Emporio armani bid proposal build group, inc

38
457 minna street, suite 100, san francisco, ca 94103 www.buildgc.com Build Group Emporio Armani Bid APRIL 8, 2015

description

 

Transcript of Emporio armani bid proposal build group, inc

Page 1: Emporio armani bid proposal build group, inc

457 minna street, suite 100, san francisco, ca 94103www.buildgc.com

BuildGroupEmporio Armani Bid

APRIL 8, 2015

Page 2: Emporio armani bid proposal build group, inc

BUILDGROUP

WE BUILD AWESOME PROJECTS WITH STAND-OUT PEOPLE.

Page 3: Emporio armani bid proposal build group, inc

TABLE OF CONTENTS

ABOUT BUILD GROUP 1

EXPERIENCE 2

PRICING 3

SCHEDULE 4

457 minna street, suite 100, san francisco, ca 94103www.buildgc.com

Page 4: Emporio armani bid proposal build group, inc

ABOUT BUILD GROUP

Page 5: Emporio armani bid proposal build group, inc

ABOUT BUILD GROUP

About Build Group We want to tell you who we are...

Company HistoryBuild Group is a boutique general contractor focused on providing a higher than usual level of service to exclusive clientele. Highly selective about deploying their top tier staff, the owners have a deep understanding of their clients’ business and are committed to providing principal involvement on all projects. To them client relationships are everything, and are driven by trust and integrity. Consequently, Build Group clients depend on the company to act as an extension of their own organizations. While most general contractors are simply pricing plans, Build Group staff source new real estate opportunities and figure out creative ways to make deals pencil.

Long time colleagues Ross Edwards, Eric Horn, Bob Hopper, Scott Brauninger, and Dave Williams came together in 2007 to form Build Group. Shortly thereafter, John Santori, Nathan Rundel and Jason Berry joined the team. Combined, the group has more than 233 years of construction experience and has played integral roles in some of the most prominent and complex buildings constructed in California. Build Group was formed with a goal of working closely with clients and driving innovation within the industry. With that in mind, they created a flat company structure that minimizes middle management and allows the Principals to remain close to the project, while entrusting employees to own their work. Their willingness to roll up their sleeves and do work has cultivated a construction company full of true revolutionary builders.

Page 6: Emporio armani bid proposal build group, inc

ABOUT BUILD GROUP

In the beginning of 2010 Build Group acquired Fine Line Group, a high-end hospitality and seismic upgrade company with more than 30 years of construction experience. The company is known for evolving creative building methodologies and project delivery strategies that successfully manage and support our clients’ design and business goals. The acquisition brought personnel with experience in signature restaurant, hotel and flagship retail expertise.

Fine Line Group has a wide-ranging repertoire of high-end interior projects that includes luxury brands such as Gucci, Christian Dior, John Varavatos and Anne Fontaine. The company has also built many signature restaurants including Kokkari, McCormick & Kuleto’s and Posterio.

Build Group has grown consistently since its inception. Employee owned, the company now has more than 200 staff members. In August 2011, the company was included on the prestigious Inc. 500 list, which profiles the nation’s fastest growing companies.

Beginning In a Down Economy

Starting Build Group in the down economy of 2007 was a risky endeavor. However the Principals’ ability to be lean and keep

business operation expenses minimal helped overcome the financial slump. The challenging financial times at the beginning taught the

Principals how to be frugal, innovative and creative. These three qualities continue to define the company today, setting us apart from

the competition.

frugalInnovativecreative

Page 7: Emporio armani bid proposal build group, inc

ABOUT BUILD GROUP

Core ValuesBUILD it Safe – BUILD it RightBUILD with ExpertsBUILD Smart and ScrappyBUILD with CharacterBUILD enduring Financial StrengthBUILD a Fun EnvironmentBUILD the highest Quality

BuildGroup’s CultureBuildGroup’s main focus is to create a highly-motivated team to deliver the highest quality construction possible. We have a diversified group that accepts individuals and works together to combine people’s strengths to form a strong team. As our number of projects and employees grow, management has maintained a tight hold on our founding values. All Principals continue to have a hands-on role in projects and consequently work very closely with every team. Employee feedback is always encouraged in order to help streamline and improve processes, eliminating errors and time.

Mission Statement

WE BUILD AWESOME PROJECTS WITH STAND OUT PEOPLE.

Employee LifeOur Principals truly want employees to enjoy their work, remain challenged, expand their knowledge of the industry, and BE HAPPY. We work hard but understand a healthy balance between work and life. Employee events including SF Giants games and other athletic games, lunch potlucks, happy hours, bring your dog on Fridays, athletic competition and parties create a fun team synergy. The Principals believe that time away from work is just as important as time at work and therefore strongly encourage employees to take vacation rather than saving them up. Build Group also has a robust health and wellness program called “Build a Better You” that endorses the Plus Three Network, an innovative wellness program that raises money for charitable donations while encouraging friendly competition among employees.

To accomplish our mission, we pay close attention to our relationships with four key groups of stakeholders: Clients, Employees, Trade Partners, and Community. We strive to build a company culture that exceeds expectations.

Page 8: Emporio armani bid proposal build group, inc

ABOUT BUILD GROUP

“What’s the evidence that people who are happy at work have it all? The happiest employees are 180% more energized than their

less content colleagues, 155% happier with their jobs, 150% happier with life, 108% more engaged and 50% more motivated. Most

staggeringly, they are 50% more productive too.”Vicki Salemi, Forbes Magazine

Page 9: Emporio armani bid proposal build group, inc

EXPERIENCE

EXPERIENCE

Page 10: Emporio armani bid proposal build group, inc

EXPERIENCE

TenantImprovements A snapshot of brands we have worked with.

Page 11: Emporio armani bid proposal build group, inc

EXPERIENCE

John Varvatos, Flagshipunion square, san francisco, ca

OwnerJohn Varvatos

ArchitectDucDuc (New York)Pollack Associates (SF)

Duration16 weeks

The seventh and the largest of the John Varvatos stores, the San Francisco flagship features two floors of sophisticated interiors, showcasing the Varvatos casual to formal menswear attire. Solid walnut floors are throughout this design/build project.

