EMERGENCY RESPONSE PLANNING

37
EMERGENCY RESPONSE PLANNING

description

EMERGENCY RESPONSE PLANNING. Why Have A Plan?. Planning can make a difference in mitigating against the effects of a disaster, including saving lives and protecting property, and helping a business recover more quickly from a disaster. - PowerPoint PPT Presentation

Transcript of EMERGENCY RESPONSE PLANNING

Page 1: EMERGENCY  RESPONSE PLANNING

EMERGENCY RESPONSEPLANNING

Page 2: EMERGENCY  RESPONSE PLANNING

Why Have A Plan?• Planning can make a difference in mitigating against the

effects of a disaster, including saving lives and protecting property, and helping a business recover more quickly from a disaster.

• Up to 40% of businesses affected by a natural or human-caused disaster never reopen.

• Larger businesses are asking their suppliers about preparedness. They want to be sure that their supply chain is not interrupted.

• Insurance is only a partial solution. It does not cover all losses and it will not replace customers.

• Many disasters — natural or human-caused — may overwhelm the resources of even the largest public agencies. Or they may not be able to reach every facility in time.

Page 3: EMERGENCY  RESPONSE PLANNING

In developing an all hazards preparedness

plan, potential hazards/threats should be identified

, vulnerabilities assessed and potential

impacts analyzed!

Page 4: EMERGENCY  RESPONSE PLANNING

Emergency Response Planning

• All facilities face a certain level of risk associated with various threats. o Threat or hazard is an event that could cause

injury, property damage, business disruption or environmental impact.

• These threats may be the result of natural events, accidents, or intentional acts to cause harm.

• Regardless of the nature of the threat, facility owners have a responsibility to limit or manage risks from these threats to the extent possible.

Page 5: EMERGENCY  RESPONSE PLANNING

• Planning-Asses Risk• Implement• Test• Improve

FEMA.GOV

Page 6: EMERGENCY  RESPONSE PLANNING

Hazard Vulnerability Analysis

• The HVA provides a systematic approach to recognizing hazards that may affect demand for a business’ services or its ability to provide those services.

• The risks associated with each hazard are analyzed to prioritize planning, mitigation, response and recovery activities.

• The HVA serves as a needs assessment for the Emergency Management program.

• This process should involve community partners and be communicated to community emergency response agencies.

Page 7: EMERGENCY  RESPONSE PLANNING

Hazard Vulnerability Analysis

• Probabilities• Severity

o Human Impacto Property Impacto Business Impact

• Preparedness• Internal Resources• External Resources

Page 8: EMERGENCY  RESPONSE PLANNING

Planning for the Threats

• Communications failure • Radiological accident • Loss of key supplier or

customer • Hurricane • Winter storm

• Fire/Explosion • Earthquake• Tornado • Hazardous materials

incident • Technological• Civil disturbance • Flood or flash flood

Probabilities-Analyze threats/hazards that are-1) unique to each occupancy, and plan for the actions of each.

Page 9: EMERGENCY  RESPONSE PLANNING

2) Identify the threats/hazards that have happened or could happen in your area and plan for the unique actions of each.  

Page 10: EMERGENCY  RESPONSE PLANNING

Severity• Issues to consider for human impact include, but are not

limited to:Potential for death or injury

• Issues to consider for property impact include, but are not limited to:

Cost to replaceCost to set up temporary replacementCost to repair

• Issues to consider for business impact include, but are not limited to:

Business interruptionEmployees unable to report to work

Customers unable to reach facility Company in violation of contractual agreements Imposition of fines and penalties or legal costs Interruption of critical suppliesInterruption of product distribution

Page 11: EMERGENCY  RESPONSE PLANNING

Preparedness• Issues to consider for preparedness include, but are not

limited to: Status of current plans

Training statusInsuranceAvailability of back-up systems

Community resources

• Issues to consider for internal resources include, but are not limited to: Types of supplies on hand

Volume of supplies on handStaff availability

• Issues to consider for external resources include, but are not limited to:

Types of agreements with community agenciesCoordination with local and state agencies

