Electricity for all
Dr. Matti Supponen
Kyiv, December 2019
![Page 2: Electricity for all€¦ · Greece Capacity payment 9 11.000 PJM Capacity market 5.5 136.000 UK Capacity market 5 49.000 UK Strategic reserve 4 2.000 Spain Capacity payment 2.7 25.000](https://reader033.fdocuments.in/reader033/viewer/2022053022/604c24e7ac8ed3178c62db39/html5/thumbnails/2.jpg)
![Page 3: Electricity for all€¦ · Greece Capacity payment 9 11.000 PJM Capacity market 5.5 136.000 UK Capacity market 5 49.000 UK Strategic reserve 4 2.000 Spain Capacity payment 2.7 25.000](https://reader033.fdocuments.in/reader033/viewer/2022053022/604c24e7ac8ed3178c62db39/html5/thumbnails/3.jpg)
Westinghouse, Lenin Tesla, Edison,
Siemens
SOURCE: Wikipedia2
![Page 4: Electricity for all€¦ · Greece Capacity payment 9 11.000 PJM Capacity market 5.5 136.000 UK Capacity market 5 49.000 UK Strategic reserve 4 2.000 Spain Capacity payment 2.7 25.000](https://reader033.fdocuments.in/reader033/viewer/2022053022/604c24e7ac8ed3178c62db39/html5/thumbnails/4.jpg)
Miguel and Matti
3
![Page 5: Electricity for all€¦ · Greece Capacity payment 9 11.000 PJM Capacity market 5.5 136.000 UK Capacity market 5 49.000 UK Strategic reserve 4 2.000 Spain Capacity payment 2.7 25.000](https://reader033.fdocuments.in/reader033/viewer/2022053022/604c24e7ac8ed3178c62db39/html5/thumbnails/5.jpg)
Menu
▪ Basics of the electricity system
▪ Roles of different players
▪ How the electricity market works
▪ Network codes
▪ Grid investments
▪ End customers
▪ Flexibility
▪ Generation investments and capacity mechanisms
▪ Future topics
4
![Page 6: Electricity for all€¦ · Greece Capacity payment 9 11.000 PJM Capacity market 5.5 136.000 UK Capacity market 5 49.000 UK Strategic reserve 4 2.000 Spain Capacity payment 2.7 25.000](https://reader033.fdocuments.in/reader033/viewer/2022053022/604c24e7ac8ed3178c62db39/html5/thumbnails/6.jpg)
Voltage = U
▪ Mobile phone charger
▪ Car battery
▪ Electricity socket
▪ Medium voltage
▪ High speed train
▪ High voltage
5
▪ = 5V
▪ = 12V
▪ ~ 230V
▪ ~ 10-20kV
▪ ~ 25kV
▪ ~ 110 – 700kV
pic
ture
sourc
e: blo
g.a
uro
sola
r.com
![Page 7: Electricity for all€¦ · Greece Capacity payment 9 11.000 PJM Capacity market 5.5 136.000 UK Capacity market 5 49.000 UK Strategic reserve 4 2.000 Spain Capacity payment 2.7 25.000](https://reader033.fdocuments.in/reader033/viewer/2022053022/604c24e7ac8ed3178c62db39/html5/thumbnails/7.jpg)
Current = I
▪ Mobile phone charger
▪ Car battery
▪ Electricity socket
▪ Medium voltage
▪ High speed train
▪ High voltage
6
▪ = 1A
▪ = 300A
▪ ~ 16A
▪ ~ 500A
▪ ~ 300A
▪ ~ 100 – 2000A
pic
ture
sourc
e: blo
g.a
uro
sola
r.com
![Page 8: Electricity for all€¦ · Greece Capacity payment 9 11.000 PJM Capacity market 5.5 136.000 UK Capacity market 5 49.000 UK Strategic reserve 4 2.000 Spain Capacity payment 2.7 25.000](https://reader033.fdocuments.in/reader033/viewer/2022053022/604c24e7ac8ed3178c62db39/html5/thumbnails/8.jpg)
▪ = 5W
▪ = 3kW
▪ ~ 4kW
▪ ~ 300kW
▪ ~ 8MW
▪ ~ 50MW
▪ ~ 2000MW
Power = U* I
▪ Mobile phone charger
▪ Car battery
▪ Flat iron
▪ Rue de Mot 24
▪ High speed train
▪ Arc furnace
▪ Berlin
7
![Page 9: Electricity for all€¦ · Greece Capacity payment 9 11.000 PJM Capacity market 5.5 136.000 UK Capacity market 5 49.000 UK Strategic reserve 4 2.000 Spain Capacity payment 2.7 25.000](https://reader033.fdocuments.in/reader033/viewer/2022053022/604c24e7ac8ed3178c62db39/html5/thumbnails/9.jpg)
Energy = P*t
▪ Mobile phone charger
▪ Car battery
▪ Flat iron
▪ High speed train
▪ Arc furnace
▪ Windmill
▪ Comb. cycle gas turbine
▪ Berlin
▪ ~ 1kWh
▪ ~ 10kWh
▪ ~ 100kWh
▪ ~ 10GWh
▪ ~ 200GWh
▪ ~ 10GWh
▪ ~ 2TWh
▪ ~ 14TWh
8
![Page 10: Electricity for all€¦ · Greece Capacity payment 9 11.000 PJM Capacity market 5.5 136.000 UK Capacity market 5 49.000 UK Strategic reserve 4 2.000 Spain Capacity payment 2.7 25.000](https://reader033.fdocuments.in/reader033/viewer/2022053022/604c24e7ac8ed3178c62db39/html5/thumbnails/10.jpg)
Physical value chain for electricity
9
generation transmission distribution end consumer
![Page 11: Electricity for all€¦ · Greece Capacity payment 9 11.000 PJM Capacity market 5.5 136.000 UK Capacity market 5 49.000 UK Strategic reserve 4 2.000 Spain Capacity payment 2.7 25.000](https://reader033.fdocuments.in/reader033/viewer/2022053022/604c24e7ac8ed3178c62db39/html5/thumbnails/11.jpg)
Generator
© George Campbell 1993
10
![Page 12: Electricity for all€¦ · Greece Capacity payment 9 11.000 PJM Capacity market 5.5 136.000 UK Capacity market 5 49.000 UK Strategic reserve 4 2.000 Spain Capacity payment 2.7 25.000](https://reader033.fdocuments.in/reader033/viewer/2022053022/604c24e7ac8ed3178c62db39/html5/thumbnails/12.jpg)
Rotor
