EFCOG Supply Chain
Quality Task Team
Conference Call November 2013
Vince Grosso
Supply Chain Quality Chair
Tank
Operations
Contract
2
Overview
1. Upcoming Conferences / Workshops
2 . Industry / Suppl ier Issues
3 . In ter face Update
4 . Pro ject Updates
5 . Audi t Update
6 . Old / New Business
7 . D iscussion & Close Out
Tank
Operations
Contract
3
JSEP Access
• Does everyone that need access to JSEP have it?
• If not, send me an email to
• Any issues with access or use?
Tank
Operations
Contract
4
Upcoming Conferences / Workshops
Date Conference Title Location Website
Dec 12 - 13, 2013
NQA-1 Requirements for Computer Software Used in Nuclear Facilities - New
Orleans New Orleans, La
https://www.asme.org/products/courses/nqa-1-requirements-for-computer-software-used--(1)
January 27-29 2014
B31.1 Power Piping Committee Meeting Savannah Georgia http://calendar.asme.org/EventDetail
.cfm?EventID=23716
March 31, 2014 - April 3,
2014
ASME NQA-1 Lead Auditor Training - Orlando
Orlando, Florida https://www.asme.org/products/courses/asme-nqa1-lead-auditor-training
April 8-10, 2014
Nuclear Quality Assurance (NQA) - April 2014 Meeting
Mesa, Arizona
May 1 - 2, 2014
NQA-1 Requirements for Computer Software Used in Nuclear Facilities -
Minneapolis Minneapolis, Mn
https://www.asme.org/products/courses/nqa-1-requirements-for-computer-software-used--(1)
May 5 - 8, 2014
ASME NQA-1 Lead Auditor Training - Las Vegas
Orlando, Las Vegas https://www.asme.org/products/courses/asme-nqa1-lead-auditor-training
May 22 - 23, 2014
NQA-1 Requirements for Computer Software Used in Nuclear Facilities - Atlanta
Atlanta, Ga https://www.asme.org/products/cou
rses/nqa-1-requirements-for-computer-software-used--(1)
Tank
Operations
Contract
5
Industry Supplier Issues / Feedback
Discussion / Issues
• Commercial Grade Dedication of Hilti Anchor Bolts
• NQA Part II interpretation
• Argonne in Need of some clean 6M’s in the 5, 10, or 15
gallon range with 2-R’s (Lee Stevens - [email protected]
• Quality Level 2 gaskets (Grant Germann)
• Requirements Management Contacts
Tank
Operations
Contract
6
Commercial Grade Dedication of Hilti
Anchor Bolts
• Y-12 is developing a new approach to CGD of
Hilti anchor
• Bob Bailey and Dean Shipley are soliciting
feedback
• Specifically for anchor bolts with grade 1 or 2
SSC’s
• They are working on a flow chart of the process
that shows the different entities involved with the
certification of Hilti’s nuclear grade anchor bolts
• The process is more robust and provides greater
assurance than an audit of Hilti corporate or their
many manufacturing locations.
Tank
Operations
Contract
7
ASME NQA-1 Inquiry 12-360
November 1, 2013
Dr. Charles R. Martin (Sr. Engineer Defense Nuclear Facilities Safety Board)
Washington, DC 20004-2901
Subjection: Inquiry # 12-360
Applicability: NQA-1-2008 Edition
Dear Dr. Martin,
We understand your question to be as follows and have provided the following
response:
Question: Would an organization's QA program be in compliance with NQA-1 (any
edition with Parts) if it only addressed the requirements in Part I and not the
requirements of Part II (or vice versa)?
Response: No. Part I and Part II are designated as Requirements. An organization
must address the requirements of Part I and Part II that are applicable to an
organization's work activities affecting quality, as either internally identified or
externally invoked upon the organization.
NQA-1 is in the process of considering a revision to the Introductions to Parts I and
II to add further clarity to this issue.
