8/18/2019 Electrostatic Precipitator Operation and Maintenance
http://slidepdf.com/reader/full/electrostatic-precipitator-operation-and-maintenance 1/7
Operation & Maintenance ManualFor
Electrostatic Precipitator
CustomerThyssenkrupp Industries India Pvt. Ltd.
Project Order No. – C099
Name Of ProjectAlsalam Cement Production Company,
Atabara, Sudan.
ThermaxO.C. NO : E – 7391.
CUSTOMER ORDER REFERENCEL.O.I NO. BOHT : ZEK : C099 : 373377
8/18/2019 Electrostatic Precipitator Operation and Maintenance
http://slidepdf.com/reader/full/electrostatic-precipitator-operation-and-maintenance 2/7
Customer : Thyssenkrupp Industries India Pvt.Ltd.Project : Alsalam Cement Production Company Ltd.( Sudan)
Operation & Maintenance ManualFor
Electrostatic Precipitator
CustomerThyssenkrupp Industries India Pvt. Ltd.
Project Order No. – C099Project
Alsalam Cement Production Company,Atabara, Sudan.
Thermax O.C. No.: E – 7391.
Model :- SC - 21– 16 – 34 - (3 X 12 . 125’) - 1.3P
Application:- ESP For Clinker Cooler.
Supplied ByThermax Ltd. (Enviro Division)
Behind P.C.M.C Pimpri,Pune - 411 018.
Prepared By Chkd. & Approved By DateR.N. Raut D.M.Dange / K.L. Patil 23/ 02 / 2007.
8/18/2019 Electrostatic Precipitator Operation and Maintenance
http://slidepdf.com/reader/full/electrostatic-precipitator-operation-and-maintenance 3/7
Customer : Thyssenkrupp Industries India Pvt.Ltd.Project : Alsalam Cement Production Company Ltd.( Sudan)
Contents
Sr No. Enclosure
1.
2.
3.
4.
5.
Operation & Maintenance Manual for ESP
Spare Part List / Lubrication Schedule
Control logic for Electrostatic Precipitator
Boughtout Item Manuals
List Of Drawings
8/18/2019 Electrostatic Precipitator Operation and Maintenance
http://slidepdf.com/reader/full/electrostatic-precipitator-operation-and-maintenance 4/7
8/18/2019 Electrostatic Precipitator Operation and Maintenance
http://slidepdf.com/reader/full/electrostatic-precipitator-operation-and-maintenance 5/7
Customer : Thyssenkrupp Industries India Pvt.Ltd.Project : Alsalam Cement Production Company Ltd.( Sudan)
Boughtout Item Manual :
Sr.No
Contents Make
1.
2.
3.
4.
5.
6.
7.
Purge Air Fan Engi – Con
Dry – Structural Bearing Mittal Pvt. Ltd
Purge Air Filter Dyna Filters Pvt. Ltd
Geared Motor IC - Bauer
Thermostat Indfos
Zero Speed Switch P & F
Level Switch E & H
8/18/2019 Electrostatic Precipitator Operation and Maintenance
http://slidepdf.com/reader/full/electrostatic-precipitator-operation-and-maintenance 6/7
Customer : Thyssenkrupp Industries India Pvt.Ltd.Project : Alsalam Cement Production Company Ltd.( Sudan)
List Of Drawings Electrical & Mechanical :
Sr. No Decription Drawing No. Revision
1. G.A. Drawings 7 E521 038 10 5
2. P & I Diagram 6 E7391 502 2 0
3. Cable Tray Layout 6 E7391 536 1 1
4. Typical Earthing Layout 6 E7391 537 1 1
5. Wiring For Rapper Distrubution Panel 6 E7391 516 3 0
6. A C P G.A. Drawing 6 E7391 522 3 2
7. A C P Wiring 6 E7391 523 3 2
8. A C P BOM 6 E7391 524 3 2
List Of Parts Catalogues
Sr. No Decription Drawing No. Revision
1. Door Inter Lock Key Diagram 6 E7391535 0 0
8/18/2019 Electrostatic Precipitator Operation and Maintenance
http://slidepdf.com/reader/full/electrostatic-precipitator-operation-and-maintenance 7/7
Customer : Thyssenkrupp Industries India Pvt.Ltd.Project : Alsalam Cement Production Company Ltd.( Sudan)
Hook Up Drawings
Sr.No Decription Drawing No. Revision
1. Hook – Up Dia.For Insulator Heater 70516 034 40 1
2. Hook – Up Dia. For Thermostat 70516 040 30 1
3. Hook - Up Dia. For Zero Speed Switch 70061 638 30 3
List Of Termination Diagrams
Sr.No Decription Drawing
No.Revision
1. Power Cable Schedule With Termination Dia. 6 E7391 538 3 2
2. Control Cable Schedule With Termination Dia. 6 E7391 539 3 2
3. Insulator Heater Junction Box Connection Dia. 6 E7391 550 4 0
4. Connection Diagram For Junction Box – 1 6 E7391 545 4 0
5. Connection Diagram For Level Switch Junction Box – 1 6 E7391 546 4 0
6. Connection Diagram For Level Switch Junction Box – 2 6 E7391 547 4 0
7. Connection Diagram For Junction Box – 2 6 E7391 548 4 0
8. Connection Diagram For Junction Box – 3 6 E7391 549 4 0