Empirical compatibility assessment in Poland LTE causes interference to ARNS Mateusz Berlik Office...

31
Empirical compatibility assessment in Poland LTE causes interference to ARNS Mateusz Berlik Office of Electronic Communications, Poland Department of Frequency Resources Management ITU Regional Seminar for Europe and CIS Countries Warsaw, 7 - 9 May 2012

Transcript of Empirical compatibility assessment in Poland LTE causes interference to ARNS Mateusz Berlik Office...

Page 1: Empirical compatibility assessment in Poland LTE causes interference to ARNS Mateusz Berlik Office of Electronic Communications, Poland Department of Frequency.

Empirical compatibility assessment in PolandLTE causes interference to ARNS

Mateusz BerlikOffice of Electronic Communications, Poland

Department of Frequency Resources Management

ITU Regional Seminar for Europe and CIS CountriesWarsaw, 7 - 9 May 2012

Page 2: Empirical compatibility assessment in Poland LTE causes interference to ARNS Mateusz Berlik Office of Electronic Communications, Poland Department of Frequency.

Mateusz Berlik, UKE :: Warsaw, 7 - 9 May 2012

Agenda

• Introduction to the LTE vs. ARNS problem• Aims and conditions of the measurements• Radio systems under tests• Measurements action• Summary

Page 3: Empirical compatibility assessment in Poland LTE causes interference to ARNS Mateusz Berlik Office of Electronic Communications, Poland Department of Frequency.

Mateusz Berlik, UKE :: Warsaw, 7 - 9 May 2012

Agenda

• Introduction to the LTE vs. ARNS problem• Aims and conditions of the measurements• Radio systems under tests• Measurements action• Summary

Page 4: Empirical compatibility assessment in Poland LTE causes interference to ARNS Mateusz Berlik Office of Electronic Communications, Poland Department of Frequency.

Mateusz Berlik, UKE :: Warsaw, 7 - 9 May 2012

Introduction to the LTE vs. ARNS problemWRC-12 AI 1.17 - to consider results of sharing studies between the mobile service and other services in the band 790-862 MHz in Regions 1 and 3, in accordance with Resolution 749 (WRC-07), to ensure the adequate protection of services to which this frequency band is allocated, and take appropriate action.

MOBILE

FIXED BROADCASTING

ARNS

Page 5: Empirical compatibility assessment in Poland LTE causes interference to ARNS Mateusz Berlik Office of Electronic Communications, Poland Department of Frequency.

Mateusz Berlik, UKE :: Warsaw, 7 - 9 May 2012

Introduction to the LTE vs. ARNS problem

Page 6: Empirical compatibility assessment in Poland LTE causes interference to ARNS Mateusz Berlik Office of Electronic Communications, Poland Department of Frequency.

Mateusz Berlik, UKE :: Warsaw, 7 - 9 May 2012

Introduction to the LTE vs. ARNS problem

• Two approaches proposed by CPM-12:– coordination distances: 125 – 515 km

(depending on ARNS system and scenario)– coordination field strength triggers

• aggregate values – eg. 13 dBµV/m @ 10m in 6 MHz RBW for RLS1 radar;

• single values – eg. -24.24 dBµV/m @ 10m for ARNS terrestrial station

Page 7: Empirical compatibility assessment in Poland LTE causes interference to ARNS Mateusz Berlik Office of Electronic Communications, Poland Department of Frequency.

Mateusz Berlik, UKE :: Warsaw, 7 - 9 May 2012

Introduction to the LTE vs. ARNS problem

Page 8: Empirical compatibility assessment in Poland LTE causes interference to ARNS Mateusz Berlik Office of Electronic Communications, Poland Department of Frequency.

Mateusz Berlik, UKE :: Warsaw, 7 - 9 May 2012

Introduction to the LTE vs. ARNS problem

Page 9: Empirical compatibility assessment in Poland LTE causes interference to ARNS Mateusz Berlik Office of Electronic Communications, Poland Department of Frequency.

Mateusz Berlik, UKE :: Warsaw, 7 - 9 May 2012

Agenda

• Introduction to the LTE vs. ARNS problem• Aims and conditions of the measurements• Radio systems under tests• Measurements action• Summary

Page 10: Empirical compatibility assessment in Poland LTE causes interference to ARNS Mateusz Berlik Office of Electronic Communications, Poland Department of Frequency.

Mateusz Berlik, UKE :: Warsaw, 7 - 9 May 2012

Aims of the measurements:

• to analyse an impact of the LTE system on the radar system;

• to determine/assess the maximum level of the interfering signal.

