EEI-AAA A2014 FD ballotfinal - NFPANFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL FR‐50, Global Input,...

64
National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 • Fax: 617-770-0700 • www.nfpa.org MEMORANDUM To: NFPA Technical Committee on Electrical Equipment of Industrial Machinery From: Elena Carroll, Administrator, Technical Projects Date: November 8, 2012 Subject: NFPA 79 First Draft TC FINAL Ballot Results (A2014 Cycle) According to the final ballot results, all ballot items received the necessary affirmative votes to pass ballot. 23 Members Eligible to Vote 4 Not Returned (Gililland, Mariuz, Sroczynski, Watson) 11 Affirmative on All 8 Negatives on one or more first revision: (Carpenter, Dobrowsky, Drobnick, Hickman, Hilbert, Neeser, Soter, Tamblingson) 1 Abstention on one or more first revision: (Carpenter) The attached report shows the number of affirmative, negative, and abstaining votes as well as the explanation of the vote for each first revision. There are two criteria necessary for each first revision to pass ballot: (1) simple majority and (2) affirmative 2 / 3 vote. The mock examples below show how the calculations are determined. (1) Example for Simple Majority: Assuming there are 20 vote eligible committee members, 11 affirmative votes are required to pass ballot. (Sample calculation: 20 members eligible to vote ÷ 2 = 10 + 1 = 11) (2) Example for Affirmative 2 / 3 : Assuming there are 20 vote eligible committee members and 1 member did not return their ballot and 2 members abstained, the number of affirmative votes required would be 12. (Sample calculation: 20 members eligble to vote – 1 not returned – 2 abstentions = 17 x 0.66 = 11.22 = 12 ) As always please feel free to contact me if you have any questions.

Transcript of EEI-AAA A2014 FD ballotfinal - NFPANFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL FR‐50, Global Input,...

Page 1: EEI-AAA A2014 FD ballotfinal - NFPANFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL FR‐50, Global Input, See FR‐50 Eligible to Vote:23 Choice Comments Votes Affirmative with Comment 1

National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 • Fax: 617-770-0700 • www.nfpa.org

 

M E M O R A N D U M

To: NFPA Technical Committee on Electrical Equipment of Industrial Machinery

From: Elena Carroll, Administrator, Technical Projects

Date: November 8, 2012

Subject: NFPA 79 First Draft TC FINAL Ballot Results (A2014 Cycle)

According to the final ballot results, all ballot items received the necessary affirmative votes to pass ballot.

23 Members Eligible to Vote 4 Not Returned (Gililland, Mariuz, Sroczynski, Watson) 11 Affirmative on All 8 Negatives on one or more first revision: (Carpenter, Dobrowsky, Drobnick, Hickman, Hilbert, Neeser,

Soter, Tamblingson) 1 Abstention on one or more first revision: (Carpenter) The attached report shows the number of affirmative, negative, and abstaining votes as well as the explanation of the vote for each first revision.

There are two criteria necessary for each first revision to pass ballot: (1) simple majority and (2) affirmative 2/3 vote. The mock examples below show how the calculations are determined.

(1) Example for Simple Majority: Assuming there are 20 vote eligible committee members, 11 affirmative votes are required to pass ballot. (Sample calculation: 20 members eligible to vote ÷ 2 = 10 + 1 = 11)

(2) Example for Affirmative 2/3: Assuming there are 20 vote eligible committee members and 1 member did not

return their ballot and 2 members abstained, the number of affirmative votes required would be 12. (Sample calculation: 20 members eligble to vote – 1 not returned – 2 abstentions = 17 x 0.66 = 11.22 = 12 )

As always please feel free to contact me if you have any questions.

 

Page 2: EEI-AAA A2014 FD ballotfinal - NFPANFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL FR‐50, Global Input, See FR‐50 Eligible to Vote:23 Choice Comments Votes Affirmative with Comment 1

NFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL

FR‐50, Global Input, See FR‐50

Eligible to Vote:23

Choice Comments VotesAffirmative with Comment  1

Mark R. Hilbert Continue to create the revision as recommended by the meeting actions. 

