Elevator Story & Working a Career Fair Experience That Works!
Elevator Execution Civil works
10
-
Upload
azam-fa -
Category
Real Estate
-
view
292 -
download
1
description
Civil work, scaffolding, lift Car, Gide rails, etc
Transcript of Elevator Execution Civil works
Entire lift shaft need to be cleaned
Water and debris keep falling from the top need to
be stopped
Scaffolding to be erected
White wash need to be done with in
the Lift shaft
10
LIFT - 2LIFT - 1