Electric Transmission and Distribution Electric Transmission and Distribution Future R&D Future R&D Needs
Planning, Operation, Planning, Operation, Control, , and Visualizationand Visualization
The Center for Advanced Power SystemsFlorida State University, Tallahassee, Florida
February 1, 2006
Presented by:
Vikram BudhrajaPresident, Electric Power Group
Chair, Consortium for Electric Reliability Technology Solutions
Page 12-1-06
Discussion Outline
CERTS Introduction
Research Drivers and Focus
Changing Research Needs
Transmission Grid Monitoring & Visualization Research Needs
Evolving Research Needs – Example of Phasor Technology
Operational Consolidation and Wide-Area Reliability
Visualization Solution for Reliability Coordinators -- Example
Long Term Grid Research Framework
Page 22-1-06
Consortium for Electric Reliability Technology Solutions (CERTS)CERTS was organized in 1999 as a partnership among universities, the private sector, and Department of Energy national labs. Consortium includes four labs (Lawrence Berkeley, Oak Ridge, Sandia, Pacific Northwest), Power Systems Engineering Research Center (consortium of 13 universities), and Electric Power Group.
CERTS Industry Advisory Board includes ISOs, utilities, regulators, generators.
CERTS research leverages public and private resources, includingfunding by the Department of Energy, Transmission Reliability Program, and the California Energy Commission Public Interest Energy Research Program.
CERTS research is focused on addressing gaps in tools, technologies, systems, market rules, and management processes needed to managethe reliability of the electric grid and efficient market operations.
Page 32-1-06
Research Drivers and Focus
COMPETITIVE MARKETSEnergyAncillary ServicesCapacityLMPReliability through Markets
INDUSTRY STRUCTUREDisaggregation of Utility FunctionsFormation of ISOs/RTOsFormation of ERO
RESEARCH FOCUSLocal vs. Wide AreaModels vs. MeasurementCommand and Control vs. MarketAnalog vs. DigitalLow vs. High Resolution DataX-Ray vs. MRI
TECHNOLOGYCHANGES
ComputersCommunicationsInternetVisualizationGPS Timing
Page 42-1-06
Changing Research Needs
Research AreaProbabilisticDynamicIntegrate Real Time Data
Phasor DataState MeasurementMarket Dispatch
Wide Area/RASDistributedElectronic/SiliconDigital
Wide Area – Graphic, Geographic,
Real Time:MonitorTrack
AnalyzeAlarm
Notify
DeterministicStaticOffline Engineering Data
SCADA – DataState EstimationEconomic Dispatch
LocalCentralMechanicalAnalog
Local AreaLine DiagramsTabular Data
PLANNING
OPERATIONS
CONTROL/ PROTECTION
VISUALIZATION
Page 52-1-06
Transmission Grid Monitoring and Visualization Research Needs
NetworkingQualitySecurityStorageAccessArchivingRetrieval
Wide-Area Monitoring –Reliability, Security, MarketsStandards ComplianceReal-Time Wide-Area Control, Protection, and AlarmingNomograms/RASSituational AwarenessInterconnection Dynamics
Wide-Area ArchitectureHuman FactorsDisplay DesignMonitorTrackAnalyzeAlarmNotify
InterconnectionPerformanceRisk-BasedTracking
Measured System StateWide-Area Voltage AssessmentProbabilistic Risk Analysis
DATA METRICS MODELS VISUALIZATION APPLICATIONS
Page 62-1-06
Evolving Research Needs –Example of Phasor Technology
Wide-Area Measurement
Systems -WAMS
Wide-AreaData
NetworkingWide AreaMonitoring
Phasor-BasedApplicationsVisualizationMonitoringControl/ProtectionAlarmingDisturbance AnalysisForensic AnalysisSystem DynamicsState Estimation
80’s 90’s-2000 2000-2010 2006
Page 72-1-06
EIPP Participants – Utilities, RTOs, Transco’s, Researchers, Vendors
PPL
Ameren
AEP
ATC
BCH
BPA
CAISOCinergy
Duke
Entergy
Exelon First Energy
FPL
HydroOne
Grid America
ISO-NEITC Keyspan
ConEd
Manitoba Hydro
MISO
NYISONYPA
PG&EProgress
PJM
Hydro Quebec
SCE SouthernSRPTVA
WAPA Trans Elect
• DOE and CERTS Initiated EIPP in 2002
• August 2003 Blackout Highlighted Need
• 50 PMUs and 7 PDCs in Place
• Initial Network of 21 PMUs Operational –TVA Data Host
Page 82-1-06
Operational Consolidation and Changing Focus From Local to Wide-Area
2006 – 8 Wide-AreaReliability Regions
2000 - 152 OperationalJurisdictions (Control Areas)
2003 – 17 Wide-AreaReliability Coordinators
Page 92-1-06
Panel 1:: Geographic View with Last Minute CPS1 for Control Areas in Selected Jurisdiction
Panel 4:: Dynamic Data Text Window with actual data displayed in tabular fashion for each selection criteria
Panel 2:2D-Plot with BAAL Violation (Last 30-Minute of CPS1) for Control Areas of Selected Jurisdiction
Panel 3:Bar-chart for last 30-Min of CPS1 with Thresholds for CPS1 and BAAL violations correlated with frequency
Visualization Solution for Reliability Coordinators -- Example
Page 102-1-06
Long Term Grid Research Framework
New Grid Infrastructure
Grid Management -Planning, Operations,
Control/Protection, and Visualization
CommercialHighInvestment
Grid Technologies
Grid Upgrades
Researchand
Demonstration
Long Term
Page 112-1-06
Long Term Grid Research Framework
HighInvestment
Grid Upgrades
Grid Management - Planning, Operations, Control/Protection,
and VisualizationCERTS
RESEARCHFOCUS
Long Term
Researchand
Demonstration
CommercialNew Grid Infrastructure
Grid Technologies
TransformersSubstationsSVC’s, DVAR, StatcomEMS, SCADA, Automation
New Lines, CablesNew ROWNew Technologies
FACTS TechnologiesPower ElectronicsComposite ConductorsSuperconductors –cables, fault current limiter, super VARStorage
Wide-Area Monitoring – EPACT 2005Application of PhasorsNew Visualization ToolsFast Simulation ModelsState Estimation and MeasurementProtection, Control, and AlarmingDynamics & SecurityIntegration of Loads and Distributed TechnologiesMarket Design and Performance