![Page 1: Eidesvik Offshore ASA 23.05...2018/05/23 · CGG Alize 5,984DWT,100mLOA Built 1999 Oceanic Challenger 5,197DWT,91.3m Built 2000/rebuilt2006 Entered into an agreement with CGG to establish](https://reader036.fdocuments.in/reader036/viewer/2022071218/605093153d68505ad4253ca6/html5/thumbnails/1.jpg)
Eidesvik Offshore ASA – Annual General Meeting 23.05.2018
![Page 2: Eidesvik Offshore ASA 23.05...2018/05/23 · CGG Alize 5,984DWT,100mLOA Built 1999 Oceanic Challenger 5,197DWT,91.3m Built 2000/rebuilt2006 Entered into an agreement with CGG to establish](https://reader036.fdocuments.in/reader036/viewer/2022071218/605093153d68505ad4253ca6/html5/thumbnails/2.jpg)
Seismic11 vessels
Supply7 vessels
Subsea4 vessels
Revenues MNOK 755 457 employees Operates 26 ships
![Page 3: Eidesvik Offshore ASA 23.05...2018/05/23 · CGG Alize 5,984DWT,100mLOA Built 1999 Oceanic Challenger 5,197DWT,91.3m Built 2000/rebuilt2006 Entered into an agreement with CGG to establish](https://reader036.fdocuments.in/reader036/viewer/2022071218/605093153d68505ad4253ca6/html5/thumbnails/3.jpg)
The offshore wind market
Contract extension with Siemens Wind Power for support work for the vessel «Acergy Viking» on German sector. The contract is firm to January 2020, and the charterer has options for extension after the firm contract.
Entered into a contract with Adwen for «Viking Neptun». Commencement in mid October 2017 for 5 months firm with further options.
![Page 4: Eidesvik Offshore ASA 23.05...2018/05/23 · CGG Alize 5,984DWT,100mLOA Built 1999 Oceanic Challenger 5,197DWT,91.3m Built 2000/rebuilt2006 Entered into an agreement with CGG to establish](https://reader036.fdocuments.in/reader036/viewer/2022071218/605093153d68505ad4253ca6/html5/thumbnails/4.jpg)
The subsea vessel Viking Poseidon was sold. The vessel was delivered to new owners in 1st Quarter 2017. The sale resulted in a gain on sale of MNOK 17,2, and a positive liquidity effect of approx. MNOK 180 after repayment of debt.
![Page 5: Eidesvik Offshore ASA 23.05...2018/05/23 · CGG Alize 5,984DWT,100mLOA Built 1999 Oceanic Challenger 5,197DWT,91.3m Built 2000/rebuilt2006 Entered into an agreement with CGG to establish](https://reader036.fdocuments.in/reader036/viewer/2022071218/605093153d68505ad4253ca6/html5/thumbnails/5.jpg)
The supply market
Contract extension with Chevron North Sea Ltd for «Viking Princess». The contract is firm to July 2019, with 12 months options.
![Page 6: Eidesvik Offshore ASA 23.05...2018/05/23 · CGG Alize 5,984DWT,100mLOA Built 1999 Oceanic Challenger 5,197DWT,91.3m Built 2000/rebuilt2006 Entered into an agreement with CGG to establish](https://reader036.fdocuments.in/reader036/viewer/2022071218/605093153d68505ad4253ca6/html5/thumbnails/6.jpg)
The seismic market
Eidesvik and CGG agreed to amend the contract for Viking Vanquish. The contract is firm to November 2020. The dayrate is reduced, and Eidesvik received listed notes and other debt instruments as compensation.