Relocating the parenthetical terms to a new annex and creating a cross 

reference for the US and IEC terms along with additional explanatory 

material will benefit all readers of the Standard as well as the harmonization 

process. The Grounding and Bonding Task Group is continuing to work on 

comments for the development of the new Annex. There is an opportunity 

for the public as well as committee members to provide comments that will 

help explain the similarities and differences between the US and the IEC 

grounding and bonding terms and applications. Recommendations in 

comments would be appreciated.

Negative  1

Page 1

Page 3: EEI-AAA A2014 FD ballotfinal - NFPANFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL FR‐50, Global Input, See FR‐50 Eligible to Vote:23 Choice Comments Votes Affirmative with Comment 1

NFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL

David R. Carpenter I certainly agree with the submitter concerning the nomenclature of 

understanding between the IEC and NFPA standards. I also agree that the 

NFPA 70 is the base standard for NFPA 79. However,that does not negate the 

need for understanding the IEC terms which are needed to properly install, 

maintain and troubleshoot industrial machines located in the US and are 

designed based on the IEC standards. Electricians, engineers and inspectors 

are increasingly faced with Industrial Machines which are designed based on 

IEC standards. It is imperative that they have guidance to prevent potential 

hazards which can, and has resulted in shock hazards, fire hazards and the 

destruction of equipment. A few examples of past problems: color codes 

difference between IEC and NFPA concerning neutral applications, schematic 

difference concerning interlocks, and transformer characteristics that change 

grounding techniques and overcurrent protection application. This is 

especially troublesome when troubleshooting and installation. Most often 

seen when an IEC design is feed by a US system. The aforementioned is 

similar discussion to why IEC clarification terms were put in this standard. 

Industrial Machines have certain nuances which are not germane to facilities 

and should have some application difference as is needed. See my comments 

FR‐15

Abstain  0

Affirmative 17

Page 2

Page 4: EEI-AAA A2014 FD ballotfinal - NFPANFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL FR‐50, Global Input, See FR‐50 Eligible to Vote:23 Choice Comments Votes Affirmative with Comment 1

NFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL

FR‐97, Section No. 1.3.1.1, See FR‐97

Eligible to Vote:23

Choice Comments VotesAffirmative with Comment  1

David R. Carpenter comply with the NFPA Manual of Style

Negative  0

Abstain  0

Affirmative 18

FR‐98, Section No. 1.3.2, See FR‐98

Eligible to Vote:23

Choice Comments VotesAffirmative with Comment  1

David R. Carpenter comply with the NFPA Manual of Style

Negative  0

Abstain  0

Affirmative 18

FR‐38, Section No. 2.3.6, See FR‐38

Eligible to Vote:23

Choice Comments VotesAffirmative with Comment  1

David R. Carpenter reference update

Negative  0

Abstain  0

Affirmative 18

Page 3

Page 5: EEI-AAA A2014 FD ballotfinal - NFPANFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL FR‐50, Global Input, See FR‐50 Eligible to Vote:23 Choice Comments Votes Affirmative with Comment 1

NFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL

FR‐39, Section No. 3.1, See FR‐39

Eligible to Vote:23

Choice Comments VotesAffirmative with Comment  1

David R. Carpenter Reference update

Negative  0

Abstain  0

Affirmative 18

FR‐99, Section No. 3.3.3.1, See FR‐99

Eligible to Vote:23

Choice Comments VotesAffirmative with Comment  1

David R. Carpenter comply with the NFPA Manual of Style

Negative  0

Abstain  0

Affirmative 18

FR‐54, Section No. 3.3.9, See FR‐54

Eligible to Vote:23

Choice Comments VotesAffirmative with Comment  0

Negative  1

Page 4

Page 6: EEI-AAA A2014 FD ballotfinal - NFPANFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL FR‐50, Global Input, See FR‐50 Eligible to Vote:23 Choice Comments Votes Affirmative with Comment 1

NFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL

David R. Carpenter Bonding ‐ the asterisk should not be removed because it leaves the reader 

with less information to determine how to correlate with IEC designed 

systems using the term "protective bonding circuit" definition ..See my 

comments FR‐50... the asterisk does not complicate the standard but gives 

needed information with out complicating the flow of sentence structure.