Page 12: EMERGENCY  RESPONSE PLANNING

Hazard Vulnerability Analysis

• Issues to consider for response include, but

are not limited to:Time to marshal an on-scene response

Scope of response capabilityHistorical evaluation of

response success

Page 13: EMERGENCY  RESPONSE PLANNING

HAZARD AND VULNERABILITY ASSESSMENT TOOLNATURALLY OCCURRING EVENTS

SEVERITY = (MAGNITUDE - MITIGATION)

EVENT

PROBABILITY HUMAN IMPACT

PROPERTY IMPACT

BUSINESS IMPACT

PREPARED-NESS

INTERNAL RESPONSE

EXTERNAL RESPONSE

RISK

Likelihood this will occur

Possibility of death or injury

Physical losses and damages

Interuption of services

PreplanningTime,

effectivness, resouces

Community/ Mutual Aid staff

and suppliesRelative threat*

SCORE

0 = N/A 1 = Low 2 = Moderate 3 = High

0 = N/A 1 = Low 2 = Moderate 3 = High

0 = N/A 1 = Low 2 = Moderate 3 = High

0 = N/A 1 = Low 2 = Moderate 3 = High

0 = N/A 1 = High

2 = Moderate 3 = Low or none

0 = N/A 1 = High

2 = Moderate 3 = Low or none

0 = N/A 1 = High

2 = Moderate 3 = Low or none

0 - 100%

Hurricane 0%

Tornado 0%

Severe Thunderstorm

0%

Snow Fall 0%

Blizzard 0%

Ice Storm 0%

Earthquake 0%

Tidal Wave 0%

Temperature Extremes

0%

Drought 0%

Flood, External 0%

Wild Fire 0%

Landslide 0%

Dam Inundation

Volcano 0%

Epidemic 0%

AVERAGE SCORE 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0%

*Threat increases with percentage.

0 RISK = PROBABILITY * SEVERITY

0 0.00 0.00 0.00

Page 14: EMERGENCY  RESPONSE PLANNING

HAZARD AND VULNERABILITY ASSESSMENT TOOL NATURALLY OCCURRING EVENTS

   SEVERITY = (MAGNITUDE - MITIGATION)      

 

EVENT

PROBABILITY HUMAN IMPACT

PROPERTY IMPACT

BUSINESS IMPACT

PREPARED-NESS

INTERNAL RESPONSE

EXTERNAL RESPONSE

RISK

 Likelihood this will

occurPossibility of

death or injuryPhysical losses and damages

Interuption of services

PreplanningTime,

effectivness, resouces

Community/ Mutual Aid staff

and suppliesRelative threat*

SCORE

0 = N/A 1 = Low 2 = Moderate 3 = High

0 = N/A 1 = Low 2 = Moderate 3 = High

0 = N/A 1 = Low 2 = Moderate 3 = High

0 = N/A 1 = Low 2 = Moderate 3 = High

0 = N/A 1 = High 2 = Moderate

3 = Low or none

0 = N/A 1 = High 2 = Moderate

3 = Low or none

0 = N/A 1 = High 2 = Moderate

3 = Low or none

0 - 100%

Tornado 2 3 3 3 1 1 1 44%

Severe Thunderstorm

2 1 1 1 1 1 1 22%

Blizzard 1 1 2 1 1 1 1 13%

Ice Storm 2 1 1 2 1 1 1 26%

Earthquake 2 3 3 3 2 2 3 59%

Pandemic 1 2 0 3 1 1 0 13%

AVERAGE SCORE 1.67 1.83 1.67 2.17 1.17 1.17 1.17 28%

*Threat increases with percentage.

10 RISK = PROBABILITY * SEVERITY

55 0.28 0.56 0.51

Page 15: EMERGENCY  RESPONSE PLANNING

HAZARD AND VULNERABILITY ASESSMENT TOOLTECHNOLOGIC EVENTS

   SEVERITY = (MAGNITUDE - MITIGATION)      

 

EVENT

PROBABILITY

HUMAN IMPACT PROPERTY IMPACT BUSINESS IMPACT PREPARED-NESS INTERNAL RESPONSE EXTERNAL RESPONSE

RISK

 