![Page 7: Eidesvik Offshore ASA 23.05...2018/05/23 · CGG Alize 5,984DWT,100mLOA Built 1999 Oceanic Challenger 5,197DWT,91.3m Built 2000/rebuilt2006 Entered into an agreement with CGG to establish](https://reader036.fdocuments.in/reader036/viewer/2022071218/605093153d68505ad4253ca6/html5/thumbnails/7.jpg)
New Seismic Vessel Joint Venture
Oceanic Vega Oceanic Sirius
6 ,013DWT, 106m LOABuilt 2010
5,800DWT, 106m LOABuilt 2011
Geo Coral
4,750DWT, 100.8m LOA Built 2010
Geo Caribbean
4,750DWT, 108.3m LOA Built 2008
Geo Celtic
4,750DWT, 108.3m LOABuilt 2007
CGG Alize
5,984DWT, 100m LOABuilt 1999
Oceanic Challenger
5,197DWT, 91.3m LOABuilt 2000/rebuilt 2006
Entered into an agreement with CGG to establish a new ownership set‐up for 7 seismic vessels. This new set‐up is based on the creation of Global Seismic Shipping AS that will hold the shares in two entities. One of the entities own the two vessels formerly co‐owned by CGG and Eidesvik (Oceanic Vega and Oceanic Sirius), and the other own five vessels formerly owned by CGG and currently cold‐stacked (Geo Coral, Geo Caribbean, Geo Celtic, CGG Alize and Oceanic Challenger).
The two shipowning entities are financially separated and no guarantees are established between the two or from the owners. Global Seismic Shipping AS, jointly owned by CGG and Eidesvik in equal parts, was operational at the beginning of the second quarter 2017.
CGG continues to charter the Oceanic Vega and Oceanic Sirius from the new Company and has extended the current contract until March 2027, thus on a reduced charter rate through the whole charter period. CGG will progressively charter the Geo Coral (from the second quarter 2017 onwards), Geo Caribbean and Geo Celtic vessels, as the charters of other vessels currently in operation expire.
![Page 8: Eidesvik Offshore ASA 23.05...2018/05/23 · CGG Alize 5,984DWT,100mLOA Built 1999 Oceanic Challenger 5,197DWT,91.3m Built 2000/rebuilt2006 Entered into an agreement with CGG to establish](https://reader036.fdocuments.in/reader036/viewer/2022071218/605093153d68505ad4253ca6/html5/thumbnails/8.jpg)
The financial restructuring
• Eidesvik Offshore ASA has reached agreement with its lenders regarding change in its repayment terms of the group’s loans. The financial restructuring period started 01.02.2018 and lasts until 31.12.2022.
• Final maturity for loans (“balloons”) are extended to the end of the financial restructuring period
• Instalments are reduced to 27,5% of its original schedule from 2018 to 30.06.2021• Extraordinary debt repayments of the proceeds from sale of tradeable CGG bonds• Private placement of MNOK 120, and conversion of shareholder loan of MNOK 30• Subsequent offer of MNOK 30 (fulfilled) • Cash sweep agreement• New financial covenants
![Page 9: Eidesvik Offshore ASA 23.05...2018/05/23 · CGG Alize 5,984DWT,100mLOA Built 1999 Oceanic Challenger 5,197DWT,91.3m Built 2000/rebuilt2006 Entered into an agreement with CGG to establish](https://reader036.fdocuments.in/reader036/viewer/2022071218/605093153d68505ad4253ca6/html5/thumbnails/9.jpg)
LTI 2017
![Page 10: Eidesvik Offshore ASA 23.05...2018/05/23 · CGG Alize 5,984DWT,100mLOA Built 1999 Oceanic Challenger 5,197DWT,91.3m Built 2000/rebuilt2006 Entered into an agreement with CGG to establish](https://reader036.fdocuments.in/reader036/viewer/2022071218/605093153d68505ad4253ca6/html5/thumbnails/10.jpg)
