NY10132.001 U0T0 0811 MN03 Line and loading data Line Line Voltage (kV) Bottom phase height (ft) 387 345 40.0 362 345 45.0 pre-construction 387 345 40.0 3041 345 45.0 362 345 45.0 post-construction -200 -100 0 100 200 0 2 4 6 8 10 new ROW ROW Electric field (kV/m) Distance from ROW center (ft) Electric field, Monitoring Site 2 Bartholomew Road view facing west, toward Chestnut Junction Pre-construction, calculated Pre-construction, measured Post-construction, calculated Post-construction, measured 362 (moved) 387 362 (old) 3041 (new) Monitoring Site 2 Bartholomew Road Segment: 1A Middletown Reference Section: 1 LEMF ROW width: 310 ft (250 ft preconstruction) Lat/Long meas. start: 72.61036W 41.50977N Lat/Long meas. end: 72.61007W 41.51044N Preconstruction measurement time: 11-Jan-2007 10:56:00 Postconstruction measurement time: 12-May-2009 09:34:00 Notes: 362 line de-energized during pre-construction readings

Transcript of Electric field, Monitoring Site 2 Bartholomew Road 10 ... · PDF fileElectric field (kV/m) old...

Page 1: Electric field, Monitoring Site 2 Bartholomew Road 10 ... · PDF fileElectric field (kV/m) old ROW old ROW new ROW new ROW ... 1610-4C 115 45.5 1640 115 45.5 1690A 115 45.0 1690B 115

NY10132.001 U0T0 0811 MN03

Line and loading data

LineLine

Voltage(kV)

Bottomphaseheight(ft)

387 345 40.0362 345 45.0

– – –– – –– – –– – –– – –

pre

-const

ruct

ion

– – –

387 345 40.03041 345 45.0362 345 45.0

– – –– – –– – –– – –

post

-const

ruct

ion

– – –

−200 −100 0 100 2000

2

4

6

8

10

new ROW ROW

Ele

ctric

fiel

d (k

V/m

)

Distance from ROW center (ft)

Electric field, Monitoring Site 2Bartholomew Road

view facing west, toward Chestnut Junction

Pre−construction, calculatedPre−construction, measuredPost−construction, calculatedPost−construction, measured

362(moved) 387

362 (old)3041 (new)

Monitoring Site 2 Bartholomew RoadSegment: 1A MiddletownReference Section: 1 LEMFROW width: 310 ft (250 ft preconstruction)Lat/Long meas. start: 72.61036W 41.50977NLat/Long meas. end: 72.61007W 41.51044NPreconstruction measurement time: 11-Jan-2007 10:56:00Postconstruction measurement time: 12-May-2009 09:34:00Notes: 362 line de-energized during pre-construction readings

Page 2: Electric field, Monitoring Site 2 Bartholomew Road 10 ... · PDF fileElectric field (kV/m) old ROW old ROW new ROW new ROW ... 1610-4C 115 45.5 1640 115 45.5 1690A 115 45.0 1690B 115

NY10132.001 U0T0 0811 MN03

Line and loading data

LineLine

Voltage(kV)

Bottomphaseheight(ft)

1975A 115 35.01975B 115 35.0

– – –– – –– – –– – –– – –

pre

-const

ruct

ion

– – –

1975 115 117.0348 345 116.0

– – –– – –– – –– – –– – –

post

-const

ruct

ion

– – –

−100 0 1000

2

4

6

8

10

ROW ROW

Ele

ctric

fiel

d (k

V/m

)

Distance from ROW center (ft)

Electric field, Monitoring Site 3Arbutus Street

view facing west

Pre−construction, measuredPost−construction, measured

1975A 1975B

348(new)

1975(moved)

Monitoring Site 3 Arbutus StreetSegment: 1A DurhamReference Section: 2 LEMFROW width: 125 ft (125 ft preconstruction)Lat/Long meas. start: 72.64907W 41.49546NLat/Long meas. end: 72.64893W 41.49581NPreconstruction measurement time: 20-Nov-2006 14:55:00Postconstruction measurement time: 12-May-2009 10:46:00Notes: proximity to residences

Page 3: Electric field, Monitoring Site 2 Bartholomew Road 10 ... · PDF fileElectric field (kV/m) old ROW old ROW new ROW new ROW ... 1610-4C 115 45.5 1640 115 45.5 1690A 115 45.0 1690B 115

NY10132.001 U0T0 0811 MN03

Line and loading data

LineLine

Voltage(kV)

