 kV “Zofiówka” after liquidation of the line 110 kV “Pniówek-Zofiówka”.

2000

263.

Tauron Wytwarzanie SA,

Jaworzno III Power Plant

Detailed designs for overhaul of the electrical equipment at unit No. 1 in the Jaworzno III Power Plant - the Jaworzno II Power Plant (total capacity: 190 MWe). Detailed designs for:

excitation system and voltage control for TG1;

control, measurements and protections circuits of the generator;

auxiliary circuits of the side 110 kV and generator TG1;

synchronisation system for generator TG1, control system for the power supply of the switchgear 6kV-1BB and switchgear 0.4kV-1CB;

cable management connected with the excitation system of TG1;

prefabrication of cross cubicle for TG1.

2000

264.

Tauron Wytwarzanie SA -

Siersza Power Plant

Reconstruction of units No. 1-2 in the Siersza Power Plant (total capacity: 786 MWe). Joint equipment of units No. 1-2. Modernization of the coal handling and purchase of bucket loading machine No. 1. Adjusting the coal storage yards to supply for units No. 1 and 2. Technical documentation – electrical engineering.

Reconstruction of the general needs switchyard – replacement of the switchgear 0.4kV for auxiliaries - electrical engineering.

Design for the smoke removal and ventilation of cable tunnels - electrical engineering.

Technical design for the lighting installations of cable tunnels - Stage 10.

Technical design for the repair socket installation in the boiler house.

Technical design for expansion of the existing pumping station of cooling water for needs of turbo-compressors - electrical engineering.

2000

ENVIRONMENT PROTECTION 106

ENERGOPROJEKT-KATOWICE SA

9. ENVIRONMENT PROTECTION

NO. PURCHASER PROJECT NAME COMPLETED

1.

SE Jastrzębie SA Calculations of noise propagation of “Zofiówka” CHP Plant in the daytime and night-time after commissioning of the CFB unit and: – one power generator in the indicated location – two power generators in the indicated location, including presentation of the conclusions and recommendations for “Zofiówka” CHP Plant on the basis of the calculations – Option I.

in progress

2.

Tauron Wytwarzanie SA – Jaworzno Power Plant III Branch

Building design for the system supplying water from the Dziećkowice2 pump station for the supercritical 910 MW power unit at TAURON Wytwarzanie S.A. - Jaworzno Power Plant III in Jaworzno. (total power: 1,345 MWe).

in progress

3. Introl Katowice

Sp. z o.o.

Update of the Detailed Design and the As-built Designs in the process, electrical, and C&I part for the Landfill and Domestic Wastewater Treatment Plant at the Waste Utilization Facility in Promnik near Kielce.

in progress

4. PGE Bełchatów

Power Plant Detailed design documentation of upgrading of the ventilation system in the absorber building at the Bełchatów Power Plant, unit #14.

2016

5.

Tauron Wytwarzanie Power Plant

Jaworzno III – Power Plant II

Analysis of the possibilities and conditions of discharging sewage from the flue gas desulphurisation plant (FGD) with the wet limestone method from the 910 MW unit to a receiver in the context of the requirements of the national law and the future BAT conclusions.

2015

6.

EM&CA SA Warszawa Calculations of dissemination of gas pollutions for the planned flue gas desulfurisation and denitrification plant for two WP-70 boilers at Wrotków CHP Plant in Lublin (total capacity: 628 MWt).

2015

7. ZE PAK SA Design documentation for the investment named: “Extension and Modernisation of the Water Treatment Plant at Elektrownia Pątnów II” (total capacity: 1,600 MWe).

2015

8.

Bobrowniki Municipality

Building documentation, including the bill of quantities and the investor’s cost estimate for the project named: “Extension of the Mechanical and Biological Waste Water Treatment Plant in Rogoźnik” on the basis of a building design held by the Contracting Authority.

2015

9. PWIK Rybnik

Sp. z o.o. A multi-discipline concept of upgrade of the biological part of the wastewater treatment plant in Rybnik - Orzepowice.

2014

10. EM&CA SA Warsaw Cooperation in preparation of two project information sheets (PIS) for the projects conducted at the CHP plants of Soda Polska Ciech.

2014

11. Tauron Ciepło SA Obtaining the environmental permit for the investment project named: Source adaptation of Zakład Wytwarzania Katowice for the needs of the heating market after 2015. (total capacity: 692 MWt).

2014

12. PGNiG Termika The documentation with the application for a decision on the environmental conditions for the project of “Construction of the Flue Gas Wet Desulphurisation and Catalytic Nitrogen Removal from the Boilers K-1 and K-2 at Siekierki CHP.”

2014

13. PWIK Rybnik

Sp. z o.o. Multi-branch concept of modernisation of the mechanical part of the sewage treatment plant in Rybnik – Orzepowice.

2014

14. M-Logistic The documentation necessary to obtain the building permit for the pipeline supplying water to M-Logistic company from the GPW distribution substation.

2013

15.

Doosan Babcock Energy Polska

Sp. z o.o.

The concept of the construction of the Water Treatment Plant including the technical infrastructure for the two deep water wells supplying PWiK Rybnik.

2013

16. Bobrowniki Municipality

Design documentation for the investment named: “Extension of the Mechanical and Biological Waste Water Treatment Plant in Rogoźnik.”

2013

17. PGE SA Opole Power

Plant Pilot study of water demineralization process in the Opole Power Plant. 2013

18. Energomontaż

Północ SA Collaboration on design and construction of the SCR system in Rybnik Power Plant. (total capacity: 1775 MWe).

2012

19. ZE PAK SA Pątnów II

Power Plant Documentation for the upgrade of the process lines of the Water Conditioning Station at the Pątnów II Power Plant (total capacity: 1600 MWe).

2012

107

ENVIRONMENT PROTECTION

REFERENCE LIST

NO. PURCHASER PROJECT NAME COMPLETED

20. Tauron

Wytwarzanie SA Environmental analysis for Tauron Wytwarzanie SA, Halemba Power Plant Branch. 2012

21. ZE PAK SA

Modernisation of the rain and industrial wastewater treatment plant in the Konin Power Plant:

expert’s report / facilities condition rating,

concept,

civil engineering design,

detailed designs.

2011

22. ZE PAK SA

Modernisation of fire water systems in respect of collection, treatment, storage and network feeding in the Konin Power Plant:

expert’s report / facilities condition rating,

concept,

civil engineering design,

detailed designs.

2011

23. EP Kraków SA Technical and environmental examination of the Energia Company. 2010

24. GDF Suez Design set of reconstruction and development of fire fighting network and stormwater drainage together with reconstruction of central heating system in the area of non-forest biomass system.

2010

25. Instal

Kraków SA/Brandl

Designing work, engineering supervision as well as participation in the technological start-up for the project: “Modernization of the water management system in the Jaworzno III Power Plant (total capacity: 1345 MWe) - the recovery of the waste water in order to limit the water absorption of the production process.

2010

26. Colt Concept for installation of smoke dampers in the main building – the nave of engine room in the Rybnik Power Plant (total capacity: 1775 MWe).

2010

27. Tauron

Wytwarzanie SA Designs of the sewerage system for the 460 MWe Power Unit with supercritical parameters in the Łagisza Power Plant (total capacity: 840 MWe).

2009

28. ZPWIK Sp. z o.o.

Zabrze

Engineering supervision of the following project: „Improvement of water and wastewater management in the Town of Zabrze - the Sanitary wastewater system and stormwater drainage.

2009

29. Vattenfall Concept: Building of the industrial waste water treatment plant together with the purified waste water dump.

2008

30.

Tauron Wytwarzanie SA,

Łaziska Power Plant

Expertise concerning the options of water supply of water circuit (including cooling circuit) for the new 800 MWe Power Unit in the Łaziska Power Plant (total capacity: 1155 MWe).

2008

31. Tauron

Wytwarzanie SA

Calculations of air quality condition together with modelling methodology.

Analysis concerning the pollutants spreading in the environment and determination of types and quantity of the gases and dusts (for the utilized fuel unit) that are released into the air in the Bielsko-Biała 2 CHP (total capacity: 172 MWt) in Town of Czechowice-Dziedzice – the above-mentioned design package covers the combustion project for coal and biomass (burning together) in the ofz-230 fluidized bed boiler (the scope included SO2, NO2, CO, dust).

2007

32. PGE SA Turów Power

Plant

Engineering supervision over the project entitled: “Waste water – replacement of the main equipment and reconstruction of the industrial waste water treatment plant in the Turów Power Plant (total capacity: 2088 MWe)”.

2007

33. Tauron

Wytwarzanie SA

Industrial wastewater Sampling together with the chemical analysis as well as technical and technological analysis for preliminary treatment of industrial wastewater for the purpose of treatment improvement of the UF Zenon system in the Łagisza Power Plant (total capacity: 840 MWe).

2007

34. Tauron

Wytwarzanie SA Inventory of water resources for the purpose of cooling circuit in the Halemba Power Plant.

2007

35.

Tauron Wytwarzanie SA,

Blachownia Power Plant

Expertise concerning the options of water supply of cooling circuit for the power unit 460-800 MW in the Blachownia Power Plant.

2007

ENVIRONMENT PROTECTION 108

ENERGOPROJEKT-KATOWICE SA

NO. PURCHASER PROJECT NAME COMPLETED

36.

Mittal Steel Poland SA Katowice

Steel Works

Technical concept of the closed water circulation for the Quarto mill stand in the plate mill rolling mill located in Chorzów.

2006

37. Skawina SA Power

Plant

Design set: Adjustment of oil-immersed transformers (in accordance with environmental protection requirements and fire protection requirements) in the Skawina Power Plant (total capacity: 590 MWe).

2006

38.

Tauron Wytwarzanie SA,

Jaworzno III Power Plant

Modernization of the waste water pumping station by construction of the pumping set and the pipeline in the direction of the slag hydrotransport trestle.

Construction of the pumping set and assembly of the pipeline in the waste water treatment plant to supply the E2 waterside pumping station with purified waste water.

2006

39. Kopex SA The Będzin CHP Plant (total capacity: 415 MWt) adaptation in order to meet the requirements of emission standard – gas and dust into the air; for the regulations, which will be in force on February 1st, 2008.

2005

40. Skawina SA Power

Plant Concept of adjustment of the Skawina Power Plant (total capacity: 590 MWe) in order meet the required emission norms applicable after 2005.

2005

41.

Thermal Power Company Sp. z o.o. in

Biała Podlaska

Report from the environment related inspection in the thermal power company in Bielsko Biała CHP Plant (total capacity: 275 MWt).

2005

42. PGE SA Rzeszów

CHP Plant Noise protection study for the combined cycle unit in the Rzeszów CHP Plant. 2004

43. Skawina SA Power

Plant

Pro-environmental review of the waste dumps as well as installation for thermal conversions of waste products in the Skawina Power Plant (total capacity: 590 MWe).

2002

44. PGE SA Rzeszów

CHP Plant Documentation for the decision on admissible pollutant emission for the combined cycle unit in the Rzeszów CHP Plant.

2002

45. PGE SA Rzeszów

CHP Plant Documentation defining the electromagnetic radiation to the environment for the combined cycle unit in the Rzeszów CHP Plant.

2002

46.

Tauron Wytwarzanie SA,

Łagisza Power Plant

Calculations of pollutant concentration in the atmospheric air for different heights of the stack discharging flue gas from the flue gas desulphurization system of the unit 460 MWe in the Łagisza Power Plant (total capacity: 840 MWe).

