El Camino College Parking Structure – Progress Photographs 12-19-15
Preparation & Installation of Deck Coating Mock-Up
Bead Blasting Deck Coating Mock-Up
Bead Blasting Deck Coating Mock-Up
Mixing Sikadur 22 Lo-Mod
Applying Sikadur 22 Lo-Mod, Primer Coat
Applying Sikadur 22 Lo-Mod, Broadcasting Sand
Applying Sikadur 22 Lo-Mod, 1st Coat Complete
Day 2 – Applying Sikalastic 720 Base
Day 3 – Applying Sikalastic 745 AL, Last Coats
Day 3 – Applying Sikalastic 745 AL, Broadcasting Sand
Day 3 – Applying Sikalastic 745 AL, Deck Coating Mock-Up Complete
Preparation for Test Pile Testing @ Gris Line D
Layout & Drilling of Drag/Chord Clips @ Grid Line C-68 & South
Layout & Drilling of Drag Plates @ Grid Line B
Electrical Rough-In Continues @ Phase I, Grid Lines 28 to 68
Howard Ridley Continuing Concrete Spall Repair @ Phase I, Grid Lines 28 to 68
Barcelo Begins Pile Cap Excavation @ Grid Lines 62 – 66
Temporary Fencing Installed Along Grid Line D, Between 28 & 68