    Steps to Ensure Effective Substation Grounding (1)

    Steps to ensure effective substation grounding (photo by peterhousephotography.co.uk)

    Substation GroundingAn electrical substation is a critical resource in a power system. Safe operation of a substation calls for a properlydesigned and installed grounding system. A well-designed grounding system will ensure reliable performance of thesubstation over its entire service life.

    How does good grounding improve substation reliability?

    Good grounding path of sufficiently low impedance ensures fast clearing of faults. A fault remaining in the system forlong may cause several problems including those of power system stability. Faster clearing thus improves overallreliability.

    It also ensures safety.

    A ground fault in equipment causes the metallic enclosure potential to rise above the true ground potential. Animproper grounding results in a higher potential and also results in delayed clearing of the fault (due to insufficientcurrent flow).

    This combination is essentially unsafe because any person coming into contact with the enclosure is exposed tohigher potentials for a longer duration.

  • Therefore, substation reliability and safety must be as built-in as possible by good grounding scheme, which in turnwill ensure faster fault clearing and low enclosure potential rise.

    Ensuring Proper GroundingThe following steps, when put into practice, will ensure a reliable, safe and trouble-free substation groundingsystem:

    1. Size conductors for anticipated faults2. Use the right connections3. Ground rod selection4. Soil preparation5. Attention to step and touch potentials6. Grounding using building foundations **7. Grounding the substation fence **8. Special attention to operating points **9. Surge arrestors must be grounded properly **

    10. Grounding of cable trays **11. Temporary grounding of normally energized parts **

    ** Will be published in next part of this technical article

    1. Size Conductors For Anticipated FaultsConductors must be large enough to handle any anticipated faults without fusing (melting).

    Failure to use proper fault time in design calculations creates a high risk of melted conductors. Two aspects governthe choice of conductor size: the first is the fault current that will flow through the conductor and the second is the timefor which it can flow.

    The fault current depends on the impedance of the ground fault loop . The time of current flow is decided by thesetting of the protective relays/circuit-breaking devices, which will operate to clear the fault.

    The IEEE 80 suggests using a time of 3.0 s for the design of small substations. This time is also equal to the short-time rating of most switchgear.

    Go to Grounding Steps

    2. Use the Right Connections

  • Grounding Connections, Resistance Test and Bonding Test

    It is very evident that the connections between conductors and the main grid and between the grid and ground rodsare as important as the conductors themselves in maintaining a permanent low-resistance path to ground.

    The basic issues here are:

    1. The type of bond used for the connection of the conductor in its run, with the ground grid and with the groundrod

    2. The temperature limits, which a joint can withstand.

    The most frequently used grounding connections are mechanical pressure type (which will include bolted,compression and wedge-type construction) and exothermically welded type.

    Pressure-type connections produce a mechanical bond between conductor and connector by means of a tightenedbolt-nut or by crimping using hydraulic or mechanical pressure. This connection either holds the conductors in placeor squeezes them together, providing surface-to-surface contact with the exposed conductor strands.

    On the other hand, the exothermic process fuses the conductor ends together to form a molecular bond between allstrands of the conductor.

    Temperature limits are stated in standards such as IEEE 80 and IEEE 837 for different types of joints based on thejoint resistance normally obtainable with each type. Exceeding these temperatures during flow of fault currents mayresult in damage to the joint and cause the joint resistance to increase, which will result in further overheating.

    The joint will ultimately fail and result in grounding system degradation or total loss of ground reference withdisastrous results.

    Go to Grounding Steps

    3. Ground Rod Selection

    In MV and HV substations, where the source and load are connected through long overhead lines, it often happensthat the ground fault current has no metallic path and has to flow through the groundmass (earth). This means that theground rods of both source and load side substations have to carry this current to or from the groundmass.

  • Substation grounding rod

    The ground rod system should be adequate to carry this current and ground resistance of the grounding systemassumes importance.

    The length, number and placement of ground rods affect the resistance of the path to earth. Doubling of ground rodlength reduces resistance by a value of 45%, under uniform soil conditions. Usually, soil conditions are notuniform and it is vital to obtain accurate data by measuring ground rod resistance with appropriate instruments.

