EFFECT OF HURRICANE BETSY
ON
PROJECT SALINITY STRUCTURES
OF THE
CENTRAL AND SOUTHERN FLORIDA FLOOD CONTROL DISTRICT
SEPTEMBER 1965
Prepared ByCentral and Southern Florida
Flood Control District
*r1
TABLE OF CONTENTS
PageNumber
General Resume of Hurricane Betsy 1
Rainfall 1
Project Salinity Structure Performance 4
Project East Coast Salinity Structures, Table I 5
Effect of Operation and Hurricane Tide - S-29 on C-9 6
Effect of Operation and Hurricane Tide - S-22 on C-2 7
General Resume of the Operation and Tidal Effect on
Broward and Palm Beach County Structures 7
Summary 8Conclusion 9Acknowledgements 10
Plate I Path of Hurricane Betsy
Plate 2 Isohyetal Map of Rainfall
Plate 3 Project Map of Central & Southern Florida Flood Control District
Plate 4 Dade County Peak Water Levels
Plate 5 Broward County Peak Water Levels
Plate 6 Tide Charts
Plate 7 Project Gate Operation
Plate 8 Stage, Discharge, Salinity, Gate Openings -
Snake Creek Canal (C-9) at S-29
Plate 9 Stage, Discharge, Salinity, Gate Openings -
Snapper Creek Canal (C-2) at S-22
Plate 10 Project Canal Salinities
EFFECT OF HURRICANE BETSYON
PROJECT SALINITY STRUCTURESOF THE
CENTRAL AND SOUTHERN FLORIDA FLOOD CONTROL DISTRICT
September 1965
GENERAL RESUME OF HURRICANE BETSY
Hurricane Betsy began as a tropical disturbance in the southwestern
Atlantic Ocean on August 27, 1965. It reached hurricane force northeast
of Puerto Rico, traveling in a general northwesterly direction, (Plate ).
A high pressure area off the South Carolina coast caused Betsy to practi-
cally reverse its direction on September 5, turning southeastward into the
Bahamas. Winds increased from 125 to 150 miles per hour as it passed
slightly north of Nassau on September 7, and headed due west toward the
lower end of the Florida peninsula.
As the eye approached the mainland, the wind effect on the tide in-
creased. Gale winds extended outward 300 miles from a center about 40
miles in diameter. The eye reached the area of Key Largo at approximately
4:30a.m., September 8, with a wind velocity ranging from 100 to 140 miles
per hour, and a forward speed of approximately 12 miles per hour. Its
forward movement increased to 18 miles per hour as it moved westward immedi-
ately adjacent to the Florida coast, turning northwesterly on September 9, to
hit the Louisiana coast at Grand Isle at approximately midnight. The maximum
estimated wind in the Florida area was 160 miles per hour at the Flamingo
Ranger Station on Key Largo, and the lowest barometric pressure was 28.12
inches at Tavernier.
Hurricane winds extended north along the coast to West Palm Beach, with
gusts of 72 miles per hour being experienced as far north as Vero Beach.
Tides varied from 3.0 feet above mean sea level at West Palm Beach, to 10.1
feet east of Homestead. Broward County tides approximated 5.7 feet above
mean sea level. Above normal tides and high seas with resulting damage was
extensive as far north as St. Lucie County. Summaries of the flooding and
damage are given in "The Report on Flood 7-9 September 1965 in Central and
Southern Florida", by the Corps of Engineers, and in a report, "Hurricane
Betsy - September 8, 1965", by the Water Control Division, Dade County Public
Works Department.
Data is not available on the estimated financial loss caused by wind,
and by flooding. Of the estimated $139 million damage in the State, of which
$125 million was in Dade County, by far the majority was the result of wind
and wave action.
RAINFALL
Rainfall attributable to Betsy started falling in south and central
Florida on September 6, and continued through September 8. Rainfall for that
Page 1
area below the north shore of Lake Okeechobee, is shown on Plate 2. This
isohyetal map indicates that the rainfall decreased from a maximum of 10.9
inches east of Homestead to 1.0 inches immediately north of Lake Okeechobee.
A comparison of Betsy rainfall on Dade, Broward and Palm Beach Counties, and
the Everglades National Park, with that of Hurricanes Donna, Cleo, and tropical
storm Florence, is as follows:
AVERAGE RAINFALLDonna Florence Cleo Betsy
Sept.9-10, Sept.21-25, Aug.26-28, Sept.6-8,
Location 1960 1960 1964 1965
Dade County 8.5 5.9 2.30 5.2
Broward County 5.0 5.1 3.32 3.0
Palm Beach County 2.9 6.2 3.37 1.5
Everglades NationalPark 5.9 4.6 0.43 6.4
The Betsy rainfall as predicted by the U.S. Weather Bureau, ranged from
5 to 10 inches for the Dade County area, to 4 to 5 inches for the Palm Beach
area.