The construction team coordinated with both architects on the East and West coasts and met a very aggressive schedule.

In addition to the remodel of the interior space, there team also completed a full seismic upgrade on the building.

Page 12: Emporio armani bid proposal build group, inc

EXPERIENCE

JINS, Flagship union square, san francisco, ca

OwnerJINS

ArchitectKwan Henmi Architects

Project Duration15 weeks

The 4,300 sf build-out includes various elements that represent the clients ‘fully-customized’ products. The store includes high-end case work, new facade, ardex polished concrete floors, and back of the house conference rooms and bathrooms.

The focal point of the store is the specialty showcase room that will be used to produce all products on-site. The room was built with epoxy flooring and is encased in glass.

Page 13: Emporio armani bid proposal build group, inc

EXPERIENCE

Nespresso, Flagshipunion square, san francisco, ca

OwnerNespresso

ArchitectGoring & Straja Architects

Duration19 weeks

The first signature Nespresso in San Francisco, this Union Square build-out features a modern design in a 100-year-old building. A complete structural rebuild of the first and second floors was constructed to make way for café and retail spaces. The team remained on a tight schedule while coordinating vendors from across the U.S. and Europe that completed high-end finishes. Architectural features include a floating staircase leading customers from the upper café area into the lower retail space.

Page 14: Emporio armani bid proposal build group, inc

EXPERIENCE

Kate Spade, Retail Storewestfield, san francisco, ca

OwnerKate Spade, NY

ArchitectFreebaim, Smith & Crane

Project Duration8 weeks

The 2,700 sf Kate Spade retail outlet is located in the Westfield San Francisco Centre Mall. The project included wall-to-wall demolition of the existing store in order to redesign with updated corporate aesthetics and branding. The updates include luxury, high-end brass finishes on all fixtures and fit-outs along with a detailed store front system.

Page 15: Emporio armani bid proposal build group, inc

EXPERIENCE

Club Monaco, Retail Storewestfield, san francisco, ca

OwnerClub Monaco

ArchitectAtelier Design, LLC

Project Duration22 weeks

Build Group provided the complete build-out of Club Monaco’s retail store in Union Square. Phase One involved the complete demolition of the existing 4,924 sf store. A portion of the Phase Two redesign work involved the high-end finishes, millwork, and hand-painted custom case work that the client is recognized for. Additionally, our team installed white oak wood floors that are a staple of this location. Build Group installed two, custom painted 12-foot-tall entrance doors, while upgrading the store’s facade.

Page 16: Emporio armani bid proposal build group, inc

EXPERIENCE

H&M, Flagshipunion square, san francisco, ca

OwnerH&M

ArchitectTEK Architects

Duration20 weeks

H&M’s flagship store in a historic building on Powell St. features new escalators, large video display screens, all new stone flooring, 42 high-end dressing rooms, new restrooms, employee locker rooms, and kitchen, as well as a carefully restored historical ceiling, entry, and 400 linear feet of new sidewalk.

The Post Street store features all new stone flooring, a new glass balcony overlooking the entry, a grand staircase, new exterior sidewalks, new restrooms, and 20 high-end dressing rooms.

Both stores were completed one month ahead of schedule.

Page 17: Emporio armani bid proposal build group, inc

EXPERIENCE

Hog Island Oyster Companysan francisco, ca

OwnerHog Island Oyster Company

ArchitectCCS Architecture

Duration12 weeks

Build Group, Inc. completed construction on the $1.2 million renovation of Hog Island Oyster Company’s restaurant space in the historic San Francisco Ferry Building.

At 3,800 sf, the facility’s new space was reconfigured to triple the existing restaurant and add 1,100 square feet of outdoor dining space. The new 130-seat restaurant features a full-service kitchen and bar, custom concrete bar counters, and reclaimed cypress millwork throughout. The ceiling, designed by CCS Architecture, was constructed to replicate the hull of a boat.

One of the toughest challenges on this job was coordinating the installation of the plumbing work. Since the Ferry Building is located on a pier, all plumbing work needed to be done by boat under the pier which required an extensive amount of coordination. In addition, work had to be completed in and around a fully-occupied building. Weekly meetings were held with the ferry building to constantly update them on our schedule. Any disruptive or noisy work was done off-hours to avoid any interference to the adjacent tenants.

Page 18: Emporio armani bid proposal build group, inc

EXPERIENCE

M.Y. China, Signature Restaurantsan francisco, ca

OwnerM.Y. China

ArchitectBCV Architects

Duration23 weeks

This project included construction of a new signature restaurant at Westfield’s San Francisco Centre. Based on television chef Martin Yan’s recipes, M.Y. China offers a 181-seat, high-end, high-class, exhibition style eating experience. Custom eucalyptus woodwork, laser cut metal screens, and antique Chinese furnishings set the scene for a sophisticated meal.

The eye-catching centerpiece of the restaurants circular bar, is an antique 1,800 pound bell that was imported in from China.

Page 19: Emporio armani bid proposal build group, inc

BUILDGROUPEXPERIENCE

Gucci, Flagshiphonolulu, hawaii

OwnerGucci

ArchitectGensler

Duration20 weeks (fast-track schedule)

This project was Gucci’s first design-build turnkey. The store remained in business throughout the entire construction period, and was completed three weeks ahead of schedule with zero change orders.

The store location is set along the city’s waterfront and included a structural upgrade to the building, with a two-story high ornamental storefront finished with stainless steel panels. The store also included imported Italian millwork in high lacquered rosewood. All fixtures were supplied and installed by the construction team.

Page 20: Emporio armani bid proposal build group, inc

BUILDGROUPEXPERIENCE

Juicy Couturesanta barbara, ca

OwnerJuicy Couture

ArchitectLalire March Architects, NY

Project Duration14 weeks

Located on historic State Street in downtown Santa Barbara, this 6,000 sf Juicy Couture features colored glass walls, perforated design panels on the ceiling and custom interior finishes.

