Venue: Gurgaon Corporate Office P KOTESWARA RAO
© LANCO Group, All Rights Reserved
Heat Rate is
The Pulse Ratefor knowing the health of the plant.
© LANCO Group, All Rights Reserved
© LANCO Group, All Rights Reserved
COAL UNLOADER FROM SHIP
© LANCO Group, All Rights Reserved
© LANCO Group, All Rights Reserved
© LANCO Group, All Rights Reserved
© LANCO Group, All Rights Reserved
© LANCO Group, All Rights Reserved
© LANCO Group, All Rights Reserved
PARAMETER AFFECTED BY
TURBINE HEAT RATE : LOADING FACTOR, AGING
BOILER EFFICNECY :COAL QUALITY
APC : LOADING FACTOR
1. FIRING BOILER RANGE COAL
2. MAINTAINING TG LOADING FACTOR
2 MOST IMPORTANT FACTORS FOR BETTER PERFORMANCE
© LANCO Group, All Rights Reserved
LOADING / DISPATCH
RECEIPT
FIRING POINT
© LANCO Group, All Rights Reserved
The Performance Ingredients
• Safety• People Management• Performance Monitoring• Condition Monitoring• Planning• The Asset Management• The Turn Around Management• Efficiency workshop
© LANCO Group, All Rights Reserved
© LANCO Group, All Rights Reserved
ZERO TOLERANCE
© LANCO Group, All Rights Reserved
© LANCO Group, All Rights Reserved
CONTRACTS MANAGEMENT
© LANCO Group, All Rights Reserved
Plant & ProcessPeople
Failu
res
attr
ibut
ed
to a
nd c
ost o
f los
sC
ost
for
corr
ectio
n
Lloyds Register
© LANCO Group, All Rights Reserved
ROLE OF CULTURE
“Culture” that characterizes any group is made of the knowledge, beliefs, customs, and practices shared within the group. These are taken for granted, but they guide attitudes and behaviours, which in turn determine actual outcomes. When a business seeks to improve its performance, it must examine its culture and assess the impact of its practices on the desired results.
© LANCO Group, All Rights Reserved
FORCED OUTAGE REDUCTION• Repetitive trips causing short duration outage
• Non repetitive outages of long duration
• Tripping of major auxiliaries leading to unit tripping
• Potential areas of multiple unit trips
© LANCO Group, All Rights Reserved
Hea
t Rat
e
No of Years
Inclined Bath Tub curve
Heat Rate Loss Life cycle
Stabilization periodAging –degradation- 0.5 to 0.7% per annum
Heat Rate recouped during major Over hauls
© LANCO Group, All Rights Reserved
COAL SAMPLING LOCATION
© LANCO Group, All Rights Reserved
• TA Manager • Operations Coordinator • Process Coordinator • Safety Coordinator • Environmental Coordinator • Scheduler • Planner(s) • Contractor Coordinator • Procurement Coordinator • Material Expeditor
THE TURNAROUND TEAM
© LANCO Group, All Rights Reserved
Turn Around Process-corporate
• Proven and requiring minimal customization;
• Has intermediate measurable mile-posts
• Scalable to various turnaround types and sizes; and
• Easy-to-use and non-cumbersome, yet provides enough detail and practical aids.
© LANCO Group, All Rights Reserved
© LANCO Group, All Rights Reserved
© LANCO Group, All Rights Reserved
© LANCO Group, All Rights Reserved
LONG TERM PLANNING
© LANCO Group, All Rights Reserved
Some best practices
ULTRA SONIC PHASED ARRAY in place of RADIOGRAPHY for weld joints-safe, quick by ALSTOM
In-situ metal spray coating on eroded tubes in the boiler
TIER blending of coal
© LANCO Group, All Rights Reserved
TOMOGRAPHY
Tomography refers to imaging by sections or sectioning, through the use of any kind of penetrating wave. A device used in tomography is called a tomograph, while the image produced is a tomogram
Sealed source and radio tracer for industrial process tomography.
© LANCO Group, All Rights Reserved
Reliability
• “Availability is the probability of a device or system being in the operating or up state at a given period t in the future”.
• A = ( Running Time + Idle Time) / (Total Time in the period ) * 100
• “Reliability is the probability of a device or system performing the purpose adequately for the period of time intended under the operating conditions encountered”.
• R = ( Running Time) / (Running Time + Force outage time) * 100
© LANCO Group, All Rights Reserved
ASH UTILISATION REQUISITES
© LANCO Group, All Rights Reserved
Monitoring • PADO / Gate cycle / PEPSE• EMS• Energy Audits • Process Deviation Audit• MIS• Reviews• Root cause Analysis• CA &PA• Knowledge sharing
THE EFFICIENCY IMPROVEMENT IN A POWER PLANT IS A CONTINUOUS LIFE TIME ACTIVITY
AND IT CAN BE ACHIEVED WITH EVERY ONE CONTRIBUTING TO IT.