ELDAS 2nd progress meeting INM Madrid, 10 & 11 dec 2003.

25
ELDAS 2nd progress meeting ELDAS 2 nd progress meeting INM Madrid, 10 & 11 dec 2003

description

ELDAS 2nd progress meeting Program 10 dec 9:00 Coffee and welcome 9:30 Introduction and agenda Bart Status of forcings 9:45 PrecipitationPaul/Franz 10:30 Radiation and heating ratesBart 11:15 Coffee break 11:30 Database for 2003Bart MARS storage issuesPedro 12:30 Remaining Database issues to be resolved all 13:00 Lunch break Data assimilation progress and overview of past and future experiments 14:00 The scm-experiments at ECMWFPedro/Janneke 15:00 The CNRM assimilation systemGianpaolo 16:00 Break 16:30 Status of the DWD data assimilationWerner/Martin 17:30 Discussionall 18:00 Day closure

Transcript of ELDAS 2nd progress meeting INM Madrid, 10 & 11 dec 2003.

Page 1: ELDAS 2nd progress meeting INM Madrid, 10 & 11 dec 2003.

ELDAS 2nd progress meeting

ELDAS 2nd progress meeting

INM Madrid, 10 & 11 dec 2003

Page 2: ELDAS 2nd progress meeting INM Madrid, 10 & 11 dec 2003.

ELDAS 2nd progress meeting

Goal of meeting

• Information on progress• Finetuning of 2004 workplan

– Revised wp’s• BALTEX & GLDAS wp’s• Rhine wp• UK flooding wp• Demonstration for crop prediction (not formal ELDAS)

• Exchange of information– New fellows– Travel plans– Contributions to progress report, TIP, URD

Page 3: ELDAS 2nd progress meeting INM Madrid, 10 & 11 dec 2003.

ELDAS 2nd progress meeting

Program 10 dec• 9:00 Coffee and welcome • 9:30 Introduction and agenda BartStatus of forcings• 9:45 Precipitation Paul/Franz• 10:30 Radiation and heating rates Bart• 11:15 Coffee break • 11:30 Database for 2003 Bart• 11.45 MARS storage issues Pedro• 12:30 Remaining Database issues to be resolved all• 13:00 Lunch break Data assimilation progress and overview of past and future

experiments • 14:00 The scm-experiments at ECMWF Pedro/Janneke• 15:00 The CNRM assimilation system Gianpaolo• 16:00 Break • 16:30 Status of the DWD data assimilation Werner/Martin• 17:30 Discussion all• 18:00 Day closure

Page 4: ELDAS 2nd progress meeting INM Madrid, 10 & 11 dec 2003.

ELDAS 2nd progress meeting

Program 11 decFurther progress and workplans • 9:00 NWP experiments Ernesto• 10:00 Offline simulations over Europe: workplan and

goals (GLDAS & BALTEX wp's) Bart• 10:30 Progress in the Baltex WP Phil• 11:00 Break• 11:30 Results and future experiments in the

Rhone-workpackage Jean-Christophe• 12:00 Progress on the pointwise validation Cor• 12:45 lunch break• 13:45 Scm-experiments with the microwave radiation

model and SSM/I evaluation Henning• 14:30 The flooding experiments in the UK Eleanor• 15:00 The Rhine WP Bart• 15:10 Discussion• 16:00 breakClosing session• 16:30 Comments by Advisory board members • 17:15 Summary of conclusions Bart• 17:30 (Administrative) input request Bart• 18:00 Closure

Page 5: ELDAS 2nd progress meeting INM Madrid, 10 & 11 dec 2003.

ELDAS 2nd progress meeting

Toulouse interim meeting

Forcings:– Precip

• daily files: done• 3hrly: in progress

– Radiation: done– Heating rates:

• 1st release: done• Additional info: in progress

– Atm forcings: in progress• MARS storage: not yet

Page 6: ELDAS 2nd progress meeting INM Madrid, 10 & 11 dec 2003.

ELDAS 2nd progress meeting

Toulouse interim meeting• Soil moisture production

– CNRM:• Done by now (?)• No direct use of precipitation & radiation

– DWD:• Started soon (?)• Direct use of precip & radiat planned

– ECMWF• Trial column simulation: in progress• First release: mid 2004

• Slower than expected (!)– Request for contract extension not

approved

Page 7: ELDAS 2nd progress meeting INM Madrid, 10 & 11 dec 2003.

ELDAS 2nd progress meeting

2004 activities• Most of validation & demonstration work !• EGU special session on land data assimilation

– Nice, 25-30 April• Closing workshop & meeting

– 2.5 days sessions, 1.5 days discussion, 1 day final ELDAS meeting

– ECMWF, 8-12 nov 2004• Forcings (incl landsaf Tskin)• Assimilation methods• Applications (incl seasonal forecasting)• Validation (including N/GLDAS)• Outlook: biomass (GEOLAND) and new landuse maps

(ECOCLIMAP)• CAHMDA workshop Princeton, 1-5 nov

Page 8: ELDAS 2nd progress meeting INM Madrid, 10 & 11 dec 2003.

ELDAS 2nd progress meeting

Page 9: ELDAS 2nd progress meeting INM Madrid, 10 & 11 dec 2003.