2002

109

ENVIRONMENT PROTECTION

REFERENCE LIST

9.1. Environmental impact assessments

NO. PURCHASER PROJECT NAME COMPLETED

1. MPEC Olsztyn Environmental impact report for the project titled "Construction of a Wast-to-Energy Plant," together with supplementary analyses.

in progress

2.

Tauron Wytwarzanie SA – Jaworzno Power Plant III Branch

Update of the Environmental Impact Report for the 910 MWe power unit built at TAURON Wytwarzanie S.A. - Jaworzno Power Plant III Branch, together with preparation of an application for an amendment of the environmental constraints decision. (total power: 1,345 MWe).

2015

3. GDF Suez Environmental impact report with obtaining a decision for the coal unit in Stara Wieś near Łęczna.

2013

4. Foster Wheeler

Warszawa Report on the ashes from the fluidized bed boilers and products from the wet desulfurisation plant.

2013

5. Dalkia Poznań Zespół Elektrociepłowni SA

Report on environmental impact assessment for the following project: Construction of a combined cycle gas and steam unit a Dalkia Poznań ZEC SA, which consists of a gas turbine, a steam turbine, and a waste heat boiler.

2013

6. Dalkia Poznań Zespół Elektrociepłowni SA

Environmental impact reports, along with requests for a decision on the environmental conditions and the approval of a project for CHP Dalkia Poznań SA in accordance with the technical specifications.

2013

7. PGE SA Bełchatów

Power Plant Environmental impact assessment concerning the modernization of Nos. 7-8 power units in the Bełchatów Power Plant (total capacity: 4440 MWe).

2010

8.

Tauron Wytwarzanie SA

Stalowa Wola Power Plant

Preparatory study for the project: "Construction of the 400 MW combined cycle unit”:

Feasibility study for the construction of the 400 MW combined cycle unit,

Environmental impact report.

2009

9. Alstom Power

Sp. z o.o. Elbląg Environmental impact assessment concerning the 18K370 turbine in the Bełchatów Power Plant (total capacity: 4440 MWe) (No. 5 power unit).

2009

10. Alstom Stuttgart Environmental impact assessment and authorisation of the basic design for the Bełchatów Power Plant (total capacity: 4440 MWe).

2009

11. Kraków SA CHP Plant The functional and usage program as well as the environmental impact assessment concerning the system for direct biomass co-combustion in the Kraków CHP Plant (total capacity: 1237 MWt).

2008

12.

Tauron Wytwarzanie SA,

Katowice CHP Plant

Environmental impact report for the investment concerning the construction of the biomass feed system to the CFB-100 fluidized boiler in the Katowice CHP Plant (total capacity: 692 MWt).

2007

13.

Tauron Wytwarzanie SA,

Siersza Power Plant

Environmental impact assessment concerning biomass co-combustion installation inside the fluidized boilers in Siersza Power Plant (total capacity: 786 MWe).

2005

14.

Thermal Power Company Sp. z o.o. in

Biała Podlaska

Environmental Impact Assessment concerning the modernization of the k1 Heating Plant together with he construction of the WR-8 water heater.

2005

15.

Water & Wastewater Municipal Company

in Piekary Ślaskie

Environmental impact assessment for the investment entitled: “Construction and modernization of the sanitary wastewater system and storm water drainage in the City of Piekary Śląskie. Decommissioning of the Brzoska wastewater treatment plant”.

2005

16. SCE Jaworzno III

Sp. z o.o.

Environmental impact assessment for the investment entitled: “Construction of a high parameters heat distribution network providing thermal energy to the centre of Mysłowice from the Jaworzno III Power Plant (total capacity: 1345 MWe).”

2004

17.

PGE SA ZE Dolna Odra Pomorzany

CHP Plant

Development of a report concerning environmental impact of the investment entitled: “Reconstruction of the flue gas ducts on the Benson boilers side in the Pomorzany CHP Plant (total capacity: 443 MWt)”.

2004

18. Kędzierzyn SA Nitric

Plant Environmental impact report for the investment entitled “Water treatment plant,” carried out in the Nitric Plant in Kędzierzyn.

2004

19. Tauron

Wytwarzanie SA

Development of a proposal concerning the assumptions and priorities in the scope of biomass for the individual renewable energy sources as well as a promotional programme for the renewable energy generation in PKE (now Tauron Wytwarzanie SA).

2004

ENVIRONMENT PROTECTION 110

ENERGOPROJEKT-KATOWICE SA

NO. PURCHASER PROJECT NAME COMPLETED

20. BPBK Katowice Report on the environmental impact of the modernization investment planned for the existing wastewater system of the town of Rybnik central districts.

2004

21.

Tauron Wytwarzanie SA, Thermal Power

Company in Bielsko-Biała

Environmental impact assessment for the modernization of the turbine generator set.

2004

22.

Tauron Wytwarzanie SA, Thermal Power

Company in Bielsko-Biała

Environmental impact assessment for the investment “Concept for the water intake from the Białka river”.

2004

23. PGE SA Turów Power

Plant

Environmental impact report for the investment entitled: “Modernization of the industrial waste treatment plant in the Turów Power Plant (total capacity: 2088 MWe)”.

2004

24.

Thermal Power Company SA in

Ostrów Wielkopolski

Environmental impact assessment for the construction of the heat source with co-generation of electric energy, based on the combustion of wood waste.

2004

25. PGE SA Rzeszów

CHP Plant Documentation for the petition for consent to the waste generation and storage – Safety report.

2003

26.

Tauron Wytwarzanie SA,

Jaworzno III Power Plant

Environmental impact assessment for the project consisting in construction of the new park of oil storage tanks in the Jaworzno II Power Plant (total capacity: 190 MWe).

2003

27. City of

Piekary Śląskie Environmental impact assessment for the project “Streamlining the water sewerage system in the District of Piekary Śląskie”.

2003

28. Skawina SA Power

Plant Environmental impact assessment for the coal mixing station in the Skawina Power Plant (total capacity: 590 MWe).

2003

29.

Tauron Wytwarzanie SA,

Łagisza Power Plant

Environmental impact assessment for the investment “Construction of the unit 460 MWe with fluidised bed boiler of supercritical parameters in the Łagisza Power Plant (total capacity: 840 MWe)”.

2003

30. Dalkia Poznań ZE SA Environmental impact assessment for the construction of the second unloading pass with coal intake from the storage yard.

2003

31. Gdynia CHP Plant Environmental impact assessment for the investment “Discharge pipeline for the post-regeneration effluents from CHP Plant to the harbour basin”.

2003

32. Nova Gliwice Forecast of the environmental impact for the spatial development plan of the town of Głodówek.

2003

33.

Water & Wastewater Municipal Company

in Piekary Ślaskie

Environmental impact assessment for the modernization of the Wastewater Treatment Plant “Północ” in Piekary Śląskie.

2003

34. Białystok SA CHP

Plant Environmental impact assessment for the unloading of coal delivered by road transport at the unloading sequence No. 19 in the Białystok CHP Plant.

2003

35. Ostrołęka SA Power

Company Report defining the impact of constructing the biomass storage yard on environment.

2003

36. Zielona Góra CHP

Plant SA Environmental impact assessment for the investment “Construction of the combined cycle unit in the Zielona Góra CHP Plant”.

2002

37.

Town of

Lesznowola

Environmental impact assessment for the investment “Construction of the wastewater treatment plant in the town of Łazy”.

2001

38.

Tauron Wytwarzanie SA,

Łagisza Power Plant

Environmental impact assessment for the industrial and rain wastewater treatment plant in Łagisza Power Plant (total capacity: 840 MWe).

2001

39.

Tauron Wytwarzanie SA,

Jaworzno III Power Plant

Environmental impact assessment for design solutions presented in the Civil Engineering Design concerning the slurry management.

2000

40. Cieszyn CHP Plant Environmental impact assessment for the Cieszyn CHP Plant. 2000

111

ENVIRONMENT PROTECTION

REFERENCE LIST

NO. PURCHASER PROJECT NAME COMPLETED

41. Thermal Power

Company in Tarnów Environmental impact assessment for the modernized “Piaskówka” boiler house in Tarnów.

2000

42. Dalkia Poznań ZE SA Environmental impact assessment for the investment “Construction of the new energy source in Poznań in Świerzawskiej Street – installation of the gas turbine and the combined cycle unit”.

2000

43.

Wastewater Treatment Plant in

Częstochowa

Environmental impact assessment for the investment “Expansion of the blowers station and compressed air pipeline to reactors in the central wastewater treatment plant in Częstochowa.

2000

44. Zabrze SA CHP Plant Environmental impact assessment for the investment: Construction of the heating-condensing unit BCK-130” in the Zabrze CHP Plant.

2000

45.

Wastewater Treatment Plant in

Białystok

Environmental impact assessment for modernization of the gas and sludge point in the wastewater treatment plant in Białystok.

2000

46.

Tauron Wytwarzanie SA,

Katowice CHP Plant

Environmental impact assessment for the newly-designed district heating pipeline from the Katowice CHP Plant (total capacity: 692 MWt) to the Jedność Pipe Mill.

2000

47. Town of Miedźno Environmental impact assessment for the sanitary wastewater treatment plant in Ostrowy.

2000

48. Chorzów ELCHO

Sp. z o.o. CHP Plant Environmental impact assessment for the designed the ELCHO CHP Plant (total capacity: 500 MWt) in Chorzów.

2000

49. Siedlce CHP Plant Environmental impact assessment for design solutions adopted in the Civil Engineering Design for the CHP Plant supplied with gas fuel and located in Siedlce.

2000

50.

Tauron Wytwarzanie SA,

Katowice CHP Plant Post-implementation environmental impact assessment for the unit BCF-100. 2000

ENVIRONMENT PROTECTION 112

ENERGOPROJEKT-KATOWICE SA

9.2. Water quality impact assessments

NO. PURCHASER PROJECT NAME COMPLETED

1.

Dąbrowa Górnicza SA Thermal Power

Company Water quality impact assessment for the central heat-generating plant in Zawiercie. 2010

2. Kraków SA CHP Plant Water quality impact assessment for discharge of treated waste into the Wisła river from the Kraków CHP Plant (total capacity: 1237 MWt).

2009

3.

Tauron Wytwarzanie SA,

Łagisza Power Plant

Water quality impact assessment, preparation of the application form together with making the necessary settlements in order to obtain a decision of the Silesian Voivode about the water abstraction form the Czarna Przemsza river.

2008

4. Tauron

Wytwarzanie SA Design set: Water quality impact assessment for the Łagisza Power Plant (total capacity: 840 MWe) concerning the construction of the new 460 MWe power unit.

2005

5. Będzin SA CHP Plant Water quality impact assessment: Wastewater disposal from the Będzin CHP Plant (total capacity: 415 MWt) to Potok Zagórski.

2004

6. Będzin SA CHP Plant Water quality impact assessment for rainwater disposal from the Będzin CHP Plant (total capacity: 415 MWt) into the Zagórski stream.

2004

7.

Tauron Wytwarzanie SA, Thermal Power

Company in Bielsko-Biała

Water quality impact assessment for discharge of treated waste from the Bielsko-Północ EC2 CHP Plant (total capacity: 172 MWt) into the Biała river after the modernization of the 13PU55 turbine set and participation in the administrative proceedings for awarding a water quality impact assessment.

2004

8. Kraków SA CHP Plant Water quality impact assessment for the Kraków CHP Plant (total capacity: 1237 MWt).

2004

9.

Tauron Wytwarzanie SA,

Katowice CHP Plant

Water quality impact assessment for the passage under the Siemianowice trench and emergency wastewater removal to the Siemianowice trench.