The Project canals of the Central and Southern Florida Flood Control
District, Plate 3, vary in design capacity, depending on urban and agricul-
tural use, from a once in 10-year runoff to approximately a once in a 150-year
runoff. The Betsy rainfall in Dade County had a frequency of approximately
once in four years. The low ground water table absorbed much of this rainfall,
resulting in less than design runoff into Project canals.
Extensive flooding existed however in areas where secondary drainage was
not sufficient to convey water to the Project canals of the District. This
was particularly true in the coastal areas of Broward County.
A portion of the Project canals in Dade and Broward Counties were affected
for varying distances upstream by tidal flow. The degree these stages were
the result of rainfall, or of tides, cannot be determined since the volume of
tidal water inflow is not available. Plates 4 and 5 indicate peak stages
which occurred in specific locations in Dade and Broward Counties.
Stages in representative canals in comparison with past storm occurrences
are as follows:
Page 2
Donna Florence Cleo Betsy
Sept.8-11, Sept.21-25, Aug.26-28, Sept.6-8,
Canal 1960 1960 1964 1965
C-9 at N.W.67th 3.88 (10th) 3.46 (25th) 3.40 (28th) 3.56 (9th)
C-8 at Red Road 3.62 ( 7th) 3.06 (24th) 2.55 (28th) 2.96 (8th)
C-7 at Palm Ave. 5.00 (10th) 3.82 (23rd) 2.81 (27th) 2.75 (8th)
Miami Canal atBroken Dam 5.00 (11th) 5.17 (24th) 4.50 (28th) 4.66 (9th)
Snapper Creek Canalat Miller Drive 6.43 (10th 5.79 (23rd) 2.94 (27th) 4.24 (8th)
Goulds C. atSalinity Structure - 1.94 (23rd) 2.05 (30th) 5.24 (8th)
C-13 at S-36 - 1.10 (28th) 4.00 (9th)
C-14 at S-37A - 3.46 (28th) 3.45 (8th)
W.P.B. Canal - U.S.
Hwy. 1 5.15 (10th) 8.76 (24th) 6.96 (27th) 3.20 (7th)
Predicted tide heights provided the Flood Control District by the U.S.
Weather Bureau were relatively close to those actually obtained. These pre-
dictions ranged from 6 to 10 feet above normal in upper and lower Biscayne
Bay, to approximately 3 feet above in the Palm Beach area, and are illustrated
by Plates 4 and 5. A comparison of some representative stages in Dade County
with past hurricanes is shown below.
Miami Beach Coconut East of Key
Hurricane Ocean Pier Miami Grove Homestead Biscayne
Betsy-1965 5.1 5.9 7.4 10.1 6.4
Donna-1960 3.2 4.8 5.0 7.3
September-1945 4.3 6.4 9.9 13.7 -
November-1935 6.7 8.3 8.0 5.5
September-1926 10.9 13+ - 8.0
Tide charts for the period September 6-11, are shown on Plate 6 for Bis-
cayne Bay at 79th Street Causeway, Biscayne Bay at Coconut Grove, and Florida
Bay at Flamingo. The approaching hurricane had little effect on the east
coastal tides until the 7th when the wind began to veer from the north to the
east. Peak stages were reached on the east coast at approximately 7:30a.m.
when the eye was approximately 115 miles south-southeast of Miami. These
peaks occurred approximately one hour prior to the high tide, and would have
been even higher had the peak hurricane tide and high tide occurred con-
currently.
Peak hurricane wind in Florida Bay at Flamingo occurred at approximately
Page 3
2:00p.m. on the 8th, as the winds turned from the east and blew from the south,
with the resultant movement of the shallow waters of the Bay against the shore.
The peak stage of 7.4 feet mean sea level resulted from the hurricane and high
tide occurring at approximately the same time.
PROJECT SALINITY STRUCTURE PERFORMANCE
The control structures at the lower end of the District's Project canals
have two primary purposes, (1) to establish an upstream stage for maintaining
a suitable ground water table by holding a head on the structure, and (2) to
prevent normal tidal salinity encroachment upstream of the structure. How-
ever, these structures were not designed for high storm tides. These structures
are listed in Table I, with pertinent information, including the maximum up-
stream stage resulting from Betsy.
The general structuk operation procedure consisted of partially, or
fully opening, all the structures -prior to the hurricane to reduce the canal
and ground water stages before the anticipated heavy rainfall. As the hurri-
cane approached the coast the structures were set to predetermined openings
the afternoon and evening of September 6th, Plate 7). The automatic gates
are designed to open or close to maintain a desirable upstream stage. They
are also designed to close completely if the downstream tidal stage reaches
an elevation 0.2 foot below the upstream stage. The automatic structures
were all placed on manual operation since a possible power failure might occur
while the gates were closed, and the possibility of extreme high tides flood-
ing the control houses constitutes a hazardous condition for occupancy. The
openings made immediately prior to the hurricane were designed to permit the
anticipated rainfall to discharge through the structure without creating
damaging stages before the gates could be adjusted. It was necessary, how-
ever, to hold this opening to a minimum to prevent damaging salinity en-
croachment from the anticipated high tides.