Page 11: Empirical compatibility assessment in Poland LTE causes interference to ARNS Mateusz Berlik Office of Electronic Communications, Poland Department of Frequency.

Mateusz Berlik, UKE :: Warsaw, 7 - 9 May 2012

What did we have?

• 4 ARSN systems operating in Poland;• agreement of the army on measurements

(with some restrictions);• LTE test terminals (provided by the

operator);• LTE signal generator (provided by Nokia

Siemens Networks Poland);• ARNS’s system operators/service staff.

Page 12: Empirical compatibility assessment in Poland LTE causes interference to ARNS Mateusz Berlik Office of Electronic Communications, Poland Department of Frequency.

Mateusz Berlik, UKE :: Warsaw, 7 - 9 May 2012

What did we NOT have?

• detailed knowledge about the ARNS systems;

• documentation of the ARNS systems;• specialists in old ARNS systems;• compatibility criteria(!).

Page 13: Empirical compatibility assessment in Poland LTE causes interference to ARNS Mateusz Berlik Office of Electronic Communications, Poland Department of Frequency.

Mateusz Berlik, UKE :: Warsaw, 7 - 9 May 2012

Agenda

• Introduction to the LTE vs. ARNS problem• Aims and conditions of the measurements• Radio systems under tests• Measurements action• Summary

Page 14: Empirical compatibility assessment in Poland LTE causes interference to ARNS Mateusz Berlik Office of Electronic Communications, Poland Department of Frequency.

Mateusz Berlik, UKE :: Warsaw, 7 - 9 May 2012

Scenario

LTE terminal/signal generator ARNS ground station

Page 15: Empirical compatibility assessment in Poland LTE causes interference to ARNS Mateusz Berlik Office of Electronic Communications, Poland Department of Frequency.

Mateusz Berlik, UKE :: Warsaw, 7 - 9 May 2012

Object of the measurements

• RSP-10 MN-1 radar system:– primary (RLS1) / secondary (RLS2) radar;– only RLS1 module currently in use;– radiolocator for traffic controllers;– less than 100 km operational radius;– is going to be replaced by modern systems.

Page 16: Empirical compatibility assessment in Poland LTE causes interference to ARNS Mateusz Berlik Office of Electronic Communications, Poland Department of Frequency.

Mateusz Berlik, UKE :: Warsaw, 7 - 9 May 2012

RSP-10 Radar system (RLS1)

Page 17: Empirical compatibility assessment in Poland LTE causes interference to ARNS Mateusz Berlik Office of Electronic Communications, Poland Department of Frequency.

Mateusz Berlik, UKE :: Warsaw, 7 - 9 May 2012

RSP-10 Radar system (RLS1)

Page 18: Empirical compatibility assessment in Poland LTE causes interference to ARNS Mateusz Berlik Office of Electronic Communications, Poland Department of Frequency.

Mateusz Berlik, UKE :: Warsaw, 7 - 9 May 2012

RSP-10 Radar system (RLS1)

Page 19: Empirical compatibility assessment in Poland LTE causes interference to ARNS Mateusz Berlik Office of Electronic Communications, Poland Department of Frequency.

Mateusz Berlik, UKE :: Warsaw, 7 - 9 May 2012

RSP-10 Radar system (RLS1)

Page 20: Empirical compatibility assessment in Poland LTE causes interference to ARNS Mateusz Berlik Office of Electronic Communications, Poland Department of Frequency.

Mateusz Berlik, UKE :: Warsaw, 7 - 9 May 2012

Agenda

• Introduction to the LTE vs. ARNS problem• Aims and conditions of the measurements• Radio systems under tests• Measurements action• Summary

Page 21: Empirical compatibility assessment in Poland LTE causes interference to ARNS Mateusz Berlik Office of Electronic Communications, Poland Department of Frequency.

Mateusz Berlik, UKE :: Warsaw, 7 - 9 May 2012

Military base15-16.02.201130.03.2011

Military airfield17-18.02.2011

Page 22: Empirical compatibility assessment in Poland LTE causes interference to ARNS Mateusz Berlik Office of Electronic Communications, Poland Department of Frequency.

Mateusz Berlik, UKE :: Warsaw, 7 - 9 May 2012

Measurement I (Toruń, 15-16.02.2011)

• The radar under maintenance works;• Direct connection to the radar receiver.

Page 23: Empirical compatibility assessment in Poland LTE causes interference to ARNS Mateusz Berlik Office of Electronic Communications, Poland Department of Frequency.