The project scope also included new wood flooring, an elaborate lighting package, and a beautiful exterior facade with signage.

Build Group delivered the project on-time and within budget.

Page 21: Emporio armani bid proposal build group, inc

BUILDGROUPEXPERIENCE

Rizzoli Bookstorepasadena, ca

OwnerRizzoli Bookstore

ArchitectMeyer & Gifford

Duration5 weeks

Throughout the 5,000 sf, the elegance of rich cherry fixtures and walnut flooring contribute to the warmth of a private study.

Stately columns, brass handrails and lush imported carpeting are reminiscent of turn of the century America, remaining faithful to early 1900’s building facade. The millwork package was provided and installed by Build Group.

This project was completed after only seven weeks of construction.

Page 22: Emporio armani bid proposal build group, inc

PRICING

Page 23: Emporio armani bid proposal build group, inc

PRICING

Pricing Proposal documents.

Proposal has been provided on the following page.

Page 24: Emporio armani bid proposal build group, inc

April 8, 2015

Emporio Armani 450 W 15th street, 3rd Floor New York, NY 10011

RE: Emporio Armani Beverly Hills

Qualifications and Exclusions

We are pleased to submit our Proposal for Emporio Armani in the amount of One Million, Forty Nine Thousand, and Four Dollars (1,049,004.00). We have included our pricing detail for your use.

Qualifications:

Division 01000 - General Requirements

Based on a 17 week construction schedule – see Schedule in Proposal

Division 02000 – Site Work

Demolition

Demolition per plans

Division 03300 – Concrete Interior Slab:

Foundation footings

Structural concrete

Floor leveling 1.25” as detailed on the first floor

Trench back fill concrete

Division 05700 – Metals Structural Steel

Two (2) 3”x3”x1/4” H.H.S. Columns One (1) 6”x3”x1/4” H.H.S. Header Beam One (1) W8x31x16’ Beam One (1) 10”x6”x3/16” H.H.S. Header Beam One (1) ½” Bent Plate 2-1/2”x14”x2-1/2”x16’ (Channel) One Stairway 19’-3” Rise, per plans

Interior Glass Guard Rail Heavy Shoe Stair Rail Per a5.01-a5.04 Furnish all material & labor to install approx. 48.0 linear feet (39’ slope, 9’ level) of

kinslo aluminum Frameless heavy shoe stair railing, using 1/2” clear tempered glass, with top rail, to extend to a height of 41” from top of stair molding

Heavy Shoe Glass Guard Rail on 2nd Floor Stair Overlook per A5.01-A5.04 Furnish all material & labor to install approx. 26.0 linear feet of kinslo aluminum

Frameless heavy shoe glass guard rail, using 1/2” clear tempered glass, with alum Top rail, to extend to a height of 44” from top of finish surface

Glass mounted handrail on stair per a5.01-a5.04 Furnish all material & labor to install approx. 48.0 linear feet of extra clear

Page 25: Emporio armani bid proposal build group, inc

plexiglass hand rail, glass-mounted to stair railing, to extend to a height of 37” from top of tread or 34” from top of stair molding. Includes appropriate extensions past tread per code

Wall mounted handrail on stair per a5.01-a5.04 Furnish all material & labor to install approx. 51.0 linear feet of extra clear plexiglass hand rail, wall-mounted to stair railing, to extend to a height of 37” from top of tread or 34” from top of stair molding. Includes appropriate extensions past tread per code

Division 06400 – Millwork Millwork per Pans BOH-Pantry:

Provide & install new P. lam base & uppers cabinets, interior made of white melamine, adjustable shelves on 5mm pins, microwave shelf, standard hardware, ADA sink cabinet

P. Lam counter tops with backsplash, square edge detail, metal brackets, 3/4" ply sub top

BOH-Manager's Office: Provide & Install new Plastic Laminate adjustable shelves on standards & brackets Plastic Laminate counter tops, square edge detail, Plastic Laminate support legs, 3/4"

ply sub top BOH-Alterations:

Provide & Install new Plastic Laminate adjustable shelves on standards & brackets BOH-Work Desk:

Provide & Install new Plastic Laminate adjustable shelves on standards & brackets Plastic Laminate counter tops, square edge detail, Plastic Laminate support legs, 3/4"

ply sub top FOH-ADA Restroom

Marble counter tops with high backsplash, square edge detail, metal brackets, 3/4" ply sub top

Division 08000 - Doors and Windows Doors, Frames and Hardware per drawings

All hollow metal doors and frames and hardware sets Hollow metal door/frame #’s 250,206 – 3’x7’ – Pivot prep Hardware Sets #6 Electronic hardware trim for two (2) existing Exit/Panic devices/stairwell doors

Glass Furnish and Install approx. 690sq.ft. 60mm SteelBuilt Curtain Wall system by TGP,

finish black powder coat; Glass ¼” tempered Solarban 70 ½” spaces ¼” tempered Starfire; oversized panel (width 9’-6” x height 11’-2”) above entry door to be butt-glazed due to exceeding maximum available panel size of Solarban 72 (96” x 144”); hoisting equipment included

Furnish and install pair of CRL glass pivot entrance door (width 6’-0 x height 10’-0”) w/

full length top and bottom rails in black finish; incl. bottom rail locks;

Jackson 900 Series floor closers in brushed s/s; 2 pairs of PBA black aluminum 112 ¼”

ladder pulls; transom (width 6’-0” x 1’-9 ¾”) and 2 sidelights (width 1’-3 1/8”, height

12’-0); 1/2” clear tempered laminated low iron

Furnish and install approx. 445 sq.ft. glass railing; CRL base shoe 2-1/2” x 4” finish

brushed s/s; approx. 120 LF 2” square cap rails in polished s/s finish; CRL wall and

glass mounted brackets Sunset Series in polished s/s; glass ½” clear tempered low iron

w/ polished edges; C-shaped cap rails in black finish

Page 26: Emporio armani bid proposal build group, inc

Glass railing at 2nd level landing and railing at 2nd level fins to include ½” low-iron glass,