2004

10. Tychy SA CHP Plant Water quality impact assessment for Tychy CHP Plant (total capacity: 290 MWt). 2003

11. PGE SA Rzeszów

CHP Plant Water quality impact assessment for the combined cycle unit in the Rzeszów CHP Plant.

2002

12. Zielona Góra SA CHP

Plant Water quality impact assessment for the investment “Construction of the combined cycle unit in the Zielona Góra CHP Plant”.

2002

13. PGE SA Turów Power

Plant Water quality impact assessment for water intake and wastewater discharge from the Turów Power Plant (total capacity: 2088 MWe).

2002

14. Bio-Kan System

Sp. z o.o. Water quality impact assessment for obtaining the permit for construction of the wastewater treatment plant in Jaworzno-Szczakowa.

2001

15. Town of Lesznowola Water quality impact assessment for obtaining the permit for construction of the wastewater treatment plant.

2001

16. PGE SA Turów Power

Plant

Water quality impact assessment for obtaining the permit for construction of the sanitary wastewater treatment plant in the Turów Power Plant (total capacity: 2088 MWe).

2000

17. Tychy SA CHP Plant Water quality impact assessment for water intake and wastewater discharge as well as operation of cleaning equipment in the Tychy Power Plant.

2000

18. Będzin SA CHP Plant Water quality impact assessment for water intake and discharge of increased volume of blowdown to the Czarna Przemsza river in the Będzin CHP Plant (total capacity: 415 MWt).

2000

19. Polish Gas Mining and Gas Industry

Water quality impact assessment of water and wastewater management within the Regional Transfer Branch in Świerklany.

2000

113

ENVIRONMENT PROTECTION

REFERENCE LIST

9.3. IPPC application forms – integrated permits

NO. PURCHASER PROJECT NAME COMPLETED

1. Energoprojekt Warszawa SA

Drawing up of the applications for an integrated permit for the new unit, units 1 – 10, and the start-up boiler room in Kozienice Power Plant.

in progress

2. JSW KOKS SA Preparation of the integrated permit application for ELCHO Heat and Radlin

Combined Heat and Power Generating Plant. 2016

3. Tauron

Wytwarzanie SA

Review of integrated permits (Jaworzno III Power Plant - Power Plant III and Power Plant III, Łaziska Power Plant, Siersza Power Plant, and Łagisza Power Plant) in the context of the new Environmental Protection Law and preparation for the power plants of applications for changes to the integrated permits pursuant to the amended Environmental Protection Law, Part 4 - Łagisza Power Plant Branch in Będzin.

2015

4.

Tauron Ciepło Sp. z o.o.

Drawing up of the applications for issue of the integrated permits and the decisions on integrated permits for the following plants: Olkusz Central Heat Generating Plant and Zawiercie Central Heat Generating Plant.

2015

5. EDF Polska Sp. z o.o. Updating of the integrated permit and the sector decisions for the non-hazardous and neutral waste storage system at CHP Kraków.

2014

6. PGE SA

CHP Rzeszów The application for an integrated permit for the combined cycle gas and steam unit (CCGSU) for PGE SA CHP Rzeszów Branch.

2013

7. CHP Kraków SA Drafting documentation and application to the Marshal of Małopolskie province to update integrated permit for the fuel combustion system in CHP Krakow (total capacity: 1237 MWt).

2012

8. Energoinstal Katowice SA

An application for an integrated permit for the newly built CCGT unit in Elektrociepłownia Głogów.

2012

9. EC Chorzów ELCHO

Sp. z o.o. Application for an integrated permit for ELCHO CHP Plant in Chorzow. 2012

10. Energoinstal Katowice SA

Application for an integrated permit for the newly built CCGT in Polkowice CHP Plant.

2012

11. Kraków SA CHP Plant Documentation and a request to the Marshal of Małopolskie to update integrated permit for the fuel combustion system in the Kraków CHP Plant (total capacity: 1237 MWt).

2012

12. CEZ Polska Skawina

Application forms:

IPPC application form – integrated permit for the combined cycle unit,

Application form in order to obtain a permission to participate in the European Union Emission Trading Scheme for the combined cycle unit until June 30, 2011 that condition obtaining a free of charge CO2 emission rights, according to the 2009/29/WE directive.

2011

13. PGE SA Bełchatów

Application and documentation required for obtaining the permission integrated by PGE GiEK SA - Oddział Elektrociepłownia Rzeszów (Rzeszów CHP Plant) for installation of the cogeneration electric energy generation unit based on internal-combustion engines.

2011

14. Tauron

Wytwarzanie SA

Documentation and applications required for obtaining the environmental constraints decision, the integrated permit, and the right for gratuitous emissions of CO2 for the 135 MW steam and gas power unit at the Katowice Combined Heat and Power Plant (total capacity: 692 MWt).

2011

15. Tauron

Wytwarzanie SA

Application form for change of the integrated permit by issuing the new integrated permit for the fuel combustion system in the Łagisza Power Plant (total capacity: 840 MWe).

2010

16. Kraków SA CHP Plant

Update of:

integrated permit decision concerning the management and organization of the furnace waste storage yard as well as of the new sector permit decision for the technical background of the storage yard connected with construction of the S-7 expressway,

cumulative inventory documentation including all devices and installations in the area of the furnace waste storage yard after the construction of the expressway.

2010

ENVIRONMENT PROTECTION 114

ENERGOPROJEKT-KATOWICE SA

NO. PURCHASER PROJECT NAME COMPLETED

17. Będzin SA CHP Plant Update of the integrated permit for the fuel combustion system in the Będzin CHP Plant (total capacity: 415 MWt).

2010

18. Kraków SA CHP Plant Documentation together with application form concerning verification of the integrated permit for the fuel combustion system in the Kraków CHP Plant (total capacity: 1237 MWt).

2010

19. Kraków SA CHP Plant Documentation (application) concerning the updating of the integrated permit for the Kraków CHP Plant (total capacity: 1237 MWt) for the for the fuel combustion system - result of the planning biomass co-combustion in the power boilers.

2008

20. PGE SA Kielce CHP

Plant IPPC application form - integrated permit as well as official assistance with application procedures.

2007

21. Kraków SA CHP Plant Modernization of the IPPC application form – integrated permit for the fuel combustion system in the Kraków CHP Plant (total capacity: 1237 MWt) - result of the planning biomass combustion in the power boilers in the Kraków CHP Plant.

2007

22. Energetyka Boruta

Sp. z o.o. IPPC application form - integrated permit as well as official assistance with application procedures.

2006

23. PGE SA Rzeszów

CHP Plant IPPC application form - integrated permit as well as official assistance with application procedures.

2006

24.

Thermal Power Company SA in

Września

IPPC application form - integrated permit as well as official assistance with application procedures.

2006

25. Skawina SA Power

Plant IPPC application form - integrated permit for the fuel combustion system in the Skawina Power Plant (total capacity: 590 MWe).

2006

26. Energetyka Rokita

Sp. z o.o. IPPC application form - integrated permit as well as official assistance with application procedures.

2006

27. ZGC Tomaszów

Mazowiecki Sp. z o.o. IPPC application form - integrated permit as well as official assistance with application procedures.

2006

28.

Thermal Power Company SA in

Dąbrowa Górnicza

IPPC application form - integrated permit for IPPC application form - integrated permit as well as official assistance with application procedures.

2005

29. Michelin Olsztyn IPPC application form - integrated permit as well as official assistance with application procedures.

2005

30. Thermal Power Company NYSA

IPPC application form - integrated permit as well as official assistance with application procedures.

2005

31. Kraków SA CHP Plant IPPC application form - integrated permit as well as official assistance with application procedures. Consulting services related to application procedures.

2005

32.

Thermal Power Company in

Starachowice

IPPC application form - integrated permit for the Thermal Energy Plant in Starachowice.

2005

33.

Thermal Power Company SA in

Dąbrowa Górnicza

Preparation of the documentation for the DH installations in Olkusz and Zawiercie with the purpose of obtaining integrated permits for discharge of compounds being emitted and energy to the natural environment which may cause significant pollution of the individual environmental components, i.e. air, water, wastewater, waste, noise, electromagnetic waves.

2005

34. Nowa Sarzyna CHP

Plant

Documentation for the application for the integrated permit for the Nowa Sarzyna CHP Plant (total capacity: 216 MWt) - report on the environmental review, application for the integrated permit.

2004

35.

Thermal Power Company Sp. z o.o. in

Biała Podlaska

Preparation of the documentation (environmental audit) and the application for awarding an integrated permit for the installation – the CHP Plant of the thermal power company in Biała Podlaska.

2004

36. Kraków SA CHP Plant Environmental review of the Kraków CHP Plant (total capacity: 1237 MWt) and organisational works connected with preparing the application for the integrated permit.

2004

37. Tauron

Wytwarzanie SA IPPC application form - integrated permit for the Łagisza Power Plant (total capacity: 840 MWe) concerning the construction of the new 460 MWe power unit.

2004

38. Będzin SA CHP Plant Application for the integrated permit for the Będzin CHP Plant (total capacity: 415 MWt).

2004

115

ENVIRONMENT PROTECTION

REFERENCE LIST

NO. PURCHASER PROJECT NAME COMPLETED

39. Tauron

Wytwarzanie SA

Preparing the new application for the integrated permit for the Southern Power Generation Concern – the Siersza Power Plant (total capacity: 786 MWe), covering the IPPC installation with boilers K1 and K2.

2004

40. PGE SA Rzeszów

CHP Plant Application for the integrated permit with necessary documentation for the Rzeszów CHP Plant for the combined cycle unit.

2004

41. Energoprojekt

Gliwice SA Application for the integrated permit for the Zielona Góra CHP Plant – the environmental engineering.

2004

42. Radom SA CHP Plant Documentation for the application for the integrated permit for the Radom CHP Plant.

2003

43. Radpec SA Preparing the petition for issuing the integrated environmental permit for Radpec. 2003

44. Skawina SA Power

Plant Preparing the petition for issuing the integrated environmental permit for the Skawina Power Plant (total capacity: 590 MWe).

2003

45. Zielona Góra SA CHP

Plant Preparing the petition for issuing the integrated environmental permit for the Zielona Góra CHP Plant.

2003

46. Będzin SA CHP Plant Preparation of the documentation and the application for awarding an integrated permit concerning discharge of compounds and energy into the environment for the Będzin CHP Plant (total capacity: 415 MWt).

2003

47. Tauron

Wytwarzanie SA Preparing the Power Plants of PKE (now Tauron Wytwarzanie SA) for obtaining the integrated environmental permits.

2002

ENVIRONMENT PROTECTION 116

ENERGOPROJEKT-KATOWICE SA

9.4. Water- and wastewater management

NO. PURCHASER PROJECT NAME COMPLETED

1. Kurita Polska Sp. Z

O.O. An assessment of the technological solution used to treat water for IR LIQUIDE plant in Cracow.

in progress

2. GDF Suez Energia

Polska SA Documentation of the Vistula River checkdam reconstruction to improve the rubber sleeve.

2016

3. PGE SA

Turów Power Plant The development of the design documentation for the investment project titled: “Potable Water – Construction of Potable Water Treatment Plant.”

2014

4. PWIK Rybnik

Sp z o.o. Multi-branch concept of modernisation of the mechanical part of the sewage treatment plant in Rybnik – Orzepowice.

2014

5. PGE SA Opole Power

Plant Implementation of pilot studies of water demineralization process at PGE Opole Power Plant SA.

2013

6. PAK Serwis Konin

Sp. z o.o.

Detailed designs for construction of the new storage and workshop unit together with the switching station as well as of the auxiliary building in the Konin Power Plant.