Tank
Operations
Contract
8
Interface Representative(s) Update
• EPWOG - Weaver
• Supply Chain Management Center - Biagioli
• Packaging Management Committee - Natali
• EFCOG QE Task Team - Thompson
• QSWG - Eshleman
• Others
Tank
Operations
Contract
9
Project Update (Supply Chain Contacts)
Task: SC-12-01
Project Manager: Cathy Nesser
Team: Grosso, Wingfield
• Action: Develop a comprehensive Supply Chain Quality Site,
Site contact, and Departmental list of Subject Matter Experts
from across the complex. The list should include National
Laboratories, NNSA, EM, and Science. Determine if the list is
to be controlled (through the supplier evaluation tool) or
publicly available (through a website or other means)
A. Phase 1 - QA Manager / Subject Matter Expert
B. Phase 2 - Engineering and Procurement Management
C. Phase 3 - This becomes a living document to ensure all
DOE sites have the opportunity to participate
• Status Update: New Project Manager volunteered
Tank
Operations
Contract
10
Project Update (Supply Chain Calls)
Task: SC-12-02
Project Manager: Vince Grosso
Team: Bill Wingfield
• Action: Schedule and Conduct Monthly Supply Chain Quality
Conference Calls with published minutes
A. Conduct monthly calls as scheduled and issue minutes
B. Calls for 2013 scheduled
C. Schedule calls for 2014
• Status Update:
– Monthly calls conducted, meeting minutes distributed
Tank
Operations
Contract
11
Project Update (Supply Chain Calls)
2013 Supply Chain Conference Call Schedule
Date EST CST MST PST
Dec 19 2013 11 AM 10 AM 9 AM 8 AM
Tank
Operations
Contract
12
Project Update (Non-NQA-1 Suppliers)
Task: SC-12-03
Project Manager: David Lewis
Team: Cathy Nesser, Marvin Montoya
• Action: Work with Engineering Practices Work Group to
evaluate the feasibility of developing a standard set of
criteria for Commercial Grade Surveys and Suppliers for
Non-NQA-1 suppliers.
• Status Update:
– Started Work with EPWOG
– Project Manager due back
Tank
Operations
Contract
13
Project Update (JSEP / MASL Integration)
Task: SC-12-04
Project Manager: Vince Grosso
Team: Bill Wingfield, Marvin Montoya, Bob Hendrickson,
Alice Lewis, Rich Taft, Mike Eshleman, Kim Loll
• Action: Utilize a single tool for supplier quality
data.(MASL / JSEP Integration)
• Status Update:
Tank
Operations
Contract
14
Project Update (JSEP / MASL Integration)
• MASL, NNSA, & EFCOG Leadership Team waiting for
the BMAC replacement to present path forward – Kim
Loll to present
• Phase III changes to MASL were identified
– Minor
Tank
Operations
Contract
15
Project Update (JSEP / MASL Integration)
• Future integration activities will include:
– Integration Project Plan
– Governance Structure determination
– Role & Responsibility determination
– Access control
– Software modifications
– Integrated Program Document(s)
– Data entry protocol
– Program Procedures
– Training Plan
– Qualification
– Roll Out Plan
Tank
Operations
Contract
16
Project Update (Joint Audit Schedule)
Task: SC-12-05
Project Manager: Alice Lewis
Team: Ron Natali, Mark Ryan, Bill Wingfield
• Action: Develop a 2013 & 2014 Joint Supplier Audit
Schedule
• Status Update:
– Base schedule available thru JSEP
– Potentials not included in database until an audit is
performed
Tank
Operations
Contract
17
Project Update (Cost Savings)
Task: SC-12-08
Project Manager: Ron Natali
Team: TBD
• Action: EM Corporate Board Requested the Supply Chain
Quality Team to address:
– Cost data and savings to the Department
– How can the Supplier Base be increased
• Status Update:
– Completed draft procedure
– Sent out to entire team for review
– Working on resolving comments on the cost procedure
Tank
Operations
Contract
18
Project Update (Packaging)
Task: SC-12-09
Project Manager: Vince Grosso
Team: Complex Wide Team
• Action: QA in DOT Type A Procurement Specifications for
the Complex.