SOURCE: Tennessee Valley Authority
11
![Page 14: Electricity for all€¦ · Greece Capacity payment 9 11.000 PJM Capacity market 5.5 136.000 UK Capacity market 5 49.000 UK Strategic reserve 4 2.000 Spain Capacity payment 2.7 25.000](https://reader033.fdocuments.in/reader033/viewer/2022053022/604c24e7ac8ed3178c62db39/html5/thumbnails/14.jpg)
3 phase alternating current
13
![Page 15: Electricity for all€¦ · Greece Capacity payment 9 11.000 PJM Capacity market 5.5 136.000 UK Capacity market 5 49.000 UK Strategic reserve 4 2.000 Spain Capacity payment 2.7 25.000](https://reader033.fdocuments.in/reader033/viewer/2022053022/604c24e7ac8ed3178c62db39/html5/thumbnails/15.jpg)
Synchronous zones in Europe
IPS/UPS
Continental Europe
Nordic
UKBaltic
14
![Page 16: Electricity for all€¦ · Greece Capacity payment 9 11.000 PJM Capacity market 5.5 136.000 UK Capacity market 5 49.000 UK Strategic reserve 4 2.000 Spain Capacity payment 2.7 25.000](https://reader033.fdocuments.in/reader033/viewer/2022053022/604c24e7ac8ed3178c62db39/html5/thumbnails/16.jpg)
SOURCE: Cigre papers, ABB
Synchronous zones in China
15
![Page 17: Electricity for all€¦ · Greece Capacity payment 9 11.000 PJM Capacity market 5.5 136.000 UK Capacity market 5 49.000 UK Strategic reserve 4 2.000 Spain Capacity payment 2.7 25.000](https://reader033.fdocuments.in/reader033/viewer/2022053022/604c24e7ac8ed3178c62db39/html5/thumbnails/17.jpg)
Wind generator
16
![Page 18: Electricity for all€¦ · Greece Capacity payment 9 11.000 PJM Capacity market 5.5 136.000 UK Capacity market 5 49.000 UK Strategic reserve 4 2.000 Spain Capacity payment 2.7 25.000](https://reader033.fdocuments.in/reader033/viewer/2022053022/604c24e7ac8ed3178c62db39/html5/thumbnails/18.jpg)
Solarpanel
17
![Page 19: Electricity for all€¦ · Greece Capacity payment 9 11.000 PJM Capacity market 5.5 136.000 UK Capacity market 5 49.000 UK Strategic reserve 4 2.000 Spain Capacity payment 2.7 25.000](https://reader033.fdocuments.in/reader033/viewer/2022053022/604c24e7ac8ed3178c62db39/html5/thumbnails/19.jpg)
Hydro power plant
18
![Page 20: Electricity for all€¦ · Greece Capacity payment 9 11.000 PJM Capacity market 5.5 136.000 UK Capacity market 5 49.000 UK Strategic reserve 4 2.000 Spain Capacity payment 2.7 25.000](https://reader033.fdocuments.in/reader033/viewer/2022053022/604c24e7ac8ed3178c62db39/html5/thumbnails/20.jpg)
Combined cycle gas turbine
19
![Page 21: Electricity for all€¦ · Greece Capacity payment 9 11.000 PJM Capacity market 5.5 136.000 UK Capacity market 5 49.000 UK Strategic reserve 4 2.000 Spain Capacity payment 2.7 25.000](https://reader033.fdocuments.in/reader033/viewer/2022053022/604c24e7ac8ed3178c62db39/html5/thumbnails/21.jpg)
Coal power station
20
![Page 22: Electricity for all€¦ · Greece Capacity payment 9 11.000 PJM Capacity market 5.5 136.000 UK Capacity market 5 49.000 UK Strategic reserve 4 2.000 Spain Capacity payment 2.7 25.000](https://reader033.fdocuments.in/reader033/viewer/2022053022/604c24e7ac8ed3178c62db39/html5/thumbnails/22.jpg)
Nuclear power station
21
![Page 23: Electricity for all€¦ · Greece Capacity payment 9 11.000 PJM Capacity market 5.5 136.000 UK Capacity market 5 49.000 UK Strategic reserve 4 2.000 Spain Capacity payment 2.7 25.000](https://reader033.fdocuments.in/reader033/viewer/2022053022/604c24e7ac8ed3178c62db39/html5/thumbnails/23.jpg)
Transformer
22
![Page 24: Electricity for all€¦ · Greece Capacity payment 9 11.000 PJM Capacity market 5.5 136.000 UK Capacity market 5 49.000 UK Strategic reserve 4 2.000 Spain Capacity payment 2.7 25.000](https://reader033.fdocuments.in/reader033/viewer/2022053022/604c24e7ac8ed3178c62db39/html5/thumbnails/24.jpg)
Step-up transformer
23
![Page 25: Electricity for all€¦ · Greece Capacity payment 9 11.000 PJM Capacity market 5.5 136.000 UK Capacity market 5 49.000 UK Strategic reserve 4 2.000 Spain Capacity payment 2.7 25.000](https://reader033.fdocuments.in/reader033/viewer/2022053022/604c24e7ac8ed3178c62db39/html5/thumbnails/25.jpg)
Substation
Pristina 24
![Page 26: Electricity for all€¦ · Greece Capacity payment 9 11.000 PJM Capacity market 5.5 136.000 UK Capacity market 5 49.000 UK Strategic reserve 4 2.000 Spain Capacity payment 2.7 25.000](https://reader033.fdocuments.in/reader033/viewer/2022053022/604c24e7ac8ed3178c62db39/html5/thumbnails/26.jpg)
Overhead line
SOURCE: Statnett 25
![Page 27: Electricity for all€¦ · Greece Capacity payment 9 11.000 PJM Capacity market 5.5 136.000 UK Capacity market 5 49.000 UK Strategic reserve 4 2.000 Spain Capacity payment 2.7 25.000](https://reader033.fdocuments.in/reader033/viewer/2022053022/604c24e7ac8ed3178c62db39/html5/thumbnails/27.jpg)
Substation
