CURRICULAM VITAE M. Mohamed Salman Faris E-Mail : [email protected] : [email protected] Mobile no : 00966 580862754 Electrical QA/QC Engineer Objective: Seven years of solid industry experience in High rise building Construction, power plant, Oil and chemical projects. Experienced to meet critical conditions and to tackle them. Ability to lead and command a team. Demonstrated excellent interpersonal qualities to manage and interact with others. Sharp and strong analytical abilities and attention to detail. Academic Qualification: Bachelor of Engineering (Electrical And Electronics) Annamalai University, Chidambaram, Tamilnadu, India. (71.20%) Computer Knowledge : Operating System : Windows 98/2000 /XP, Software : Auto cad basic, Ms Office. Languages : C, C++. Work Experiences: Company : NESMA AND PARTNERS. Position : Electrical QC Inspector. Duration : November 2015 to Until Now Project : KBR in Thuwal.

Transcript of Electrical QA QC Engineer

Page 1: Electrical QA QC Engineer

CURRICULAM VITAE

M. Mohamed Salman Faris E-Mail : [email protected] : [email protected] no : 00966 580862754

Electrical QA/QC Engineer

Objective: Seven years of solid industry experience in High rise building

Construction, power plant, Oil and chemical projects. Experienced to meet critical conditions and to tackle them.

Ability to lead and command a team. Demonstrated excellent interpersonal qualities to manage

and interact with others. Sharp and strong analytical abilities and attention to detail.

Academic Qualification:

Bachelor of Engineering (Electrical And Electronics) Annamalai University, Chidambaram, Tamilnadu, India. (71.20%)

Computer Knowledge :

Operating System : Windows 98/2000 /XP, Software : Auto cad basic, Ms Office. Languages : C, C++.

Work Experiences:Company : NESMA AND PARTNERS.Position : Electrical QC Inspector.Duration : November 2015 to Until NowProject : KBR in Thuwal.

Duties & Responsibilities: Checking and inspection of all materials as per the standard specification

(such as NFPA 72 & 70, SAIC, SATIP, Schedule Q, SAES) Preparing Inspection request (RFI) and update status and rectify the SAPID

Comment. Prepare Checklist (SAIC) & Explanation properly to the SAPID during our

inspection. Checking routing and Installation of Electrical work (Conduits, Wiring

Devices, Lighting Fixture, Grounding, Lightning System & cable tray) as per Drawing.

Page 2: Electrical QA QC Engineer

Follow up the Construction Work with site engineer & Construction Manager (Two week ahead Schedule).

Studies drawings and specification and checking Standards. Preparing the punch list and non-conformance and corrective report (NCR). Inspection of All kind of Conduit, Cables, Cable tray & Panels. Checking site irregular activities during installation and site surveillance time

and make report to construction department. Make the material inspection (MIR) and arrange the inspection with SAPID. Witness for Cable & wire testing with PID and Proponent Monitor Quality control on construction progress activities. Responsible for test packages documentation from pre-commissioning to final

hand over to client.

Company : NESMA AND PARTNERS.Position : Electrical QA/QC Engineer.Duration : Sep 2014 to October 2015 ( Previously June 2011 to June 2012)Project : JODP in Makkah Phase 1 (High Rise building Construction)

Duties & Responsibilities: Checking and inspection of all materials as per the standard and JODP

specification (such as NEC, NFPA & NEMA) Preparing Inspection request (IR) and update status from consultant and

rectify the consultant Comment. Explanation properly to the consultant during our inspection.

Checking routing and Installation for lighting and Power System. Follow up the Construction Work in the site engineer. Inspection of cable tray, cable trunk, cable ladder, Busway, cables, panel

board & all type of Lighting Fixture (Chandelier), Power Socket. Studies drawings and specification and checking Standards.

Preparing the punch list and non-conformance and corrective report (NCR) and Inspection testing plan (ITP).Checking site store report voucher (SSRV) and make the material inspection (MIR) and arrange the inspection with consultant.

Inspection of lighting system, power system, central battery system and cable routing system for Electrical works.

Inspection of all Fire alarm System, Evacuation & Public address speaker for low current as per standard specification.

Excellent hands hold skills of Process automation system and BMS system, Communication System (PABX, CCTV, SACS, PA, Intercom and Telephone).

Checking site irregular activities during installation and Make site surveillance and make report to construction department.

Inspect the installation and Commissioning for all electrical equipment such as motor, panel board, Transformer, Switch gear, MDB and electrical device.

Inspection of Panel Board (DP, EDP), Motor control center (MCP &EMCP), Transformer, Switch gear, MDB and generator.

Witness and verify Continuity, Insulation resistance test for LV, MV Cables. Monitor Quality control on construction progress activities.

Page 3: Electrical QA QC Engineer

Company : NESMA & PARTNERS, JUBAILPosition : Electrical QA/QC Engineer Duration : Dec 2013 to Aug 2014Project & Client: SADARA (Chemical & Gas Plant Power Distribution Bldg.) / Fluor

Duties & Responsibilities: Checking and inspection of all materials as per the standard specification

(SADARA Standards , NEMA , NFPA , NETA and Saudi Aramco Standards) Preparing Inspection request (RFI) and rectify the Client QC Comment. Prepare Checklist & Explanation properly to Client QC (Fluor) during our

inspection. Checking routing for Raceways and Inspection of Material & Installation for

Electrical Equipment (230 KV & 34.5 KV Transformer, 34.5 KV & 480V Switchgear, EPMS, 480V MCC, Battery Charger, Isolation Switch, Neutral Grounding Resistance, Power & DC Distribution Panel).