‐600‐400‐200
0200400600
2013 2014 2015 2016 2017
Profit
Profit Gain on sale and termination fee
Results(in million NOK)
0
500
1 000
2013 2014 2015 2016 2017
EBITDA
EBITDA Gain on sale and termination fee
0
500
1 000
1 500
2013 2014 2015 2016 2017
Revenues
Operating revenue Gain on sale and termination fee
‐500
0
500
2013 2014 2015 2016 2017
Operating profit
EBIT Gain on sale and termination fee
![Page 11: Eidesvik Offshore ASA 23.05...2018/05/23 · CGG Alize 5,984DWT,100mLOA Built 1999 Oceanic Challenger 5,197DWT,91.3m Built 2000/rebuilt2006 Entered into an agreement with CGG to establish](https://reader036.fdocuments.in/reader036/viewer/2022071218/605093153d68505ad4253ca6/html5/thumbnails/11.jpg)
Balance (in million NOK)
Equity Equity
Long‐term liabilitiesLong‐term liabilities
Fixed assetsFixed assets
Current assets
Current assetsCurrent liabilities
Current liabilities
0
1 000
2 000
3 000
4 000
5 000
6 000
Assets 31.12.17 Equity andLiabilities31.12.17
Assets 31.12.16 Equity andLiabilities31.12.16
Equity ratio 31.12.17: 36 % (29 %)
![Page 12: Eidesvik Offshore ASA 23.05...2018/05/23 · CGG Alize 5,984DWT,100mLOA Built 1999 Oceanic Challenger 5,197DWT,91.3m Built 2000/rebuilt2006 Entered into an agreement with CGG to establish](https://reader036.fdocuments.in/reader036/viewer/2022071218/605093153d68505ad4253ca6/html5/thumbnails/12.jpg)
01.01.2018 01.01.2019 01.01.2020 31.12.2020 01.01.2022
Vantage
Veritas Viking
Viking Vision
Viking Vanquish
Oceanic Vega
Oceanic Sirius
Geo Coral
Geo Caribbean
Geo Celtic
Oceanic Challenger
CGG Alize
Viking Avant
Viking Energy
Viking Athene
Viking Prince
Viking Princess
Viking Lady
Viking Queen
Acergy Viking
Subsea Viking
Viking Neptun
Seven Viking
Contract Status
Firm contract Option
LAY UP
LAY UP
LAY UP
LAY UP
LAY UP
LAY UP
LAY UP
LAY UP
![Page 13: Eidesvik Offshore ASA 23.05...2018/05/23 · CGG Alize 5,984DWT,100mLOA Built 1999 Oceanic Challenger 5,197DWT,91.3m Built 2000/rebuilt2006 Entered into an agreement with CGG to establish](https://reader036.fdocuments.in/reader036/viewer/2022071218/605093153d68505ad4253ca6/html5/thumbnails/13.jpg)
277139
27
166
213
231 224 223
919
0
200
400
600
800
1 000
Rest 2018 2019 2020 2021 2022 From 2023
Millions
Contract Backlog 31.03.2018
Consolidated Share of JV's
![Page 14: Eidesvik Offshore ASA 23.05...2018/05/23 · CGG Alize 5,984DWT,100mLOA Built 1999 Oceanic Challenger 5,197DWT,91.3m Built 2000/rebuilt2006 Entered into an agreement with CGG to establish](https://reader036.fdocuments.in/reader036/viewer/2022071218/605093153d68505ad4253ca6/html5/thumbnails/14.jpg)
68 87 87 192385
149
1 382
98
0
200
400
600
800
1 000
1 200
1 400
1 600
1 800
2 000
Rest 2018 2019 2020 2021 2022 After 2022
Millions
Debt maturity profile 31.03.2018
Instalments Balloons
![Page 15: Eidesvik Offshore ASA 23.05...2018/05/23 · CGG Alize 5,984DWT,100mLOA Built 1999 Oceanic Challenger 5,197DWT,91.3m Built 2000/rebuilt2006 Entered into an agreement with CGG to establish](https://reader036.fdocuments.in/reader036/viewer/2022071218/605093153d68505ad4253ca6/html5/thumbnails/15.jpg)
Thanks for Your attention!