– Work with the PMC to develop Procurement Specifications
and reduce quality assurance related issues concerning
commonly used DOT Type A containers (drums and boxes)
for packaging and transportation of solid and/or liquid
radioactive materials and waste complex-wide
• Status Update:
Tank
Operations
Contract
19
Project Update (Packaging)
1. Joint EFCOG / PMC-QA working group formed two teams
to help with packaging QA issues
– Commercial Graded Dedication Team (M. Bowers)
– Graded Approach Team (R. Natali)
2. Will develop an EFCOG project plan by January
3. Will be having a conference call with Skolnik
– Address letter
– Discuss path forward
Tank
Operations
Contract
20
December EFCOG Meeting
DOE North Las Vegas Office
Las Vegas, Nevada
12/2/13 (1 PM – 5 PM)
– EFCOG Leadership Team Meeting
12/2/13 (1 PM – 5 PM)
– DOE EM Corporate QA Board Meeting
Day 1 – 12/2/13
Tank
Operations
Contract
21
Fall EFCOG Meeting
– Joint session all Working Groups (8 AM – 11:30 AM)
– Supply Chain Quality Working Day (1 PM – 5 PM)
• SC/I briefing
• QA Council Activities
• Lessons Learned – Procurements
• Supply Chain tasks
• Graded Approach/Procurement Engineering
• Software
• EM Corporate QA Board Debrief
(NOTE – Will attempt to arrange for Teleconference,
webex, etc. for those that can not travel)
Day 2 – 12/3/13
Tank
Operations
Contract
22
Fall EFCOG Meeting
– QA Working Group Joint Session (8 AM – 11:30 AM, Room
6376)
• Overview/Update of Tasks
– Supply Chain Quality Working Session (1 PM – 5 PM, Room
6376)
• Task 1 & 7 Contact & SME List
• Task 5 Audit Scheduling
• Task 8 Cost Data
• Task 3 CGS/EPWOG Interface
• Task 4 JSEP/MASL Integration
• Task 9 Joint EFCOG / PMC QA Working Group
(NOTE – Will attempt to arrange for Teleconference, webex,
etc. for those that can not travel)
Day 3 – 12/3/13
Tank
Operations
Contract
23
Fall EFCOG Meeting
12/4/12 Morning (8 AM – 11:30 AM, Room TBD)
– Packaging/Transportation/QA Working Group
• Commercial Grade Dedication Team
• Graded Approach Team
12/4/12 Afternoon 1 PM – 5 PM, Room TBD)
– Packaging/Transportation/QA Working Group
– JSEP / MASL Integration
(NOTE – Will attempt to arrange for Teleconference,
webex, etc. for those that can not travel)
Day 4 – 12/4/13
Tank
Operations
Contract
24
Audit Update
(As of November 2013)
Tank
Operations
Contract
25
Audit Opportunities – December 2013
Supplier Website Lead
Columbia Energy & Environmental Services (CEES), Richland, WA (J71)
http://www.columbia-energy.com/
B. Fairchild
Energy and Process Corporation, Tucker, GA (J19) http://energyandprocess.com/locations.shtml
TBD
Newport News Nuclear, Newport News, VA (J68) http://nnn.huntingtoningalls.com/about_us.html
Walker
On Power Inc., Lebanon, OH (J73) http://onpowerinc.com/ D Ripplinger
Paragon D&E, Grand Rapids, MI (J56) http://www.paragonde.com/ J. Fulghum
Savannah River Nuclear Solutions, Aiken, SC (J81) http://www.savannahrivernuclearsolutions.com/
P. Auer
Specialty Maintenance and Construction (SMCI), Lakeland, FL (J150)
http://www.metaltek.com/divisions/smci/
TBD
Wagstaff Applied Technologies, Spokane Valley, WA (J78)
