C- Proposed projects within 2014-2018 National Plan - Implementing Site: Various Slums in different areas of Egypt Project Title Project Duration Total Project Cost Strat. Obj. Oper. Obj. The development of unsafe areas 2014-2018 8 billion LE 1 2 3 a b d The development of unplanned areas 2014-2018 100 billion LE 1 2 3 a b d Strategic objectives: 1- To improve the living conditions of affected populations 2- To improve the condition of affected ecosystem. 3- To generate global benefits through effective implementation. 4- To mobilize resource to support implementation of the convention through building effective partnerships between national and international actors Operational objectives: a-Advocacy awareness – raising and education b- Policy Framework c- Science technology and knowledge d- Capacity building e- Financing and Technology transfer

Transcript of EGYPT: Future projects

Page 1: EGYPT: Future projects

C- Proposed projects within 2014-2018 National Plan- Implementing Site: Various Slums in different areas of Egypt

Project Title

ProjectDuration

TotalProject

CostStrat.Obj.

Oper.Obj.

The development of unsafe areas 2014-2018 8 billion LE 123

abd

The development of unplanned areas 2014-2018 100billion LE

123

abd

Strategic objectives: 1- To improve the living conditions of affected populations 2- To improve the condition of affected ecosystem. 3- To generate global benefits through effective implementation. 4- To mobilize resource to support implementation of the convention through building effective partnerships between national and international actors Operational objectives: a-Advocacy awareness – raising and education b- Policy Framework c- Science technology and knowledge d- Capacity building e- Financing and Technology transfer

Page 2: EGYPT: Future projects

C- Proposed projects within 2014-2024 National Plan: Implementing Site : Five locations that represent the three major geographic regions that characterize the Egyptian Desert Rangelands, northeast coast of Egypt, and the southeast corner of Egypt (the Halaib Triangle).

Project Title

ProposedProject

Duration

Total Project Cost ( Budget)

Start.Obj.

Oper.Obj.Local Foreign

Geospatial technology – based Rangelands long term monitoring research station for combating desertification.

Five years Estimated cost 10 million US$

1234

abcde

Strategic objectives: 1- To improve the living conditions of affected populations 2- To improve the condition of affected ecosystem.

3- To generate global benefits through effective implementation.4- To mobilize resource to support implementation of the convention through building effective partnerships between national and international actors

Operational objectives:a-Advocacy awareness – raising and education b- Policy Framework c- Science technology and knowledge d- Capacity building