Amazon BayIronsands Project
April 2013
Amazon Bay Ironsands Project foyson...abundant harvest April 2013
Overview
Nearly 200 km stretch of coast line, 150 km south east of Port Moresby, PNG
Focus on 30 km long Threadfin area, which has exploration target of 630 million tonnes¹
Concentrate of 52% Fe, 1% V2O5 & 17% TiO2 to be produced on site
Metallurgical processes now exist to separate out high purity vanadium and titanium products, from the iron
Low cost, well tested production process - similar to New Zealand Iron & Steel operation
¹ Quantity estimate based on previous drilling, Landsat and available radiometrics covering Amazon Bay dune formation.Refer Disclaimer Cautionary Statement
Amazon Bay Ironsands Project foyson...abundant harvest April 2013
Amazon Bay -Undervalued Leverage
¹ Resources as defined by Company ² As at 11 April 2013³ Threadfin Area - Refer Disclaimer Cautionary Statement
Significantly under valued when compared to ASX listed peers with iron-vanadium-titanium resources
Company ASX Resource¹ (tonnes) Location Market Cap² ($M)
PNG 4
54
105
30
43
40
Indonesia
Fiji
Peru
Australia
Australia
630 million³
165 million
220 million
1.5 billion
160 million
450 million
FOY
IDO
AXZ
LRS
TNG
-
Foyson
Indo Mines
Amex Resources
Latin Resources
TNG
Balla Balla Project
Amazon Bay Ironsands Project foyson...abundant harvest April 2013
Project Strategy
Analysis indicates 10% of ironsands reports to Heavy Minerals concentrate
Build project in 15 mtpa “modules” to produce 1.5 mtpa HM concentrate
Module comprises:
2000tph cutter/suction dredge Floating Wet Concentrator plant Land based screening and selective grinding facility Stockpiling Single-point ship loading
Amazon Bay Ironsands Project foyson...abundant harvest April 2013
Amazon Bay TenementsTotal Exploration area: 3355 square kilometres
0 10
kilometres
Map projection: Lat Long (WGS84)Produced by: Edward S. K. Fry
20
OCEANA ELA 1217km2
SANDBANK
EL 1623
193km2
AMAZON BAY NORTH
ELA 2149 586km2
DOMARA
EL 1637
200km
POI
EL 1628
POI SOUTH
ELA 1643
514km2
FOYSON RESOURCES LIMITED
AMAZON BAY IRON SANDS PROJECT
P.N.G.
AMAZON BAY
EL 1396 193km2 MARUTA ELA 682km2
-10º-10º
149º3
0'
MARYTA ELA 652km²
Amazon Bay Ironsands Project foyson...abundant harvest April 2013
Amazon Bay Proposed Drilling CY2013
Radiometrics draped over Google Earth
Strategy for Creating Shareholder Value May 2012An Option on a World Class Minerals Package
June 2012foyson...abundant harvest
Amazon Bay Proposed Drilling
Radiometrics draped over Google Earth
1600m
Amazon Bay Ironsands Project foyson...abundant harvest April 2013
Amazon BayComparative Advantages
Relatively close to China
Limited environmental impediments
Low population on the resource area
Unlimited freshwater
Can be dredged due to high water table
Can pre-fabricate plant offshore in lower cost environment
Ocean transport of product possible
Coastline is more protected compared to the open coastline of south Java and South America
Amazon Bay Ironsands Project foyson...abundant harvest April 2013
Conceptual Flow SheetConceptual Amazon Bay Processing Scheme14th April 2013Dredge-floating processing plant-land based magnetite plant & non-mag VHM circuit
Primary Concentrator Plant "PCP" (floating)
+3mm Oversizeundersize
Oveflow (slimes)underflow (sand)
sand tails to pond
heavy mineral concentrate
Land based Concentrating Upgrading Plant "CUP"
Oversize-3mm +1mm
-1mm undersize
Magnetics non-magnetics
MAGNETITE CIRCUIT NON-MAGNETIC CIRCUIT
to tails dam sand tailings
heavy minerals
magnetics-150um170 t/h Super-concentrate
+150um 390 t/h heavy minerals ( contails free gold)
to tailsnon-magnetics tails
magnetics -75um
non-magneticsto waste magnetics
Final magnetite concentrate Non-magnetic VHM concentrate Gold concentrate to stockpile for shipment ( contains rutile, zircon, ilmenite)
1.5mtpa
Dredge 2000 t/h
Trommel 3mm
Linear Screens 1mm
Possibly spiral upgrading
2 X LIMS 380Gauss
Classify at 150um spirals
380G magnets Ball or rod mill
P100 75um
2 X LIMS 380Gauss 3 stage cleaning magnets
Gravity Circuit - 4 stages -Rougher spirals -Mids retreats
-Cleaner scavanger spirals -Cleaner spirals
Deslimming cyclones
HMC stockpile ( on-shore) trucked or pumped to Concentrate
Upgrading Plant
Primary Wet Drum Magnets 1000 Gauss
Gravity Circuit -Primary spirals
Gravity Circuit -Secondary spirals Gold circuit
Knelsen, Spinner or ILR
Amazon Bay Ironsands Project foyson...abundant harvest April 2013
Cost Estimates
Based on mining 15mtpa of ironsands to produce 1.5mtpa of HM concentrate, costs are estimated at:
