EGK 2011: Construction 03 IRDS

24
Prepared by: Michael Asfaw (MSc, BSc, MAPM, MBCS)

description

 

Transcript of EGK 2011: Construction 03 IRDS

Page 1: EGK 2011: Construction 03 IRDS

Prepared by:

Michael Asfaw (MSc, BSc, MAPM, MBCS)

Page 2: EGK 2011: Construction 03 IRDS

IRDS

• is established with experts, and a company in Germany; • is a progressive and multi-disciplinary Engineering and

Consultancy Office with vested interest in development projects in the Region.

Page 3: EGK 2011: Construction 03 IRDS

Our Services

• Planning – economic and environmental feasibility studies• Design and Supervision – real estates, transport,

terminals, water treatment, bridges, tunnels ...• Consultancy and Capacity Building.

Page 4: EGK 2011: Construction 03 IRDS

Pre-DesigningDesigning / Supervision

Page 5: EGK 2011: Construction 03 IRDS

HEnd-to-end Solution

•Feasibility Design•Architectural Design•Surveying•Soil Investigation•Sanitary Design•Electrical Design•Structural Design•Mechanical Design•Contract Administration•Quality Management

Housing and Real Estate

Page 6: EGK 2011: Construction 03 IRDS

CConstruction Site ManagementDefinition of planning goalsOrganization and staffingCoordination of programs and participantsControls of deliverablesConstruction supervisionTechnical supervisionDocumentation

Construction

Page 7: EGK 2011: Construction 03 IRDS

TTransport Planning and Optimisation•State Transport Planning. •State and Regional Transport Studies•Light-Speed Rail and Passenger Rail. •Freight Rail Capacity and Planning. •National Rail Policy and Planning. •Rail and Environmental Planning

Transport

Page 8: EGK 2011: Construction 03 IRDS

RRoad Planning

TurnpikesExpress waysMunicipal roadsCity by-passBicycle paths

Road Infrastructure

Page 9: EGK 2011: Construction 03 IRDS

RRailroad Stations•Transfer connection bus/ railroad/cars/pedestrians•Volume of traffic•Allocation of station platforms•Traffic junctions•Availability of railroad stations •Freight traffic•Combined freight load from roads to rail tracks•Freight terminals

Railroad

Page 10: EGK 2011: Construction 03 IRDS

RQuality Management•National laws•European/Regional laws

Special railroad regulations:•Ground constructions•Track construction•Construction design•Drainage•Outfitting•Railroad stations

Railroad

Page 11: EGK 2011: Construction 03 IRDS

TDesigning

•Terminal Planning •Program Management •Marine Structures •Terminal Security •Terminal Automation •Ferry Terminals •Bulk Terminals •Gate Planning & Design •Terminal Simulation •Traffic Studies

Terminal

Page 12: EGK 2011: Construction 03 IRDS

WWaterTreatment Plants

Sewage treatment is the basis for water purification and the protection of our water resources.

Reports and studiesEconomic analysisMaster planning of waste water collection and treatment systemsEvaluations and hydraulic systems modellingSewage treatment plants

Ablaufwerte KA Altlay, 1.700 EW, GK 2: Soll-Ist-Vergleichaus Betriebstagebuch 2006

20 mg/l

10 mg/l

2 mg/l6 mg/l 6 mg/l

2 mg/l

60 mg/l

29 mg/l

0

10

20

30

40

50

60

70

CSB BSB5 Nges Pges

Kon

zent

rati

on [

mg/

l]

SOLL-WerteIST-Werte

Page 13: EGK 2011: Construction 03 IRDS

BBridge

• General Steel Bridges• Cable Bridges • Modular Bridges• Movable Bridges• Special Design – fly

over etc….

Page 14: EGK 2011: Construction 03 IRDS

TTunnel

• Feasibility study and Technology Section.

• Full and detailed Tunneling Design. • Environmental friendliness and Impact

Assessment.

Page 15: EGK 2011: Construction 03 IRDS

TTerminals

Page 16: EGK 2011: Construction 03 IRDS

AArchitecture

Page 17: EGK 2011: Construction 03 IRDS

Consultancy and Capacity Building

Page 18: EGK 2011: Construction 03 IRDS

CConsultancy

• Why?– Complexity..

• Lack of Coordianation,• Lack of Communication,• Lack of Progress Control,• Lack of Quality Control,• Insufficent Measurables,• Insufficent Stakeholders Management.

Page 19: EGK 2011: Construction 03 IRDS

CCapacity Building

• How?– Through set of Processes: provides controlled

start, controlled progress and controlled close to all projects.

– Component: controls, business case, organization, quality, risk, planning…

– Techniques: product-based planning, quality review, change control …

Page 20: EGK 2011: Construction 03 IRDS

CCapacity Building

• Process– Project startup,– Initiating a project,– Controlling stages,– Managing Product Delivery,– Managing Stage Boundaries,– Closing a Project

Page 21: EGK 2011: Construction 03 IRDS

CCapacity Building

• Controlling Stages– Work allocation,– Quality reviews,– Risk managment,– Change management,– Stage plan management,– Product delivery on aggreed: time, cost,

quality– Reporting

Page 22: EGK 2011: Construction 03 IRDS

CCapacity Building

• Potential Benefits– Creates stability,– Simplifies complexity,– Provides effective tool on warning of

problems,– Facilitates smooth boundary/stage

management,– Easily teachable, scalable and repeatable.

Page 23: EGK 2011: Construction 03 IRDS

PProject Management • Adoption in 2007

– Over 250,000 practitioners worldwide– Used on all 7 continents– Translated in more than 17 languages – More than 20 User Groups around the world– Most widely used method on all types of

projects (construction, technology, etc.)

PRINCE2 (Project Managment in a Controlled Enviroment)

Page 24: EGK 2011: Construction 03 IRDS

For further information please contact us:

[email protected] or [email protected]

THANKS!