EMAS II and Port Authorities
Emanuele Zanotto
Venice Port Authority
Venice Port Authority
Contents of the presentation
What’s EMAS From EMAS to EMAS II What’s new in EMAS II EMAS II and Governance Port Authorities and EMAS II Venice and Environmental Challenges
What’s EMAS
Performance, Credibility, Transparency
The Eco-Management and Audit Scheme (EMAS) is the EU voluntary instrument which acknowledges organisations that improve their environmental performance on a continuous basis. EMAS registered organisations are legally compliant, run an environment management system and report on their environmental performance through the publication of an independently verified environmental statement. They are recognised by the EMAS logo, which guarantees the reliability of the information provided.
Improving your environmental and business performance.
SOURCE: http://europa.eu.int/comm/environment/emas/index_en.htm
What’s EMAS
Cardinal Points for organisation for registering to EMAS Full observance of the environmental law Continual improvements of the environmental performances Transparency and external communication Employee involvement
What’s EMAS
Differences with ISO14001 ISO14001 has private legal origin that is recognized by the international standardisation organism; EMAS has state (government) legal origin and it’s regulate by state organism. EMAS is only an European regulation not worldwide accepted EMAS imposes an external communication (not present in the ISO14001) EMAS requires a full compliance to the environmental rules and regulations; even thought this compliance is strongly recommended, in ISO14001 this duty is not present.
From EMAS to EMAS II
June 1993 — Council Regulation 1836/93 adopted on 29 June 1993. It creates the Eco-Management and Audit Scheme (EMAS) with a view to allow companies to voluntarily participate in an environmental management scheme. It is open to industrial sector companies operation in the European Union and the European Economic Area (EEA). 1993-1995 — Set up of the structures for the implementation of the scheme: Competent Bodies, Accreditation Bodies. April 1995 — EMAS is open for participation by companies of the manufacturing sectors 1996 — Commission recognises EN ISO 14001 as a stepping-stone towards participating in EMAS.
From EMAS to EMAS II
1997 — Consultation process for the review of EMAS begins : DG Environment carried out a series of consultations with all relevant stakeholders in order to gather their views concerning possible amendments to EMAS. October 1998 — The Commission presents a proposal for the revision of EMAS. This proposal goes through the legislative procedure of co-decision. March 2001 — EMAS II is born; the new EMAS regulation (2001/761/EC) is adopted by the Council and the European Parliament. September 2001 — The Commission adopts technical guidance documents (2001/681/EC) for the implementation of the scheme
What’s new in EMAS II
Opening to the participation of any organisation dedicated to improving its overall environmental performance (Ref. art 2 s) 2001/761 and Annex I 2001/681). Shift from “site” to “any organisation” that effects the environment Organisation: company, corporation, authority, or part or combination thereof, whether incorporated or not, public or private List of 8 categories Highline the importance of the authority’s policies as indirect environmental aspects
What’s new in EMAS II
Indication that the environmental Management system shall be implemented according to the requirements by EN ISO 14001:1996 section 4 (Ref Annex I 2001/761). ISO 14001 is the engine for the EMS requested by EMAS II
What’s new in EMAS II
Institution of regular meeting of the Competent bodies from all Member States shall meet, at least once per year in the presence of a representative of the Commission (Ref art. 5.5 2001/761). At least once per year Peer review for common understanding Publicly availability of the peer review report.
What’s new in EMAS II
Logo use guidelines and rules (ref. art. 8 761/01 and Annex III of 681/01)
Logo is the external tool, jointly with the environmental declaration, for the external communication of the organisation
List of permitted and avoid uses of the logo
What’s new in EMAS II
Environmental Authorities are involved in the procedures for registering the organisation/site (ref art. 6.1 761/2001)
What’s new in EMAS II
Organisation and employee involvement in the EMAS (ref. art. 1 Annex I.B 761/01 and Annex I.7 681/01)
Particularly “stressed” for the small companiesFor making know the implication of all relevant
legislation implication to whole organisationEmployees shall be involved in the process aimed
at continually improving the organisation’s environmental performance
What’s new in EMAS II
Assessment and evaluation of the direct and indirect environmental aspects of the organisation (ref. Annex VI, co 6.3 761/01)
Direct aspects – directly managed by origanisationIndirect aspects - as a result of the activities, products
and services of an organisation there may be significant environmental aspects over which it may not have full management control.
Authorithies have to pay attention on the policies and rules/guideline that can effect the environment.
EMAS II and Governance
EMAS I created an environmental culture only in a “company perspective”, where all processes could be clearly define
Objectives/targets of Institution/Authority cannot be viewed in a economic and management perspective.
State/public organisation are drivers for building a model of economic development, jointly with life and environment quality and considering institutional, company, occupational and social policies.
EMAS II and Governance
That’s is a complex route, more difficult from the registration of a private company.
Not only the registration of the public authority in its structure, but also the extension in the national, regional and local territory: this is the challenge.
It’s not only a registration, it’s a socioeconomic agreement for a Corporate Governance of whole the system, that’s include production, employment, environmental, ethical and social unity.
