Emergency shelter ferropanel
-
Upload
ferropanel -
Category
Documents
-
view
480 -
download
0
Transcript of Emergency shelter ferropanel
FERROPANEL CONSTRUCTION SYSTEMS
Low cost and high
resistance
houses
Construction systems across timeFERROPANEL : the latest in construction tecnology
Stone
Clay
Concrete prefabricationWalls built In Situ-
Concrete form
The product
Expanded polystyrene addend to reduce the weight
Upper beam(Variable diameter)
Hydraulic and electric conduits
Window aperture
Columns
Lower beam (Variable diameter)
The panels include structure, conduits and metalwork
1. The house is carried to the building place in a small truck
House of 45m² areaLoad capacity : 1 tn
Construction process
The weight facilitates transportation to places of difficult access
3. Floor deck concrete pouring
2 . Pre-assembly stripping, compression and ground levelling
Construction process
4. The panels are tied up and electric, hydraulic and sanitary conduits are assembled
The panels are tied up with wires; specialized tools or skilled labor are not required
Construction process
5. Smelting of the columns and plastering with mortar
The mortar is pumped with a machine which allows to plaster in short time
Construction process
6. Finishing Bathroom fittings, kitchen, painting, etc.
Construction process
AdvantagesShort construction process times – 5
houses per day in projects of massive construction
Finished construction resists earthquakes and hurricanes of up to 160 mph
The lowest cost in Colombia
Generates local, formal and lasting employment
It’s possible to build in stages
Building stagesFirst stage: 24.4 m²
Second stage: 34.32 m²
Building stages
Third stage: 45 m²
Building stages
Fourth stage: 63 m²
Building stages
Solution!
Em
erg
en
cy!
FerropanelConstructions
Emergency accommodation
Ferropanel can accommodate families in the house itself during
the construction process!
Specially designed in case there are no resources to build the house
entirely
1. Ferropanel Assembles the panels
The structure is temporarily covered in plastic, enabling the house to work as a tent during the construction process
Emergency accommodation
Ready in less than 6 hours
The first step towards final accommodation
Adapts to any architectural design
The family can be sheltered during the construction process!
Emergency accommodation
2. Ferropanel makes the foundation and plastering by stages, the family does not have to vacate
or the family can do the plastering on its own
Emergency accommodation
Immediate shelter
Decent homes: safer and more secure than
tents
Progressive building without need for skilled
labor
No waste: the cost of the emergency
accommodation is itself an initial investment
towards final house
ObjectiveTo offer vulnerable population a fast, dignifying and solid solution
FERROPANEL CONSTRUCTION SYSTEMS
The best answer to a catastrophe
Contact: Germán Echeverry L.
Tel: (57)311 2173089 [email protected] www.ferropanel.over-blog.es