Winds of 40 to 50 miles per hour on the afternoon of the 6th made it
mandatory that gates be set at predetermined openings prior to a possible
loss of power and the occurrence of exceptionally high tides predicted by
the U.S. Weather Bureau. These openings are underlined on Plate 7, and were
based on, (1) the existing upstream stages when set, (2) anticipated runoff,
(3) the general knowledge gained in prior hurricanes on tidal backwater
through open structures. The majority of these openings varied from 2 to 3
feet.
District field personnel continued to make structure inspections and
gage readings on the 7th even though whole gale winds were being felt in
many locations. After a revaluation of conditions in the late afternoon,
the openings with some exceptions, were left as set the previous afternoon.
The majority of the Project canals peaked the night of the 7th or on the
morning of the 8th, Table I).
Adjustment of openings, after the passing of the peak tides, were be-
gun approximately at noon on the 8th. Portable power equipment adapted for
this purpose, was used where power was off. All structures functioned
Page 4
TABLE I
PROJECTEAST COAST SALINITY STRUCTURES
WEST PALM BEACH CANAL (C-51) TO BIACK CREEK (C-1)
OPERATING BETSY-STRUCTURE CANAL EQUIPMENT OPTIMUM MAXIMUM REMARKS
(M.S.L.)
Gate & Spillway W.P.B.C. Manual 7.5 8.4 (8th) U.S.H~y. No. 1
S-41 C-16 Automatic 8.5 7.1 (7th) 60% SPF stage 8.1'
S-40 C-15 Automatic 8.5 6.7 (7th) 60% SPF stage 8.2'
Gate & Spillway Hillsboro Manual 7.5-8.0 5.5 (8th) Deerfield Lock
S-37A C-14 Automatic 3.5 5.2 (8th) 60% SPF stage 3.0'
S-36 C-13 Manual 5.5 4.8 (12th) 50% SPF stage 5.2'
S-33 C-12 Manual 3.5 4.6 (8th) 50% SPF stage 5.1'
Spillway N.N.R.C. Manual 3.0-4.5 3.0 (9th) Sewell's Lock
S-13 & Spillway C-ll Manual 2.0 2.1 (7th)
C-10 - - - No structure
S-29 C-9 Manual 2.5 3.9 (8th) SPF stage 2.95'
S-28 (a) C-8 Automatic 1.8-3.0 4.2 (8th) SPF stage 2.20'
S-27 (a) C-7 Automatic 1.8-3.0 4.5 (8th) SPF stage 3.27'
Spillway 36th St. Miami Manual 2.7 2.5 (6th) Oper.by Dade Co.
Spillway FEC R.R. C-4 Manual 2.8 4.7 (8th) Oper.by Dade Co.
S-22 (a) C-2 Manual 1.8-3.0 6.0 (8th) SPF stage 3.23'
S-123 (a) C-100 Automatic 2.0-3.5 3.9 (9th) SPF stage 3.80'
S-21 (a) C-i Automatic 2.0 6.1 (8th) SPF stage 2.8'
(1) All structures on manual during Betsy sinceno power available.
(2) (a) Structure topped or bypassed.(3) S.P.F. - Standard Project Flood (in excess of 150
year frequency). Design does not assume tidal flooding.
Page 5
properly with the following exceptions:
S-21 on C-1 Structure topped and apparently small amount
tidal bypass around south side.
S-27 on C-7 Structure topped, and the tieback between
structure and southerly bank washed out,permitting tide encroachment.
S-22 on C-2 Structure overtopped and tidal bypass aroundwest side,
S-28 on C-8 Tidal bypass around structure through golfcourse on both sides.
S-123 on C-100 Structure possibly topped by wave action.
Only the washout at S-27 necessitated immediate attention, the necessary fill
being placed the afternoon of the 8th.
Difficulties experienced in operation inmediately following the hurricane
were limited to two structures, as follows:
S-28 Flooding of access road prevented adjust-ment of the gate openings until 8:15p.m. of the 8th.
S-21 A head of more than 4 feet prevented the use ofportable motors to open the structure. Both
gates were opened on the morning of the 9th by
the use of two draglines.
Stage, discharge, gate openings and salinity data are shown for C-9 and
C-2 on Plates 8 and 9 for the period September 6-11, and were selected as
being generally indicative of the effect on other Project canals in Dade
County,under similar conditions.