2011

7. PAK Serwis Konin

Sp. z o.o.

Detailed designs for construction of the new storage and workshop unit together with the switching station as well as of the auxiliary building in the Konin Power Plant.

2011

8. Kozienice SA Power

Plant

Rainwater-industrial sewage treatment plant modernisation concept and sewage pumping station in Kozienice Power Plant, in connection with planned erection of a new 1000 MWe power unit.

2011

9. Alstom Power

Sp. z o.o. Elbląg

Detailed design for the reconstruction of the existing water and sewerage system in the area of the coal handling equipment of the 858 MWe Power Unit in the Bełchatów Power Plant (total capacity: 4440 MWe).

2008

10. Polimex-

Mostostal SA Modernization of water management system and of waste water disposal system in the Gdyńska CHP Plant.

2007

11. Kraków SA CHP Plant Water source modernization of the fire protection system in the area of the turbine hall and of the boiler house - Detailed design: Water pumping station of the fire protection system (together with pipelines).

2006

12. Vattenfall Technical concept: Final waste management in the Żerań CHP Plant. 2006

13. PGE SA Turów Power

Plant Design set: Modernization of the industrial waste treatment plant in the Turów Power Plant (total capacity: 2088 MWe).

2005

14. Będzin SA CHP Plant Development of technical documentation concerning rainwater disposal from the Będzin CHP Plant (total capacity: 415 MWt) into the Zagórski Stream.

2004

15. Tauron

Wytwarzanie SA

Performance project for the water supply and sewerage system as well as fire protection system under the task entitled: “Reconstruction of PKE’s (now Tauron Wytwarzanie SA) office building.”

2004

16. Kraków SA CHP Plant

Performance projects for the water treatment station building overhaul in the Kraków CHP Plant (total capacity: 1237 MWt) – performance project for the central heating system with a heat exchanger centre in the water treatment station building and public use compartments.

2004

17. Wybrzeże SA CHP

Plant Performance supervision for the investment: “Discharge pipeline for the post-recycling waste from the Gdynia CHP into the harbour”.

2004

18.

Water & Wastewater Municipal Company

in Piekary Ślaskie

Emergency reconstruction of the sewerage system in the area of Bytomska and Wyszyńskiego streets crossing in Piekary Śląskie.

2004

19. City of Zabrze

Project documentation for performance of the sewerage and rainwater drainage systems with sewerage connections with buildings and rainwater treatment station under the water and waste management settlement programme in Zabrze-Grzybowice.

2004

117

ENVIRONMENT PROTECTION

REFERENCE LIST

NO. PURCHASER PROJECT NAME COMPLETED

20. Tauron

Wytwarzanie SA

Modernization of the Łagisza Power Plant (total capacity: 840 MWe) heating system. Development of the full technical documentation for modernization of the internal central heating system and central heating station.

Performance project for the sewerage system for the new 460 MWe power unit in the Łagisza Power Plant.

Performance project for modernization of the internal central heating system – balance calculations with the purpose of obtaining required thermal power in the winter and summer seasons together with the central heating system related measurements.

2004

21.

Tauron Wytwarzanie SA,

Katowice CHP Plant

Documentation concerning rearrangement of the pipeline discharging the waste from the Siemianowice-Centrum Waste Treatment Plant placing it from the trestle to the ground on the B3-B4 section.

2004

22. PGE SA Turów Power

Plant Instruction for water management in the Turów Power Plant (total capacity: 2088 MWe).

2004

23. PGE SA Turów Power

Plant Modernization of the industrial waste treatment plant in the Turów Power Plant (total capacity: 2088 MWe).

2004

24. PGE SA Turów Power

Plant Modification of the sewerage system in the area of power unit No. 6 – construction of electro-filter.

2004

25.

Tauron Wytwarzanie SA,

Łagisza Power Plant

Detailed design for the sanitary wastewater system for the new unit 460 MWe in the Łagisza Power Plant.

2004

26. Rafako SA

Water sewerage installation and central heating for the following task “Detailed design for the reactor unit and bag filter construction of the Flue Gas Desulphurization System in the Łódź-4 CHP Plant - dust removal from flue gas and management of the post-reaction product.

2003

27. PGE SA Turów Power

Plant

Detailed designs for the wastewater discharge to oil trap inclusive of the relocation of rain sewerage within the task: "Modernization of the turbine and transformer oil management."

2003

28. Zielona Góra SA CHP

Plant

Installation of the combined cycle unit in the Zielona Góra CHP Plants. Detailed designs of:

water sewerage installations (to the gas pre-heat and filtration building, sludge drainage building, cooling water pumping station);

central heating connections to the gas pre-heat and filtration building;

central heating overground network;

water sewerage connections (to the gas pre-heat and filtration building, sludge drainage building, pumping station).

2003

29. Chorzów ELCHO

Sp. z o.o. CHP Plant

Detailed designs of: internal and underground water sewerage installations, networks of potable water, fire fighting water, industrial and sanitary wastewater, stormwater sewerage, internal installations of fire fighting hydrants, connections of street inlets to the rain sewerage.

2003

30. Zabrze SA CHP Plant

Detailed designs for the water and wastewater installation of boiler house, external water and fire fighting networks, rain and industrial sewerage with elements of treatment for the following investment task ”Construction of the steam boiler KP-20 fired with natural gas GZ50 with auxiliary installations and equipment functionally related with the boiler operation in the Zabrze Power Plant.

2003

31. ZE PAK SA

Design for buildings and auxiliary installations at Power Plant Pątnów II (total capacity: 1600 MWe) - Unit a of capacity 460 MWe. Detailed designs of:

wash water installation;

industrial and stormwater sewerage installation;

wash water connections;

industrial sewerage connections;

central heating installation;

potable water and sanitary sewerage installation;

drainage installation;

water sewerage installation with connections.

2003

ENVIRONMENT PROTECTION 118

ENERGOPROJEKT-KATOWICE SA

NO. PURCHASER PROJECT NAME COMPLETED

32.

Tauron Wytwarzanie SA,

Siersza Power Plant

Detailed designs for:

internal water sewerage installations;

water sewerage installations with connections (pumping station of demineralised water, limestone milk tank, accelerator No. 1 and 2);

connections of the heating installation to the external network with heat unit – the water treatment station;

within the task: “Modernization of the water treatment station”.

2003

33. ZE PAK SA

Detailed designs for the internal water sewerage installations, connections to the external central heating network for the following task: Installation of slag discharge from boilers and transport to the suspension production plant in the Pątnów Power Plant (total capacity: 1600 MWe).

2003

34. PGE SA Rzeszów

CHP Plant Detailed design (water&wastewater engineering) fuel preparation station within the project: “Construction of the combined cycle unit in the Rzeszów CHP Plant”.

2002

35. PGE SA Turów Power

Plant Modernization of the fire fighting and potable water tank in the Turów Power Plant (total capacity: 2088 MWe).

2002

36. Czyste Środowisko Civil design for the Plant of Municipal Waste Utilization in Rudno. 2002

37.

Tauron Wytwarzanie SA,

Jaworzno III Power Plant

Design for the modernization of wastewater treatment plant in the Jaworzno III Power Plant (total capacity: 1345 MWe) – the two pumps.

2002

38. PGE SA Lublin-

Wrotków CHP Plant

Basic and detailed design for the additional crane in Electrical Building (E4), stormwater drainage system DN 800 in the area of the cooling tower – level adjustment in the Lublin Wrotków CHP Plant (total capacity: 628 MWt).

2002

39. Gdynia CHP Plant Design for the discharge pipeline of post-regeneration wastewater from the Gdynia CHP to the harbour basin.

2002

40. PGE SA Turów Power

Plant Design for the sanitary protection zone of the following tanks: Zatonie, Witka, and the daily compensation tank.

2002

41.

Połaniec Power Plant SA – Electrabel

Group

Detailed design for the installation of central heating and hot service water in the scope of modernized technological equipment. Modernization of the Water Demineralisation Station in the Tadeusz Kościuszko Power Plant in Połaniec.

2002

42.

Tauron Wytwarzanie SA,

Jaworzno III Power Plant

Detailed design for the modernization of wastewater discharge from the turbine hall at units No. 1-6 to cooling water pipelines in the Jaworzno III Power Plant (total capacity: 1345 MWe).

2002

43. PGE SA Rzeszów

CHP Plant

Designs of the water and wastewater installations for facilities of the combined cycle unit in the Rzeszów CHP Plant.

Fuel oil tank, main building, reverse osmosis station, demineralised water tank, preliminary water treatment building, electrical building, transformer station, Diesel Power Plant, external networks and related facilities, cable ducts and tunnels.

2002

44.

Tauron Wytwarzanie SA,

Łagisza Power Plant

Detailed designs for water, wastewater, central heating within modernization of the coal storage yard in the Łagisza Power Plant (total capacity: 840 MWe).

2002

45. Białystok SA CHP

Plant

Designs for installation of the bleeding-condensing set of electrical power 20 MW in the Białystok CHP Plant. Detailed designs for:

industrial sewerage with oil trap in the area of the unit transformer with connection;

external networks of water, sewerage, sanitary, stormwater and fire fighting water.

2002

46. Kraków SA CHP Plant

Detailed design for wastewater discharge – within the oil transport installation - to and from tanks of the main turbine generator sets and reserve tanks ZS1 and ZS2 together with oil filtration systems in the Kraków CHP Plant (total capacity: 1237 MWt).

2002

119

ENVIRONMENT PROTECTION

REFERENCE LIST

NO. PURCHASER PROJECT NAME COMPLETED

47. Chorzów ELCHO

Sp. z o.o. CHP Plant

Detailed designs of:

underground water and sewerage installations;

potable water networks;

fire fighting water networks;

sanitary wastewater networks;

networks of rain and industrial sewerage;

internal water and sewerage installations;

underground water and wastewater installations;

rain sewerage;

internal fire fighting installations with hydrants;

relocations of the wastewater networks;

technological design for the wastewater retention tank;

fire fighting water pipelines, rain and water sewerage, pipelines of wash water for the rooms of electrostatic precipitators and fans;

heating and hot service water networks.

2002

48.

Tauron Wytwarzanie SA -

Siersza Power Plant

Reconstruction of units No. 1 and 2 – detailed designs for unit No. 2 as well as designs of joints installations for units No. 1-2. Detailed designs for:

external network of hot service water to the recreation building;

heat centre for needs of hot service water;

heating installation in the building.

2002

49.

District Thermal Power Company SA

in Legnica

Civil design for the Głogów CHP Plant – wastewater treatment plant, cooling water.

Architectural-civil design for the sanitary wastewater treatment plant.

Architectural-civil design for facilities of the cooling water management.

2001

50. Bio-Kan System

Sp. z o.o. Civil engineering and detailed design of the sanitary wastewater treatment plant in Jaworzno Szczakowa.

2001

51.

Połaniec Power Plant SA – Electrabel

Group

Detailed design for the installations of heating and hot service water for the following task "Coal handling – expansion of the control centre with control systems for the coal handling equipment at No. 5 and gallery No. 3 as well as visualisation of the sorbent transport system to the boiler bunker at unit No. 5".

2001

52. PGE SA Bełchatów

Power Plant

Detailed design for modernization of the building B-11 in the Bełchatów Power Plant (total capacity: 4440 MWe) – water and wastewater as well as the hot water networks.

2001

53. Tychy SA CHP Plant Detailed design for the potable water network in the area of the coal storage yard for the Tychy CHP Plant (total capacity: 290 MWt).

2001

54. PGE SA Turów Power

Plant

Technical designs and author’s supervision over implementation of the following task “Modernization of the external fire fighting and potable water network in the Turów Power Plant (total capacity: 2088 MWe)”.