Praha Sever SOURCE: Eltodo 26
![Page 28: Electricity for all€¦ · Greece Capacity payment 9 11.000 PJM Capacity market 5.5 136.000 UK Capacity market 5 49.000 UK Strategic reserve 4 2.000 Spain Capacity payment 2.7 25.000](https://reader033.fdocuments.in/reader033/viewer/2022053022/604c24e7ac8ed3178c62db39/html5/thumbnails/28.jpg)
Undersea cable
Praha Sever SOURCE: Eltodo 27
![Page 29: Electricity for all€¦ · Greece Capacity payment 9 11.000 PJM Capacity market 5.5 136.000 UK Capacity market 5 49.000 UK Strategic reserve 4 2.000 Spain Capacity payment 2.7 25.000](https://reader033.fdocuments.in/reader033/viewer/2022053022/604c24e7ac8ed3178c62db39/html5/thumbnails/29.jpg)
380kV cable in Berlin
Source: Wikipedia28
![Page 30: Electricity for all€¦ · Greece Capacity payment 9 11.000 PJM Capacity market 5.5 136.000 UK Capacity market 5 49.000 UK Strategic reserve 4 2.000 Spain Capacity payment 2.7 25.000](https://reader033.fdocuments.in/reader033/viewer/2022053022/604c24e7ac8ed3178c62db39/html5/thumbnails/30.jpg)
Converter - easy part
29
![Page 31: Electricity for all€¦ · Greece Capacity payment 9 11.000 PJM Capacity market 5.5 136.000 UK Capacity market 5 49.000 UK Strategic reserve 4 2.000 Spain Capacity payment 2.7 25.000](https://reader033.fdocuments.in/reader033/viewer/2022053022/604c24e7ac8ed3178c62db39/html5/thumbnails/31.jpg)
Converter - difficult part
30
![Page 32: Electricity for all€¦ · Greece Capacity payment 9 11.000 PJM Capacity market 5.5 136.000 UK Capacity market 5 49.000 UK Strategic reserve 4 2.000 Spain Capacity payment 2.7 25.000](https://reader033.fdocuments.in/reader033/viewer/2022053022/604c24e7ac8ed3178c62db39/html5/thumbnails/32.jpg)
Converter - done
31
![Page 33: Electricity for all€¦ · Greece Capacity payment 9 11.000 PJM Capacity market 5.5 136.000 UK Capacity market 5 49.000 UK Strategic reserve 4 2.000 Spain Capacity payment 2.7 25.000](https://reader033.fdocuments.in/reader033/viewer/2022053022/604c24e7ac8ed3178c62db39/html5/thumbnails/33.jpg)
Converter - built
32
![Page 34: Electricity for all€¦ · Greece Capacity payment 9 11.000 PJM Capacity market 5.5 136.000 UK Capacity market 5 49.000 UK Strategic reserve 4 2.000 Spain Capacity payment 2.7 25.000](https://reader033.fdocuments.in/reader033/viewer/2022053022/604c24e7ac8ed3178c62db39/html5/thumbnails/34.jpg)
Back-to-back
33
![Page 35: Electricity for all€¦ · Greece Capacity payment 9 11.000 PJM Capacity market 5.5 136.000 UK Capacity market 5 49.000 UK Strategic reserve 4 2.000 Spain Capacity payment 2.7 25.000](https://reader033.fdocuments.in/reader033/viewer/2022053022/604c24e7ac8ed3178c62db39/html5/thumbnails/35.jpg)
Back-to-back station Etzenricht
SOURCE: Wikimedia 34
![Page 36: Electricity for all€¦ · Greece Capacity payment 9 11.000 PJM Capacity market 5.5 136.000 UK Capacity market 5 49.000 UK Strategic reserve 4 2.000 Spain Capacity payment 2.7 25.000](https://reader033.fdocuments.in/reader033/viewer/2022053022/604c24e7ac8ed3178c62db39/html5/thumbnails/36.jpg)
Good old times
35
![Page 37: Electricity for all€¦ · Greece Capacity payment 9 11.000 PJM Capacity market 5.5 136.000 UK Capacity market 5 49.000 UK Strategic reserve 4 2.000 Spain Capacity payment 2.7 25.000](https://reader033.fdocuments.in/reader033/viewer/2022053022/604c24e7ac8ed3178c62db39/html5/thumbnails/37.jpg)
New roles
DSO
ProducerTrader
Regulator
TSO
End consumer
Supplier
Powerexchange 36
![Page 38: Electricity for all€¦ · Greece Capacity payment 9 11.000 PJM Capacity market 5.5 136.000 UK Capacity market 5 49.000 UK Strategic reserve 4 2.000 Spain Capacity payment 2.7 25.000](https://reader033.fdocuments.in/reader033/viewer/2022053022/604c24e7ac8ed3178c62db39/html5/thumbnails/38.jpg)
Regulator's life is not always easy
37
![Page 39: Electricity for all€¦ · Greece Capacity payment 9 11.000 PJM Capacity market 5.5 136.000 UK Capacity market 5 49.000 UK Strategic reserve 4 2.000 Spain Capacity payment 2.7 25.000](https://reader033.fdocuments.in/reader033/viewer/2022053022/604c24e7ac8ed3178c62db39/html5/thumbnails/39.jpg)
Power market
38
![Page 40: Electricity for all€¦ · Greece Capacity payment 9 11.000 PJM Capacity market 5.5 136.000 UK Capacity market 5 49.000 UK Strategic reserve 4 2.000 Spain Capacity payment 2.7 25.000](https://reader033.fdocuments.in/reader033/viewer/2022053022/604c24e7ac8ed3178c62db39/html5/thumbnails/40.jpg)
Power market
Sellers
Buyers
Liquidity
39
![Page 41: Electricity for all€¦ · Greece Capacity payment 9 11.000 PJM Capacity market 5.5 136.000 UK Capacity market 5 49.000 UK Strategic reserve 4 2.000 Spain Capacity payment 2.7 25.000](https://reader033.fdocuments.in/reader033/viewer/2022053022/604c24e7ac8ed3178c62db39/html5/thumbnails/41.jpg)
