EH · 2020-08-01 · Procurement Reform Act" and its Implementing Rule and Regulations (IRR). The...
Transcript of EH · 2020-08-01 · Procurement Reform Act" and its Implementing Rule and Regulations (IRR). The...
EH REputEc Of the Philippines" =jp=aqlHTHERT OF PUBLIC WORKS.&FjD HIGHWAYSI OFFICE OF "E DISTRICT ENGINEER
BHiran District Engineering OfficeNaval, Biliran Province
REQUEST FOR EXPRESSION OF INTEREST (RE0I)(Consulting Services)
July 29, 2020
Contract ID: 21CSIA004 - Conduct of Soil Exploration for the following FloodControl Projects under FY 2021 Infrastructure Program
1. Construction of Anog Flood Control along Biliran Circumferential Road, Cabucgayan, Biliran
2. Construction of Amambahag Flood Control along Biliran Circumferential Road, Culaba, Biliran
3. Construction of Bool Flood Control along Biliran Circumferential Road, Culaba, Biliran
4. Construction of Santol Flood Control along Biliran Circumferentjal Road, Biliran, Biliran
5. Construction of Cabibihan Flood Control along Biliran Circumferential Road, Caibiran, Biliran
6. Construction of Kaulangohan Flood Control along Biliran Circumferential Road, Caibiran, Biliran
7. Rehabilitation of Caray-caray Flcod Control along Bjliran Circumferential Road, Naval, Bjliran
8. Rehabilitation of Catmon Flcod Control along Biliran Circumferential Road, Naval, Biliran
9. Construction of Mapula Flcod Control along Biliran Circumferential Road, Caibiran, Biliran
10. Construction of Ungali Flood Control along Biliran Circumferential Road, Kawayan, Biliran
ABCScope of Work
Contract LocationContract Duration
P 1,000,000.00Conduct drilling of 20 bore holes at 10 meters for soft soil and 5 meters intohard strata (N-Value>30) for all items,Biliran Circumferential Road, Province of Biliran90 Calendar Days
The DPWH-Biliran District En(Requirements for the release of
Office, Naval, Biliran, as per Memorandum dated November 6, 2012 forintends to apply the sum above stated being the
Approved Budget for the Contract (ABC) to payments under the contract for the abovementioned contracts. Bids receivedin excess of the ABC shall be automatically rejected /declared non-complying at the opening of the financial proposal.
The DPWH - Biliran District Engineering Office, Naval, Biliran now calls for the silbmission of Eligibility Documents for the
preparation of Subsurface Exploraand the subiect of the Terms and
2020 ugiven below. Applications for
technical Investigation for the Proposed Construction of Flood Control ProjectsITOR). Interested Consultants must submit their eligibility documents on orubmission/Opening of Eligibility Documents) at the BAC Office with address
be evaluated based on a non-discretionary "pass/fail" criterion, The eligibilityforms will be available at www.dpwh.hov.ph.
The BAC shall dr:w up the short list of consultants from those who have submitted Eligibility Documents and have beendetermined as eligible in accordance with the provisions of Republic Act 9184 (RA 9184), otherwise as the GovernmentProcurement Reform Act" and its Implementing Rule and Regulations (IRR). The short list shall consist of three (3)prospective bidders/consultants who will be entitled to attend Pre-Bid Conference and submit bids/proposals. The criteriaand rating system for short listing are:
1, Experience of the Firm (35 points)2. Qualifications of Key personnel of the Firm (40 Points)3. Job Capacity (25 points). For a total of 100 points.
Bidding will be conducted through open competitive bidding procedures for the procurement of Consulting Services usingnon-discretionary pass/fail criterion as specified in the Implementing Rules and Regulations (IRR) of Republic Act 9184(RA 9184), otherwise known as the ``Government Procurement Reform Act". Bidding is restricted to Filipino citizens/soleproprietorships, partnerships, organizations or joint venture with at least seventy five percent (60%) interest oroutstanding capital stock belonging to citizens of the Philippines.
1lpage
.
-4444ippTheBACshaHconductEvaluationofConsultants'Bids/ProposalsusingtheQuality-CostBasedEvaluation(QCBE):Pass/nyrectin/ca/ Sbones aw Oralfty-Cast Ire/j7flg procedure. Only bids whose technical proposals pass the minimumtechnical evaluation score of seventy five percent (75%) shall have their financial proposals opened and evaluated. Thetechnical proposal shaH carry eighty percent (80%) weight in the evaluation. The criteria and rating system for theevaluation of bids shall be provided in the Instruction to bidders (ITB).
The contract shall be completed within E©,
The DPWH-Biliran District Engineering Office, Naval, Biliran reserves the right to accept or reject any bid, to annul thebidding process, and to reject aH bids at any time prior to contract award, without thereby incurring any liability orobligation to the affected bidder/consultant,
For further information, please refer to:SALVADOR a. REGIS, JR.Engineer IllBAC Chairman
Attention:Head, BAC SecretariatB_AC Office, DPWH Bi/iran District Engineering OfficeBrgy. Ca/umpang, Naval, Biliran ProvinceTelefax No. : (053) 500-9097Email Add: dBjwh.bdeo@gngj!:fen