Likelihood this will occur Possibility of death or injury Physical losses and damages Interruption of services Preplanning Time, effectiveness, resourcesCommunity/ Mutual Aid staff

and suppliesRelative threat*

SCORE 0 = N/A 1 = Low 2 = Moderate 3 = High

0 = N/A 1 = Low 2 = Moderate 3 = High

0 = N/A 1 = Low 2 = Moderate 3 = High

0 = N/A 1 = Low 2 = Moderate 3 = High

0 = N/A 1 = High 2 = Moderate

3 = Low or none

0 = N/A 1 = High 2 = Moderate

3 = Low or none

0 = N/A 1 = High 2 =

Moderate 3 = Low or none

0 - 100%

Electrical Failure               0%

Generator Failure               0%

Transportation Failure               0%

Fuel Shortage               0%

Natural Gas Failure               0%

Water Failure               0%

Sewer Failure               0%

Steam Failure               0%

Fire Alarm Failure               0%

Communications Failure               0%

Medical Gas Failure               0%

Medical Vacuum Failure               0%

HVAC Failure               0%

Information Systems Failure               0%

Fire, Internal               0%

Flood, Internal               0%

Hazmat Exposure, Internal               0%

Supply Shortage               0%

Structural Damage               0%

AVERAGE SCORE 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0%

*Threat increases with percentage.

0RISK = PROBABILITY * SEVERITY

00.00 0.00 0.00

Page 16: EMERGENCY  RESPONSE PLANNING

HAZARD AND VULNERABILITY ASSESSMENT TOOLHUMAN RELATED EVENTS

   SEVERITY = (MAGNITUDE - MITIGATION)      

 

EVENT

PROBABILITY

HUMAN IMPACT PROPERTY IMPACT BUSINESS IMPACT PREPARED-NESS INTERNAL RESPONSE EXTERNAL RESPONSE

RISK

 

Likelihood this will occur Possibility of death or injuryPhysical losses and

damagesInterruption of services Preplanning Time, effectiveness, resources

Community/ Mutual Aid staff and supplies

Relative threat*

SCORE 0 = N/A 1 = Low 2 = Moderate 3 = High

0 = N/A 1 = Low 2 = Moderate 3 = High

0 = N/A 1 = Low 2 = Moderate 3 = High

0 = N/A 1 = Low 2 = Moderate 3 = High

0 = N/A 1 = High 2 = Moderate

3 = Low or none

0 = N/A 1 = High 2 = Moderate

3 = Low or none

0 = N/A 1 = High 2 =

Moderate 3 = Low or none

0 - 100%

Mass Casualty Incident (trauma)               0%

Mass Casualty Incident (medical/infectious)

              0%

Terrorism, Biological               0%

VIP Situation               0%

Infant Abduction               0%

Hostage Situation               0%

Civil Disturbance               0%

Labor Action               0%

Forensic Admission               0%

Bomb Threat               0%

AVERAGE 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0%

*Threat increases with percentage.

0RISK = PROBABILITY * SEVERITY

00.00 0.00 0.00

Page 17: EMERGENCY  RESPONSE PLANNING

HAZARD AND VULNERABILITY ASSESSMENT TOOLEVENTS INVOLVING HAZARDOUS MATERIALS

   SEVERITY = (MAGNITUDE - MITIGATION)      

 

EVENT

PROBABILITY

HUMAN IMPACT PROPERTY IMPACT BUSINESS IMPACT PREPARED-NESS INTERNAL RESPONSE EXTERNAL RESPONSE

RISK

 

Likelihood this will occurPossibility of death or

injuryPhysical losses and

damagesInterruption of services Preplanning

Time, effectiveness, resources

Community/ Mutual Aid staff and supplies

Relative threat*

SCORE 0 = N/A 1 = Low 2 = Moderate 3 = High

0 = N/A 1 = Low 2 = Moderate 3 = High

0 = N/A 1 = Low 2 = Moderate 3 = High

0 = N/A 1 = Low 2 = Moderate 3 = High

0 = N/A 1 = High 2 = Moderate

3 = Low or none

0 = N/A 1 = High 2 = Moderate

3 = Low or none

0 = N/A 1 = High 2 =

Moderate 3 = Low or none

0 - 100%

Mass Casualty Hazmat Incident (From historic events at your MC with >= 5 victims)

              0%

Small Casualty Hazmat Incident (From historic events at your MC with < 5 victims)

              0%

Chemical Exposure, External

              0%

Small-Medium Sized Internal Spill

              0%

Large Internal Spill               0%

Terrorism, Chemical

              0%

Radiologic Exposure, Internal

              0%

Radiologic Exposure, External

              0%

Terrorism, Radiologic

              0%

AVERAGE 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0%

*Threat increases with percentage.

