Page 1: Elitery data center_presentation_to_schneider_march 4_2013
Page 2: Elitery data center_presentation_to_schneider_march 4_2013

Elitery Certifications

TUV ISO 9001:2008Uptime Institute Tier III Certified

Page 3: Elitery data center_presentation_to_schneider_march 4_2013

1. Latest trend in data usage around the world and in Indonesia

2. Business opportunity; Elitery Case Study, Cloud Computing Trend => Data Center Needs

3. Regulation and business challenges in Indonesia that we need to anticipate

4. Elitery facilities

Today’s agenda

Page 4: Elitery data center_presentation_to_schneider_march 4_2013

The world is becoming more and more digitized!

Page 5: Elitery data center_presentation_to_schneider_march 4_2013

Internet Users In the World by Geographic Regions - 2011

Page 6: Elitery data center_presentation_to_schneider_march 4_2013
Page 7: Elitery data center_presentation_to_schneider_march 4_2013
Page 8: Elitery data center_presentation_to_schneider_march 4_2013

Cloud Computing Trend

Page 9: Elitery data center_presentation_to_schneider_march 4_2013

• More Users

• >1Billion More Netizen’s

Global Trend in 2015!

1. IDC “Server Workloads Forecast” 2009. 2.IDC “The Internet Reaches Late Adolescence” Dec 2009, extrapolation by Intel for 20152.ECG “Worldwide Device

Page 10: Elitery data center_presentation_to_schneider_march 4_2013

Global Trend in 2015!

More Devices

>15 Billion Connected Devices1. IDC “Server Workloads Forecast” 2009. 2.IDC “The Internet Reaches Late Adolescence” Dec 2009, extrapolation by Intel for 20152.ECG “Worldwide Device

Page 11: Elitery data center_presentation_to_schneider_march 4_2013

Global Trend in 2015!

More Data

>1 Zetabyte Internet Traffic1. IDC “Server Workloads Forecast” 2009. 2.IDC “The Internet Reaches Late Adolescence” Dec 2009, extrapolation by Intel for 20152.ECG “Worldwide Device

Page 12: Elitery data center_presentation_to_schneider_march 4_2013

Global Trend in 2015!

Internet penetration, cloud computing trend and device expansion

drive the need for Data Centers!

Page 13: Elitery data center_presentation_to_schneider_march 4_2013

Data Center Business Trend (ASPAC)

Page 14: Elitery data center_presentation_to_schneider_march 4_2013

Data Center Business Trend (ASPAC)

1. Japan accounted for the largest portion of the region's total market revenues in 2009, generating $5.7 billion

2. Other major Asia-Pacific data center "hubs" are Australia, Singapore, Hong Kong and, to a lesser degree, China, India and Malaysia.

3. Across the region, most demand is driven by "government initiatives towards e-governance and e-readiness."

4. Remaining 45 percent of the market is driven by Internet media, telecommunications and IT companies, whose sectors continue growing at high rates.

Page 15: Elitery data center_presentation_to_schneider_march 4_2013

Data Center Business Trend INDONESIA

Three key drivers1. Macroeconomic2. Technology/Cultural3. Political/Regulation

Page 16: Elitery data center_presentation_to_schneider_march 4_2013

Indonesia Macroeconomic Driver

Page 17: Elitery data center_presentation_to_schneider_march 4_2013

Population growth rate1.04% (2011 est.)Birth rate17.76 births/1,000 population (2011 est.)

237,556,363 people living in Indonesia

Page 18: Elitery data center_presentation_to_schneider_march 4_2013

Indonesia also more digitalized!

Page 19: Elitery data center_presentation_to_schneider_march 4_2013
Page 20: Elitery data center_presentation_to_schneider_march 4_2013

Indonesia Stock Exhchange from Indonesia BEI’s Performance Table 2005-2007

Indikator 2005 2006 2007

IHSG 1162.64 1805.52 2745.83

Kapitalisasi Pasar Rp 801T Rp 1249T Rp 1982T

Transaksi Harian Rp 1.67T Rp 1.84T Rp 4.26T

Volume Harian 1.65M 1.78M 4.26M

Emiten Baru 8 12 24

IPO Rp 3.54T Rp 3.01T Rp 17.18T

Right Issue Rp 10.36T Rp 9.76T Rp 29.8T

Emisi obligasi Rp 8.25T Rp 11.45T Rp 31.28T

NAB Reksadana Rp 29.17T Rp 52.28T Rp 91.5T

Transaksi harian BEI di 2011 Rp 5,7 T!

Page 21: Elitery data center_presentation_to_schneider_march 4_2013

Indonesia Technology Driver

Page 22: Elitery data center_presentation_to_schneider_march 4_2013

• Many new alternative ways to share information.

Indonesia also more digitalized!

Page 23: Elitery data center_presentation_to_schneider_march 4_2013

• Indonesia Officially The Twitter Capital Of Asia.

• Alexa, the California-based web information company, puts Facebook on the top list of most visited sites in Indonesia exceeding Google and Yahoo!

Indonesia also more digitalized!

Page 24: Elitery data center_presentation_to_schneider_march 4_2013

Why Singapore was chosen instead of Indonesia as place to host their servers?

 

Why Facebook does not have servers in Indonesia?