EFFECT OF OPERATION AND HURRICANE TIDE ON S-29 AT C-9
Salinity structure S-29 on C-9 (Snake Creek Canal) was neither overtopped
nor bypassed. This structure was fully opened on the 6th, and left open dur-
ing the hurricane because of the critical flooding in this basin at relatively
low stages. Reversal of flow, as shown on the discharge graph, on Plate 8,
occurred on high tide but was relatively small. This inflow reached a maximum
on the 8th as the tidal stage in Biscayne Bay at North Miami (N.W.79th Street)
peaked at 7.41 feet. Inflow on high tide continued through the 8th, after
which tides reduced and rainfall runoff conditions resulted in continuous
outflow. Tidal inflow through the 8th was 1200 acre-feet, and the total out-
flow was 3,600 acre-feet.
Even though the structure was open, a relatively small amount of saline
encroachment occurred until the hurricane tide on the 8th. The concentration
Page 6
above the structure during this period undoubtedly approached that of sea
water. This concentration of chloride had reduced to 12,000 ppm on the 9th,
and to 390 ppm by the 11th as the structure was partially closed. Salinity
concentration of points further upstream is shown on Plate 10.
Rainfall on the 84 square mile basin of C-9 approximated 4.6 inches.
The maximum discharge of 4,000 second-feet occurred for approximately one-
half hour on the 9th with the structure fully open, but an abnormal high
tide limited the discharge. The structure is designed for 4,790 second-
feet at 2.95 feet under normal tidal conditions.
EFFECT OF OPERATION AND HURRICANE TIDE ON S-22 ON C-2
Salinity structure S-22 on C-2 (Snapper Creek Canal) was both over-
topped and bypassed, with the waves lapping over the service bridge and the
service road still under water on the morning of the 9th. The bypassing
occurred around the west side, with a portion of the tidal inflow passing
over Red Road into the adjacent low ground, and a portion into the canal
above the structure.
As at S-29, it can be assumed the chloride concentration immediately
above the structure on the 8th approximated that of sea water. This had
reduced to 1,100 ppm by the 10th with the passage downstream of an additional
2,000 acre-feet. With the passage of an additional 5,400 acre-feet by the
end of the 12th, the chlorides had reduced to 35 ppm, Plate 10).
The structure was initially opened fully on the 6th and then closed to
a 3-foot opening on each gate. A slight reversal, as indicated on the dis-
charge graph on Plate 9, occurred on the 7th. The majority of the tidal
inflow occurred with the hurricane tide on the 8th as it reached a height
of 6.08 feet immediately upstream of the structure. The tidal inflow on
the 7th and 8th was 660 acre-feet, and the outflow 1,660 acre-feet. The
stage at Miller Drive reached 5.3 feet as a result of this tidal inflow
(Plate 4).
GENERAL RESUME OF THE OPERATION AND TIDAL EFFECT
ON BROWARD AND PALM BEACH COUNTY STRUCTURES
The tide height attained was not sufficient to create any overtopping
or bypassing of Project salinity structures. Seaweed was found on the S-37A
service bridge which is at 8.0 feet, but this is assumed to have been de-
posited by wave action. Table I and Plate 5.
The 5.2 foot stage in C-14 above S-37A exceeded the design stage of 2.2
feet, while the 4.8 foot stage in C-13 above S-36 exceeded the design stage
by 0.1 foot. The stages on the Hillsboro Canal above the Deerfield control,
C-12 above S-33, North New River Canal above Sewell's control, and C-ll above
S-13, were all below the design stage.
All of these structures were open varying amounts during the actual
hurricane to permit some runoff but at the same time to permit as little
tidal inflow as possible, Plate 7) . The exception was S-37A which was opened
Page 7
fully, since any salinities could be quickly flushed by water stored above
S-37B. The only salinity data available above the salinity structures was
that collected above S-37A by the City of Fort Lauderdale, which indicated
a concentration of 13,900 ppm on the 7th and 140 ppm on the 14th.
S-44 on C-17, and S-46 on C-18 were opened and placed on manual opera-
tion prior to the hurricane. The weir crests were sufficiently high that
no overtopping occurred. A relatively low stage of 8.4 feet was the maximun
recorded above the fully opened structure on the West Palm Beach Canal above
U.S. Highway No. 1. The recently completed S-40 on C-15, and S-41 on C-16,
were both placed on manual operation and remained on manual during the storm
to maintain stages below the optimum (Table I) No tidal encroachment
occurred in any of the Palm Beach County structures.
SUMMARY
1. Actual Betsy rainfall in Dade, Broward and Palm Beach
Counties was less than that predicted by the Weather
Bureau.
2. Actual Betsy tides closely approximated those predicted
by the Weather Bureau.
3. Coastal structure gate openings were based upon rainfall
and tide predictions, and the best estimate of runoff
resulting from this rainfall.
