Efficiency and turnaround management

33
© LANCO Group, All Rights Reserved LANCO Group, All Rights Reserved POWER EPC INFRASTRUCTU RE SOLA R RESOURCE S ue: Gurgaon Corporate Office P KOTESWARA RAO

Transcript of Efficiency and turnaround management

Page 1: Efficiency and turnaround management

© LANCO Group, All Rights Reserved© LANCO Group, All Rights Reserved

POWEREPC INFRASTRUCTURESOLAR RESOURCES

Venue: Gurgaon Corporate Office P KOTESWARA RAO

Page 2: Efficiency and turnaround management

© LANCO Group, All Rights Reserved

Heat Rate is

The Pulse Ratefor knowing the health of the plant.

Page 3: Efficiency and turnaround management

© LANCO Group, All Rights Reserved

Page 4: Efficiency and turnaround management

© LANCO Group, All Rights Reserved

COAL UNLOADER FROM SHIP

Page 5: Efficiency and turnaround management

© LANCO Group, All Rights Reserved

Page 6: Efficiency and turnaround management

© LANCO Group, All Rights Reserved

Page 7: Efficiency and turnaround management

© LANCO Group, All Rights Reserved

Page 8: Efficiency and turnaround management

© LANCO Group, All Rights Reserved

Page 9: Efficiency and turnaround management

© LANCO Group, All Rights Reserved

Page 10: Efficiency and turnaround management

© LANCO Group, All Rights Reserved

PARAMETER AFFECTED BY

TURBINE HEAT RATE : LOADING FACTOR, AGING

BOILER EFFICNECY :COAL QUALITY

APC : LOADING FACTOR

1. FIRING BOILER RANGE COAL

2. MAINTAINING TG LOADING FACTOR

2 MOST IMPORTANT FACTORS FOR BETTER PERFORMANCE

Page 11: Efficiency and turnaround management

© LANCO Group, All Rights Reserved

LOADING / DISPATCH

RECEIPT

FIRING POINT

Page 12: Efficiency and turnaround management

© LANCO Group, All Rights Reserved

The Performance Ingredients

• Safety• People Management• Performance Monitoring• Condition Monitoring• Planning• The Asset Management• The Turn Around Management• Efficiency workshop

Page 13: Efficiency and turnaround management

© LANCO Group, All Rights Reserved

Page 14: Efficiency and turnaround management

© LANCO Group, All Rights Reserved

ZERO TOLERANCE

Page 15: Efficiency and turnaround management

© LANCO Group, All Rights Reserved

Page 16: Efficiency and turnaround management

© LANCO Group, All Rights Reserved

CONTRACTS MANAGEMENT

Page 17: Efficiency and turnaround management

© LANCO Group, All Rights Reserved

Plant & ProcessPeople

Failu

res

attr

ibut

ed

to a

nd c

ost o

f los

sC

ost

for

corr

ectio

n

Lloyds Register

Page 18: Efficiency and turnaround management

© LANCO Group, All Rights Reserved

ROLE OF CULTURE

“Culture” that characterizes any group is made of the knowledge, beliefs, customs, and practices shared within the group. These are taken for granted, but they guide attitudes and behaviours, which in turn determine actual outcomes. When a business seeks to improve its performance, it must examine its culture and assess the impact of its practices on the desired results.

Page 19: Efficiency and turnaround management

© LANCO Group, All Rights Reserved

FORCED OUTAGE REDUCTION• Repetitive trips causing short duration outage

• Non repetitive outages of long duration

• Tripping of major auxiliaries leading to unit tripping

• Potential areas of multiple unit trips

Page 20: Efficiency and turnaround management

© LANCO Group, All Rights Reserved

Hea

t Rat

e

No of Years

Inclined Bath Tub curve

Heat Rate Loss Life cycle

Stabilization periodAging –degradation- 0.5 to 0.7% per annum

Heat Rate recouped during major Over hauls

Page 21: Efficiency and turnaround management

© LANCO Group, All Rights Reserved

COAL SAMPLING LOCATION

Page 22: Efficiency and turnaround management

© LANCO Group, All Rights Reserved

• TA Manager • Operations Coordinator • Process Coordinator • Safety Coordinator • Environmental Coordinator • Scheduler • Planner(s) • Contractor Coordinator • Procurement Coordinator • Material Expeditor

THE TURNAROUND TEAM

Page 23: Efficiency and turnaround management

© LANCO Group, All Rights Reserved

Turn Around Process-corporate

• Proven and requiring minimal customization;

• Has intermediate measurable mile-posts

• Scalable to various turnaround types and sizes; and

• Easy-to-use and non-cumbersome, yet provides enough detail and practical aids.

Page 24: Efficiency and turnaround management

© LANCO Group, All Rights Reserved

Page 25: Efficiency and turnaround management

© LANCO Group, All Rights Reserved

Page 26: Efficiency and turnaround management

© LANCO Group, All Rights Reserved

Page 27: Efficiency and turnaround management

© LANCO Group, All Rights Reserved

LONG TERM PLANNING

Page 28: Efficiency and turnaround management

© LANCO Group, All Rights Reserved

Some best practices

ULTRA SONIC PHASED ARRAY in place of RADIOGRAPHY for weld joints-safe, quick by ALSTOM

In-situ metal spray coating on eroded tubes in the boiler

TIER blending of coal

Page 29: Efficiency and turnaround management

© LANCO Group, All Rights Reserved

TOMOGRAPHY

Tomography refers to imaging by sections or sectioning, through the use of any kind of penetrating wave. A device used in tomography is called a tomograph, while the image produced is a tomogram

Sealed source and radio tracer for industrial process tomography.

Page 30: Efficiency and turnaround management

© LANCO Group, All Rights Reserved

Reliability

• “Availability is the probability of a device or system being in the operating or up state at a given period t in the future”.

• A = ( Running Time + Idle Time) / (Total Time in the period ) * 100

• “Reliability is the probability of a device or system performing the purpose adequately for the period of time intended under the operating conditions encountered”.

• R = ( Running Time) / (Running Time + Force outage time) * 100

Page 31: Efficiency and turnaround management

© LANCO Group, All Rights Reserved

ASH UTILISATION REQUISITES

Page 32: Efficiency and turnaround management

© LANCO Group, All Rights Reserved

Monitoring • PADO / Gate cycle / PEPSE• EMS• Energy Audits • Process Deviation Audit• MIS• Reviews• Root cause Analysis• CA &PA• Knowledge sharing

THE EFFICIENCY IMPROVEMENT IN A POWER PLANT IS A CONTINUOUS LIFE TIME ACTIVITY

AND IT CAN BE ACHIEVED WITH EVERY ONE CONTRIBUTING TO IT.

Page 33: Efficiency and turnaround management

© LANCO Group, All Rights Reserved

THANK YOU