CRL base shoe and powder coat black railing cap

1”x1” Clear Plexiglass handrail with stainless steel bracket and supports

Install Storefront, Entry Doors, Glass Railings and Stair Handrail

Furnish and install six (6) mirrors (Fitting Rooms and Rest Rooms). Five (5) mirrors

with ¼” extra clear mirror glass; one (1) mirror (Room #10) w/ 3/8” extra clear mirror

glass; metal framing provided by others

ADD: (92) 2”x4” aluminum fixed fins and four (4) moveable fin modules at upper level

(SEE ADD/ALTERNATES BELOW)

Division 09000 – Finishes Barricade

Removal of owner supplied and installed factored Metal Stud Framing and Drywall

All new walls as shown on plans Scaffolding Exterior Lath & Stucco system as detailed Plywood at walls, ceilings, and soffits Level % Finish on ceiling, Level 4 finish on walls were designated Install HM door frames Install PITTCON Knife Edge

Tile Leveling of floor Pour back and saw cut concrete in two (2) locations as shown on plans Install of Owner supplied Tile, wall tile, and field tile as shown on plans Install of all tile and VCT as shown on plans Install of marble on stairs Install of granite at bathroom countertops Install W10, VCT, F-5, Shulter Strips Renovate T-connection F7 Stair treads and risers – including landing F-6 back of house Dal Tile F-1 flood tile supplied by Owner

Acoustic Ceilings Furnish and Install a 2x2 Suprafine T-Bar System with #304 Tundra Tile by Armstrong

in the BOH, Restroom, Manager’s Office, and Pantry Painting

Interior Paint per Plans Prime and paint the interior BOH gypsum board wells per the Interior Finish Schedule,

the Interior Finish Plan and the Interior Finished Legend Prime (only) the walls and ceiling scheduled to receive the specialty wall and ceiling

finished install by others Painting of doors and frames per plans Painting of the exterior stucco control joint, Fry Reglet and weep screed at the Western

façade Prep, patch, and repaint the existing exterior stucco, joints, and reveals on the side

façade Painting of the aluminum coping to match the adjacent plaster finish by MWC

Page 27: Emporio armani bid proposal build group, inc

Division 10000 – Specialties Toilet Accessories

Three (3) T23 Vola Grab Rail, Chrome, 13.75" One (1) T12 Vola Toilet Paper Holder with Backplate, Chrome One (1) T33 Vola Toilet Brush Holder, Chrome One (1) 83430970 Dornbracht Soap Dispenser, Platinum Opaco Finish One (1) B-6806.99-18 Grab Bar, 1 1/2" OD, Snap Flange, 18" Peened One (1) B-6806.99-36 Grab Bar, 1 1/2" OD, Snap Flange, 36" Peened One (1) B-6806.99-42 Grab Bar, 1 1/2" OD, Snap Flange, 42" Peened One (1) B-1556 2448 Stainless Steel Mirror, 24x48 One (1) B-262 Towel Dispenser, Surface Mount One (1) B-685 Single Toilet Paper Holder, Bright One (1) B-822 Soap Dispenser, Lav Mount, 4" Spout, 34 Oz.

Window Accessories Furnish and install one (1) Lutron brand motorized roller shade at the south facing

perimeter window on the 2nd floor of tenant space as called out on Page A2.12 Mounting of shade included

Window Film Solar Control Film

Furnish and install Vista Solar Film per spec and play on approx. 175sq.ft. of glass (4 panels)

Division 15000 – Mechanical Fire Protection

Install new pendant sprinkler heads for new ceiling areas required for proper coverage

Plumbing Provide and install all Plumbing in accordance with plans Included in Pricing:

Rough-In, Top-Out And Set Finish On The Following:

One (1) Toto Ada Toilet per Plan And Spec

One (1) Kohler Ada Lavy Per Plan and Spec

One (1) Kohler Wall Hung Toilet per Plan

One (1) Lacava Lavy Per Plan and Spec

One (1) Elkay Bi-Level Drinking Fountain Per Plan

One (1) Dayton Pantry Sink Per Plan And Spec

One (1) Advance Tabco Mop Sink Per Plan And Spec

Run Water Sewer and Vent To Complete Project

HVAC Provide and Install complete Mechanical system per plans Titus manufactured supply air diffusers, linear diffusers and return air grill per

plan Steel sheet round spiral type branch supply branch air ducting externally

wrapped with Foil back type duct insulation and flexible type ducting not to exceed 6’ in length for final air distribution connections

Young Regulator Cable operated volume dampers Two (2) “Honeywell” manufactured Title 24 approved programmable

thermostats Two (2) “BAPI” stainless steel button type remote wall mounted temperature

sensors Low voltage wire New duct smoke detectors

Page 28: Emporio armani bid proposal build group, inc

Division 16000 – Electrical Electrical

Temporary Power: Temporary Power as needed All cable needed for temporary power

Power: Furnish and install all materials and equipment as shown on Electrical plans

Low Voltage: CAT6 cable runs:

Thirty (30) Single locations of 1 CAT6 each Twenty Six (26) Camera locations Two (2) WIFI locations One (1) LAN location One (1) Shop tracker

Seven (7) Locations of 1 CAT6 & 1 CAT5e each Two (2) Locations of 2 CAT5e each

Fire Alarm

Installation of alarm system pre wire: conduit, boxes and cabling for the keypads, glass break, motion sensors, cctv and door contacts per plan. All low voltage wiring termination done by others

One (1) Intelligent Fire Alarm Control Panel (NFS-320SYS)

One (1) Addressable Manual Pull Station

Four (4) Intelligent Smoke Detectors

Two (2) Addressable Heat Detector

Two (2) Addressable Heat Detector

Two (2) Intelligent Duct Detectors

Two (2) Relay Module, Fan Shut Down

Eleven (11) Strobes Ceiling Mount

Eleven (11) Horn Strobes Ceiling Mount

One (1) Horn / Strobe Wall Mount (WP)