http://www.wagstaffat.com/ D. Ripplinger
X-R-I Testing, Independence, OH (J175) http://www.xritesting.com/ D. Willford
Tank
Operations
Contract
26
Audit Opportunities – January 2014
Supplier Website Lead
Accurate Machine Products Corporation (AMPCO), Johnson City, TN (J33)
http://accmachprod.com/ TBD
Addison Fabricators, Addison, AL (J106) http://www.addisonfab.com/ TBD
Air Liquide Specialty Gases, Longmont, CO (J2) http://alspecialtygases.com/Home.aspx
TBD
Ellis & Watts, Batavia, OH (J93) http://www.elliswatts.com/ B. Fairchild
Fluid Components International (FCI), San Marcos, CA (J5)
http://www.fluidcomponents.com/
L. Wagner
IONEX Research Corp, Lafayette, CO (J86) http://www.ionexres.com/ J. Maupin
Joseph Oat Corporation, Camden, NJ (J95) http://www.josephoat.com/ P. Auer
Northwest Copper Works Inc, Portland, OR (J97) http://www.nwcopper.com/ B. Fairchild
Pacific Northwest National Laboratory, Richland, WA (J174)
http://www.pnnl.gov/ D. Ripplinger
Shaw Nap Tech Inc, Clearfield, UT (J53) http://www.shawgrp.com/about L. Wagner
Teledyne Brown Engineering, Inc., Huntsville, AL (J37) http://www.tbe.com/ TBD
Terminal Manufacturing Co. LLC, Berkley, CA (J151) http://www.terminalmanufacturing.com/
TBD
The Roberts Company, Winterville, NC (J152) http://www.robertscompany.com/ TBD
Tank
Operations
Contract
27
Audit Opportunities – February 2014
Supplier Website Lead
American Crane, Douglassville, PA (J12) http://www.americancrane.com/ L. Wagner
Becht Nuclear Services, Richland, WA (J1) http://www.bechtns.com/ L. Wagner
Fluke Corporation, Everett, WA (J132) http://www.fluke.com/ TBD
Mid Columbia Engineering Inc, Richland, WA (J173) http://go2mce.com/ B. Fairchild
Mississippi State University Institute for Clean Energy Technology, Starkville, MS (J161)
http://www.dial.msstate.edu/ D. Ripplinger
Southern Calibration & Service, Inc., Roswell, GA (J55) http://www.scscal.com/index.html Frazier
URS, Princeton, NJ (J57) http://www.urscorp.com/About_URS/index.php
T. Worrell
Veolia Environmental Services North America (VESNA), Flanders, NJ (J155)
http://www.veoliaes.com/en.html TBD
Viking Packing Specialists, Tulsa, OK (J156) http://vikingpacking.com/ TBD
Westerman Companies, Bremen, OH (J158) http://www.westermancompanies.com/
TBD
Wright Industries, Nashville, TN (J32) http://www.doerfer.com/corporate/Locations_TN.htm
TBD
Tank
Operations
Contract
28
Audit Opportunities – March 2014
Supplier Website Lead
AREVA Federal Services LLC (AFS), Charlotte, NC (J65) http://us.areva.com/EN/home-105/areva-federal-services.html
L. Wagner
B.F.E. Bonney Forge Valve, Alessandro, Bergamo, Italy (J176)
http://www.bfe.it/bfe/index.php D Ripplinger
James C. White Company, Greenville, SC (J172) http://jcwco.com/index.php P. Auer
PBM Inc, Irwin, PA (J162) http://www.pbmvalve.com/ L. Wagner
Tank
Operations
Contract
29
Old Business
• Any Other Old Business to Discuss?
Tank
Operations
Contract
30
New Business
• Any Other New Business?
• Next Webinar/Call:
– 12/19/13
• 11:00 AM EST
• 10:00 AM CST
• 09:00 AM MST
• 08:00 AM PST
Tank
Operations
Contract
31
Open Discussion & Close Out