Abstain  0

Affirmative 18

Page 5

Page 7: EEI-AAA A2014 FD ballotfinal - NFPANFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL FR‐50, Global Input, See FR‐50 Eligible to Vote:23 Choice Comments Votes Affirmative with Comment 1

NFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL

FR‐5, Section No. 3.3.34, See FR‐5

Eligible to Vote:23

Choice Comments VotesAffirmative with Comment  1

David R. Carpenter Change needed

Negative  0

Abstain  0

Affirmative 18

FR‐3, Section No. 3.3.50, See FR‐3

Eligible to Vote:23

Choice Comments VotesAffirmative with Comment  1

David R. Carpenter Agree in principle

Negative  0

Abstain  0

Affirmative 18

FR‐40, New Section after 3.3.55, See FR‐40

Eligible to Vote:23

Choice Comments VotesAffirmative with Comment  4

Palmer L. Hickman This term should apply globally throughout the document. This is a 

recommendation to do so and have it included in the First Draft for public 

review and comment.

David R. Carpenter Agree to be consistent with acceptably definition to all NFPA standards

Daniel R. Neeser The term should be consistent throughout the document. In some cases the 

term that is used is “control panel” and these should be changed to 

“industrial control panel”.

Page 6

Page 8: EEI-AAA A2014 FD ballotfinal - NFPANFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL FR‐50, Global Input, See FR‐50 Eligible to Vote:23 Choice Comments Votes Affirmative with Comment 1

NFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL

Jay Tamblingson While it is useful to add the definition of industrial control panel, there are a 

number of uses of similar terms within the standard (control panel, control 

enclosure, main enclosure, etc) which should either be included as reference 

within this definition or those sections revised to use the defined term as 

appropriate.

Negative  0

Abstain  0

Affirmative 15

Page 7

Page 9: EEI-AAA A2014 FD ballotfinal - NFPANFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL FR‐50, Global Input, See FR‐50 Eligible to Vote:23 Choice Comments Votes Affirmative with Comment 1

NFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL

FR‐15, New Section after 3.3.71, See FR‐15

Eligible to Vote:23

Choice Comments VotesAffirmative with Comment  1

David R. Carpenter The term needs constancy but clarification in relation to Industrial Machines. 

Branch Circuits have certain nuances indigenous to industrial machines which 

are not to facilities

Negative  0

Abstain  0

Affirmative 18

Page 8

Page 10: EEI-AAA A2014 FD ballotfinal - NFPANFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL FR‐50, Global Input, See FR‐50 Eligible to Vote:23 Choice Comments Votes Affirmative with Comment 1

NFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL

FR‐41, Section No. 3.3.74, See FR‐41

Eligible to Vote:23

Choice Comments VotesAffirmative with Comment  0

Negative  0

Abstain  1

David R. Carpenter Not sure I fully understand the reasoning behind this change

Affirmative 18

FR‐51, Section No. 3.3.77, See FR‐51

Eligible to Vote:23

Choice Comments VotesAffirmative with Comment  1

Mark R. Hilbert Continue to accept the revision. See my ballot comment on FR 50.

Negative  1

David R. Carpenter See comments on FR‐50

Abstain  0

Affirmative 17

FR‐53, Section No. 3.3.78, See FR‐53

Eligible to Vote:23

Choice Comments VotesAffirmative with Comment  1

Mark R. Hilbert Continue to accept the revision. See my ballot comment on FR 50.

