Electrical Load at OMC 1 Ton (Amps) 1.5 Ton (Amps) 2 Ton (Amps) 2.5 Ton (Amps)Amps Qty Total Amps Items Tube Lights 0.5 37 18.5 Bulbs 0.3 70 21 Fans 1 9 9 Computers 2 50 100 Air Conditioners W 8 12 16 20 0 S 7 11 15 19 16 188 Heaters (2000W) 8 2 16 5 357.5 Amps 230 Volts 82,225 VA 82.225 KVA 3 Phase max. 90Amps 1 Amp 230Volt 230Watts 8.69565217391304 Room wise Electricity Load Tech Dept Server Room Call Center M.S&O Reception C.E.O Board Room Items Tube Lights(0.5 2 2 1 11 3 2 4 18 Bulbs 2 2 24 bulbs 16(Bulbs) 12 Bulbs 2 Fans (1 AMP) 1 1 1 1 1 1 1 1 Computers (2 AMP 6 2 4 20 2 8 1 3 2 1 1 Heaters (8 AMPS) 1 1 Air Conditioner 1(1 Ton) Split 1(1.5 Ton) Split AMPS 29 17 20.5 75.5 25.5 3 41 18.4 19 25 31.2 20.8 16.6 1 (2 Tons) & 1(1 Ton) Other Equipment Server Room Marketing Dept Kitchen (Upper Floor) Lobby (Upper Floor) Finance Dept Finance manager Asst Admin (Ground Floor) 1(2 Ton)Split 1(1.5 Ton) Split 2 (2 Tons) Split 2(1.5 Ton)Split 1(1.5 Ton) Split 1(1.5 Ton) Split 1(1.5 Ton) Split 2(1.5 Ton) Split 1(2 Ton) Split 1(1.5 Ton) Split (5 AMPS)

Transcript of Electrical load report

Page 1: Electrical load report

Electrical Load at OMC Date:5/4/2005

1 Ton (Amps) 1.5 Ton (Amps) 2 Ton (Amps) 2.5 Ton (Amps) Amps Qty Total Amps

ItemsTube Lights 0.5 37 18.5

Bulbs 0.3 70 21

Fans 1 9 9

Computers 2 50 100

Air Conditioners

W 8 12 16 20 0

S 7 11 15 19 16 188

Heaters (2000W) 8 2 16

5357.5 Amps

230 Volts 82,225 VA

82.225 KVA

3 Phase max. 90Amps

1 Amp 230Volt 230Watts 8.69565217391304

Room wise Electricity Load

Tech Dept Server Room Call Center M.S&O Reception C.E.O Board Room

ItemsTube Lights(0.5 AM 2 2 1 11 3 2 4 18 Bulbs 2 2 24 bulbs 16(Bulbs) 12 Bulbs 2 2 2

Fans (1 AMP) 1 1 1 1 1 1 1 1 1

Computers (2 AMP) 6 2 4 20 2 8 1 3 2 1 1

Heaters (8 AMPS) 1 1

Air Conditioner 1(2 Ton)Split 1(1.5 Ton) Split 1(1 Ton) Split 2 (2 Tons) Split 1(1.5 Ton) Split 2(1.5 Ton)Split 1(1.5 Ton) Split 1(1.5 Ton) Split 1(1.5 Ton) Split 2(1.5 Ton) Split 1(2 Ton) Split

AMPS 29 17 20.5 75.5 25.5 3 41 18.4 19 25 31.2 20.8 16.6 1 1 13 357.5

11(1.5 tons), 4 (2 Tons) & 1(1 Ton)

Other Equipment Server Room

Marketing Dept

Kitchen (Upper Floor)

Lobby (Upper Floor)

Finance Dept

Finance manager

Asst Admin

Kitchen (Ground Floor)

Lobby (Ground

Guest Room

1(1.5 Ton) Split

1(1.5 Ton) SplitOther Equipment

(5 AMPS)

Page 2: Electrical load report

Date: 18.04.2005

Room wise Electricity Load

Tube Lights(0.5 AMP) Bulbs(0.3) Fans (1 AMP) Computers (2 AMP) Heaters (8 AMPS) Air Conditioner AMPS

Tech Dept 2 1 6 1(1.5 Ton)Split 25

Marketing Dept 2 1 2 1(1.5 Ton) Split 17

Server Room 1 4 1(1 Ton) Split 20.5

Call Center 11 20 2 (1.5 Tons) Split 67.5

M.S&O 3 1 2 1 1(1.5 Ton) Split 25.5

Kitchen (Upper Floor) 2 1 3

Lobby (Upper Floor) 4 1 82(1.5 Ton)Split

41

Reception 18 1 1(1.5 Ton) Split 18.4

Finance Dept 2 1 3 1(1.5 Ton) Split 19

Finance manager 2 1 2 1 1(1.5 Ton) Split 25

C.E.O 24 1 2(1.5 Ton) Split 31.2

Board Room 16 1 1(1.5 Ton) Split 16.8

Asst Admin 12 1 1(.75 Ton) Split 11.6

2 1

Lobby(Ground floor) 2 1

Guest Room 2 1 1(1.5 Ton) Split 13

Total 336.5 Approx.

Electrical Load at OMC

.75 Ton (Amps) 1.5 Ton (Amps) 2 Ton (Amps) 2.5 Ton (Amps) Amps Quantity Total Amps

Items

Tube Lights 0.5 37 18.5

Bulbs 0.3 70 21

Fans 1 9 9

Computers 2 50 100

Air Conditioners Split 6 11 15 19 16 167 14 (1.5 Tons), 1 (1 Ton) & 1 (.75 Ton )

Heaters (2000W) 8 2 16

5 Approx

336.5 Amps Approx.

230 Volts

77,395 VA

77.40 KVA Approx.

Other Equipments (5 AMPS)

Kitchen(Ground Floor)

Other Equipment of Server Room