One (1) Addressable Module (Flow & Tamper Switch)

One (1) Sprinkler Bell (FBO)

Two (2) Elevator (Pri & Alt) Recall Modules

One (1) Elevator Hat Lamp (Steady & Flashing) Activation Module

One (1) Elevator Shunt Trip Module

One (1) Elevator Battery Pack Shunt Trip Module

One (1) Elevator Recall PH 1 Module

One (1) Elevator Shunt Trip Bypass Key Switch (PH 2)

One (1) Elevator Shunt Trip Control Circuit Monitoring

Division 22000 – Cleaning Daily site cleaning

Pre-Punch Cleaning

Final Clean

White glove cleaning at conclusion of merchandising

Page 29: Emporio armani bid proposal build group, inc

ADD/Alternates:

Aluminum Fins – ADD: $80,987.50 PIP Shelving install only – ADD: $1,100.00

Exclusions: Permits, inspection fees, testing fees, and architectural/engineering fees Any unforeseen conditions and work not shown on the plans Any earthquake liability or damage insurance Builders Risk Insurance assumed provided by Owner Any work in adjoining buildings Performance payment is excluded Bonding Any work not provided in attached estimate Title 24 Calculations

Neighbor access Trade Permits Proposal is based on Construction working hours 8am – 4pm – Sunday’s are excluded per City

of Beverly Hills Rules All work in Common/Shared Areas – work to be done in Tenant Space and required areas

relating to tenant space only Spray applied Fire Proofing Roofing – by landlord Wall Covering Supplied and Installed by Owner Interior Signage by MWC Backflow Preventer (plumbing) Price is based on removal of barricade only, existing to remain Speaker rough in provided only Shop tracker/punch clock

If you have any questions regarding the proposal please feel free to contact me at 925.223.7566

Thank you for the opportunity to earn your work,

Eric Owen Build Group

Page 30: Emporio armani bid proposal build group, inc

Vendor: Build Group, Inc.

CODE FOR GA USE ONLY

DESCRIPTION UNIT QTY. PRICE UNIT TOTAL NOTES

PLEASE ADD TO THE BELOW ITEMS AS REQUIRED

Div 01 GENERAL REQUIREMENTSD.02.00 01000 Permits & fees By Owner

B.00.00 01020 Insurance 1 LS $7,867.00

B.00.03 01085 Site Office Expenses Inc

B.00.06 01090 Barricades (F&I) 1 LS $4,900.00 Barricade Removal Only

B.00.10 01560 Final Cleaning 1 LS $4,281.00

B.00.12 01310 Dumpsters 1 LS $7,692.00

B.00.13 01350 Misc. Tools & Materials - Scaffolding 1 LS $6,209.00 MWC able to use

B.00.13 01541 Site Protection Inc

B.00.13 01530 Testing & Inspection Exclud

B.00.15 01100 Supervision 17 weeks $0.00 - $122,400.00

B.00.15 01120 Super, Travel & SubstinenceB.00.15 01510 General Labor 1 LS $6,882.00

B.00.15 General ConditionsB.01.14 Overhead and Profit 1 LS $39,947.00

GENERAL REQUIREMENTS TOTAL: $200,178.00

Div 02 SITE WORKB.01.01 Demolition 1 LS $4,594.00

SITE WORK TOTAL: $4,594.00

Div 03 CONCRETEB.01.10 03500 Cementitious Decks & Underlayment, Footings 1 LS $29,383.00

CONCRETE TOTAL: $29,383.00

Div 04 MASONRYN/A

MASONARY TOTAL: $0.00

Div 05 METALSB.01.02 05100 Structural Metal Framing, Stairs, Misc Metals 1 $66,154.00 Includes Stair

METALS TOTAL: $66,154.00

Div 06 WOOD & PLASTICSB.01.07 06100 Rough Carpentry 1 LS $13,667.00

B.08.01 06200

Finish Carpentry / Millwork BOH - Please provide breakdown $11,890.00

WOOD & PLASTICS TOTAL: $25,557.00

Div 07 THERMAL & MOISTUREB.01.13 07100 Damproofing & Waterproofing Roofing by Landlord

B.04.03 07800 Fire & Smoke Protection Excluded Fire Proofing

THERMAL & MOISTURE TOTAL: $0.00

Div 08 DOORS & WINDOWS

B.02.04 08100

Metal Doors & Frames -Please specify numbers of doors 1 LS $7,806.00

B.02.04 08700 Hardware $0.00 Included Above

C.01.02 08400 Entrances & Storefront $191,672.00

C.01.02 08800 Glazing $58,806.00

DOORS & WINDOWS TOTAL: $258,284.00

Div 09 FINISHESB.01.09 09640 Floor Leveling In concrete

B.02.00 09200 Drywall included Framing and Plaster 1 LS $130,388.00 Includes Drywall and Plaster

B.02.02 09500

Ceilings (Painting, Framing and Materials Sales Floor)