Data Sharing Vision demonstrate the need for data centers by the global industry average tier-3. 

Page 25: Elitery data center_presentation_to_schneider_march 4_2013
Page 26: Elitery data center_presentation_to_schneider_march 4_2013

Indonesia Political Driver

1. PBI no 9/15 thn 20072. Permen PP 82 th 2012

Page 27: Elitery data center_presentation_to_schneider_march 4_2013

Indonesia need more Quality data centers!

Page 28: Elitery data center_presentation_to_schneider_march 4_2013

Elitery Data CenterSafeguarding your Business©

Page 29: Elitery data center_presentation_to_schneider_march 4_2013

Elitery Building Location

• Located in Bogor, a quick 45 minutes from Jakarta CBD• Only 10 minutes from Bogor Toll Exit

Elitery Data Center Location

Elitery Data CenterJl Pajajaran No 17

1. Hotel Pangrango 1,2,3

2. Hotel Salak The Heritage

RS PMIElitery Data CenterJl Pajajaran No 17

Page 30: Elitery data center_presentation_to_schneider_march 4_2013
Page 31: Elitery data center_presentation_to_schneider_march 4_2013
Page 32: Elitery data center_presentation_to_schneider_march 4_2013
Page 33: Elitery data center_presentation_to_schneider_march 4_2013
Page 34: Elitery data center_presentation_to_schneider_march 4_2013

Elitery Surrounding

Front view of our Data Center

Page 35: Elitery data center_presentation_to_schneider_march 4_2013

Elitery Surrounding

View from our 6th Floor to our front yard

Page 36: Elitery data center_presentation_to_schneider_march 4_2013

Elitery Building Facilities

• Reception room

• Staging room

Page 37: Elitery data center_presentation_to_schneider_march 4_2013

Elitery Building Facilities

• Building Management System Room

• Form 3B Electrical Power Panels

Page 38: Elitery data center_presentation_to_schneider_march 4_2013

Elitery Building Facilities

• Cool water tower (N+1)

• Chiller engine (N+1)

Page 39: Elitery data center_presentation_to_schneider_march 4_2013

• 2 X 1.5 MW Diesel Generator

Elitery Building Facilities

• High end generator controller by Schneider

Page 40: Elitery data center_presentation_to_schneider_march 4_2013

• UPS Battery

Elitery Building Facilities

• UPS N+1

Page 41: Elitery data center_presentation_to_schneider_march 4_2013

Elitery Data Center Lay Out

Loading Space

Page 42: Elitery data center_presentation_to_schneider_march 4_2013

Our Offer: Elitery Data Center – Building Specs

Gross Area: 5000m2 (50,000 ft2)Building Management SystemConcurrently Maintainable BuildingMultiple Separated M&E Rooms with redundant AHU unitsDual Redundancy Chill Water Chillers SystemDual Redundancy Cooling Tower SystemDual Redundancy Pump SystemSpecial Design Diesel Generators Room216.000 Liters Diesel Tanks100,000 Liters makeup Water Tanks100,000 Liters Hydrant Water Tanks100,000 Liters Ground Water TanksStructure:

Reinforce Concrete Structure building with Fire resistance wallsEarthquake Resistance Building up to 8.5 RS5.0 m slab to slab heightColumn spacing primarily based on 7 & 8.5m gridBomb, Bullet & Quake resistance windowsDual Separated & compartmented RisersPassenger/Cargo Lift 1x1.6 tones (2x2 meters internal dimension)Positive Air Intake Building

Page 43: Elitery data center_presentation_to_schneider_march 4_2013

Our Offer: Elitery Data Center – Data Center Specs

Gross Area: 1,320m2 (13,200 ft2)Gross Raise Floor: 1,140m2 (11,400 ft2)Structure:

Data Center floor loading of 1 toneReinforced Concrete Floor with Fire & Water Resistance applied Floor5 meters slabs to slabs Height Flooring0.8 meter high 1 ton Raised floor with anti static tilesDual Feed Chilled water pipe on ring topology Under Raised FloorDual Feed Zonings Power Distribution System Under Raised FloorPre Action FM 200 Above & Under Raised FloorSmoke, Heat & water Detection system above & Under RaisedTrap man Door appliedRedundant Duel Coil CRAC Parameter CoolingSeparated Utility from Datacenter FloorState of the art Access Door SystemState of the art CCTV & Surveillance System

Page 44: Elitery data center_presentation_to_schneider_march 4_2013

Our Offer: Elitery Data Center – Power and Environment System Specs

Power2 Separated Power Feeds to 2 Dry TransformerForm 3B Power Panels SystemBus Bar Panel InterconnectionN +1 centralized redundant UPS systemBattery reserve 15 to 30 minutes depends on loadIndividual Rack power outlet (Form 2B)100% Full backup generatingOnsite diesel tank support up to 14 days (216.000 liters)

Environmental SystemN+1 Total Redundancies Water Cool Chiller SystemN+1 Total Redundancies Chilled Water Piping SystemN+1 Dual Coil Precision Air Conditioning SystemUp to 15- ‐30 Minets CWT depends on LoadTemperature maintained at 22oC (+/-2oC)Humidity range of 45% (+/-10%)

Page 45: Elitery data center_presentation_to_schneider_march 4_2013