Coal power in duty, gas power stations not in the money
Oil
10 20 30 40 6050 70 80 90 100
load
35 €/MWh
Renewables Nuclear Lignite
1153*
Coal
882**
Gas
440** g CO2/kWh
not in the market
GW
* www.co2-emissionen-vergleich.de** E-Control-Referenzwerte
Merit Order Austria/Germany 2014
40
![Page 42: Electricity for all€¦ · Greece Capacity payment 9 11.000 PJM Capacity market 5.5 136.000 UK Capacity market 5 49.000 UK Strategic reserve 4 2.000 Spain Capacity payment 2.7 25.000](https://reader033.fdocuments.in/reader033/viewer/2022053022/604c24e7ac8ed3178c62db39/html5/thumbnails/42.jpg)
Nordic electricity market without EU ETS
41
Gas
turb
ines
100 200 400
Hydro (average year) Nuclear
300
Variable
generation
costs
(€/MWh)
Generation
capacity
(TWh/a)
Imp
orts
Ru
ssia
Win
d
Demand
Market price
for electricity
Co
al
co
nd
en
sin
g
CHP
Oil c
on
den
sin
g
Imp
orts
Germ
an
ySOURCE: Federation of Finnish Technology industries
![Page 43: Electricity for all€¦ · Greece Capacity payment 9 11.000 PJM Capacity market 5.5 136.000 UK Capacity market 5 49.000 UK Strategic reserve 4 2.000 Spain Capacity payment 2.7 25.000](https://reader033.fdocuments.in/reader033/viewer/2022053022/604c24e7ac8ed3178c62db39/html5/thumbnails/43.jpg)
Nord pool spot
42
![Page 44: Electricity for all€¦ · Greece Capacity payment 9 11.000 PJM Capacity market 5.5 136.000 UK Capacity market 5 49.000 UK Strategic reserve 4 2.000 Spain Capacity payment 2.7 25.000](https://reader033.fdocuments.in/reader033/viewer/2022053022/604c24e7ac8ed3178c62db39/html5/thumbnails/44.jpg)
EPEX Germany/Austria
Price for 13.1.2015 hour 11-1243
![Page 45: Electricity for all€¦ · Greece Capacity payment 9 11.000 PJM Capacity market 5.5 136.000 UK Capacity market 5 49.000 UK Strategic reserve 4 2.000 Spain Capacity payment 2.7 25.000](https://reader033.fdocuments.in/reader033/viewer/2022053022/604c24e7ac8ed3178c62db39/html5/thumbnails/45.jpg)
Market coupling
44
![Page 46: Electricity for all€¦ · Greece Capacity payment 9 11.000 PJM Capacity market 5.5 136.000 UK Capacity market 5 49.000 UK Strategic reserve 4 2.000 Spain Capacity payment 2.7 25.000](https://reader033.fdocuments.in/reader033/viewer/2022053022/604c24e7ac8ed3178c62db39/html5/thumbnails/46.jpg)
Singlematching
800MW
1500MW
1000MW
800MW
100MW
40€/MWh
42€/MWh
45€/MWh50€/MWh
47€/MWh
+2300MW
+0MW
-700MW
+900MW
-2500MW
45
![Page 47: Electricity for all€¦ · Greece Capacity payment 9 11.000 PJM Capacity market 5.5 136.000 UK Capacity market 5 49.000 UK Strategic reserve 4 2.000 Spain Capacity payment 2.7 25.000](https://reader033.fdocuments.in/reader033/viewer/2022053022/604c24e7ac8ed3178c62db39/html5/thumbnails/47.jpg)
REGIONAL DAY AHEAD IMPLICIT AUCTIONS
North West Europe
(NWE)
Price coupling
Poland Poland coupled within NWE
through SwePol- and LitPol -link
Czech – Slovak –
Hungary-Romania
Price coupling
Source: APX, updated by Matti Supponen
Day-ahead market coupling status in December 2019
46
![Page 48: Electricity for all€¦ · Greece Capacity payment 9 11.000 PJM Capacity market 5.5 136.000 UK Capacity market 5 49.000 UK Strategic reserve 4 2.000 Spain Capacity payment 2.7 25.000](https://reader033.fdocuments.in/reader033/viewer/2022053022/604c24e7ac8ed3178c62db39/html5/thumbnails/48.jpg)
EPEX + EXAA
(NL 30%
DE/AT 50%
BE 23%
FR 23%
CH 40%
Nord Pool (94%)
EPEX + Nord Pool (46%)
OMEL (75%)
OPCOM (47%)
IPEX (65%)
South Pool (44%)
OTE (27%)
HUPX (42%)
TGE (18%)
Hellenic Pool (93%)
IBEX (8%)
SEMO (100%)
Share of day-ahead spot trading of consumption in 2016
47
![Page 49: Electricity for all€¦ · Greece Capacity payment 9 11.000 PJM Capacity market 5.5 136.000 UK Capacity market 5 49.000 UK Strategic reserve 4 2.000 Spain Capacity payment 2.7 25.000](https://reader033.fdocuments.in/reader033/viewer/2022053022/604c24e7ac8ed3178c62db39/html5/thumbnails/49.jpg)
25,2
28,7
25,1
29,2
32,5
36,529,0
32,3
36,6
36,8
39,7
39,4 42,7
42,9
33,3
31,2
29,0
26,7
29,4
Main commercial flow direction
40,447,6
41,6
42,6
41,6
Average spot prices (€) and electricity cross-border tradein Europe (2016)
48
29,0
29,0
29,5
33,1
36,1
36,5
37,931,5
35,435,6
49,141,9
Source: ENTSO-E Transparencyplatform
![Page 50: Electricity for all€¦ · Greece Capacity payment 9 11.000 PJM Capacity market 5.5 136.000 UK Capacity market 5 49.000 UK Strategic reserve 4 2.000 Spain Capacity payment 2.7 25.000](https://reader033.fdocuments.in/reader033/viewer/2022053022/604c24e7ac8ed3178c62db39/html5/thumbnails/50.jpg)
Target Model
Intraday
AllocationImplicit
Continuos
Trading and/or
Implicit Auction
Day-Ahead
Implicit
AllocationPrice Coupling
Monthly
Y+1
Futures on Y+1
Explicit Auctions
Physical and/or
Financial
Transmission