2001

55. PGE SA Turów Power

Plant

Detailed designs for the sewerage and fire hydrants installation in the boiler house at unit No. 4 – rehabilitation of boilers No. 4-6 in the Turów Power Plant (total capacity: 2088 MWe).

2001

56. Town of Herby Expansion of the mechanical-biological treatment plant in Herby. Sanitary sewerage in Olszyna, Kalina with transmission to the central treatment plant in Herby.

2001

57. Tychy SA CHP Plant

Design documentation for the biomass plant in Radków upon commission of the Tychy CHP Plant (total capacity: 290 MWt). Detailed designs of: fire fighting and floor drainage installations, heating in the boiler house and main production building.

2001

58.

Tauron Wytwarzanie SA,

Łagisza Power Plant

Technical documentation for the industrial wastewater treatment plant in the Łagisza Power Plant (total capacity: 840 MWe).

Technical material for the site development decision.

Environmental report for the site development decision.

Detailed design for the installation of stormwater treatment plant together with the equipment.

Detailed design for the installations of heating, hot service water, ventilation, air conditioning, compressed air, water, sewerage and fire fighting.

2001

ENVIRONMENT PROTECTION 120

ENERGOPROJEKT-KATOWICE SA

NO. PURCHASER PROJECT NAME COMPLETED

59. Zabrze SA CHP Plant Characteristics for the receiving points of rain and industrial wastewater from the Zabrze CHP Plant - the Guido brook (a tributary of the Kłodnica river), ditch "D" and water-course "U" (a tributary of the Bytomka river).

2000

60. PGE SA Turów Power

Plant

Modernization of the potable water treatment plant as well as the pumping station of potable and fire fighting water in the Turów Power Plant (total capacity: 2088 MWe).

2000

61. Water Company

of Białystok

Wastewater treatment plant in Białystok.

Materials for an application to the pre-accession fund ISPA for modernization of the gas-sludge management in the Wastewater treatment plant in Białystok.

Concept for expansion and modernization for the gas-sludge sequence in the wastewater treatment plant in Białystok.

Modernization of the gas-sludge unit in the wastewater treatment plant – environmental impact assessment.

2000

62. Town of Bobrowniki

Wastewater treatment plant in Rogoźnik.

Design documentation for the municipal wastewater treatment plant in Rogoźnik of capacity 1000 m3/24 hours with the environmental impact assessment.

Documentation for the wastewater network of diameter 300 mm and length 1530 running metres.

2000

63. Town of Miedźno Civil engineering and detailed design for the wastewater treatment plant in Ostrowy, the municipality of Miedźno.

2000

64. Town of Otwock Development of the technology and civil-detailed design for sub-cleaning of transported wastewater, together with a concept for modernization of the entire wastewater treatment plant in Otwock.

2000

65. Town of

Lesznowola Detailed design for construction of the wastewater treatment plant in the town of Łazy.

2000

66. Polish Kerosene

Mining Technical and technological conditions for acceptance of the in-house wastewater treatment plant.

2000

121

ENVIRONMENT PROTECTION

REFERENCE LIST

9.5. HVAC

NO. PURCHASER PROJECT NAME COMPLETED

1. Alstom Power

Sp. z o.o. Detailed Design of the HVAC discipline - Pylons - at the PGE, Opole Power Plant Branch. in progress

2. El. Kozienice SA Complete technical documentation for construction of a new ventilation system and restoration of the existing ventilation system in the production buildings at ENEA Wytwarzanie S.A. - Segment Ciepło Białystok.

2015

3. Alstom Power

Sp. z o.o. HVAC Engineering For WFGD II RYBNIK. 2015

4. Tauron

Wytwarzanie SA

Detailed engineering of the coal handling buildings’ ventilation system as well as lengthening of the dusting system at the level of 23.5 m of the bunker house in the Jaworzno III Power Plant - No. 2 Power Station (total capacity: 190 MWe).

2010

5. Tauron

Wytwarzanie SA

As-built documentation for the control system of the HVAC installations (in the fire function) as well as for the fire extinguishing control system in the engine room of the 460 MW Power Unit in the Łagisza Power Plant (total capacity: 840 MWe).

2009

6.

Koksoprojekt Consulting

Engineering Company Ltd. Zabrze

The modernization of the Coal Derivatives’ Production Department in the Przyjaźń Coking Plant – detailed engineering of the switchgear room (HVAC branch).

2008

7. PGE SA Turów Power

Plant Project supervision: Hydrogen removal system and smoke removal system in the engine room.

2007

8.

Koksoprojekt Consulting

Engineering Company Ltd. Zabrze

The modernization of the Coal Derivatives’ Production Department in the Przyjaźń Coking Plant – the detailed design of the ventilation system for the No. 34 dumping station.

2006

9. City of Piekary Śląskie Construction of the Andaluzja II Heating Plant in Piekary Śląskie - Civil design of ventilation system and of air conditioning system.

2006

10. Kraków SA CHP Plant Modernization of the water source for the fire-fighting system in the area of the engine room and boiler room in the Kraków CHP Plant (total capacity: 1237 MWt). Detailed design of the fire-fighting water pumping station – HVAC system.

2006

11. Elektrobudowa

Katowice SA Design package: detailed design and as-built documentation concerning the modernization of the 03BBA and 03BBB switchgears (6 kV) in the Krakow CHP Plant.

2005

12. PGE SA Turów Power

Plant Modernization of the heating pumps – the HVAC branch. 2004

13. Rafako SA

Installation of ventilation and air conditioning for the task “Detailed design for the reactor unit and bag filter building of flue gas desulphurization system in the Łódź 4 CHP Plant” – dust removal from flue gas and management of the post-reaction product.

2003

14. PGE SA Bełchatów

Power Plant Modernization of the smoke removal installation in DIRE control centre. 2003

15. Będzin SA CHP Plant Modernization of the ventilation and air conditioning installation for rooms of control cubicles and back-up facilities of the control centre as well as excitation switchgear 01CB.

2003

16. Zabrze SA CHP Plant

Detailed design for the installation of central heating and ventilation in the boiler house for the following investment task "Construction of the steam boiler KP-20 fired with natural gas GZ50 with auxiliary installations and equipment functionally related with the boiler operation in the Zabrze CHP Plant”.

2003

17.

Tauron Wytwarzanie SA,

Siersza Power Plant

Detailed design for the heating and ventilation installation of rooms under accelerator No. 1 and 2 – within the task: Modernization of the water treatment station in the Siersza Power Plant (total capacity: 786 MWe).

2003

18. PGE SA Bełchatów

Power Plant

Detailed design for modernization of the ventilation installation in the cable house and switchgear P01, P02, PR1, PR2 in the Bełchatów Power Plant (total capacity: 4440 MWe).

2003

19. Skawina SA Power

Plant Detailed design for the modernization of air conditioning in the control centre K8 - K11 in the Skawina Power Plant (total capacity: 590 MWe).

2003

ENVIRONMENT PROTECTION 122

ENERGOPROJEKT-KATOWICE SA

NO. PURCHASER PROJECT NAME COMPLETED

20. ZE PAK SA Detailed designs for the installation of ventilation and heating for the following investment task ”Installation of slag discharge from boilers and transport to the suspension production plant in the Pątnów Power Plant (total capacity: 1600 MWe)”.

2003

21. ZE PAK SA

Detailed designs for the installation of ventilation, air conditioning, heating and smoke removal for the following investment task ”Design for buildings and auxiliary installations in the Pątnów II Power Plant (total capacity: 1600 MWe) – Unit a of power 460 MWe”.

2003

22. Energoprojekt

Gliwice SA Detailed designs for the installation of HVAC within the task “Construction of the combined cycle unit in the Zielona Góra CHP Plant”.

2003

23. Chorzów ELCHO

Sp. z o.o. CHP Plant Detailed designs for the installation of ventilation, air conditioning and heating, cooling and smoke removal systems; cooling installations for air conditioning.

2003

24. Kraków SA CHP Plant

Modernization of the Water Treatment Station in the Kraków CHP Plant (total capacity: 1237 MWt). Technical designs of:

ventilation and air conditioning in the control centre at units No. 1-3;

technological heat installation for needs of ventilation in the control centre at units No. 1-3;

cooling water installation for needs of the control centre at units No. 1-3.

2002

25.

Tauron Wytwarzanie SA,

Siersza Power Plant

Design of the boiler house for two fluidised bed boiler of capacity 425t/h each at the Siersza Power Plant (total capacity: 786 MWe).

Ventilation, hot service water, smoke removal and joint installations;

Ventilation, hot service water, smoke removal and joint installation for the coal bunkers bay of boiler No. 1;

Water and wastewater installation in the boiler house of unit No. 2 with connections - installations;

Rooms (building) of the transformer converters and switchgears for the flue gas fans – ventilation and hot service water;

Ventilation installation for the elevator shaft;

Ventilation and smoke removal for the converter and transformer room for induced draft fans of boiler No. 2;

Design for the cooling water installation for needs of air conditioning and ventilation of unit No. 1-2 – Part 2;

Heating installations in the boiler house of unit No. 2 – connections;

Concept for relocations of the ventilation installations in the battery room in the Siersza Power Plant;

Concept for the coal slurry feeding installation to fluidised bed boilers at units No. 1-2 in the Siersza Power Plant;

Detailed design for external networks of water and sewerage within the slurry intermediary station;

Detailed design for ventilation installations in the intermediary station building.

2002

26. PGE SA Lublin-

Wrotków CHP Plant

Basic and detailed design for the additional crane in Electrical Building (E4) - developing the guidelines (within the basic design) and civil assumptions for ventilation of the crane building.

2002

27. PGE SA Rzeszów

CHP Plant Basic and detailed design for HVAC installations in the building of gas preparation. 2002

28.

Połaniec Power Plant SA – Electrabel

Group

Detailed design for the installation of ventilation and air conditioning within the modernized equipment – modernization of the Water Demineralisation Station in the Tadeusz Kościuszko Power Plant in Połaniec.

2002

29. Będzin SA CHP Plant Detailed design for the ventilation and air conditioning of frequency converters for electrical items.

2002

30.

Tauron Wytwarzanie SA,

Łagisza Power Plant

Detailed designs for ventilation installations within modernization of the coal storage yard in the Łagisza Power Plant (total capacity: 840 MWe).

2002

31. Białystok SA CHP

Plant Designs for installation of the bleeding-condensing set of electrical power 20 MW in the Białystok CHP Plant - detailed designs of ventilation, heating and air conditioning.

2002

123

ENVIRONMENT PROTECTION

REFERENCE LIST

NO. PURCHASER PROJECT NAME COMPLETED

32. PGE SA Turów Power

Plant

Rehabilitation of units No. 4-6 in the Turów Power Plant (total capacity: 2088 MWe).

Documentation for the HVAC system;

Electrical engineering of the HVAC system in bay "B-C";

Electrical engineering of the HVAC system at axis "A";

Design for the cooling channel of generator brushes at unit No. 5.

2002

33.

Tauron Wytwarzanie SA,

Siersza Power Plant

Reconstruction of units No. 1 and 2 – detailed design for the coal slurry transport – structural engineering. Technical design for heating and ventilation installations the slurry receipt and preparation station.

2002

34.

Tauron Wytwarzanie SA,

Siersza Power Plant

Reconstruction of units No. 1 and 2 in Siersza Power Plant (total capacity: 786 MWe). Technical design for ventilation of the battery room A1 and A2.

2002

35.