Capital cost A$160-180million Operating cost A$29/tonne concentrate FOB
These compare favourably with other ironsands projects under consideration in Asia/Pacific and South America
Amazon Bay Ironsands Project foyson...abundant harvest April 2013
Secondary Processing
The HM concentrate can be processed to produce high purity titanium, vanadium and ironThere are two process routes available
Pyrometallurgy: involves a reducing, high temperature environment to produce molten iron, with titanium and vanadium slags, for further processing
Hydrometallurgy: involves leaching and solvent extration to produce three high purity metals
Pilot scale testing of both these processes is underway world-wide on various Fe/Ti /V deposits;
Amazon Bay Ironsands Project foyson...abundant harvest April 2013
Secondary ProcessingSecondary processing could occur in low cost environments such as the Philippines or China
Strategy for Creating Shareholder Value May 2012Partnering Strategy for Resource Development
PNG Mining Conference December 2012foyson...abundant harvest
Amazon Bay Processing
Australia
PNG
CHINA
PHILIPPINES
AMAZON BAY
HONG KONG
BATANGAS
Amazon Bay Ironsands Project foyson...abundant harvest April 2013
Amazon Bay is a very large Fe/Ti /V resource
The project has very favourable logistics for supply of a HM concentrate into China and Asia generally
The HM component of the ironsands is typically higher than other comparable iron sands projects
The current market value of Amazon Bay is only 5% to 10% of comparable ironsands projects
Summary
Amazon Bay Ironsands Project foyson...abundant harvest April 2013
Foyson ResourcesNOTICE AMD DISCLAIMER CAUTIONARY STATEMENT
Strategy for Creating Shareholder Value May 2012An Option on a World Class Minerals Package
June 2012foyson...abundant harvest
This document has been prepared by Foyson Resources Ltd (the Company). This document contains background information about the Company and its projects current at the date of this document. It does not purport to be all inclusive or complete. Recipients should conduct their own investigations and perform their own analysis in order to satisfy themselves as to the accuracy and completeness of the information, statements and opinions contained in this document.
The document is for information purposes only. Neither the document nor the information contained in it constitutes an offer, invitation, solicitation or recommendation in relation to the purchase or sale of shares in any jurisdiction. This document may not be distributed in any jurisdiction except in accordance with the legal requirements applicable in such jurisdiction. Recipients should inform themselves of the restrictions that apply in their own jurisdiction.
To the fullest extent permitted by law, Foyson Resources Ltd, its officers, employees, agents and advisers do not make any representation or warranty, expressed or implied, as to the currency, accuracy, reliability or completeness of any information, statements, opinions, estimates, forecasts or other representations contained in this document. No responsibility for any errors in or omissions from this document is accepted.
Where Foyson Resources Ltd expresses or implies an expectation or belief as to future events or results, such expectation or belief is expressed in good faith and believed to have a reasonable basis.
1 To the extent that there is information set out in this document, any potential quantity and grade is conceptual in nature, as there has been insufficient exploration to define a mineral resource under the JORC Code and it is uncertain if further exploration will result in the determination of a mineral resource under the JORC Code. Quantity estimate based on previous drilling, Landsat and available radiometrics covering Amazon Bay dune formation.
The information contained in this document that relates to Exploration Results or Mineral Resources or Ore Reserves is based on information compiled by Mr Chris Young who is a Member of the Australian Institute of Geoscientists. Mr Young has sufficient experience which is relevant to the style of mineral deposits under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 edition of the “Australasian Code for Reporting of Mineral Resources and Ore Reserves”. Mr Young consents to the inclusion in this presentation of the matters based on his information in the form and context in which it appears.
Foyson Resources LtdNOTICE AND DISCLAIMER CAUTIONARY STATEMENT