B.02.09 ACT (BOH) 1 LS $6,432.00

B.03.00 09600 Flooring (BOH) 1 LS $6,028.00

B.03.08 09901 Paints & Coatings BOH Included Below

C.02.07 09300 Ceramic Tile Installation 1 LS $73,149.00

C.02.20 09685 Carpet N/A

C.02.15 09700 Wall Finishes By Owner

C.02.14 09900 Paints & Coatings 1 LS $4,951.00

FINISHES TOTAL: $220,948.00

Div 10 SPECIALTIES

GC BID MATRIXEA Beverly Hills - Rodeo Drive

Page 1 of 2

Page 31: Emporio armani bid proposal build group, inc

B.00.13 10260 Corner Guards By MWC

B.00.13 10400 Signage - $0.00 Interior Signage by MWC

B.04.03 10520 Fire Protection Specialties (Estinguishers) 1 LS $2,552.00

B.08.00 10670 Storage Shelving By Owner

B.08.06 10800 Toilet Accessories 1 LS $5,503.00

SPECIALTIES TOTAL: $8,055.00

Div 11 EQUIPMENTB.08.03 11400 Kitchen Appliances 1 LS $2,348.00

EQUIPMENT TOTAL: $2,348.00

Div 12 FURNISHINGSC.01.00 12401 Exterior Signage 1 LS $15,705.00

FURNISHINGS TOTAL: $15,705.00

Div 13 SPECIAL CONSTRUCTIONWindow Coverings 1 LS $6,023.00

SPECIAL CONSTRUCTION TOTAL: $6,023.00

Div 14 CONVEYING SYSTEMS

CONVEYING SYSTEMS TOTAL: $0.00

Div 15 MECHANICALB.04.00 15400 Plumbing Fixtures & Equipment 1 LS $24,348.00

B.04.01 15700 Heating, Ventilating & Air Conditioning Equipment 1 LS $55,697.00

B.04.01 15800 Air Distribution 1 LS In HVAC Above

B.04.02 15300 Fire Protection Piping 1 LS $13,782.00

MECHANICAL TOTAL: $93,827.00

Div 16 ELECTRICALB.05.00 16200 Electrical Power (F&I) Please specify $95,463.00

B.07.01 16400 Low-Voltage Distribution $22,485.00 Fire Alarm, Data

ELECTRICAL TOTAL: $117,948.00

ALTERNATESRSA provided Light Troughs

C.03.01 GC install of RSA provided Light Troughs

ALTERNATES TOTAL: $0.00

GRAND TOTAL $1,049,004.00

Page 2 of 2

Page 32: Emporio armani bid proposal build group, inc

Emporio Armani – Beverly Hills Page 7 of 11

DIVISION I: BIDDING REQUIREMENTS IB. Bid Form

Project: Emporio Armani 338 North Rodeo Drive Beverly Hills, CA 90210

To whom it may concern, In compliance with your "Invitation to Bid" and instruction to bidders, the Undersigned proposes to provide all material, labor, equipment and services necessary to perform all the work for Emporio Armani, Beverly Hills. In accordance with the Contract Documents prepared by Antunovich Associates, for the Lump Sum Price of:

One Million, Forty Nine Thousand, and Four Dollars

(1 ,049,004.00) .

The Undersigned agrees that the following quoted prices are firm, not subject to escalation, and will not be withdrawn within 60 days after receipt of bids.

Name of Firm: Build Group, Inc.

Name and Signature of Officer: Eric Owen

Date: April 9, 2015 IC. Bid Cost Breakdown.

See Document AOCH GC BID FORM

Page 33: Emporio armani bid proposal build group, inc

Emporio Armani – Beverly Hills Page 8 of 11

DIVISION I: BIDDING REQUIREMENTS IE. Unit Prices The following Unit Prices shall be held at a constant throughout construction as part of "Agreement" and shall be utilized by all parties for Scope of Work Change Orders. Note that prices shall include all costs including removal, applied finishes, wall patching, overhead and profit, etc. Unless otherwise noted, the bid will assume that the value is the same for both add and delete. Prepare the following Unit Prices, to be used for additions to the contract, due to field or scope changes. Refer to specification sections for description of each item:

A. Construction: a. Doors: Furnish and install 1 3/4” X 3’-0” X 7’-0” typical 1 ¾” solid core wood door and

frame. Typical hardware set per unit ……………………………………………. $1,500.00 Furnish and install 1 3/4” X 3’-0” X 7’-0” typical 1 ¾” hollow metal door and

frame. Typical hardware set per unit ……………………………………………. $1,800.00

b. Partitions:

Non rated GWB wall full height (11’ typ.) including 3 5/8” metal studs framing

per linear foot…………………………………………………………………………$115.00 Non rated GWB furred wall full height (11’ typ.) including 7/8” metal studs framing

per linear foot…………………………………………………………………………$115.00

1 hr rated GWB (single sided) wall full height (11’ typ.) including 3 5/8” metal studs framing

per linear foot…………………………………………………………………………$125.00 1 hr rated GWB (double sided) wall full height (11’ typ.) including 3 5/8” metal studs framing

per linear foot…………………………………………………………………………$125.00

2 hrs rated GWB (single sided) wall full height (11’ typ.) including 3 5/8” metal studs framing

per linear foot…………………………………………………………………………$ Existing 2 hrs rated GWB (double sided) wall full height (11’ typ.) including 3 5/8” metal studs framing

per linear foot…………………………………………………………………………$ Existing

Page 34: Emporio armani bid proposal build group, inc

Emporio Armani – Beverly Hills Page 9 of 11

c. Flooring:

Install 1 ¼” thick stone on mud set per sq. ft .................................................... . $22.40

Install 1 ¼” thick stone on thin set per sq. ft ……………………………… ……....$18.70

Install ceramic tile on mud set per sq. ft ........................................................... . $8.35

Install ceramic tile on thin set per sq. ft ............................................................. . $6.35

F&I VCT tile per sq. ft ……………………………………………………………....$4.75

F&I Luxury VCT (non speckled) tile per sq. ft ......... ………………………………....$6.75

F&I carpet per sq. ft ……………………………………………………………....$3.40

F&I vinyl base per LF ft ……………………………………………………………....$1.35

F&I floor leveling per sq. f………………………………………………………........$6.35

F&I cocoa mat per sq. ft……………………………………………………………...$16.66

F&I waterproofing membrane per sq. ft (12” high return on walls typ) ………....$7.00 d. Ceiling:

Suspended drywall ceiling per sq. ft .................................................................. . $12.00

Furnish and install suspended acoustical tile ceiling per sq. Ft. ........................ .$4.75 (Assuming 2’x4’ Armstrong Ultima #1913 w/prelude exposed grid or equal)

e. Finishes:

Install ceramic tile at wall per sq. ft .................................................................... . $12.00

Painting and skim coat at wall level 5 finish per sq. Ft. ..................................... .$4.50

Painting and skim coat at ceiling level 5 finish per sq. Ft. ................................. .$5.50