Port Authorties and EMAS II
EMAS II includes also Port Authorities Italian experience notes that it’s not an easy task to go towards
EMAS due to:– In a port system there’s not only one owner and administrator but
several institutional authorities (Port Authority, Coast Guard, Harbor Master, Municipality, Province, Military and Navy Corps, Police, Financial Police) that create a system of institutional actors;
– It’s not possible to delimitate the port area for the strong links and feedbacks between port, urban area and territory.
– Port system are usually constituted more by logistical network for passenger and goods than structures and infrastructures for port facilities, this create a stronger pressure to the environment for the use of fossil energy for feeding logistics.
Port Authorities and EMAS II
Livorno Port Authority registered EMAS the “system” Port of Livorno.
Implementation of Port Stakeholders Consortium was the tool for agreement subscriptions among the port actors and state authorities.
CONGRATULATIONS!
http://europa.eu.int/comm/environment/emas/news/archive_en.htm
Questions
Do we really need a EMAS?
Are other tools and European guidelines for ports that want to reach an effective environmental policy?
www.espo.be
Answer: Environmental Policy Code – Main Environmental objectives which EU port sector aim to achieve.
To contribute to the development of a sustainable logistics chain, as ports are key elements of the Trans-European Network.
To encourage wide consultation, dialogue and cooperation between port administrations and the relevant stakeholders at local level (port users, public, NGOs) to facilitate the reconciliation, at an early stage, of differing interests and the acceptance of port projects by the local community.
To generate new knowledge and technology and to develop sustainable techniques which combine environmental effectiveness and cost efficiency. The aim is to achieve self-regulation and develop a bottom-up approach. Even if the EU decides to issue environmental regulations, the existing self-regulatory instruments, developed by the port sector itself and which address day-to-day practice, will provide a port-accepted background to be used as a basis for EU environmental policy. This will enable EU legislation to be more easily supported and implemented.
Answer: Environmental Policy Code – Main Environmental objectives which EU port sector aim to achieve.
To enhance cooperation between port administrations in the field of environment and facilitate the exchange of experiences and implementation of best practices on environmental issues to avoid unnecessary duplication and enable port administrations to share the costs of environmental solutions. This can be notably achieved through the participation of port administrations in a network, which will be coordinated by the ECOPORTS Foundation. The aim is to create a level playing field by limiting poor environmental practice as a competitive factor between port administrations.
To increase awareness of environmental concerns and to integrate sustainable development into ports’ policies, by encouraging port administrations to prepare a publicly available environmental policy setting out their strategies and methods of achieving them. This will contribute to promote a “corporate social responsibility” on the port.
To encourage port administrations to conduct appropriate environmental impact assessments for port projects and appropriate strategic environmental impact assessments for port development plans to assess, at an early stage, how their effects on the environment can be minimised.
Answer: Environmental Policy Code – Main Environmental objectives which EU port sector aim to achieve.
To stimulate continual improvement in the port environment and its port environmental management by promoting the use of Environmental Management Information System tools (such as environmental audit, environmental review, environmental management system, decision support system, port visitor internet tool, as developed by the ECOPORTS Foundation).
To promote monitoring, based on environmental performance indicators, as recommended by the 2001 ESPO Environmental Review, in order to measure objectively identifiable progress in environmental port practices.
To promote environmental reporting as a means of communicating environmentally good behaviour to stakeholders and the European institutions, in line with the recommendations of the ESPO Environment Review published in 2001.
To intensify the communication about environmental improvements achieved by ports, with the aim to create a better understanding of the role of ports and their efforts towards sustainability.
Port and Venice Lagoon
Surface: 2.000 hectares Channels: 16 km2 30 km berthing places 163 operational berthing 20 terminal operators 205 km of railways
network Lido
AD
RIA
TIC
O
Venezia
CanaleMalamocco-Marghera
PortoMarghera
S.Leonardo
Docks and NavigationChannelscontrolled
and managedby Port Authority
Venice and Lagoon
The Venice Lagoon is widely regarded as a unique environmental resource with cultural and ecological significance both to Italy and the international community.
The natural and commercial resources of the estuary are rapidly becoming the focus of considerable scientific study. Ecological Surveys
Public Health / Fish Consumption Studies
Watershed and Sediment Assessments
Within the past 10 years, local environmental and public health officials have expressed concerns regarding chemical contamination of fish, soil, and sediment within the Lagoon.
D.P.C.M. 12th February 1999Action Plan for Chemistry in Porto MargheraD.P.C.M. 12th February 1999
Action Plan for Chemistry in Porto Marghera
D.P.C.M. 15th November 2001Updated Action Plan for Chemistry in Porto Marghera
Master Plan
D.P.C.M. 15th November 2001Updated Action Plan for Chemistry in Porto Marghera
Master Plan
MASTER PLAN
programming document for
Porto Margheracleanup and green
projects
Guidelines
Contaminated soil and water isolation from lagoon Environmental Dredging of the industrial channels Industrial soil cleanup Storing area for restoring contaminated materials Soil and sediments treatment plants Stormwater and drainage contaminated water
pipeline to the treatment plant Improvement of soil and water chemical/physical
database Piezometric level and water quality monitoring
system Soil fine particles and emission monitoring GIS for managing the Master Plan Decision Support System for cleanup activities Risk analysis Flux and transport hydrogeology model Technology scouting for sediment treatment Landscaping improvement
Master Plan for Porto MargheraAction Issues
Master Plan for Porto MargheraContaminated soil and water isolation from lagoon
Isolate lagoon using sheet piles and quay walls creating “macroislands” (total 2000 ha)
Drainage system for collecting and treating water (10m3/h) from contaminated soils
About 36 km of barriers
Port of Venice and Environmental challenges
Unique ecosystem, to be preserved by :– Soil contamination– Water contamination, wastewater– Exhaust gas emissions– Waste production– Sediment contamination
Interface city and port– Noise– Dust
Soil Characterization
Soil core every 50 m, 2500 m2 area representative.