0RISK = PROBABILITY * SEVERITY

0 0.00 0.00 0.00

Page 18: EMERGENCY  RESPONSE PLANNING

Implementation- Developing A Plan

• Implementation of the preparedness program includes identifying and assessing resources, and writing plans.

Page 19: EMERGENCY  RESPONSE PLANNING

Emergency Response Plan

• Plans to protect people, property and the environment should be developed. Plans should include evacuation, sheltering in place and lockdown as well as plans for other types of threats identified during the risk assessment.

• Best practices and instructional guidance published by trade associations, professional societies, newsletters and government website can be resources to develop, evaluate and improve your preparedness program.

Page 20: EMERGENCY  RESPONSE PLANNING

Threats/Hazards• Communications

failure • Radiological

accident • Loss of key

supplier or customer

• Hurricane • Winter storm

• Fire/Explosion • Earthquake• Tornado • Hazardous

materials incident

• Technological• Civil disturbance • Flood or flash

flood

Page 21: EMERGENCY  RESPONSE PLANNING

Fire- Planning• Have your facility inspected for fire hazards. • Distribute fire safety information to

employees.o How to prevent fires in the workplaceo Where to report a fire.

• How to contain a fire, o Place fire extinguishers in appropriate locations.o Train employees in use of fire extinguishers.

• How to evacuate the facilityo Instruct personnel to use the

stairs -- not elevators -- in a fire. o Conduct evacuation drills. o Post maps of evacuation

routes.

Page 22: EMERGENCY  RESPONSE PLANNING

Planning - Fire• Establish procedures to prevent the

accumulation of combustible materials.• Provide for the safe disposal of smoking

materials.• Ensure that key personnel are familiar with

all fire safety systems.• Identify and mark all utility shutoffs so that

electrical power, gas or water can be shut off quickly.

• Establish procedures for the safe handling and storage of flammable liquids and gases.

Page 23: EMERGENCY  RESPONSE PLANNING

Planning- Tornadoes• Establish procedures to inform personnel when tornado

warnings are posted. Consider the need for spotters to be responsible for looking out for approaching storms.

Tornado Watch -- Tornadoes are likely. Be ready to take shelter. Stay tuned to radio and television stations for additional information.

Tornado Warning -- A tornado has been sighted in the area or is indicated by radar. Take shelter immediately.

• The best protection in a tornado is usually an underground area. If an underground area is not available, consider: o Small interior rooms on the lowest floor and without windowso Hallways on the lowest floor away from doors and windowso Rooms constructed with reinforced concrete, brick or block

with no windows and a heavy concrete floor or roof system overhead

o Protected areas away from doors and windowso Note: Auditoriums, cafeterias and gymnasiums that are

covered with a flat, wide-span roof are not considered safe.

Page 24: EMERGENCY  RESPONSE PLANNING
Page 25: EMERGENCY  RESPONSE PLANNING

• Make plans for evacuating personnel away from lightweight modular offices or mobile home-size buildings.

These structures offer no protection from tornadoes.

• Conduct tornado drills.• Once in the shelter,

personnel should protect their heads with their arms and crouch down.

Page 26: EMERGENCY  RESPONSE PLANNING
Page 27: EMERGENCY  RESPONSE PLANNING

Planning- Earthquake• Inspect your facility for any item that could fall, spill,

break or move during an earthquake. Take steps to reduce these hazards,

• Move large and heavy objects to lower shelves or the floor. Hang heavy items away from where people work.

• Secure shelves, filing cabinets, tall furniture, desktop equipment, computers, printers, copiers and light fixtures.

• Secure fixed equipment and heavy machinery to the floor. Larger equipment can be placed on casters and attached to tethers which attach to the wall.

• Review processes for handling and storing hazardous materials. Have incompatible chemicals stored separately.

• Establish procedures to determine whether an evacuation is necessary after an earthquake.

Page 28: EMERGENCY  RESPONSE PLANNING

• Designate areas in the facility away from exterior walls and windows where occupants should gather after an earthquake if an evacuation is not necessary.