Rights
Harmonised GCT
Coordination of
ATCs (Flow
Based and/or
NTC)
Flow
Based where
more efficient
Ba
lan
cin
g, R
ea
l T
ime
Flow
Based where
more efficient
„Physical“ market„Forward“ market
![Page 51: Electricity for all€¦ · Greece Capacity payment 9 11.000 PJM Capacity market 5.5 136.000 UK Capacity market 5 49.000 UK Strategic reserve 4 2.000 Spain Capacity payment 2.7 25.000](https://reader033.fdocuments.in/reader033/viewer/2022053022/604c24e7ac8ed3178c62db39/html5/thumbnails/51.jpg)
Source: XBID project
First go-live: June 2018
Second go-live: Autumn 2019
![Page 52: Electricity for all€¦ · Greece Capacity payment 9 11.000 PJM Capacity market 5.5 136.000 UK Capacity market 5 49.000 UK Strategic reserve 4 2.000 Spain Capacity payment 2.7 25.000](https://reader033.fdocuments.in/reader033/viewer/2022053022/604c24e7ac8ed3178c62db39/html5/thumbnails/52.jpg)
FCR(Frequency containment
reserve)
mFRR(Manual frequency restoration reserve)
RR(Replacement reserve)
aFRR(Automatic frequency
restoration reserve)
Balancing
51
![Page 53: Electricity for all€¦ · Greece Capacity payment 9 11.000 PJM Capacity market 5.5 136.000 UK Capacity market 5 49.000 UK Strategic reserve 4 2.000 Spain Capacity payment 2.7 25.000](https://reader033.fdocuments.in/reader033/viewer/2022053022/604c24e7ac8ed3178c62db39/html5/thumbnails/53.jpg)
Source: ENTSO-E
LFC Area = Load Frequency Control Area = usually one country
= 15min usually
Balancing
52
![Page 54: Electricity for all€¦ · Greece Capacity payment 9 11.000 PJM Capacity market 5.5 136.000 UK Capacity market 5 49.000 UK Strategic reserve 4 2.000 Spain Capacity payment 2.7 25.000](https://reader033.fdocuments.in/reader033/viewer/2022053022/604c24e7ac8ed3178c62db39/html5/thumbnails/54.jpg)
53
European platforms for standard products
▪ RR market – 2019Project Terre
▪ mFRR market – 2021Project MARI
▪ aFRR market – 2022ENTSO-E aFRR project
![Page 55: Electricity for all€¦ · Greece Capacity payment 9 11.000 PJM Capacity market 5.5 136.000 UK Capacity market 5 49.000 UK Strategic reserve 4 2.000 Spain Capacity payment 2.7 25.000](https://reader033.fdocuments.in/reader033/viewer/2022053022/604c24e7ac8ed3178c62db39/html5/thumbnails/55.jpg)
European electricity rules
55
Electrity Directive2009/72/EC
Electrity Regulation EC/714/2009
Agency Regulation EC/713/2009
![Page 56: Electricity for all€¦ · Greece Capacity payment 9 11.000 PJM Capacity market 5.5 136.000 UK Capacity market 5 49.000 UK Strategic reserve 4 2.000 Spain Capacity payment 2.7 25.000](https://reader033.fdocuments.in/reader033/viewer/2022053022/604c24e7ac8ed3178c62db39/html5/thumbnails/56.jpg)
European electricity rules
56
Electrity Regulation EC/714/2009
technical & operational rules
marketrules
tariffrules
![Page 57: Electricity for all€¦ · Greece Capacity payment 9 11.000 PJM Capacity market 5.5 136.000 UK Capacity market 5 49.000 UK Strategic reserve 4 2.000 Spain Capacity payment 2.7 25.000](https://reader033.fdocuments.in/reader033/viewer/2022053022/604c24e7ac8ed3178c62db39/html5/thumbnails/57.jpg)
European electricity rules
57
technical & operational rules
![Page 58: Electricity for all€¦ · Greece Capacity payment 9 11.000 PJM Capacity market 5.5 136.000 UK Capacity market 5 49.000 UK Strategic reserve 4 2.000 Spain Capacity payment 2.7 25.000](https://reader033.fdocuments.in/reader033/viewer/2022053022/604c24e7ac8ed3178c62db39/html5/thumbnails/58.jpg)
European electricity rules
58
marketrules
![Page 59: Electricity for all€¦ · Greece Capacity payment 9 11.000 PJM Capacity market 5.5 136.000 UK Capacity market 5 49.000 UK Strategic reserve 4 2.000 Spain Capacity payment 2.7 25.000](https://reader033.fdocuments.in/reader033/viewer/2022053022/604c24e7ac8ed3178c62db39/html5/thumbnails/59.jpg)
European electricity rules
59
tariffrules
![Page 60: Electricity for all€¦ · Greece Capacity payment 9 11.000 PJM Capacity market 5.5 136.000 UK Capacity market 5 49.000 UK Strategic reserve 4 2.000 Spain Capacity payment 2.7 25.000](https://reader033.fdocuments.in/reader033/viewer/2022053022/604c24e7ac8ed3178c62db39/html5/thumbnails/60.jpg)
Network codes
Source: ENTSO-E
years/ monthsbefore delivery
D-24hGate closure(1h/30min beforerealtime)
Realtime
60
![Page 61: Electricity for all€¦ · Greece Capacity payment 9 11.000 PJM Capacity market 5.5 136.000 UK Capacity market 5 49.000 UK Strategic reserve 4 2.000 Spain Capacity payment 2.7 25.000](https://reader033.fdocuments.in/reader033/viewer/2022053022/604c24e7ac8ed3178c62db39/html5/thumbnails/61.jpg)
Wind
production
Surplus
Deficit 15
25
Storage
hydro
80
3030
25 3510
1025
25
25
2540
50
20
25
20
30
45 5020
10
1010
1025
20
TWh
20 TWh
TWh
TWh
25
40
15
15
10
5