Bottomphaseheight(ft)

387 345 57.0– – –– – –– – –– – –– – –– – –

pre

-const

ruct

ion

– – –

387 345 64.0362 345 57.0

3754 345 65.0– – –– – –– – –– – –

post

-const

ruct

ion

– – –

−200 −100 0 100 2000

2

4

6

8

10

ROW ROW

Ele

ctric

fiel

d (k

V/m

)

Distance from ROW center (ft)

Electric field, Monitoring Site 6Meriden PBA

view facing south

Pre−construction, measuredPost−construction, measured

387(old)

362(new)

387 (new)

3754(new)

Monitoring Site 6 Meriden PBASegment: 1A MeridenReference Section: 3 LEMFBROW width: 275 ft (275 ft preconstruction)Lat/Long meas. start: 72.74929W 41.52330NLat/Long meas. end: 72.75003W 41.52356NPreconstruction measurement time: 20-Nov-2006 13:02:00Postconstruction measurement time: 12-May-2009 12:38:00Notes: proximity to Meriden Police Benevolent Association meet-

ing hall

Page 4: Electric field, Monitoring Site 2 Bartholomew Road 10 ... · PDF fileElectric field (kV/m) old ROW old ROW new ROW new ROW ... 1610-4C 115 45.5 1640 115 45.5 1690A 115 45.0 1690B 115

NY10132.001 U0T0 0811 MN03

Line and loading data

LineLine

Voltage(kV)

Bottomphaseheight(ft)

387 345 45.01975 115 50.01466 115 45.5

– – –– – –– – –– – –

pre

-const

ruct

ion

– – –

1975 115 55.01466 115 54.0387 345 45.0362 345 46.0

3754 345 51.0– – –– – –

post

-const

ruct

ion

– – –

−200 −100 0 100 2000

2

4

6

8

10

ROW ROW

Ele

ctric

fiel

d (k

V/m

)

Distance from ROW center (ft)

Electric field, Monitoring Site 8Gravel Operation

view facing south, toward Beseck Substation

Pre−construction, calculatedPre−construction, measuredPost−construction, calculatedPost−construction, measured

1466 (old)

1975(new)

362(new)

387(old)

387(moved)

3754(new)

1466(moved)

Monitoring Site 8 Gravel OperationSegment: 1A WallingfordReference Section: 4ROW width: 320 ft (320 ft preconstruction)Lat/Long meas. start: 72.75376W 41.49599NLat/Long meas. end: 72.75482W 41.49596NPreconstruction measurement time: 20-Nov-2006 11:14:00Postconstruction measurement time: 12-May-2009 13:56:00Notes: proximity to Mountain Mist Day Camp

Page 5: Electric field, Monitoring Site 2 Bartholomew Road 10 ... · PDF fileElectric field (kV/m) old ROW old ROW new ROW new ROW ... 1610-4C 115 45.5 1640 115 45.5 1690A 115 45.0 1690B 115

NY10132.001 U0T0 0811 MN03

Line and loading data

LineLine

Voltage(kV)

Bottomphaseheight(ft)

1630 115 35.0– – –– – –– – –– – –– – –– – –

pre

-const

ruct

ion

– – –

3827 345 94.61630 115 34.0

– – –– – –– – –– – –– – –

post

-const

ruct

ion

– – –

−100 0 1000

2

4

6

8

10

ROW ROW

Ele

ctric

fiel

d (k

V/m

)

Distance from ROW center (ft)

Electric field, Monitoring Site 13South Cherry Street

view facing west, toward Pent Road Junction

Pre−construction, measuredPost−construction, measured

3827(new)

1630

Monitoring Site 13 South Cherry StreetSegment: 2A WallingfordReference Section: 6 WESTROW width: 200 ft (200 ft preconstruction)Lat/Long meas. start: 72.83667W 41.43949NLat/Long meas. end: 72.83623W 41.44012NPreconstruction measurement time: 10-Nov-2006 16:51:00Postconstruction measurement time: 13-May-2009 08:41:00Notes:

Page 6: Electric field, Monitoring Site 2 Bartholomew Road 10 ... · PDF fileElectric field (kV/m) old ROW old ROW new ROW new ROW ... 1610-4C 115 45.5 1640 115 45.5 1690A 115 45.0 1690B 115

NY10132.001 U0T0 0811 MN03

Line and loading data

LineLine

Voltage(kV)

Bottomphaseheight(ft)

