EF 151 Team Project 6 The Gutter Guzzlers Jonathan Wallace, Ben Goodrich C.J. Hurt, Richard Bryn

description

EF 151 Team Project 6. The Gutter Guzzlers Jonathan Wallace, Ben Goodrich C.J. Hurt, Richard Bryn . The Gutter Guzzlers. Introduction. Our projects goal was to design and build a contraption that could lift a 1 kg weight 1 meter in the air in roughly 10 seconds - PowerPoint PPT Presentation

Transcript of EF 151 Team Project 6

Page 1: EF 151 Team Project 6

EF 151 Team Project 6The Gutter Guzzlers

Jonathan Wallace, Ben Goodrich C.J. Hurt, Richard Bryn

Page 2: EF 151 Team Project 6

The Gutter Guzzlers

Page 3: EF 151 Team Project 6

IntroductionOur projects goal was to design and build a

contraption that could lift a 1 kg weight 1 meter in the air in roughly 10 seconds

The parts were found around EST 13 and the parts that were bought were cheap and easily found

Page 4: EF 151 Team Project 6

OverviewThe first step in this design is to fill the top

bucket with about 2 L of water. When ready we simply open the valve that is connected to the bottom of the top bucket so the water will run down the gutter and fill the bucket at the end of the gutter, which will eventually lift the 1 kg weight.

Page 5: EF 151 Team Project 6

The Contraption

Page 6: EF 151 Team Project 6

Potential EnergyThe Water – Potential Energy to Kinetic

Energy

The Bucket- Potential Energy to Kinetic Energy

Page 7: EF 151 Team Project 6

ConclusionOur contraption took around 6 hours to build

and required help from all of the team, planning took even longer to get it right.

Complication – LEAKSFinally we are done with 151, good luck to