Surplus and deficit areas (2008)
61
![Page 62: Electricity for all€¦ · Greece Capacity payment 9 11.000 PJM Capacity market 5.5 136.000 UK Capacity market 5 49.000 UK Strategic reserve 4 2.000 Spain Capacity payment 2.7 25.000](https://reader033.fdocuments.in/reader033/viewer/2022053022/604c24e7ac8ed3178c62db39/html5/thumbnails/62.jpg)
Extension of Renewables in Germany
Source: Boris Schucht, 5o Hertz 62
![Page 63: Electricity for all€¦ · Greece Capacity payment 9 11.000 PJM Capacity market 5.5 136.000 UK Capacity market 5 49.000 UK Strategic reserve 4 2.000 Spain Capacity payment 2.7 25.000](https://reader033.fdocuments.in/reader033/viewer/2022053022/604c24e7ac8ed3178c62db39/html5/thumbnails/63.jpg)
Source: Caiso
Duck curve
63
![Page 64: Electricity for all€¦ · Greece Capacity payment 9 11.000 PJM Capacity market 5.5 136.000 UK Capacity market 5 49.000 UK Strategic reserve 4 2.000 Spain Capacity payment 2.7 25.000](https://reader033.fdocuments.in/reader033/viewer/2022053022/604c24e7ac8ed3178c62db39/html5/thumbnails/64.jpg)
Renewables need flexible backup, not baseload
Estimated power demand over a week in 2012 and 2020, Germany
Source: Volker Quaschning, HTW
![Page 65: Electricity for all€¦ · Greece Capacity payment 9 11.000 PJM Capacity market 5.5 136.000 UK Capacity market 5 49.000 UK Strategic reserve 4 2.000 Spain Capacity payment 2.7 25.000](https://reader033.fdocuments.in/reader033/viewer/2022053022/604c24e7ac8ed3178c62db39/html5/thumbnails/65.jpg)
![Page 66: Electricity for all€¦ · Greece Capacity payment 9 11.000 PJM Capacity market 5.5 136.000 UK Capacity market 5 49.000 UK Strategic reserve 4 2.000 Spain Capacity payment 2.7 25.000](https://reader033.fdocuments.in/reader033/viewer/2022053022/604c24e7ac8ed3178c62db39/html5/thumbnails/66.jpg)
55.09 €
55.09 €
55.09 €
55.09 €
63.82 €
62.82 €
57.78 €
63.82 €
90.00 €
114.54 €
58.28 €
1375 MW
91.96 €
67.25 €
870 MW
538 MW
1505 MW
593 MW
3235 MW
383 MW
38.40 €
420 MW
108.00 €
Prices & flows
66
Wind speed in Kiel ~15 m/s
Phase angle map from ELES
8.12.2011
![Page 67: Electricity for all€¦ · Greece Capacity payment 9 11.000 PJM Capacity market 5.5 136.000 UK Capacity market 5 49.000 UK Strategic reserve 4 2.000 Spain Capacity payment 2.7 25.000](https://reader033.fdocuments.in/reader033/viewer/2022053022/604c24e7ac8ed3178c62db39/html5/thumbnails/67.jpg)
Average unschueduled flows (2011, 2012, in MWh/h)
Sourc
e:
TH
EM
A C
onsultin
g G
roup
67
![Page 68: Electricity for all€¦ · Greece Capacity payment 9 11.000 PJM Capacity market 5.5 136.000 UK Capacity market 5 49.000 UK Strategic reserve 4 2.000 Spain Capacity payment 2.7 25.000](https://reader033.fdocuments.in/reader033/viewer/2022053022/604c24e7ac8ed3178c62db39/html5/thumbnails/68.jpg)
Matti’s proposal for electricity spot-market price zones in Europe
68
![Page 69: Electricity for all€¦ · Greece Capacity payment 9 11.000 PJM Capacity market 5.5 136.000 UK Capacity market 5 49.000 UK Strategic reserve 4 2.000 Spain Capacity payment 2.7 25.000](https://reader033.fdocuments.in/reader033/viewer/2022053022/604c24e7ac8ed3178c62db39/html5/thumbnails/69.jpg)
Or is nodal pricing better?
69
![Page 70: Electricity for all€¦ · Greece Capacity payment 9 11.000 PJM Capacity market 5.5 136.000 UK Capacity market 5 49.000 UK Strategic reserve 4 2.000 Spain Capacity payment 2.7 25.000](https://reader033.fdocuments.in/reader033/viewer/2022053022/604c24e7ac8ed3178c62db39/html5/thumbnails/70.jpg)
~~~ ~~~ ~~~ ~~~
Transmission
380/220kV
Distribution
110kV
Distribution
Virtuelle Erzeugung
Virtuelle Last
~~~
~~~~~
~
)*
Overlay network
Source: Klaus Kleinekorte in VDE DACH 2010 conference
Overlay network?
![Page 71: Electricity for all€¦ · Greece Capacity payment 9 11.000 PJM Capacity market 5.5 136.000 UK Capacity market 5 49.000 UK Strategic reserve 4 2.000 Spain Capacity payment 2.7 25.000](https://reader033.fdocuments.in/reader033/viewer/2022053022/604c24e7ac8ed3178c62db39/html5/thumbnails/71.jpg)
Strom-autobahnen
71
![Page 72: Electricity for all€¦ · Greece Capacity payment 9 11.000 PJM Capacity market 5.5 136.000 UK Capacity market 5 49.000 UK Strategic reserve 4 2.000 Spain Capacity payment 2.7 25.000](https://reader033.fdocuments.in/reader033/viewer/2022053022/604c24e7ac8ed3178c62db39/html5/thumbnails/72.jpg)
Source: FSR encyclopedia
Link between wholesale and retail
72
![Page 73: Electricity for all€¦ · Greece Capacity payment 9 11.000 PJM Capacity market 5.5 136.000 UK Capacity market 5 49.000 UK Strategic reserve 4 2.000 Spain Capacity payment 2.7 25.000](https://reader033.fdocuments.in/reader033/viewer/2022053022/604c24e7ac8ed3178c62db39/html5/thumbnails/73.jpg)
Smart homes … the future is now!