Follow up the Construction Work with site engineer & Construction Manager and handling team work.

Inspection of Lux Test for Lighting Fixtures, Mandrel Test for Duct Bank & Conduits, under conduits.

Inspection of Lightning Protection system for Power Distribution Building. Inspection of Material and Installation for all kind of Conduit, Cables, Cable

tray, Lighting Fixture, Power system devices and Fire alarm system devices in Indoor & Outdoor area.

Preparing the punch list (Pro-Active & Surveillance Report) and non-conformance and corrective report (NCR).

Inspect the installation of Grounding Rod, Test Well, Embedded Pad & Bars and grounding for all electrical equipment.

Monitoring the work of a third party independent qualified inspection and testing agency for the Electrical Equipment’s.

Witness and verify Insulation Resistance test for Low Voltage Cables, HIPOT test for Medium Voltage Cables & High Voltage Cable (34.5 KV & 230 KV) & Bus bar.

Witness for Pre-commissioning of Transformer, Switchgear, MCC, EPMS, Power Panel & Circuit Breakers, Motor and Generator.

Preparing Packages (MCDR) for Mechanical Completion certificate to final hand over to client.

Company : PAN GULF INDUSTRIAL SERVICES, AL-KHOBAR.Position : Electrical QC Inspector (SAUDI ARAMCO Approved).Duration : Aug 2012 to Oct 2013Project : BI-10-00570 (Halon phases out IT Facilities)

Duties & Responsibilities: Checking and inspection of all materials as per the standard specification

(such as NFPA 72 & 70, SAIC, SATIP, Schedule Q, SAES)

Page 4: Electrical QA QC Engineer

Preparing Inspection request (RFI) in the QMIS and update status from the QMIS and rectify the SAPID Comment.

Prepare Checklist (SAIC) & Explanation properly to the SAPID during our inspection and Make Aramco Site access for SAPID.

Contacting MCI Walkthrough with Fire Department & Loss prevention team, Project management Team & PID.

Checking routing and Installation for Fire System Layout Drawing. Follow up the Construction Work with site engineer & Construction Manager

(Two week ahead Schedule). Inspection of All kind of Smoke detector, cables, panel board (FACP), Horn

& Strobe, Manual Release Station, and Manual Pull Station & Abort Station. Preparing the punch list and non-conformance and corrective report (NCR). Inspection of All kind of Conduit, Cables, Cable tray & Panels. Checking site irregular activities during installation and site surveillance time

and make report to construction department. Make the material inspection (MIR) and arrange the inspection with SAPID. Witness for FACP Site Acceptance test (SAT) with PID, PMT, Loss and

Prevention Team, Proponent...etc. Responsible for test packages documentation from pre-commissioning to final

hand over to client.

Company : SAIPEM TAQA AL_RUSHIED FABRICATION CO. LTD.(STAR), DAMMAM PORT.Position : Electrical Site EngineerDuration : June 2010 to May2011

Duties & Responsibilities: To implement Electrical work complying with materials specification and

standard. Supervise and maintain proper method of Electrical work practices. To request necessary materials required during operation on site. Provide

electrical power and hydraulic tools. Supervise the electrical motor for safety and electrical maintenance of the whole

plant. Performs installation of single phase and three phase motor and observed safety procedures in electrical installation.

Preparing Method of Statement for all Electrical works. Checking all electrical machinery and equipment control system before Installation.

Install wiring devices for all Electrical system. Layout of wires & cables for those equipment & terminate the name according to drawing.

Ensuring minimum electrical faults and rectifying errors. Ensuring minimum expenditure on power and maintenance

Making of daily progress and monthly progress and invoice making for Electrical works. Erection of Panel boards, Installation of Transformers, motor and cabling of distribution lines.

Proper utilization of given machines, Equipments, Consumables and Man power. Recruiting Man power, Preventive maintenance, Proper utilization of given funds.

Company : Faradays Instruments Pvt. Ltd, India.Position : Maintenance Engineer

Page 5: Electrical QA QC Engineer

Duration : June 2009 to April 2010

Duties & Responsibilities : Testing of electrical cables such as continuity test and insulation resistance

test by megger. Supervising and maintenance of electrical machines such as motors, generator, transformer…etc. Installation of electrical machines and makes sure the testing before installing. Supervising and monitoring the status of machine.

Performing testing for transformer such as insulation resistance test by megger, winding test and Preparing Preservation list for weekly. Supervising the installation of grounding for all electrical equipment such as motors, generators and prepare daily work reports to the project manager.

Supervision of Cable Termination and Cable laying. Installation of Electrical lighting system and power system as per drawing procedure. Working of MS conduit laying and Internal wiring. Carrying Preventive scheduling maintenance periodically.

Implement and adheres safety process, rules and regulations and standard operating procedure. Making of daily progress and monthly progress and invoice making for Electrical works.

Personal Information:NAME : MOHAMED SALMAN FARISDATE OF BIRTH : 10.12.1986SEX : MaleNATIONALITY : IndianPASSPORT NO : M 2868428DATE OF ISSUE : 21/10/2014DATE OF EXPIRY : 20/10/2024PLACE OF ISSUE : JeddahMARITAL STATUS : MarriedLANGUAGE KNOWN : Tamil, English, Arabic & Hindi

Declaration :

I hereby declare that the above given information are true to the best of my

knowledge and belief.

Mohamed Salman Faris .M