ELDAS 2nd progress meeting

Radiation and heating rates

• ELDORADO– Database delivered to ECMWF &

Alterra– Paper (Meetschen et al) submitted– KNMI Preprint

Page 10: ELDAS 2nd progress meeting INM Madrid, 10 & 11 dec 2003.

ELDAS 2nd progress meeting

Heating rates workplan

• Gisela’s scm-study MUREX:– METEOSAT info consistent with local Tskin

measurements, but too low sampling frequency

Page 11: ELDAS 2nd progress meeting INM Madrid, 10 & 11 dec 2003.

ELDAS 2nd progress meeting

Heating rates workplan

• Gisela’s scm-study MUREX:– METEOSAT info consistent with local Tskin

measurements, but too low sampling frequency• 2000 database prepared

– Additional info on obs.error stil to be added• Case study with 2003 in progress

– 3 months (May-July)– METEOSAT and MSG– Simple data assimilation in RACMO– If successful & feasible: ECMWF will use 2000

database

Page 12: ELDAS 2nd progress meeting INM Madrid, 10 & 11 dec 2003.

ELDAS 2nd progress meeting

Database for 2003• Originally intended for MSG demonstration• No full data assimilation experiments

foreseen within ELDAS• However: forcings database will enable

future heating rate pilot exps prior to operational implementation: presence in MARS very helpful!

• Anticipated period: 1 May-1 Aug 2003– Precip?– ELDORADO: ok– Heating rates: ok

Page 13: ELDAS 2nd progress meeting INM Madrid, 10 & 11 dec 2003.

ELDAS 2nd progress meeting

Selected subregions and domain

Page 14: ELDAS 2nd progress meeting INM Madrid, 10 & 11 dec 2003.

ELDAS 2nd progress meeting

Heating rates of low vegetation and data

coverage

Page 15: ELDAS 2nd progress meeting INM Madrid, 10 & 11 dec 2003.

ELDAS 2nd progress meeting

Results from RACMO control run

Page 16: ELDAS 2nd progress meeting INM Madrid, 10 & 11 dec 2003.

ELDAS 2nd progress meeting

Page 17: ELDAS 2nd progress meeting INM Madrid, 10 & 11 dec 2003.

ELDAS 2nd progress meeting

New GLDAS/BALTEX workplans

• GLDAS-wp (4300):– Original: Evaluate ELDAS over US basins– New: over 2000 Europe:

• GLDAS: offline VIC-simulation (well-calibrated hydrologically oriented surface scheme)

• ELDAS1: offline TESSEL-simulation• ELDAS2: assimilated run• Optional: use GLDAS precip dataset (currently not

yet available for 2000)– ELDAS1 – GLDAS: 2 surface schemes driven

as in GLDAS (no data assimilation)– ELDAS2 – ELDAS1: added value of data

assimilation

Page 18: ELDAS 2nd progress meeting INM Madrid, 10 & 11 dec 2003.

ELDAS 2nd progress meeting

New GLDAS/BALTEX workplans

• Baltex wp (5400)– Original: use 18-year dataset to compare

to ELDAS climatology (unfeasible)– New: as in previous wp: use both offline

& full simulations to compare to discharge dataset, assessing• Intermodel differences• Added value of data assimilation• Added value of high resolution precip forcing

Page 19: ELDAS 2nd progress meeting INM Madrid, 10 & 11 dec 2003.

ELDAS 2nd progress meeting

New GLDAS/BALTEX workplans

• Required:– Offline forcing over Europe (ALMA netCDF

standard)• From MARS-archive• To be compiled by SMHI

– Offline simulation of VIC• To be carried out by SMHI in context of workvisit UW

– Offline simulation of TESSEL• To be carried out by KNMI

– Analyses: as planned• GLDAS-wp: KNMI• BALTEX-wp: SMHI

Page 20: ELDAS 2nd progress meeting INM Madrid, 10 & 11 dec 2003.

ELDAS 2nd progress meeting

Page 21: ELDAS 2nd progress meeting INM Madrid, 10 & 11 dec 2003.

ELDAS 2nd progress meeting

New Rhine workplan

• Originally: demonstrate ELDAS for Rhine flooding

• New: demonstrate ELDAS for discharge & soil water storage annual cycle

Page 22: ELDAS 2nd progress meeting INM Madrid, 10 & 11 dec 2003.

ELDAS 2nd progress meeting

Info on soil hydrological memory from reanalysis

& discharge• P – E = R + dS/dt

– P – E: from ERA40 convergence

– R: from river discharge

– dS/dt: budget closure

Hirschi et al, ETH Zurich, 2003

Page 23: ELDAS 2nd progress meeting INM Madrid, 10 & 11 dec 2003.

ELDAS 2nd progress meeting

Time series of soil water

Will ELDAS observations be closer to large scale estimate?

Page 24: ELDAS 2nd progress meeting INM Madrid, 10 & 11 dec 2003.

ELDAS 2nd progress meeting

Page 25: ELDAS 2nd progress meeting INM Madrid, 10 & 11 dec 2003.

ELDAS 2nd progress meeting

Additional requests• Cost statements & progress reports• Travels

– AGU jan 2004 (Cor Jacobs)– ?

• Technical Implementation Plan– See http://etip.cordis.lu/ (eldas_tip/tipeldas)

• User Requirements Document– See eldas-website

• All publications & presentations