73
![Page 74: Electricity for all€¦ · Greece Capacity payment 9 11.000 PJM Capacity market 5.5 136.000 UK Capacity market 5 49.000 UK Strategic reserve 4 2.000 Spain Capacity payment 2.7 25.000](https://reader033.fdocuments.in/reader033/viewer/2022053022/604c24e7ac8ed3178c62db39/html5/thumbnails/74.jpg)
Smart meters and grids
74
![Page 75: Electricity for all€¦ · Greece Capacity payment 9 11.000 PJM Capacity market 5.5 136.000 UK Capacity market 5 49.000 UK Strategic reserve 4 2.000 Spain Capacity payment 2.7 25.000](https://reader033.fdocuments.in/reader033/viewer/2022053022/604c24e7ac8ed3178c62db39/html5/thumbnails/75.jpg)
SOURCE: Wikipedia
Influence of demand response on the price
75
![Page 76: Electricity for all€¦ · Greece Capacity payment 9 11.000 PJM Capacity market 5.5 136.000 UK Capacity market 5 49.000 UK Strategic reserve 4 2.000 Spain Capacity payment 2.7 25.000](https://reader033.fdocuments.in/reader033/viewer/2022053022/604c24e7ac8ed3178c62db39/html5/thumbnails/76.jpg)
Source: Helen Sävel system
Price based demand response
76
![Page 77: Electricity for all€¦ · Greece Capacity payment 9 11.000 PJM Capacity market 5.5 136.000 UK Capacity market 5 49.000 UK Strategic reserve 4 2.000 Spain Capacity payment 2.7 25.000](https://reader033.fdocuments.in/reader033/viewer/2022053022/604c24e7ac8ed3178c62db39/html5/thumbnails/77.jpg)
SOURCE: Quora
Load control = incentive based demand response
77
![Page 78: Electricity for all€¦ · Greece Capacity payment 9 11.000 PJM Capacity market 5.5 136.000 UK Capacity market 5 49.000 UK Strategic reserve 4 2.000 Spain Capacity payment 2.7 25.000](https://reader033.fdocuments.in/reader033/viewer/2022053022/604c24e7ac8ed3178c62db39/html5/thumbnails/78.jpg)
Source: SEDC 2017
Aggregators
78
![Page 79: Electricity for all€¦ · Greece Capacity payment 9 11.000 PJM Capacity market 5.5 136.000 UK Capacity market 5 49.000 UK Strategic reserve 4 2.000 Spain Capacity payment 2.7 25.000](https://reader033.fdocuments.in/reader033/viewer/2022053022/604c24e7ac8ed3178c62db39/html5/thumbnails/79.jpg)
Dispatching
79
![Page 80: Electricity for all€¦ · Greece Capacity payment 9 11.000 PJM Capacity market 5.5 136.000 UK Capacity market 5 49.000 UK Strategic reserve 4 2.000 Spain Capacity payment 2.7 25.000](https://reader033.fdocuments.in/reader033/viewer/2022053022/604c24e7ac8ed3178c62db39/html5/thumbnails/80.jpg)
Source: ENTSO-E
TSOs' Regional Security CooperationInitiatives
80
![Page 81: Electricity for all€¦ · Greece Capacity payment 9 11.000 PJM Capacity market 5.5 136.000 UK Capacity market 5 49.000 UK Strategic reserve 4 2.000 Spain Capacity payment 2.7 25.000](https://reader033.fdocuments.in/reader033/viewer/2022053022/604c24e7ac8ed3178c62db39/html5/thumbnails/81.jpg)
Investments
81
![Page 82: Electricity for all€¦ · Greece Capacity payment 9 11.000 PJM Capacity market 5.5 136.000 UK Capacity market 5 49.000 UK Strategic reserve 4 2.000 Spain Capacity payment 2.7 25.000](https://reader033.fdocuments.in/reader033/viewer/2022053022/604c24e7ac8ed3178c62db39/html5/thumbnails/82.jpg)
Source: Zachmann, Bruegel
Capital cost decrease is no physical law
![Page 83: Electricity for all€¦ · Greece Capacity payment 9 11.000 PJM Capacity market 5.5 136.000 UK Capacity market 5 49.000 UK Strategic reserve 4 2.000 Spain Capacity payment 2.7 25.000](https://reader033.fdocuments.in/reader033/viewer/2022053022/604c24e7ac8ed3178c62db39/html5/thumbnails/83.jpg)
Levelized cost of electricity in Germany
83
![Page 84: Electricity for all€¦ · Greece Capacity payment 9 11.000 PJM Capacity market 5.5 136.000 UK Capacity market 5 49.000 UK Strategic reserve 4 2.000 Spain Capacity payment 2.7 25.000](https://reader033.fdocuments.in/reader033/viewer/2022053022/604c24e7ac8ed3178c62db39/html5/thumbnails/84.jpg)
Source: Lion Hirth NEON
The wind and solar value drop
84
![Page 85: Electricity for all€¦ · Greece Capacity payment 9 11.000 PJM Capacity market 5.5 136.000 UK Capacity market 5 49.000 UK Strategic reserve 4 2.000 Spain Capacity payment 2.7 25.000](https://reader033.fdocuments.in/reader033/viewer/2022053022/604c24e7ac8ed3178c62db39/html5/thumbnails/85.jpg)
Who takes the risk?
Source: IEA Energy Technology Perspectives 2014Modified by Matti
Feed-in tariffs
Auctions
85
Ratepayer
Investors
Quotas
AuctionsRegulation
Feed-in tariffs
SubsidiesMarketbased
![Page 86: Electricity for all€¦ · Greece Capacity payment 9 11.000 PJM Capacity market 5.5 136.000 UK Capacity market 5 49.000 UK Strategic reserve 4 2.000 Spain Capacity payment 2.7 25.000](https://reader033.fdocuments.in/reader033/viewer/2022053022/604c24e7ac8ed3178c62db39/html5/thumbnails/86.jpg)
Source: Thema consulting
Capacity mechanisms
86
![Page 87: Electricity for all€¦ · Greece Capacity payment 9 11.000 PJM Capacity market 5.5 136.000 UK Capacity market 5 49.000 UK Strategic reserve 4 2.000 Spain Capacity payment 2.7 25.000](https://reader033.fdocuments.in/reader033/viewer/2022053022/604c24e7ac8ed3178c62db39/html5/thumbnails/87.jpg)
Capacitymechanisms
87
![Page 88: Electricity for all€¦ · Greece Capacity payment 9 11.000 PJM Capacity market 5.5 136.000 UK Capacity market 5 49.000 UK Strategic reserve 4 2.000 Spain Capacity payment 2.7 25.000](https://reader033.fdocuments.in/reader033/viewer/2022053022/604c24e7ac8ed3178c62db39/html5/thumbnails/88.jpg)
Capacitymechanisms
Christmas and New Year‘sAddresses by European Heads of States
88
![Page 89: Electricity for all€¦ · Greece Capacity payment 9 11.000 PJM Capacity market 5.5 136.000 UK Capacity market 5 49.000 UK Strategic reserve 4 2.000 Spain Capacity payment 2.7 25.000](https://reader033.fdocuments.in/reader033/viewer/2022053022/604c24e7ac8ed3178c62db39/html5/thumbnails/89.jpg)
Who does what(or is planning to)?
