Hi-LITE Mall -ELECTRICAL Incomplete Works.
Location Issue Remarks
1 Sub station
2 D.G room
34 Substation no back up supply for 6kva ups in substation Done5 Substation floor epoxy painting need to do
6 Substation
8 Diesel service tank need to fix a calibrated gauge scale for service tank 9 D.G room no illumination provided
10 D.G room battery charger not yet provided for all d.g s11 D.G room no fire standards provided inside d,g room
12 Diesel pump
13 Diesel
14 Basement 3
15 WTP electrical panel not commissioned
16 Basement -3
17 Basement -3 Done
18 Basement -3 Done
19 Basement -2 Done
20 Basement -1 Done21 Ground floor entrance one ckt foot light ckt not working
22 wall fixed foot lights are not working 23 Ground floor UPS pm is pending
Sl No.
Earth Pit not yet commissioned and kept in an open condition
floor epoxy painting work is not completed and air filters are getting choked
HSD service tank area
diesel transfer pump supply socket is kept in open condition with no enclosure.need to give proper covering .
all the ACB breakers UV RELAY not yet connected. Still Breakers are not working Properly.
diesel transfer pump kept above a disel barrel .need to fix on a permanent platform and permanet G.I line to be lined to tank
no permanet platform for diesel unloading and barrel are getting damged
fresh air,exhaust,gas fan cabling work not completed and not yet commissioned
Emergency plant room
still on temporary connection.work under progress and cables lying are not properly dressed
there is no power socket(single and 3 phase) connection provided for any kind of maintanance work in future
there is no water connection point given for maintanance in future
there is no power socket(single and 3 phase) connection provided for any kind of maintanance work in future
exterior focussing illumination light should be provided with a permanent power connection
GF to base 1 Ramp(exterior)
24 Ground floor
25 1st floor
26 2nd floor
27 3rd floor
28 Basement 1
29 Terrace no energy meter provided for chiller.
30Floor
31 Floor floor wise separate energy meter not fixed 32 Cooling tower area no illumination provided
33 Terrace area34 All AHU rooms no lighting yet provided35 Basement 1 IBS room debris not cleared. Done36 CCTV camera not yet connected in all mall area Done37 Electrical rooms ventillation work not yet completed 38 Service lift one lift near lifestyle not yet commissioned
39 Electrical rooms 40 Substation electrical total load balancing not completed . Under Progress.
41 D.G Air compresser need to order for cleaning the radiater
42 Electrical panel electrical mats need to be placed in all electrical panels 43 Stair Case No.2 There is no lighting supply given.
44 Exit Gate No.2 Lighting cables are provide but there is no light fixture.Done
45 Common Need to purchase hydraulic ladder to repalce fuse lights.
46 Common area Most of pillar focus LED lights are not working.
47Some panels CT's are not fixed.
48 ShopsDone
49 Basement -3
50 Substation All the ABB breakers need to do preventive maintenace.
sockets with no power supply:- near PUMA shop,near SPLASH,near DANIEL HETCHER ,near passenger lift
sockets with no power supply: near MAX,near OPTIC ZONE
sockets with no power supply: near MAX,near LEE FOOT ,near wash room
sockets with no power supply: near BARBIQUE. socket directly mounted on wall
no energy meter provided seperately for lift,escalator,fire system,WTP
Chiller#1, Chiller#2 & MCC Panel#2 is done. Need MCC Panel#1
all floor csu are connected from common area lighting panel MLT3B.
no illumintaionin in entire trerrace area and point also not given
MLT1 electrical cabling work under progress and smoke detecters are fixed
Cabling work completed. But Smoke detecter fixing still pending.
Substation, Electric Rooms
Major Anchor shops not fix in Energey Meter (Fbb,I am In, Baby Care, Malabar Fresh ) and other shops (Fazal Bag, Paont ball).
All the Sumps need to connect with submergible pump with starter panel to be connected to common Drain.
51 Pump Room WTP pumps need to be connected with level controls.52 Parking Area Fire Exits signag need to fix with battery Back-Up.
24 Ground floor 25 1st floor sockets with no power supply: near MAX,near OPTIC ZONE 26 2nd floor sockets with no power supply: near MAX,near LEE FOOT ,near wash room 27 3rd floor sockets with no power supply: near BARBIQUE. socket directly mounted on wall 28 Basement 1 no energy meter provided seperately for lift ,escalater,fire system,WTP
sockets with no power supply:near PUMA shop,near SPLASH,near DANIEL HETCHER ,near passenger lift