Tauron Wytwarzanie SA,

Łaziska Power Plant

Concept for adjusting the existing ventilation system in the turbine house of units 200 MWe in the Łaziska Power Plant (total capacity: 1155 MWe) to modified conditions due to windows being permanently closed.

2001

36.

Połaniec Power Plant SA – Electrabel

Group

Detailed design for the installations of ventilation and air conditioning for the following task "Coal handling – expansion of the control centre with control systems for the coal handling equipment at No. 5 and gallery No. 3 as well as visualisation of the sorbent transport system to the boiler bunker at unit No. 5".

2001

37. PGE SA Turów Power

Plant Detailed design for modernization of the switchyard PO-4, RO-4 and PO-6 – room ventilation and heating.

2001

38. PGE SA Turów Power

Plant

Detailed design for the air conditioning, ventilation and technological heat installations for needs of the temperature measurement laboratory and protection personnel on duty.

2001

39. Tychy SA CHP Plant

Design documentation for the Bio-mass Plant in Radków upon commission of the Tychy CHP Plant (total capacity: 290 MWt). Detailed designs of:

ventilation in the boiler house and main production building;

smoke removal installation in the boiler house and main production building.

2001

40. Kraków SA CHP Plant

Technical documentation to improve the ventilation system in the boiler house and turbine house at units No. 1-4 and to eliminate excessive SO2 emissions in the Kraków CHP Plant (total capacity: 1237 MWt).

Technical concept and detailed design to solve the problem of SO2 in the Kraków CHP Plant.

Comprehensive documentation for improvement of the ventilation system in the boiler house and turbine house of units No. 1-4 together with measurements.

2000

41.

Tauron Wytwarzanie SA,

Jaworzno III Power Plant

Opinion on solutions for the ventilation system in the building of the repair team. 2000

42.

Połaniec Power Plant SA – Electrabel

Group

Detailed design of the cooling station for needs of the air conditioning equipment in the office building F-12 in the Połaniec Power Plant.

2000

43.

Tauron Wytwarzanie SA,

Katowice CHP Plant

Design works connected wit the power and heat unit BCF-100 No. 1 being constructed in the Katowice CHP Plant (total capacity: 692 MWt).

Mechanical ventilation for rooms of the electrical equipment building and blowers of fluidising air in the ESP area.

Mechanical ventilation and technological heat installation for ventilation – boiler house, turbine house, electrical operation rooms, control centre of unit No. 1, coal handling level.

Central vacuuming installation – the boiler house, coal handling level.

Mechanical ventilation and smoke removal for the staircase and elevator engine room in the boiler house.

2000

44.

Tauron Wytwarzanie SA,

Łaziska Power Plant

Designs for ventilation and air conditioning installations in the building of electrical switchgears, switchyard and control centre.

2000

ENVIRONMENT PROTECTION 124

ENERGOPROJEKT-KATOWICE SA

NO. PURCHASER PROJECT NAME COMPLETED

45.

Tauron Wytwarzanie SA,

Jaworzno III Power Plant

Detailed designs for the ventilation and smoke removal installation of the goods elevator shaft in the modernized and old part of the boiler house in the Jaworzno III Power Plant (total capacity: 1345 MWe).

2000

125

INSTRUMENTATION & CONTROL SYSTEMS

REFERENCE LIST

10. INSTRUMENTATION & CONTROL SYSTEMS

NO. PURCHASER PROJECT NAME COMPLETED

1. Tauron Ciepło Sp. Z

O.O. Maintenance and repair of pneumatic actuators, positioners, and pneumatics components (of SAMSON and other companies) installed in the BC35 unit assemblies.

in progress

2. Emerson Warszawa Contract for implementation of the I&C design on a “turn-key basis” for the 910 MW supercritical power unit in Jaworzno III Power Plant – Power Plant II (total capacity: 1,345 MWe).

in progress

3. Foster Wheeler Sofia Delivery of Basic Engineering of instrumentation and automation – Project Deven. in progress

4.

Valmet Automation Polska Sp. z o.o.

Delivery of the Control System for the Turbine, the Measuring Instruments with the Necessary Wiring, Including the Spare Parts Needed for Start-Up and 3-Year Operation, with All Association Documentation, Installation of the Delivered Components, and Participation in the Commissioning.

2016

5. Energoinstal Katowice SA

Delivery, installation, and start-up of the I&C system on-site facilities of the Water Treatment Station at SEJ S.A. – Zofiówka CHP Plant.

2016

6. SE Jastrzębie SA Freelance system retrofit at “Pniówek” CHP Plant. 2015

7. Omega Głogów

Sp. z o.o. Delivery, installation, and start-up of I&C equipment for the FGD plant at SEJ S.A. – Zofiówka CHP Plant.

2015

8. Omega Głogów

Sp. z o.o. Implementation of the I&C part for the project: “Flue Gas Desulfurisation Plant of the Boiler WR40 TC of the Tychy CHP Plant”.(total capacity: 290 MWt).

2015

9. Omega Głogów

Sp. z o.o. Deliveries, installation, and commissioning of the ICA equipment for the Flue Gas Desulphurisation Plant (FGD) of the water boilers at Pniówek CHP Plant.

2015

10. Energoinstal Katowice SA

Complex ICA-related works concerning the deliveries and services for the cooling water system.

2015

11. Metso Automation

Gliwice Design of the instrumentation and automatics equipment for the turbine and turbine-related part of the unit BC-50 at ZW Tychy.

2015

12. Eltrans Sp. z o.o.

Chorzów Performance of the automatics system for the project named: “Construction of the 2nd Stage of the Compressed Air Generation Plant at Pniówek CHP Plant.”.

2015

13.

Omega Głogów Sp. z o.o.

Performance of the ICA works on a “turn key” basis as a part of the construction of the Flue Gas Desulfurisation Plant at the Heating Plant within the area of “Cukrownia Krasnystaw” sugar refinery.

2014

14.

DPMTECH Sp. z o.o.

Performance of the automatics system on the “turn key” basis for construction of the cooling water connection for a new compressor room at ZEC EC Pniówek combined heat and power plant – 2nd stage, implemented by Spółka Energetyczna Jastrzębie S.A.

2014

15. Tauron Ciepło SA Upgrade of the wastewater discharge cooling system at the Tychy Production Plant.

(total power: 290 MWt). 2014

16. Messer Polska

Sp. z o.o.

Extension of the existing software of the control system Simatic S7-400 and iFIX in Messer Polska Spółka z o.o. Kędzierzyn Plant with the management of sulphur compounds analysis in the liquid food-grade CO2 production process.

2014

17. Messer Polska

Sp. z o.o. Extension of the existing software of the control system Simatic S7-400 and iFIX in Messer Polska Spółka z o.o. Kędzierzyn Plant.

2014

18. Energomontaż

Wrocław SA Order of the control valve with AUMATIC electric drive for Koksownia Częstochowa Nowa.

2013

19. Metso Automation

Gliwice

Detailed design for the electrical works, ICA concerning connection of the electric and pneumatic control of the dust pumps to extract ash from WR-40 boiler in Zakład Wytwarzania Tychy. (total capacity: 290 MWt).Delivery and execution of works for the above systems.

2013

20. Tauron Ciepło SA Modernisation of the desalination control system of the cold store in Zakład Wytwarzania Tychy. (total capacity: 290 MWt).

2013

21. Tauron Ciepło SA Delivery and installation of the electric AUMA-type drive as well as connection and starting up as the DCS system of the Control Room of District Heating Substation in Zakład Wytwarzania Tychy. (total capacity: 290 MWt).

2013

22. Emerson Warszawa Detailed engineering (I&C branch) for the flue gas desulphurization system of the No. 1 and 2 power units in the Bełchatów Power Plant (total capacity: 4440 MWe).

2013

INSTRUMENTATION & CONTROL SYSTEMS 126

ENERGOPROJEKT-KATOWICE SA

NO. PURCHASER PROJECT NAME COMPLETED

23. Emerson Warszawa Technical and as-built design with included supervision costs of design supervision to the extent required by the AER for the installation of 2 and 3 turbine release in Power Plant Jaworzno II TG1.

2013

24. Emerson Warszawa

Delivery and services related to the automation and instrumentation part of the design and assembly of facility instrumentation, together with delivery of assembly materials, startup of measurement instrumentation, and participation in the commissioning of the technologies in the engine and generator part of the new 50 MW biomass power unit at the Jaworzno II Power Plant (total capacity: 190 MWe).

2013

25. Metso Automation

Gliwice Technical documentation of the facility part of ICA for modernisation of the boiler for 135/7 Bielsko-Biała Heat and Power Generating Plant (total capacity: 290 MWt).

2013

26. Nalco Polska RofA system modification design in the K5 boiler in the Pątnów Power Plant (total capacity: 1600 MWe), consisting in building RofA channels for four boxes at about 33.0 m.

2013

27. Elektrobudowa

Katowice SA

Delivery, installation and commissioning of I&A facility part for the electrical part of construction of RES Generation Unit (Renewable Energy Sources) in PKE SA - Jaworzno III Power Plant – Power Plant II (total capacity: 190 MWe).

2013

28. Mostostal

Katowice SA

1. The complete detailed design of the ICA system and necessary connections with the DCS master system along with the cable routes connecting the cable distribution cabinet in the DN2 switching station with the signal room building. 2. The development of the as built documentation.

2013

29. Eltrans Sp. z o.o.

Chorzów

Execution of automation system for a new compressors system with auxiliary equipment and systems implemented in the Pniówek CHP Plant by Spółka Energetyczna Jastrzębie SA

2013

30.

Tauron Wytwarzanie SA

Katowice

Developing objectives and input data needed to design the master automation system for the RES manufacturing unit in Jaworzno III Power Plant – Power Plant II (total capacity: 190 MWe) for the range of the turbine.

2012

31. Eloros Service works covering all the devices included in the Freelance 800F system in Wytwórnia Gazów Skroplonych MESSER Polska Sp. z o.o. - plant in Rybnik.

2012

32. Kraków SA CHP Plant Freelance systems service in the Kraków SA CHP Plant (total capacity: 1237 MWt). 2012

33.

Tauron Wytwarzanie SA

Katowice CHP Plant

Repair of Simatic S-7 controller for the system of preparation and administration of sludge in the Katowice CHP Plant (total capacity: 692 MWt).

2012

34. Foster Wheeler Design of the earthing and lightning protection system as well as the equalizer connections for the boiler in the “Deven” Power Plant in Bulgaria.

2012

35. Tauron

Wytwarzanie SA Concept of the Renewable Energy Sources (RES) Generation Unit at the Jaworzno III Power Plant – Power Plant II (total capacity: 190 MWe).

2011

36. Foster Wheeler

Warszawa Design works for additional automation and instrumentation signals and from the electrical distribution boards at the Konin Power Plant.

2011

37. EDF Polska Sp. z o.o. Design of the designation system concerning installations, equipment and its elements according to the KKS standard for two companies belonging to the EDF Group in Poland: Toruńska Cergia SA and PEC Tarnobrzeg Sp. z o.o.

2011

38. EC Nowa Sp. z o.o. I&C technical documentation of pressure stabilisation in the fresh steam collectors in EC Nowa thermal Power Plant.

2011

39. Mostostal Kraków SA As-is designs of the I&C branch for modernisation of the coal unloading node in the Jaworzno III Power Plant (total capacity: 1345 MWe).

2011

40. Nowa CHP Plant Concept concerning the complex modernization of the automation and control system for the technological processes and equipment in the Nowa Sarzyna CHP Plant (total capacity: 216 MWt).