B. Electrical:

a. Furnish and install new duplex outlet location……………………………………. $145.00

b. Furnish and install new switch location…………………………………….………$130.00

c. Furnish and Install new light fixture location……………………………………….$95.00

d. Furnish and Install new data/tel location…………………………………………...$160.00

Page 35: Emporio armani bid proposal build group, inc

Emporio Armani – Beverly Hills Page 10 of 11

e. Furnish and install new junction box location……………………………………...$95.00

f. Furnish and Install dedicated electrical location…………………………………..$340.00

g. Furnish and install audio location (wire and device provided by owner)………...$95.00

h. Furnish and install speaker location (wire and device provided by owner)……. $95.00

C. Sprinkler:

a. Additional head, per head……………………………………………………………$225.00

b. Relocated head, per head……………………………………………………………$195.00

D. Fire Alarm:

a. Smoke and heat detector (electrician work and device)…………………………. $225.00

b. Pull station (electrician work and device)……………………………………………$225.00

c. Strobe (electrician work and device)…………………………..……………………. $275.00

d. Strobe device cost, allowance…………..………………………………………$150.00

E. General Labor Costs:

a. Overtime Non Union (per hour)……………….……………………………………. $48.63

b. Overtime Union (per hour)……………………………..……………………………. $72.50

c. Trades Non Union (per man/per day)…………...…………………………………. $55.70

d. Trades Union (per man/per day)…………..........………………………………….$94.65

e. Laborer- Rough Cleaning (per hour)……………….…..........…………………….$48.63

f. Laborer- Final Cleaning (per hour)…………..........……………………………….$40.00 DIVISION I: BIDDING REQUIREMENTS