… regarding capacity mechanisms
89
Variation in models reflects the issues and political perceptions
decentralisedmechanism
system widecentral machanism
capacity payment
strategic reserve
![Page 90: Electricity for all€¦ · Greece Capacity payment 9 11.000 PJM Capacity market 5.5 136.000 UK Capacity market 5 49.000 UK Strategic reserve 4 2.000 Spain Capacity payment 2.7 25.000](https://reader033.fdocuments.in/reader033/viewer/2022053022/604c24e7ac8ed3178c62db39/html5/thumbnails/90.jpg)
SOURCE: Thema consulting
Market Market design
Per gross
electricity
generated
€/MWh
Committed
capacity
MW
Ireland Capacity payment 20 7.000
Greece Capacity payment 9 11.000
PJM Capacity market 5.5 136.000
UK Capacity market 5 49.000
UK Strategic reserve 4 2.000
Spain Capacity payment 2.7 25.000
Italy Capacity payment 0.5 -
Finland Strategic reserve 0.3 600
Norway Strategic reserve 0.2 300
Sweden Strategic reserve 0.1 2.000
Capacity payment vs. strategic reserve in Europe
90
![Page 91: Electricity for all€¦ · Greece Capacity payment 9 11.000 PJM Capacity market 5.5 136.000 UK Capacity market 5 49.000 UK Strategic reserve 4 2.000 Spain Capacity payment 2.7 25.000](https://reader033.fdocuments.in/reader033/viewer/2022053022/604c24e7ac8ed3178c62db39/html5/thumbnails/91.jpg)
Reversibility of capacity mechanisms
91
![Page 92: Electricity for all€¦ · Greece Capacity payment 9 11.000 PJM Capacity market 5.5 136.000 UK Capacity market 5 49.000 UK Strategic reserve 4 2.000 Spain Capacity payment 2.7 25.000](https://reader033.fdocuments.in/reader033/viewer/2022053022/604c24e7ac8ed3178c62db39/html5/thumbnails/92.jpg)
Future is uncertain
92
Source: PhD thesis of Stefano Moret, EPFL“Strategic planning under uncertainty”
![Page 93: Electricity for all€¦ · Greece Capacity payment 9 11.000 PJM Capacity market 5.5 136.000 UK Capacity market 5 49.000 UK Strategic reserve 4 2.000 Spain Capacity payment 2.7 25.000](https://reader033.fdocuments.in/reader033/viewer/2022053022/604c24e7ac8ed3178c62db39/html5/thumbnails/93.jpg)
Future issuesregardingelectricity markets
• Capacity mechanisms
• New forms of trading (forexample peer-to-peer)
• Local markets (including DSO congestion management)
• Role of DSOs vs. TSOs
• Concepts for demandresponse
Design issues
93
![Page 94: Electricity for all€¦ · Greece Capacity payment 9 11.000 PJM Capacity market 5.5 136.000 UK Capacity market 5 49.000 UK Strategic reserve 4 2.000 Spain Capacity payment 2.7 25.000](https://reader033.fdocuments.in/reader033/viewer/2022053022/604c24e7ac8ed3178c62db39/html5/thumbnails/94.jpg)
Future issuesregardingelectricity markets
• Cybersecurity, Internet ofThings, Big data
• Who will manage dataplatforms?
• More active control of assetsfor balancing
Digitalisation
94
![Page 95: Electricity for all€¦ · Greece Capacity payment 9 11.000 PJM Capacity market 5.5 136.000 UK Capacity market 5 49.000 UK Strategic reserve 4 2.000 Spain Capacity payment 2.7 25.000](https://reader033.fdocuments.in/reader033/viewer/2022053022/604c24e7ac8ed3178c62db39/html5/thumbnails/95.jpg)
Future issuesregardingelectricity markets
• Power to gas
• Power to liquids
• Interplay between electricityand heat
• electrification of transport
• …
Sector coupling
95
![Page 96: Electricity for all€¦ · Greece Capacity payment 9 11.000 PJM Capacity market 5.5 136.000 UK Capacity market 5 49.000 UK Strategic reserve 4 2.000 Spain Capacity payment 2.7 25.000](https://reader033.fdocuments.in/reader033/viewer/2022053022/604c24e7ac8ed3178c62db39/html5/thumbnails/96.jpg)
New relations between players
96
![Page 97: Electricity for all€¦ · Greece Capacity payment 9 11.000 PJM Capacity market 5.5 136.000 UK Capacity market 5 49.000 UK Strategic reserve 4 2.000 Spain Capacity payment 2.7 25.000](https://reader033.fdocuments.in/reader033/viewer/2022053022/604c24e7ac8ed3178c62db39/html5/thumbnails/97.jpg)
Digitalisationand energy
97Source: Pöyry
![Page 98: Electricity for all€¦ · Greece Capacity payment 9 11.000 PJM Capacity market 5.5 136.000 UK Capacity market 5 49.000 UK Strategic reserve 4 2.000 Spain Capacity payment 2.7 25.000](https://reader033.fdocuments.in/reader033/viewer/2022053022/604c24e7ac8ed3178c62db39/html5/thumbnails/98.jpg)
Sector coupling provides opportunities for flexible storage…
… by integrating a growing share of renewable electricity in carbon-intensive industries
98
![Page 99: Electricity for all€¦ · Greece Capacity payment 9 11.000 PJM Capacity market 5.5 136.000 UK Capacity market 5 49.000 UK Strategic reserve 4 2.000 Spain Capacity payment 2.7 25.000](https://reader033.fdocuments.in/reader033/viewer/2022053022/604c24e7ac8ed3178c62db39/html5/thumbnails/99.jpg)
Regulation vs. market
Regualation Regulation/ market Market
• Grid tariffs
• Regulated prices
• Capacitymechanisms
• RES targets
• Subsidies
• Energy efficiencytargets
• Mandatory ancillaryservices
• Priority dispatch
• Emission standards
• Emissions trading
• Trading of greencertificates
• Auctions forgeneration capacity
• Competition
• Free price formation
• Liquidity
• Markets for ancillaryservices
• Right to self-produce/-consumeand store electricity
• Right to beaggregated
99
![Page 100: Electricity for all€¦ · Greece Capacity payment 9 11.000 PJM Capacity market 5.5 136.000 UK Capacity market 5 49.000 UK Strategic reserve 4 2.000 Spain Capacity payment 2.7 25.000](https://reader033.fdocuments.in/reader033/viewer/2022053022/604c24e7ac8ed3178c62db39/html5/thumbnails/100.jpg)