2011

41. Tauron

Wytwarzanie SA

Delivery, assembly, and startup of the Electronic Data Processing System for recording of data, measurement results, and calculation results to document the production of electric energy and heat from Renewable Energy Sources (RES) at the Katowice Combined Heat and Power Plant (total capacity: 692 MWt).

2011

127

INSTRUMENTATION & CONTROL SYSTEMS

REFERENCE LIST

NO. PURCHASER PROJECT NAME COMPLETED

42. ZE PAK SA

Process automation system of water and wastewater systems in the Pątnów Power Plant (total capacity: 1600 MWe): operating station of water and wastewater systems:

basic design,

civil engineering design.

2011

43. ZE PAK SA

Detailed design of auxiliary systems and lines of K-12-TG6 unit with regard to electrical and ICA branches including technological connections with individual system in the Konin Power Plant:

adaptation of cooling and service water systems for interaction of K-12 boiler with TG-6 turbine as well as reconstruction of service water collectors within the area of the engine room and the boiler room,

auxiliary pipelines connecting K-12 boiler with TG-6 turbine,

reconstruction of fresh steam and feeding water collector functions,

cooling water system,

steam, water and condensate Sampling system of the new unit,

boiler blowing system.

2011

44. ZE PAK SA

Process automation system of water and wastewater systems in the Pątnów Power Plant (total capacity: 1600 MWe):

Detailed design: operating station of water and wastewater systems,

detailed design of 10.6 MWt new heating exchanger installation,

Detailed design: hydrogen management – ICA part,

Detailed design of HCL storage tank bay,

Detailed design: fire water pumping station in the Main Building and at the level of +28m,

Detailed design: PPD, PPS, PP1 rain and communal wastewater pumping stations.

2011

45. ZE PAK SA Integration of process automation system of the dumping dustiness reduction system with the process automation system of the biomass system in the Adamów Power Plant.

2011

46. Eloros Servicing of software and Freelance 800F computer automation system in Messer Polska Sp. z oo - plant in Rybnik.

2011

47. Foster Wheeler

Warszawa Execution of additional I&A boxes for biomass boiler in the Konin Power Plant. 2011

48. Babcock Oberhausen

Detailed engineering for the civil engineering work, for the I&C branch as well as authorization of documents for the detailed engineering concerning modernization of the flue gas preheating system in the Bełchatów Power Plant (total capacity: 4440 MWe), Nos. 5 and 6 power units.

2010

49. Metso Automation

Reconstruction of the OP-130/K2 boiler at the ZEW Kogeneracja SA Facility, Czechnica CHP in Siechnica to use a bubbling fluidized bed boiler.

Performance of deliveries and services pertaining to the automation and instrumentation system.

2010

50. Instal Kraków SA

Delivery, assembly, and startup of a complete automation and instrumentation system as a part of the project titled “Upgrade of the water management system at the Jaworzno III Power Plant (total capacity: 1345 MWe) – recovery of wastewater to limit the water demand of the production process.”

2010

51. Metso Automation

Gliwice

Delivery and installation services for instrumentation system in scope of installation of biodiesel Sampling along with additional supplies for the installation of the K-2 boiler in the Czechnica CHP Plant.

2010

52. Metso Automation As-built documentation (I&C branch) for the additional measurements for the 460 MW power unit in the Łagisza Power Plant (total capacity: 840 MWe).

2009

53. Tauron

Wytwarzanie SA

Comparative analysis of the operating costs of the automation and operation system of the 200 MW power units in the perspective of their target service life till the year 2027.

2009

54. Ekonomia Water-

Chemical Laboratory

Working drawing (I&C branch): the water preparation system for the 460 MWe Power unit with supercritical parameters in the Łagisza Power Plant (total capacity: 840 MWe).

2009

55. SNC-Lavalin Warszawa

The I&C system of the coal handling system in the Pątnów II Power Plant (total capacity: 1600 MWe).

2009

INSTRUMENTATION & CONTROL SYSTEMS 128

ENERGOPROJEKT-KATOWICE SA

NO. PURCHASER PROJECT NAME COMPLETED

56. Tauron

Wytwarzanie SA As-built documentation (I&C branch) for the main automation system of the 460 MW Power Unit in the Łagisza Power Plant (total capacity: 840 MWe).

2009

57. Kraków SA CHP Plant Designing work in the scope of the electrical and I&C engineering part for construction of the new flue gas fans in the No. 3 power unit in the Kraków CHP Plant (total capacity: 1237 MWt).

2009

58. Energetyka Sp. z o.o.

Lubin Modernization of the degassing system as well as of the steam and water distribution system in the E-3 department in Głogów.

2009

59. Kraków SA CHP Plant Services and deliveries connected with development of the Freelance 2000 system for the compressor room and the water purification plant in the Kraków CHP Plant (total capacity: 1237 MWt).

2009

60. SNC-Lavalin Warszawa

Instrumentation works associated with the addition of cleanouts for the screens B4a and B4b in 460 MWe Unit coal handling system in the Pątnów II Power Plant (total capacity: 1600 MWe).

2009

61. Foster Wheeler

Sosnowiec Delivery of supply and air distribution boxes for pneumatic boiler devices in the FORTUM CHP Plant in Częstochowa.

2009

62. Kraków SA CHP Plant Technical service: Freelance 2000 system for water purification plant in the Kraków CHP Plant (total capacity: 1237 MWt).

2008

63. Compair Polska

Sp. z o.o. Delivery and assembly of the turbocompressors together with the dryers for the 460 MWe power unit in the “Łagisza” Power Plant (total capacity: 840 MWe).

2008

64. Arctic Paper Kostrzyn SA

Modification of the shutter control mode in the HVAC system as well as the service and survey of the ventilation and air conditioning system in Arctic Paper Kostrzyn.

2008

65. H. Cegielski Poznań SA

Design of the assumptions for the I&C systems for the Emdem Power Plant (Germany).

2008

66. Kraków SA CHP Plant Designing services (electrical and I&C branch) for the construction of the new BAB 120 flue gas fans in the No. 4 power unit in the “Kraków” CHP Plant (total capacity: 1237 MWt).

2008

67. Metso Automation Design of the additional measurements for the NSAB for balancing the 460 MW power unit in the Łagisza Power Plant (total capacity: 840 MWe).

2008

68. Besecke GmbH Detailed design (I&C branch) of the palm oil fired 4.52 MW Diesel engine installation in Brake, Germany.

2007

69. Tauron

Wytwarzanie SA Design of the visualization system for the existing, unmodernized water management system connected with the construction of the 460 MW Power unit.

2007

70. PGE SA Turów Power

Plant

Modernization of the detailed engineering together with the bill of quantities and the investor’s cost calculation for the project entitled: “The Power unit No. 2 – adaptation of the protection and control system, the interlocks and the electrical measurements of the power evacuation system for the requirements of the PSE (Polish Power Grid) in the scope of secondary circuits”.

2007

71. SFW Energia

Sp. z o.o. Development of visualization system together with data logging system in the Poniatowa Heating Station.

2006

72. SFW Energia

Sp. z o.o. Software upgrade of the Freelance 200 Control System to the latest version.

Replacement of the computer units. 2006

73. Przyjaźń Coking Plant

Sp. z o.o.

Design set for the Project entitled: “Balancing and visualization of the basic boiler operation parameters in the boiler house. Modernization of the control system of boiler power supply.

2006

74.

PGE SA Thermal Power Company in

Bydgoszcz

Modernization of district water pumps (together with district automatic control) in the Bydgoszcz II CHP Plant.

2006

75. Agro-Eko-Energia

Sp. z o.o. Civil Design for the biofuel-fired CHP Plant in Elbląg. 2005

76. Metso Automation Design set (I&C branch): the purification water plant in the Kędzierzyn Nitrogen Plants.

2005

77. Tauron

Wytwarzanie SA Design set: Modernization of the return pressure system in the heating network supplied by the Bielsko-Biała CHP Plant (total capacity: 275 MWt).

2005

129

INSTRUMENTATION & CONTROL SYSTEMS

REFERENCE LIST

NO. PURCHASER PROJECT NAME COMPLETED

78.

Tauron Wytwarzanie SA,

Jaworzno III Power Plant

As-built documentation of the central heating station No. 1-3 and the hot water station in the Jaworzno III Power Plant (total capacity: 1345 MWe).

2005

79. Alstom Power

Sp. z o.o. Design services for the investment entitled: The modernization of the TZ2 turbine set in the Łódź CHP Plant.”

2005

80.

Tauron Wytwarzanie SA,

Katowice CHP Plant

Detailed engineering: Section of manifolded flue gas ducts between the WP 120 water heater No. 1 and the electrostatic precipitator No. 3 (of the WP-200 boiler).

2005

81. Rafako SA Design set: Construction of the flue gas desulphurization system in the Ostrołęka Power Plant – I&C branch.

2005

82. Energo-Inwest

Rybnik Sp. z o.o. Design set: Visual monitoring system of water gauge glass on boiler drum (boilers No. 4-6).

2005

83. Energo-Inwest

Rybnik Sp. z o.o.

Electrical design set: Modernization of the flue gas desulphurization system No. 5 in the Rybnik Power Plant (total capacity: 1775 MWe), together with as-built documentation.

2005

84. Tauron

Wytwarzanie SA Technical expertise: the existing AEG system, which control FGDS operation in the Jaworzno III Power Plant (total capacity: 1345 MWe).

2005

85. PGE SA Bełchatów

Power Plant Detailed design: Modernization of the Ac 1.4 accelator. 2005

86. R&M Mainserv

Sp. z o.o. Advanced design set (detailed design): Modernization of two mechanical-draught cooling tower system (boiler Ofz 450A) in the Żerań CHP Plant.

2005

87. SFW Energia

Sp. z o.o. Assembly of the ventilation panel in the processor station of the Freelance 2000 system.

2005

88. PGE SA Turów Power

Plant

Heat engineering – modernization of the heat distribution pumps in the Turów Power Plant (total capacity: 2088 MWe) together with adjustment of the regulation unit to changing hydraulic conditions of the network.

Heat engineering performance projects in the scope of intermediate measurements, automatic pressure regulation systems, introduction of the valve into the automatic control system, valve power transmission electric supply.

2005

89. SEJ SA Moszczenica

CHP Plant Control and measurement equipment and automatic control system related documentation of OCG-64 boiler 4.

2004

90. SFW Energia

Sp. z o.o. Maintenance and service of the Freelance 2000 control and monitoring system in the Izo-Energo CHP Plant in Gliwice.

2004

91. Dalkia Poznań ZE SA

Performance supervision for the investment entitled: „Modernization of the fuel oil management system in the Karolin CHP Plant (total capacity: 844 MWt)” – preparation of the documentation in the branch of control and measurement equipment and automatic control system: assembly diagrams and detailed temperature regulation systems and the PID SX25VDM regulator setting procedures.

2004

92. RCEkoenergia

Sp. z o.o.

Performance project of the control and measurement equipment and automatic control system branch for the network water production and distribution installation.

2004

93. SFW Energia

Sp. z o.o. Project of the Danfoss DN 250 PN16 water meter assembly at the DN400 network water pipeline.

2004

94. Kraków SA CHP Plant

Restoration and repair tasks of the 13UK125/TG2 turbine set in the Kraków CHP Plant (total capacity: 1237 MWt) – Performance projects in the scope of: automatic control system for the lubrication and hoisting oil installation as well as the oil vapours suction installation; automatic control system for regulation of the EHR turbine set and regulation oil as well as performance of works on the regeneration exchangers (control and measurement equipment and automatic control system deliveries).

2004

95. PGE SA Turów Power

Plant Extension of the coaling unit control system by the additional drives on power unit No. 5.