1610-1P 115 45.51640 115 45.5

1690A 115 45.01690B 115 45.0

– – –– – –– – –

pre

-const

ruct

ion

– – –

1610-1P 115 50.01640 115 50.0

3827A 345 57.03827B 345 57.0

– – –– – –– – –

post

-const

ruct

ion

– – –

−100 0 100 200 3000

2

4

6

8

10

old ROW old ROW new ROW new ROW

Ele

ctric

fiel

d (k

V/m

)

Distance from pre−construction ROW center (ft)

Electric field, Monitoring Site 20Jewish Community Center Parking Lot

view facing south

Pre−construction, measuredPost−construction, measured

1610 1640

1690A&B(removed)

1610(moved)

1640(moved)

3827A(new)

3827B(new)

Monitoring Site 20 JCC Parking LotSegment: 2B WoodbridgeReference Section: 8 LEMFROW width: 165 ft (165 ft preconstruction)Lat/Long meas. start: 72.99244W 41.35153NLat/Long meas. end: 72.99358W 41.35181NPreconstruction measurement time: 10-Nov-2006 11:18:00Postconstruction measurement time: 13-May-2009 12:13:00Notes: on Jewish Community Center property; 1690 line de-

energized during pre-construction readings

Page 7: Electric field, Monitoring Site 2 Bartholomew Road 10 ... · PDF fileElectric field (kV/m) old ROW old ROW new ROW new ROW ... 1610-4C 115 45.5 1640 115 45.5 1690A 115 45.0 1690B 115

NY10132.001 U0T0 0811 MN03

Line and loading data

LineLine

Voltage(kV)

Bottomphaseheight(ft)

1610-4C 115 45.51640 115 45.5

1690A 115 45.01690B 115 45.0

– – –– – –– – –

pre

-const

ruct

ion

– – –

1685 115 46.01640 115 46.0

3827A 345 47.03827B 345 47.0

– – –– – –– – –

post

-const

ruct

ion

– – –

−100 0 100 2000

2

4

6

8

10

old ROW old ROWnew ROW new ROW

Ele

ctric

fiel

d (k

V/m

)

Distance from pre−construction ROW center (ft)

Electric field, Monitoring Site 21Congregation B’nai Jacob

view facing south

Pre−construction, measuredPost−construction, measured

1685 1640

1690A&B (removed)

1685(moved)

1640(moved)

3827A(new)

3827B(new)

Monitoring Site 21 Congregation B’nai JacobSegment: 2B WoodbridgeReference Section: 8 LEMFROW width: 165 ft (165 ft preconstruction)Lat/Long meas. start: 73.00237W 41.33900NLat/Long meas. end: 73.00266W 41.33944NPreconstruction measurement time: 09-Nov-2006 16:33:00Postconstruction measurement time: 14-May-2009 11:07:00Notes: 1690 line de-energized during pre-construction readings

Page 8: Electric field, Monitoring Site 2 Bartholomew Road 10 ... · PDF fileElectric field (kV/m) old ROW old ROW new ROW new ROW ... 1610-4C 115 45.5 1640 115 45.5 1690A 115 45.0 1690B 115

NY10132.001 U0T0 0811 MN03

Line and loading data

LineLine

Voltage(kV)

Bottomphaseheight(ft)

1610-4C 115 45.51640 115 45.5

1690A 115 45.01690B 115 45.0

– – –– – –– – –

pre

-const

ruct

ion

– – –

1685 115 55.01640 115 55.0

3827A 345 66.03827B 345 66.0

– – –– – –– – –

post

-const

ruct

ion

– – –

−100 0 1000

2

4

6

8

10

ROW ROW

Ele

ctric

fiel

d (k

V/m

)

Distance from ROW center (ft)

Electric field, Monitoring Site 24Eisenhower Park Parking Lot and Equestrian Field

view facing southwest

Pre−construction, measuredPost−construction, calculatedPost−construction, measured

1685 1640

1690A&B (removed)

1685(moved)

1640(moved)

3827A(new)

3827B(new)

Monitoring Site 24 Eisenhower Park ParkingLot and Equestrian Field

Segment: 2B MilfordReference Section: 8 LEMFROW width: 165 ft (165 ft preconstruction)Lat/Long meas. start: 73.05573W 41.25170NLat/Long meas. end: 73.05664W 41.25219NPreconstruction measurement time: 09-Nov-2006 12:06:00Postconstruction measurement time: 14-May-2009 09:35:00Notes: 1690 line de-energized during pre-construction readings