4. Actual fresh water inflow into Project canals nowhere
reached Project design values because of the com-
paratively light rainfall. Peak canal stages reached
were the result of hurricane driven tides rather than
fresh water discharges.
5. Tidal inflow into canals occurred at all locations in
Dade and Broward Counties; at C-1, C-2, C-7 and C-8
tidal inflow through the partially opened gates was
augmented by the bypassing or overtopping of the salinity
structures by tidal waters.
6. Volume of tidal inflow was dependent on: (a) tide height
and (b) volume of fresh water discharge.
7. Flushing out of salinities took place comparativelyrapidly once structures could be manned and gates fully
opened: exception being C-100 and C-9, both containingdeep free dug areas which trapped the heavier high
saline water below the design canal bottom.
8. Flood damage was largely the result of tidal flooding.
Fresh water flooding occurred in some areas because of
inadequacies in the secondary drainage systems,.
Page 8
9. Full effectiveness of the Project system was notattained at S-21 on Canal 1, due to the lack ofauxiliary power for operation of gates immediatelysubsequent to passage of the storm.
CONCLUSIONS
1. The practice of establishing gate settings atcoastal structures immediately prior to the adventof a hurricane should be continued. It is evidentthat the risks of saline contamination, or even tidalflooding, must be balanced against the risk of freshwater flooding. The experience of Betsy indicatesthat the effects of a comparatively severe occurrence;that is, extremely high tides and low fresh water dis-charge, productive of large volumes of tidal inflow,are not long-lasting or of a permanently damagingnature. The probable risk from allowing the structuresto remain open, or partially open, appears to besmaller than that which would result from keeping thegates closed during the occurrence. This is parti-cularly true since the Project structures are notdesigned to withstand overtopping or bypassing undermoderate to severe tide occurrences, as witness theoccurrences at C-1, C-2, C-7 and C-8.
2. Risks would be further reduced if more accurate rain-fall predictions were received. For example, it isquite probable that had the actual Betsy rainfalls beenpredicted certain of the Dade County structures wouldhave been initially set with reduced openings, with aconsequent increase in their effectiveness.
3. Auxiliary power should be provided at Project coastalstructures. Difficulties in operation, in terms ofmanpower and time, during the period commercial poweris not available would be largely eliminated.
4. At every location where feasible, construction shouldbe undertaken to prevent the bypassing of coastalstructures.
5. Undue reliance should not be placed on manning coastalstructures during storm occurrences which will produceexcessive tides, The experience at S-123 on Canal 100indicates that the risk of continuing occupancy through-out the period of storm occurrence are too great in termsof the possible benefit to be derived. The logical al-ternative to continuous manning is (a) pre-determinedgate settings, (b) provision of auxiliary power and(c) immediate visitation upon passage of the storm.
Page 9
ACKNOWLEDGEMENTS
The assistance of the following agencies in supplying portions of the
information and data used in preparing this report is gratefully acknow-
ledged.
1. U.S. Weather Bureau - Miami, Florida
2. U.S. Geological Survey - Miami, Florida
3. Corps of Engineers, Department of the Army
4. Dade County Public Works Department
5. Broward County Public Works Department
6. U.S. Coast Guard
Page 10
*0 I In
AT LAN /TIC
I' C EA /V
o "
I, t
-. 0
SP - 4-
PLAT
I
SEPTEMBER 4-8, 1965
PLTE
I . .. . S
I.---- (I, I " -
l i7\ /r . ;FT. PIERCE
D E S. 0 0 H GH A
OKEECHOBEE
ULADES P LMS
*~ - CLEWISTON JLM
SLAU DERACE
CO LL IER
OF RAINFALL RESULTINGLFROM
HURRICANE BETSY
CSFFC.D. NOVEMBER 1I965
PLATE 2
LfF3 R U 3 r oafs
r- I F nrus II -I
CIi: q ' " [ PfVGR
a r
,y ni"rr 4-s- 1 a w
° "y'° O [ensi[r
uwac . f r r - -
-nT.Nf,'! a rAUCxu [a INC o I rwx -- w
RAO[nFo . id x 3 Ja "3 c x K P3ARASOTA c xLA HI + \
- I3c 1
j ,aEA iA N[ D
A- . ,aN.N.nO AFFlHOx[E --- -
VRN, r r" ~ R T Al la I WE3T
1} V I° _ - TrrN 6 L/r rre I [
1 aPo'r aY r .,. INIKE kL .. u " MN
t U wD: NO L [ e EAL CHT
J +, s 10A VA
e xyG.. aR ci o
J u 1 N j6 skJ- \ '" L[3 G D L 3 N Fw \' " DLE
LEGEND f"rr ~ \-nTR w 8 ."ilf°' rwcaD
=f
NFNSxNNN -_ y VLN a - .-ie MIAN ,'-
.. AN'.wn s 1 D Q
re. a 3. " o ". Nn
CENTRAL AND SOUTHERN FLORIDAFLOOD CONTROL PROJECT
N.S.MYY ENGINEER DdWI AAMW MLLE CENTRAL AND SOUTHERN FLOR6LCOBS OF ENGINEERS FLOOD CONTROL DISTRICT
ARMIRML3. ass Kfff ILLY LKK ILaLM
PLATE 3
-3-. I
1/-I J , ....., -, ,i
I-° "-Q
D A D E C O U N T Y o " / .. . . . ... .EC O E .