2004

96. Kraków SA CHP Plant Modernized vacuum set for the 13UK125 turbine in the Kraków CHP Plant (total capacity: 1237 MWt) with application of the Nash-Elmo vacuum aggregates.

2004

INSTRUMENTATION & CONTROL SYSTEMS 130

ENERGOPROJEKT-KATOWICE SA

NO. PURCHASER PROJECT NAME COMPLETED

97. Skawina SA Power

Plant

Control and measurement equipment and automatic control system related documentation for the automatic control of operation of four compressors in the Skawina Power Plant (total capacity: 590 MWe) and participation in the technological start-up.

2003

98.

Tauron Wytwarzanie SA -

Thermal Power Company in Bielsko-

Biała

Comprehensive maintenance and service of computer software for the degasifiers visualisation, control and measurement system in the Bielsko-Biała CHP Plant (total capacity: 275 MWt).

2003

99. Skawina SA Power

Plant Modernization of the control systems for four compressors 4VRZ. 2003

100. PGE SA Rzeszów

CHP Plant Performance project of the control and measurement equipment and automatic control system part for HVAC in the gas preparation station building.

2003

101.

Tauron Wytwarzanie SA,

Siersza Power Plant

Control and measurement equipment and automatic control system branch projects in the scope of the task entitled: “The modernization of water treatment plant, – preliminary treatment centre, filtration centre, demineralising centre, auxiliary installations centre” – I&C branch.

2003

102. Poniatowa CHP Plant System for the remote registration of operational data from the Poniatowa CHP Plant.

2003

103. Kraków SA CHP Plant Preparation of the subcontracting documentation for the turbine oil transportation system in the control and measurement equipment and automatic control system, as well as electric branch, including: control, signaling and protection algorithms.

2003

104.

Tauron Wytwarzanie SA, Thermal Power

Company in Bielsko-Biała

Performance of the regulation systems for steam pressure and ventilation automatic regulation systems of the OP 230 type K5 boiler mill – development of the Simatic controller software and visualisation for the regulation systems; implementation of the regulation systems software together with operation optimisation.

2003

105.

PGE SA ZE Dolna Odra Pomorzany

CHP Plant

Guidelines for the measurement unit assembly and project of the support construction adjustment with the purpose of the extensometer sensors installation.

2003

106.

Połaniec Power Plant SA – Electrabel

Group

Technical documentation for the comprehensive modernization of the Water Demineralisation Station in the Tadeusz Kościuszko Power Plant in Połaniec.

2002

107. PGE SA Rzeszów

CHP Plant Installation of heating, ventilation and air conditioning for buildings and rooms of the combined cycle unit in the Rzeszów CHP Plant.

2002

108. Tauron

Wytwarzanie SA

Comprehensive maintenance and service for software of the system Freelance 2000 – visualisation, control and measurements in the degasifiers station in the Bielsko-Biała CHP Plant (total capacity: 275 MWt).

2002

109. Kraków SA CHP Plant Modernization of the water treatment station – the I&C branch. 2002

110.

Tauron Wytwarzanie SA,

Siersza Power Plant

Modernization of the Water Treatment Station in the Siersza Power Plant (total capacity: 786 MWe) – I&C branch.

2002

111. Będzin SA CHP Plant

Modernization of the heat transmission from the Będzin CHP Plant (total capacity: 415 MWt) in order to adjust the flow-through system of the CHP Będzin to variable flows in the district heating system, pursuant to the requirements of the thermal power company in Dąbrowa Górnicza.

2002

112. IZO-Energo Supervision over putting into operation the remote measurements system in the heating plant SFW-Energia.

2002

113. ZE PAK SA Ash removal to the Northern Dumping Yard from Power Plant – the I&C branch. 2002

114. PGE SA Rzeszów

CHP Plant Detailed design for the gas, oil, light-up gas system – I&C branch. 2002

115. Kraków SA CHP Plant Detailed design for the modernization of turbine oil installation - the I&C branch. 2002

116. Cieszyn III CHP Plant Designs for the technological modernization in the Cieszyn CHP Plant. 2002

117. PGE SA Turów Power

Plant Control system for the coal handling equipment of units No. 1-5 in the Turów Power Plant (total capacity: 2088 MWe).

2002

131

INSTRUMENTATION & CONTROL SYSTEMS

REFERENCE LIST

NO. PURCHASER PROJECT NAME COMPLETED

118. Zielona Góra SA CHP

Plant Installation of the combined cycle unit in the Zielona Góra CHP Plant – documentation for auxiliary installations.

2002

119. Dalkia Poznań ZE SA Design documentation for execution of the second unloading path with coal uptake from the storage yard in the Poznań II Karolin CHP Plant (total capacity: 844 MWt).

2001

120.

Tauron Wytwarzanie SA,

Jaworzno III Power Plant

Design set of installing the reducing station that combines the discharge of steam from boilers K-2 and K-3 with header 1.5 Pa (technology, civil engineering and I&C) in the Jaworzno Power Plant (total capacity: 1345 MWe).

2001

121. Non-Ferrous Metal Works in Szopienice

Installation of the turbine generator set 3 MW in the CHP Plant of the Szopienice Non-Ferrous Metal Works – the I&C branch.

2001

122. PGE SA Turów Power

Plant Modernization of the external ash removal system in the Turów Power Plant (total capacity: 2088 MWe).

2001

123. Lindacorp Developing and putting into operation the software of Simatic controllers for two boilers in the CHP Plant located at the Kayseri sugar plant in Turkey.

2001

124.

Vattenfall Heat Poland SA - Żerań

CHP Plant

Technical design and as-built documentation for I&C systems for the boiler Ofz 450-B in the Żerań CHP Plant.

2001

125. PGE Bechatów SA

Power Plant Detailed design for modernization of the industrial wastewater pumping station – the I&C branch.

2001

126.

Tauron Wytwarzanie SA

Stalowa Wola Power Plant

Detailed design for installation of two reducing-cooling stations – the I&C branch. 2001

127. PGE SA Turów Power

Plant Design for the unit control and measuring instruments for the sanitary wastewater treatment plant in the Turów Power Plant (total capacity: 2088 MWe).

2001

128. Dalkia Poznań ZE SA Detailed designs for installation of the service water pumping aggregate No. 6 in the cooling water pumping station in the Poznań II Karolin CHP Plant (total capacity: 844 MWt) – the I&C branch.

2001

129.

Tauron Wytwarzanie SA,

Siersza Power Plant

Integrated computer system for algorithms of the station RS1 and comprehensive protections system at unit No. 1.

Regulation and control algorithms for the station RS1 at unit No. 1.

Comprehensive protections system at unit No. 1 – basic design.

2001

130. Kraków SA CHP Plant Updating the detailed documentation for I&C systems of the light-up burners at unit No. 4 in the Kraków CHP Plant (total capacity: 1237 MWt).

2000

131. Kraków SA CHP Plant Updating the detailed documentation for the protections system of high-pressure heat recovery at units No. 1, 2, 4 in the Kraków CHP Plant (total capacity: 1237 MWt).

2000

132. PGE SA Turów Power

Plant Modernization of the water treatment station for boiler purposes – the I&C branch. 2000

133. PGE SA Turów Power

Plant

Modernization of the potable water treatment station as well as potable and fire fighting water pumping station in the Turów Power Plant (total capacity: 2088 MWe).

2000

134. PGE SA Bełchatów

Power Plant Reconstruction and modernization of the Ac 1.5 accelerator structure and slime removal installation as well as pump replacement – the I&C branch.

2000

135. Rybnik SA Power

Plant Design for the flue gas desulphurization system of units 200 MWe in the Rybnik Power Plant (total capacity: 1775 MWe) – the I&C branch.

2000

136.

Tauron Wytwarzanie SA,

Siersza Power Plant Technical design for the management of fly ash from stack H=160 m – I&C branch. 2000

137.

Water & Wastewater Municipal Company

in Wrocław

Detailed design for the installation of storing, pulping and automatic dosing of soda lye in the "Mokry Dwór" Water Treatment Plant.

2000

138.

Tauron Wytwarzanie SA,

Jaworzno III Power Plant

Detailed design for the modernization of the compressor room – I&C branch. 2000

INSTRUMENTATION & CONTROL SYSTEMS 132

ENERGOPROJEKT-KATOWICE SA

NO. PURCHASER PROJECT NAME COMPLETED

139. Będzin SA CHP Plant Detailed design for the modernization of the system of industrial wastewater preparation and utilization from the water preparation station in the Będzin CHP Plant (total capacity: 415 MWt) – I&C branch.

2000

140. PGE SA Dolna Odra

Power Plant Detailed design for installation of the compressor Q=10000 Nm3/h in the Dolna Odra Power Plant.

2000

141.

Tauron Wytwarzanie SA,

Jaworzno III Power Plant

Detailed design for installation of the heating-condensing turbine TG-3 in Jaworzno II Power Plant (total capacity: 190 MWe) – the I&C branch.

2000

142.

Tauron Wytwarzanie SA,

Łagisza Power Plant

Reconstruction of the district heating stations No. 1, 2, 3 and modernization of the reducing-cooling stations RS 1, RS 2 - the I&C branch.

2000

143.

Tauron Wytwarzanie SA,

Łagisza Power Plant

Control system for the water pumping station at the Czarna Przemsza in Łagisza Power Plant (total capacity: 840 MWe) – the I&C branch.

2000

144.

Tauron Wytwarzanie SA,

Łaziska Power Plant

Design and modernization of the compressor station in order to ensure compressed air for purpose of the flue gas desulphurization system at the 200 MWe units MW in the Łaziska Power Plant (total capacity: 1155 MWe) - the I&C branch.

2000

133

DIESEL POWER PLANTS

REFERENCE LIST

11. DIESEL POWER PLANTS

NO. POWER PLANT TOTAL CAPACITY

(MW) FUEL ENGINES X MW YEAR

1. Commendator

Dominikana 83 Dead oil 3 x 27,7

2003-2004 (basic engineering together with the

implementation offer)

2. Baja California Sur I and SUR II

Mexico 46,8 Dead oil 1 x 46,8

2002-2004 (basic engineering together with the

implementation offer)

3. Soluziona Barbados

30 Dead oil 1 x 30,5 2002

(basic engineering together with the implementation offer)

4. Kilo-X Sudan

266 Dead oil 6 x 41,49 1 x 23,73

1999-2002 (basic engineering together with the

implementation offer)

5. Samos II Greece

12,28 Dead oil 1 x 12,28 1999

6. Chios II Greece

12,28 Dead oil 1 x 12,28 1998

7. Lesvos Greece

11 Dead oil 1 x 11 1990

8. Chios

Greece 11 Dead oil 1 x 11 1990

9. Samos Greece

12,6 Dead oil 2 x 6,3 1990

10. Syros

Greece 6,3 Dead oil 1 x 6,3 1990

11. Linoperamata

Greece 49,12 Dead oil 4 x 12,28 1990

12. Rhodos Greece

24,56 Dead oil 2 x 12,8 1990

13. Paros

Greece 12,6 Dead oil 2 x 6,3 1988

14. Dunlop

India 3,820 Dead oil 1 x 3,82 1990

15. Manta

Equador 14 Dead oil 4 x 3,5 1973

16. Regla Cuba

120 Dead oil 3 x 41,5 1972

DIESEL POWER GENERATORS FOR NUCLEAR POWER PLANTS

1. Kursk Russia

18,6 Light oil 3 x 6,2 1986

2. Kozloduj Bulgaria

18,6 Light oil 3 x 6,2 1985

3. Jaslanskie Bohunice

former Czechoslovakia 16,8 Light oil 6 x 2,8 1984