IF. List Of Drawings

Page 36: Emporio armani bid proposal build group, inc

SCHEDULE

Page 37: Emporio armani bid proposal build group, inc

SCHEDULE

Schedule our approach

Page 38: Emporio armani bid proposal build group, inc

ID Task Name Duration Start Finish Predecessors Resource

Names

1 Project Award 1 day Fri 4/17/15 Fri 4/17/15

2 Buyout 5 days Mon 4/20/15 Fri 4/24/15 1

3 Mobilization 3 days Mon 5/11/15 Wed 5/13/15 1,2

4 Receive permit 1 day Thu 5/14/15 Thu 5/14/15 3

5 Official Start Date 1 day Fri 5/15/15 Fri 5/15/15 4

6 OWNER ITEMS 56 days Wed 4/15/15 Wed 7/1/15

7 RECEIVE AIA CONTROL SAMPLES 1 day Mon 4/20/15 Mon 4/20/15 1

8 RECEIVE OWNER FIXTURE CANS 1 day Wed 4/15/15 Wed 4/15/15

9 RECEIVE MILLWORK 1 day Wed 7/1/15 Wed 7/1/15

10 Submittals 34 days Mon 4/27/15 Thu 6/11/15 1

11 Fire Alarm Shop Drawings 14 days Mon 4/27/15 Thu 5/14/15 2

12 Fire Sprinkler Shops 14 days Mon 4/27/15 Thu 5/14/15 2

13 MEP Cut Sheets 5 days Mon 4/27/15 Fri 5/1/15 2

14 Finish Samples 7 days Mon 4/27/15 Tue 5/5/15 2,7

15 Stone Shops 5 days Mon 4/27/15 Fri 5/1/15 2

16 Glass Rail & Hand Rail Shops 7 days Wed 6/3/15 Thu 6/11/15 2,77

17 Glass Curtain Shop drawings 7 days Mon 4/27/15 Tue 5/5/15 2

18 Signage Shops 10 days Mon 4/27/15 Fri 5/8/15 2

19 Structural Shops 7 days Mon 4/27/15 Tue 5/5/15 2

20 Exterior 37 days Mon 5/18/15 Tue 7/7/15

21 Sheathing 1 day Mon 5/18/15 Mon 5/18/15 5

22 Screw inspection 1 day Tue 5/19/15 Tue 5/19/15 21

23 Thermal & Moisture Membrane 2 days Wed 5/20/15 Thu 5/21/15 22

24 Reveal Layout/Install 2 days Fri 5/22/15 Mon 5/25/15 23

25 Metal Mesh Install 1 day Tue 5/26/15 Tue 5/26/15 24

26 Mortar Setting Bed/ Brown Coat (Dry Time) 15 days Wed 5/27/15 Tue 6/16/15 25

27 Finish Coat 10 days Wed 6/17/15 Tue 6/30/15 26

28 MARMORINO RAPPONGI 5 days Wed 7/1/15 Tue 7/7/15 27

29 Storefront 106 days Tue 4/21/15 Tue 9/15/15

30 Field Verification & Layout 1 day Mon 5/18/15 Mon 5/18/15 5

31 Submit Finish Samples & Shops 7 days Tue 4/21/15 Wed 4/29/15 7

32 Order Curtain Wall & Glass 70 days Tue 5/19/15 Mon 8/24/15 17,30,31

33 Structural Curtain Wall System 8 days Tue 8/25/15 Thu 9/3/15 32

34 Install Glazing / Sealing 4 days Fri 9/4/15 Wed 9/9/15 33

35 Cladding 2 days Thu 9/10/15 Fri 9/11/15 34

36 UV Film 1 day Mon 9/14/15 Mon 9/14/15 35

37 Signage 1 day Tue 9/15/15 Tue 9/15/15 36,19

38 Interior 29 days Mon 5/18/15 Thu 6/25/15

39 Establish Bench Mark 1 day Mon 5/18/15 Mon 5/18/15 5

40 Partition / Ceiling Layout 2 days Tue 5/19/15 Wed 5/20/15 39

41 HVAC Rough In (prewrapped) 5 days Thu 5/21/15 Wed 5/27/15 40

42 Entrance Columns 2 days Thu 5/21/15 Fri 5/22/15 19,40

43 Ceiling Framing 6 days Thu 5/28/15 Thu 6/4/15 41,40

44 Cove Framing 3 days Fri 6/5/15 Tue 6/9/15 43

45 Rough In Can Installation 4 days Fri 6/5/15 Wed 6/10/15 8,43

46 Receive Plenum Boxes & Install 3 days Fri 6/5/15 Tue 6/9/15 13,43

47 Wrap Inspection 1 day Thu 5/28/15 Thu 5/28/15 41

48 Electrical & Low Voltage Flex Pull 5 days Fri 6/5/15 Thu 6/11/15 43

49 Fire Sprinkler Drops 3 days Thu 6/11/15 Mon 6/15/15 12,45

50 Fire Alarm Rough In 2 days Tue 6/16/15 Wed 6/17/15 11,49

51 Install Seismic wire on all fixtures 1 day Fri 6/12/15 Fri 6/12/15 45,48

52 Diffuser & Damper Control Install at Coves 2 days Wed 6/10/15 Thu 6/11/15 44

53 Spray All Coves Flat Black 1 day Fri 6/12/15 Fri 6/12/15 52

54 Install Cove Track 2 days Mon 6/15/15 Tue 6/16/15 53

55 Curtain Track Box Install (2nd Floor) 1 day Fri 6/5/15 Fri 6/5/15 43

56 City Inspections 1 day Thu 6/18/15 Thu 6/18/15 43,47,48,49,50,51,52

57 AIA/EOD Cover Up Inspection 1 day Fri 6/19/15 Fri 6/19/15 56

58 Ceiling Backing 1 day Fri 6/19/15 Fri 6/19/15 56

59 Drywall Hanging 3 days Mon 6/22/15 Wed 6/24/15 56,58

60 Screw Inspection 1 day Thu 6/25/15 Thu 6/25/15 59

61 Finish Schedule (FOH) 72 days Thu 5/21/15 Fri 8/28/15

62 Tape & Fill 2 days Fri 6/26/15 Mon 6/29/15 60

63 PITTCON Install 4 days Thu 6/25/15 Tue 6/30/15 59

64 Level 5 Ceilings / Level 4 Walls (2nd Floor) 5 days Wed 7/1/15 Tue 7/7/15 62,63

65 Level 5 Ceilings / Level 4 Walls (1st Floor) 5 days Wed 7/1/15 Tue 7/7/15 62,63

66 Primer & First Coat Walls 1 day Wed 7/8/15 Wed 7/8/15 64,65

67 Tile Installation 7 days Thu 7/9/15 Fri 7/17/15 64,65,66

68 Floor Protection 1 day Mon 7/20/15 Mon 7/20/15 67

69 MARMORINO FINISH 5 days Wed 7/8/15 Tue 7/14/15 64,65

70 Ceiling Finish Trim Out 3 days Wed 7/15/15 Fri 7/17/15 69

71 Millwork Installation 20 days Tue 7/21/15 Mon 8/17/15 67,68,9

72 Shade Installation 1 day Fri 8/28/15 Fri 8/28/15 93

73 Stairwell 50 days Thu 5/21/15 Wed 7/29/15

74 Footings & Rebar 2 days Thu 5/21/15 Fri 5/22/15 40

75 Inspection 1 day Mon 5/25/15 Mon 5/25/15 74

76 Pour Back 1 day Tue 5/26/15 Tue 5/26/15 75

77 Structural Layout & Installation 5 days Wed 5/27/15 Tue 6/2/15 76,19

78 Glass Rail & Hand Rail Install 5 days Mon 7/20/15 Fri 7/24/15 16,77,67

79 Finish Metal Cladding 2 days Mon 7/27/15 Tue 7/28/15 78

80 Stone Installation / SS Inlay 1 day Wed 7/29/15 Wed 7/29/15 78,79

81 Finish Schedule (BOH) 16 days Thu 7/9/15 Thu 7/30/15 66

82 BOH Grid Installation 2 days Thu 7/9/15 Fri 7/10/15 66

83 Sprinkler Drops 2 days Mon 7/13/15 Tue 7/14/15 82

84 Light Fixtures 2 days Wed 7/15/15 Thu 7/16/15 83

85 Mechanical Trim Out 1 day Fri 7/17/15 Fri 7/17/15 84

86 Millwork Installation 3 days Mon 7/20/15 Wed 7/22/15 85

87 VCT/Base 2 days Thu 7/23/15 Fri 7/24/15 86

88 PIPP Mobile Shelving 2 days Mon 7/27/15 Tue 7/28/15 87

89 Low Voltage Rack Installation & Trim Out 2 days Wed 7/29/15 Thu 7/30/15 88

90 Pre Clean 2 days Tue 8/18/15 Wed 8/19/15 71

91 Punch List Walk Through 1 day Thu 8/20/15 Thu 8/20/15 90

92 Completion of Punch 3 days Fri 8/21/15 Tue 8/25/15 91

93 Final Clean 2 days Wed 8/26/15 Thu 8/27/15 92

94 Merchandising 5 days Fri 8/28/15 Thu 9/3/15 93

95 White Glove Clean 1 day Fri 9/4/15 Fri 9/4/15 94

96 Final Inspection / Building & Fire Life Safety 1 day Mon 9/7/15 Mon 9/7/15 95

97 Grand Opening 1 day Tue 9/8/15 Tue 9/8/15 96

S W S T F M T S W S T F M T S W S T F M T S W S T F M T S W S T F M T S W S T F M T S W S T F M T S W S T F

Apr 12, '15 Apr 19, '15 Apr 26, '15 May 3, '15 May 10, '15 May 17, '15 May 24, '15 May 31, '15 Jun 7, '15 Jun 14, '15 Jun 21, '15 Jun 28, '15 Jul 5, '15 Jul 12, '15 Jul 19, '15 Jul 26, '15 Aug 2, '15 Aug 9, '15 Aug 16, '15 Aug 23, '15 Aug 30, '15 Sep 6, '15 Sep 13, '15 Sep 20, '15

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Page 1

Project: Emporio Armani Sched

Date: Thu 4/9/15