Cost 2/2.5 M€
2070
2210 2211
2283
2350
2425
2490 2492
10090 10094
2566
2497
2498 2500
2569
2071
2140 2142
2213
2280
24202422 2426 2428
24912493 2494 2499
2560 2562 2564
2141
2212
2281
2345
24212427 2429
2495
2561 2563 2565 2570
10088
10091
10092
100932351
2423
10089
APV049/05
APV054/05APV055/05
APV056/05APV057/05
APV058/05
APV062/05 APV063/05
APV066/05APV067/05
APV068/05APV069/05
APV070/05 APV071/05
APV074/05 APV075/05
APV084/05APV080/05APV081/05 APV082/05 APV083/05
APV087/05 APV088/05
APV091/05APV092/05
APV093/05APV094/05
APV095/05APV096/05
APV098/05 APV099/05APV100/05
APV103/05APV104/05
APV105/05APV106/05
APV107/05APV108/05 APV109/05
APV110/05 APV111/05 APV112/05 APV113/05APV114/05
APV116/05APV117/05
APV118/05APV119/05
APV120/05APV121/05 APV122/05
APV123/05
APV124/05 APV125/05 APV126/05 APV127/05 APV128/05 APV129/05 APV130/05
APV132/05APV133/05
APV134/05APV135/05
APV136/05APV137/05
APV138/05APV139/05
APV140/05 APV141/05APV142/05
APV143/05APV144/05
APV146/05 APV147/05 APV148/05 APV149/05 APV150/05 APV151/05
APV153/05APV154/05
APV155/05APV156/05
APV157/05 APV158/05 APV159/05APV160/05
APV161/05APV162/05
APV163/05 APV164/05
WastewaterManagement
1976-1999 free discharge of storm water in the lagoon: 100 % of the Port Area not compliant with law
2000: 100% of the Port Area wastewater discharges closed to avoid any contamination
2005: 30% Port compliant with law, 70% emergency solution
2010: 100% Port compliant with law
Seawage system length: 26 KmArea interested to wastewater
management: 120 ha
Wastewater Managementfor the passenger terminal
Area12 ha.
Wastewater Management
Stormwater filter: treating 95% of the wastewater
Exhaust Emissions
Exhaust emission monitoring
Laser beam analysis device, for monitoring air quality in case of industrial incident, will be used for monitoring air quality in the city of Venice, close to cruise e ferry terminal
Waste Management
Application of Directive 2000/59/EC to the Port of Venice
Implementation of “flow-permits form” WEB based for complete check of waste disposal (Ship – Agency – Harbor Master – Suppliers)
EMS for internal procedures.
Sediment contamination
Venezia, 9th December 1996
CITY OF VENICEEnvironment Office
URGENT FISH ADVISORY TO PROTECTPUBLIC HEALTH
FISHING BAN IN AREAS AROUND PORTO MARGHERADURING INDUSTRIAL CANALS DREDGING ACTIVITY
VENICE MAYOR
Fish advisory area dueto dredging activity
Venice 1996
Interpolated 2,3,4,7,8-PeCDF concentration map
log [pg g-1]ss
Interpolated PCB-180 concentration map
log [pg g-1]ss
ABCOver C
Pollution Class
1Environment Ministery, 1993
GIS andSediment QualityCriteria
Navigational dredging coincideswith Environmental Dredging
2003 Channel Bottom
Original Channel Bottom
Contaminated Sediment
UncontaminatedSediment
Sediment Core Sample
Disposal within lagoon
Class B Class A
2.300.000 m3
Beneficial Reuse
CDF
3.100.000 m3
Class C
Removed from Lagoon
C +
1.500.000 m3
22 %78 %
Volumes to be dredged
Sediment management: from waste to clean material
Sediment Washing
Sediment managementfrom waste to clean material
•Reduction of waste•Reuse•Low impact to the Environment
Sediment managementfrom waste to new material
Brick Production
Cruise and Ferry Piersin the historical city
Marittima
Riva Sette Martiri
A port inside the city
A port inside the city: skyline change
A port inside the city: impact to structures
A port inside the city: impact to structures – ships waves
A port inside the city: dust and noise
In the past:– noisy refrigerated trailers parked close to a
quarter– iron discharge in a commercial pier, close to the
city.
Solution: immediately wind speed alarm to stop iron handling and then transfer of these high impact activities to Porto Marghera