    For maximum efficiency, grounding rods should be placed nocloser together than the length of the rod. Normally, this is 10ft (3 m). Each rod forms an electromagnetic shell around it,and when the rods are too close, the ground currents of theshells interfere with each other.

    It should be noted that as the number of rods is increased,the reduction of ground resistance is not in inverseproportion. Twenty rods do not result in 1/20th ofthe resistance of a single rod but only reduce it by a factor of1/10th.

    For economic reasons, there is a limit to the maximumdistance between rods.

    Normally, this limit is taken as 6 m. At more than 6 m, the cost of additional conductor needed to connect the rodsmakes the design economically attractive.

    In certain cases, the substation layout may not have the required space and acquiring the needed space may involvesubstantial expense. Four interconnected rods on 30 m centers will reduce resistivity 94% over one rod but require atleast 120 m of conductor.

    On the other hand, four rods placed 6 m apart will reduce resistivity 81% over one rod and use only 24 mof conductor.

    Go to Grounding Steps

    4. Soil PreparationSoil resistivity is an important consideration in substation grounding system design. The lower the resistivity, theeasier it is to get a good ground resistance.

    Areas of high soil resistivity and those with ground frost ( which inturn causes the soil resistivityto increase by ordersof magnitude) need special consideration. The highest ground resistivity during the annual weather cycle should formthe basis of the design since the same soil will have much higher resistivity during dry weather when percentage ofmoisture in the ground becomes very low.

  • Grounding Tests - Earth Potential and Grounding Mesh Effectiveness (courtesy of DCS Engineering Sdn Bhd - www.dcsesb.com)

    One approach to take care of this problem is to use deep driven ground rods so that they are in contact with the soilzone deep enough to remain unaffected by surface climate.

    The other approach is to treat the soil around the ground rod with chemical substances that have the capacity toabsorb atmospheric/soil moisture.

    Use of chemical rods is one such solution.

    Go to Grounding Steps

    5. Attention to Step and Touch PotentialsLimiting step and touch potential to safe values in a substation is vital to personnel safety.

    Step potential is the voltage difference between a persons feet and is caused by the voltage gradient in the soil atthe point where a fault enters the earth. The potential gradient is steepest near the fault location and thereafterreduces gradually. Just 75 cm away from the entry point, voltage usually will have been reduced by 50%.

    Thus at a point of 75 cm from the fault (which is less than the distance of a normal step), a fatal potential of a fewkilovolts can exist.

    Touch potential represents the same basic hazard, except the potential exists between the persons hand and his or

  • her feet. This happens when a person standing on the ground touches a structure of the substation, which isconducting the fault current into ground (for example, when an insulator fixed on a gantry flashes over, the gantrydissipates the current to earth).

    Since the likely current path within the human body runs through the arm and heart region instead of through thelower extremities, the danger of injury or death is far greater in this case. For this reason, the safe limit of touchpotential is usually much lower than that of step potential.

    In both situations, the potential can essentially be greatly reduced by an equipotential wire mesh safetymat installed just below ground level.

    This mesh will have to be installed in the immediate vicinity of any switches or equipment a worker might touch, andconnected to the main ground grid. Such an equipotential mesh will equalize the voltage along the workers path andbetween the equipment and his or her feet. With the voltage difference (potential) thus essentially eliminated, thesafety of personnel is virtually guaranteed.

    An equipotential wire mesh safety mat is usually fabricated from #6 or #8 AWG copper or copper-clad wire toform a 0.5 0.5 m or 0.5 1 m mesh. Many other mesh sizes are available.

    To ensure continuity across the mesh, all wire crossings are brazed with a 35% silver alloy. Interconnections betweensections of mesh and between the mesh and the main grounding grid should be made so as to provide a permanentlow-resistance high-integrity connection.

    Go to Grounding Steps

    To bi continued in part 2

    Resource: Practical Grounding, Bonding, Shielding and Surge Protection G. Vijayaraghavan; Mark Brown; MalcolmBarnes (Get this book at Amazon )