Mateusz Berlik, UKE :: Warsaw, 7 - 9 May 2012

RSP-10

(part of RSP10)

G4-76A 75/50

RSP-10

50/75

indicator

oscilloscope

receiver unit

LTE signal generator

Signal

generator

Power adder

(double pulse)

Pulse gen.

2 dB 2 dB

6 dB 0.3 dB 0.4 dB

0.4 dB

0.4 dB 0.3 dB

Measurement I (Toruń, 15-16.02.2011)

Page 24: Empirical compatibility assessment in Poland LTE causes interference to ARNS Mateusz Berlik Office of Electronic Communications, Poland Department of Frequency.

Mateusz Berlik, UKE :: Warsaw, 7 - 9 May 2012

Measurement I (Toruń, 15-16.02.2011)

LTE parameters:

Bandwidth [MHz] 5 5 10 20 5 5

Modulation QPSK 16-QAM 16-QAM 16-QAM 16-QAM 16-QAM

G4-76A generator settings:

„Reflected” signal [dBm] - 92.3 - 92.3 - 92.3 - 92.3 -82.3 -72.3

LTE generator „critical” power:

LTE Power [dBm] - 89.1 - 89.1 - 89.1 - 89.1 -87.1 -87.1

Sensitivity: -92.3 dBm Pol H: E = 24.6 dBμV/mPol V: E = 48.6 dBμV/m

Page 25: Empirical compatibility assessment in Poland LTE causes interference to ARNS Mateusz Berlik Office of Electronic Communications, Poland Department of Frequency.

Mateusz Berlik, UKE :: Warsaw, 7 - 9 May 2012

Measurement II (Malbork, 17-18.02.2011)

• Operating radar used by military airfield in Malbork

Page 26: Empirical compatibility assessment in Poland LTE causes interference to ARNS Mateusz Berlik Office of Electronic Communications, Poland Department of Frequency.

Mateusz Berlik, UKE :: Warsaw, 7 - 9 May 2012

Measurement II (Malbork, 17-18.02.2011)

• The radar in „receive-only” mode:– very optimistic results

(allowable interference > 50 dBµV/m);• Received interference’s level dramatically

higher when it works in regular „send-and-receive” mode;– there was no ability to repeat the

measurements.

Page 27: Empirical compatibility assessment in Poland LTE causes interference to ARNS Mateusz Berlik Office of Electronic Communications, Poland Department of Frequency.

Mateusz Berlik, UKE :: Warsaw, 7 - 9 May 2012

Measurement III (Toruń, 30.03.2011)

• Operating radar (after maintenance works);• Measurements similar to ones performed in

Malbork;• LTE terminals as interfering transmitters.

Page 28: Empirical compatibility assessment in Poland LTE causes interference to ARNS Mateusz Berlik Office of Electronic Communications, Poland Department of Frequency.

Mateusz Berlik, UKE :: Warsaw, 7 - 9 May 2012

Measurement III (Toruń, 30.03.2011)

Page 29: Empirical compatibility assessment in Poland LTE causes interference to ARNS Mateusz Berlik Office of Electronic Communications, Poland Department of Frequency.

Mateusz Berlik, UKE :: Warsaw, 7 - 9 May 2012

Measurement III (Toruń, 30.03.2011)

Measure No. Received power [dBm]

Field strength at receiving

point [dBμV/m]

Distance [m] Frequencies

1 -95,2 35,5 706RSP-10: 835 MHzLTE: 834.75 MHz

2 -96,5 34,2 1 488RSP-10: 835 MHzLTE: 834.75 MHz

3 -96,3 34,4 1 504RSP-10: 835 MHzLTE: 834.75 MHz

4 -80,3 50,4 128RSP-10: 835 MHzLTE: 839.5 MHz

5 -69,7 61,0 128RSP-10: 835 MHzLTE: 840.5 MHz

Page 30: Empirical compatibility assessment in Poland LTE causes interference to ARNS Mateusz Berlik Office of Electronic Communications, Poland Department of Frequency.

Mateusz Berlik, UKE :: Warsaw, 7 - 9 May 2012

Agenda

• Introduction to the LTE vs. ARNS problem• Aims and conditions of the measurements• Radio systems under tests• Measurements action• Summary

Page 31: Empirical compatibility assessment in Poland LTE causes interference to ARNS Mateusz Berlik Office of Electronic Communications, Poland Department of Frequency.

Mateusz Berlik, UKE :: Warsaw, 7 - 9 May 2012

Summary

• Because of the lack of the technical compatibility criteria, it was difficult to use the results as a point in discussion.

• General conclusions:– LTE terminal does really interfere RSP-10 radar;– allowable interference field strength is probably higher

than protection level from the CPM-12 Report.• The results were useful for our administration.