PEAK WATER LEVELS RESULTING "H "" ........
FROM HURRICANE BETSY .., .EEV.aTs......C.S.EFC.D. NOVEMBER 1965 s
PLATE 4
S-.- -JIa- zL . ... . . . .
I .I . a
BROWARD COUNTYPEAK WATER LEVELS RESULTING
FROM HURRICANE BETSYC.B S.E F C. D NOVEMBER 1965 ov t vao N .T
PLATE 5
STAOC /N-'e'E£T -" STAGE YN FEL'T S TAGS IN FEET
aoy
y
j
j
- - - 3
_y
---
_ . T- - r_. W ill:- -
a
m
-= - -- ' -'
D
.. - ... n -. _ _ r ..
-777
___ - x N ...... .._ -. ... _._
a r Y n 1= = Ll - - -
w
7' '
~iTisft:
;i eh -tV- rc---
Ci- i--- -t
th
r=~7 i
-- ---- -- ii-- "
:s- I=3 =~ ii I"-a, --~b-71:T:::::?:1:- 31 r 7
-i1 _ i:::1:: ":. :::::: .. ;-..; - L* I
i :I::: - _ :::.:i-.:11:1: _~----9b i- :: ::: ;i: i --- -;-ii-ii:_ --L +-? -----il-----"-
"X ::: :: : . . rr : :::: r: : :T:- :o I:::
"3 -ijl~ ---i:-I , i:c : :
n :::r k ::-- X''" - i-_:' Im .: i :: ::-r - I ::::::L:::::::l::: :: ::1 :I ::::
:i:::: :! :__:~-::: :: _ -:-- :i------:-;:N~:: ::: I : I ::: :_I-- -'
i
HURRICANE BETSYPROJECT GATE OPERATION
West Palm Beach Canal To C-I
DATE OPERATION REMARKS
W.P.B. GATE ON WEST PALM BEACH CANAL(1 Gate)
September 6 Open 6.0 feet at 1:00pm From closed normal positionSeptember 9 Closed fully at 8:00am Return to normal operation
W.P.B. SPILLWAY ON WEST PALM BEACH CANAL(4 Bays)
September 6 All boards out of all bays at 9:00am From 3 boards in all baysSeptember 8 4 boards in all bays at 11:00am Return to normal operation
S-41 BOYNTON CANAL (C-16)(2 Gates)
September 6 This structure was manned duringthe storm and operated to maintaina headwater of 6.5 feet.
S-40 HIDDEN VALLEY CANAL (C-15)(2 Gates)
September 6 This structure was manned duringthe storm and operated to maintaina headwater of 6.5 feet.
DEERFIELD LOCK ON HILLSBORO CANAL(1 Gate)
September 6 Open 9.00 feet at 11:00am From closed normal positionSeptember 9 Closed fully at 4:00pm Return to normal operation
DEERFIELD SPILLWAY ON HILLSBORO CANAL(5 Bays)
September 6 All boards out of all bays at11:00am From 2 boards in all bays
September 9 7 boards in all bays at 11:10am Return to normal operation
S-37B CYPRESS CREEK CANAL (C-14)(2 Gates)
September 6 2 open 0.60 feet at 9:25pm Fully closed and on manualcontrol.