• Conduct earthquake drills. Provide personnel with the following safety information:

• In an earthquake, if indoors, stay there. Take cover under a sturdy piece of furniture or counter, or brace yourself against an inside wall. Protect your head and neck.

• If outdoors, move into the open, away from buildings, street lights and utility wires.

• After an earthquake, stay away from windows, skylights and items that could fall. Do not use the elevators.

• Use stairways to leave the building if it is determined that a building evacuation is necessary.

Page 29: EMERGENCY  RESPONSE PLANNING

• Identify and label all hazardous materials stored, handled, produced and disposed of by your facility. Follow government regulations that apply to your facility. Obtain material safety data sheets (MSDS) for all hazardous materials at your location.

• Train employees to recognize and report hazardous material spills and releases. Train employees in proper handling and storage.

• Establish procedures to notify management and emergency response organizations of an incident.

• Establish procedures to warn employees of an incident. • Establish evacuation procedures. • Identify other facilities in your area that use hazardous

materials. Determine whether an incident could affect your facility.

Planning- Hazardous Materials

Page 30: EMERGENCY  RESPONSE PLANNING

Planning- Technological Emergencies

• Identify all critical operations, including:o Utilities including electric power, gas, water, hydraulics,

compressed air, municipal and internal sewer systems, wastewater treatment services

o Security and alarm systems, elevators, lighting, life support systems, heating, ventilation and air conditioning systems, electrical distribution system.

o Manufacturing equipment, pollution control equipmento Communication systems, both data and voice computer

networks

• Determine the impact of service disruption.o Ensure that key safety and maintenance personnel are

thoroughly familiar with all building systems.o Establish procedures for restoring systems. Determine need

for backup systems.

Page 31: EMERGENCY  RESPONSE PLANNING

Planning- Terrorism• All employees need training about their

company's policies regarding workplace violence.• What they can do to prevent violence and how

they should respond if violence does occur. • Training should include how to deal with hostile

or angry customers or clients, conflict resolution skills and stress management techniques.

• Managers also need training on how to deal with angry or belligerent employees.

Page 32: EMERGENCY  RESPONSE PLANNING

Further Considerations

• Resource Management: Resources needed for responding to emergencies, continuing business operations and communicating during and after an incident should be identified and assessed.

• Incident Management: An incident management system is needed to define responsibilities and coordinate activities before, during and following an incident.

• Training: Persons with a defined role in the preparedness program should be trained to do their assigned tasks. All employees should be trained so they can take appropriate protective actions during an emergency.

Page 33: EMERGENCY  RESPONSE PLANNING

• Employee Assistance & Support: The business preparedness plan should encourage employees and their families to develop family preparedness plans. Plans should also be developed to support the needs of employees following an incident.

• Crisis Communications Plan: A plan should be established to communicate with employees, customers, the news media and stakeholders.

Page 34: EMERGENCY  RESPONSE PLANNING

• Business Continuity Plan: A business continuity plan that includes recovery strategies to overcome the disruption of business should be developed.

• Information Technology Plan: A plan to recover computer hardware, connectivity and electronic data to support critical business processes should be developed.

Page 35: EMERGENCY  RESPONSE PLANNING

Testing, & Exercises• You should conduct testing and exercises to

evaluate the effectiveness of your preparedness program, make sure employees know what to do and find any missing parts.

• Improve individual performance as well as organizational coordination and communications

• Evaluate policies, plans, procedures and the knowledge and skills of team members

• Reveal weaknesses and resource gaps• Comply with local laws, codes and

regulations

Page 36: EMERGENCY  RESPONSE PLANNING

Program Improvement• There are opportunities for program

improvement following an actual incident. • A critique should be conducted to assess the

response to the incident. • Lessons learned from incidents that occur within

the community, within the business’ industry or nationally can identify needs for preparedness program changes.

• Gaps and deficiencies identified during reviews should be recorded and addressed through a corrective action program. Reviews, evaluations and improvements should be documented and maintained on file.

Page 37: EMERGENCY  RESPONSE PLANNING

How Can We Help?• Business Inspections• Fire Extinguisher Training• CPR & AED classes• CERT Classes• Community Services