September 7 2 open 0.40 feet at 1:00am7 2 open 0.50 feet at 5:05am7 2 closed fully at 7:00am On automatic control
PLATE 7 Sheet 1 of 5
DATE OPERATION REMARKS
S-37B CYPRESS CREEK CANAL (C-14)(Cont inued)
September 7 2 open 0.70 feet at 5:00pm On manual control7 2 open 1.00 feet at 5:30pm7 2 open 0.70 feet at 10:00om
September 8 2 open 0.65 feet at 12:05am8 2 open 0.50 feet at 7:45pm
September 10 2 open 0.25 feet at 8:05amSeptember 11 2 closed fully at 3:25pm Return to normal operation
Placed on automatic controlSeptember 19
S-37A CYPRESS CREEK CANAL (C-14)(2 Gates)
September 6 2 open 14.0 feet at 5:30pm Top slots open and onmanual control
September 7 On automatic control at 9:00am7 Closed fully at
2:45pm On manual control
7 2 open 14.0 feet at 4:00pmSeptember 8 Top slots closed at 2:45pm On automatic controlSeptember 11 Top slots opened at 6:30pm Normal operation
S-36 MIDDLE RIVER CANAL (C-13)(1 Gate)
September 7 Open 1.0 feet at 8:30pm From 0.1 foot openSeptember 8 Closed fully at 9:30am Normal operation
S-33 PLANTATION ROAD CANAL (C-12)(1 Gate)
September 6 Open 6.5 feet at 5:45pm Fully closed normal positionSlots open full throughout
September 8 Closed fully at 2:00pm Normal operation
S-13 SPILLWAY S.NEW RIVER CANAL (C-11)(1 Gate)
September 6 Open 11.30 feet at 7:10pm From closed normal positionSeptember 7 Closed fully at 7:00am
7 Open 3.0 feet at 2:00pm7 Closed fully at 3:20pm Pumping started 4:00pm
September 9 Open 11.30 feet at 1:00pm Pumping stopped at 1:00pm
SEWELL'S LOCK ON N.NEW RIVER CANAL(8 Bays)
September 6 All boards out of all bays at9.30m From normal position
September 9 10 boards in all bays at 2:00pm Normal
S-149 BLACK CREEK CANAL (C-l-N) *(2 Gates)
September 6 2 fully open at 6:00pm From closed positionRemained open entire month
PLATE 7 Sheet 2 of 5
DATE OPERATION REMARKS
S-148 BLACK CREEK CANAL (C-1-W) *(2 Gates)
September 6 2 fully open at 6:00pm Fully closed position andon manual control
September 8 2 fully closed at 8:00pmSeptember 9 2 fully open at 9:00amSeptember 11 2 open 3.0 feet at 9:30amSeptember 13 2 open 1.5 feet at 3:30pm Normal operation, placed on
automatic control Sept. 20
S-29 ON SNAKE CREEK CANAL (C-9)(4 Gates)
September 6 4 fully open at 11:00am Fully closed normal positionSeptember 8 2 fully closed at
8:30am
September 9 1 fully closed, 1 fully open and2 open 6.0 feet at 6:30am
9 2 closed to 4.0 feet at 7:45am1 fully closed and 1 fully open
9 2 fully closed and 2 fully openat 8:30am
9 4 fully open at 2:00pm9 2 fully closed and 2 at 4.0 feet
at 2:30pm9 2 open 6.0 feet and 2 fully closed
at 5:25pmSeptember 10 3 open 3.0 feet and 1 closed at
11:30amSeptember 13 4 open 1.0 feet at 11:15am For flushingSeptember 17 4 open 3.0 feet at 8:00am For flushing
S-28 ON BISCAYNE CANAL (C-8)(2 Gates)
September 6 2 fully open at 7:30am Changed from automatic tomanual for hurricane
6 2 open 3.5 feet at 6:00pmSeptember 8 1 open 7.0 feet and 1 open 12.0
feet at 4:30pm8 2 fully closed at 8:15pm
September 9 1 open 8.0 feet and 1 closed at1:OOam
9 2 open 2.0 feet at 8:30am9 2 open 12.0 feet at 11:15am9 1 open 6.0 feet and 1 open 4.0 feet
at 12:00 midnightSeptember 10 2 open 3.5 feet at 4:45pmSeptember 12 2 changed to automatic
PLATE 7 Sheet 3 of 5
DATE OPERATION REMARKS
S-27 ON LITTLE RIVER CANAL(C-7)(2 Gates)
September 6 2 open full at 7:00am Fully closed normal positionand on manual
6 2 open 3.0 feet at 6:00pm Power went offSeptember 8 2 fully closed at
8:00pm
8 2 fully open at 12:00pmSeptember 9 2 open 3.0 feet at 9:15am
9 2 open 4.0 feet at 11:45am9 2 open 2.0 feet at 1:00pm9 1 open 1.5 feet Return to normal operation,
1 gate and on automaticcontrol
S-22 ON C-2 (SNAPPER CREEK)(2 Gates)
September 6 2 fully opened at 2:00pm From fully closed normal6 2 open 3.0 feet at 6:00pm position
September 9 2 fully opened at 11:00am9 2 open 4.0 feet at 4:20pm
September 12 2 open 1.5 feet at 9:00am Return to normal operation
S-123 ON C-100(2 Gates)
September 6 2 open 13.0 feet at 1:00pm From closed normal position6 2 fully closed at 8:30pm6 1 open 4.0 feet. 1 fully closed
at 9:30pm6 2 fully closed at 10:30pm6 1 open 2.0 feet, 1 fully closed
at 11:30pmSeptember 7 2 fully closed at 1:30pmSeptember 8 2 open 1.0 feet at 12:30pmSeptember 9 1 open 12.0 feet, 1 open 10.0 feet
at 8:30am
9 2 open 3.0 feet at 4:00pmSeptember 14 2 fully closed at 9:30am Normal operation
S-122 ON C-100B *(2 Gates)
September 8 2 fully open at 8:00pm Fully closed normal position
September 9 2 fully closed at 10:00am Return to normal
PLATE 7 Sheet 4 of 5
DATE OPERATION REMARKS
S-21 on C-i (BLACK CREEK)(3 Gates)
September 6 3 fully opened at 2:00pm Fully closed normal positionand on Manual control
6 2 open 2.0 feet at 6:00pm1 fully open
September 9 2 open 9.0 feet at 11:00am1 fully open
9 3 fully open at 12:00noonSeptember 10 3 open 3.0 feet at 3:30pmSeptember 13 3 open 0.5 feet at 3:00pmSeptember 16 3 on automatic control Return to normal operation
* First control above salinity structure.
Note: Underlined operations indicates those existingduring Hurricane.
PLATE 7 Sheet 5 of 5
M
lC N M ' W
u°o aco M Opp L "' 4 H
0] d C H 13.i 7.Y, 00 M H fq W W "'I z 7 N
NN N N gg N 00 U L N .CQ U M 0 3 0 C N 3> Wd O ++ Ol W M U1ai W - ,G L 61 m O. W
u 0 u m m 0 y C3 M G. ". ."- d 3 WV H H 7 N W q V E g E-
ca O O dO N O n O d
O ON L M H O ''+ u
W O W C+
G
W 000 00 aU W O n Ou100 30000OMIT V)Oh U v1MO+CO MvlM Oh h LY tnMHN N 00 31 NNH HH N O
HO N JJ O N
N H HNM
W O
Cl) "-100 Ln Lntn O OONU10 01) LL
." "" O .7 N M "H Z CIJ V) 00 00 N 10
Ln H 1 N NID H N O1 3 Hrn H NH yJ
GN
UW d U gE. Ln Oh 00 O ph Ln O u"f G.O Ln Le)H > i N N O N 1- n O Ln U O O n IT N p O I M
aH O E y~ ou7 ItN 00 N Mu1MN M
W N N M
0 3
azwz ED0LnLn0 v aoLnW)LnLn aIn0000E6 H Orn nh. v1 U 0.1 N nCO N 000--4010
OMMM L) U3 M V1 MN MNNd
H N b Cl) d
oy mR+ O °000 11 X20 O
c0 H T 00 10 01 .741
Ha O y N 0 0
N H yH N N
H
NN N 7 O m 01 cc m
W $ w$ U O .O-I .- Ui .Ui N U N U 4! W U N N N
L O H "'I M "'I M .".1 O M M "iH -1 M O M M M
1Jq (n o ff '"I N M O N N M O N N N M
NW
y L
T W 7 b d
$; G1 d U d d N 7 . >
dda+n Im+66aa+ WC C
x^ 0 0 0 4 0 0 a p CO iP zz UW Fizz N n
3 O. M '. .I OO W M 1 W
C a" N IHI W z P'. F4 00 N .""1 W N 1. I N U W 3.aV wP zz U) w u M Ozz 5 V) U U7 W zWz
PLATE 10 Sheet 1 of 3
0 4.en(0 o 0
.(44 4 r.4
(4a a40.0 O
N ~ O c
4400 c- O 0O0nOL nu
cV rn 10 (444,
a: w
Ln.0 0 ~ n0 04 000 nc"1 NI M C02 (41 O tu N +Ln~~~ ~ ~ '0 t 7 L. " - -
W n
(N 4.4 (
E. 0. 0 0t4PN 4 0OM0 040 0 0000 00 of 0
ONN .U 7.0 00 (1 44 N
- 44-0
azQ. w Ok e(44N n nIU H u 2 N Na
H t.7 b ~(4)VW o.A. 0 '4 0 00 'o
L. (4Ma
o 04. 0 o44((4 44.r4 cr-
u 0 0 "- MO -1'" 4
44 "4 d4
a a 4. .0. 0.0Z O0
0 P4. 04. M 4 00 0U 0 P
04U 0 W~ 0 0 P4v4.444 1 U O C
PLAT 10 hee 2 f
PROJECT CANAL SALINITIES
RESULTING FROM
HURRICANE BETSY
NOTES:
1. Salinity readings obtained by District personnel using
salinity meter, "Solu Bridge", Industrial Instruments,
Inc., Model No. RB3-334i, Serial No. 62753.
2. Salinity readings are in Parts Per Million of chlorides.
3. Time shown is the approximate time the reading was made
at the lower structure.
4. All readings were taken just clear of bottom of canal.
PLATE 10 Sheet 3 of 3