Negative  1

David R. Carpenter See comments on FR‐50

Abstain  0

Affirmative 17

Page 9

Page 11: EEI-AAA A2014 FD ballotfinal - NFPANFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL FR‐50, Global Input, See FR‐50 Eligible to Vote:23 Choice Comments Votes Affirmative with Comment 1

NFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL

FR‐44, Section No. 3.3.98, See FR‐44

Eligible to Vote:23

Choice Comments VotesAffirmative with Comment  1

David R. Carpenter Not needed

Negative  0

Abstain  0

Affirmative 18

Page 10

Page 12: EEI-AAA A2014 FD ballotfinal - NFPANFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL FR‐50, Global Input, See FR‐50 Eligible to Vote:23 Choice Comments Votes Affirmative with Comment 1

NFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL

FR‐21, Section No. 3.3.100, See FR‐21

Eligible to Vote:23

Choice Comments VotesAffirmative with Comment  1

David R. Carpenter much needed and should be in other NFPA standards

Negative  0

Abstain  0

Affirmative 18

FR‐19, New Section after 3.3.101, See FR‐19

Eligible to Vote:23

Choice Comments VotesAffirmative with Comment  1

David R. Carpenter needed for clairification

Negative  0

Abstain  0

Affirmative 18

FR‐85, Section No. 4.4.2.1, See FR‐85

Eligible to Vote:23

Choice Comments VotesAffirmative with Comment  3

Paul Dobrowsky The entire section number appears to be struck through on the ballot. The 

submitter did not strike through the entire number and I believe intended 

the section be numbered 4.4.2.

David R. Carpenter comply with the NFPA Manual of Style

Page 11

Page 13: EEI-AAA A2014 FD ballotfinal - NFPANFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL FR‐50, Global Input, See FR‐50 Eligible to Vote:23 Choice Comments Votes Affirmative with Comment 1

NFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL

Jay Tamblingson The existing requirements of 4.4.2 for providing EMC mitigation are likely 

unenforceable as they give no specific guidance regarding electrical noise and 

transient levels permitted and when suppression must be provided. This 

section should be revised to reference appropriate standards, manufacturer 

requirements, and application considerations.

Negative  0

Abstain  0

Affirmative 16

FR‐45, Section No. 5.3.1.3, See FR‐45

Eligible to Vote:23

Choice Comments VotesAffirmative with Comment  4

David R. Carpenter needed

Jay Tamblingson The requirements in 5.3.1.4 need to be revised to align with the new 

permitted use of separately mounted disconnecting means and asscociated 

interlocking requirements contained in the revised text.

Mark R. Hilbert Continue to accept the revision. With the increasing awareness of electrical 

hazards in the workplace and the desire to create safe work practices for 

electrical workers in the United States it is common to locate the supply 

circuit disconnecting means in a separate enclosure. This new exception 

maintains the interlocking requirements of 6.2.3 while allowing the electrical 

hazard reduction strategies formally limited to machines totaling 2 hp or less.

Page 12

Page 14: EEI-AAA A2014 FD ballotfinal - NFPANFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL FR‐50, Global Input, See FR‐50 Eligible to Vote:23 Choice Comments Votes Affirmative with Comment 1

NFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL

J. B. Titus The new text from the committee action does not take into account random 

events such as material handling, staged tooling and other situations that 

could temporarily block immediate access to the disconnecting means. I 

suggest inserting..... "and always readily accessible to the operator."

Negative  0

Abstain  0

Affirmative 15

Page 13

Page 15: EEI-AAA A2014 FD ballotfinal - NFPANFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL FR‐50, Global Input, See FR‐50 Eligible to Vote:23 Choice Comments Votes Affirmative with Comment 1

NFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL

FR‐23, Section No. 5.3.2, See FR‐23

Eligible to Vote:23

Choice Comments VotesAffirmative with Comment  2

Paul Dobrowsky The committee statement indicates that the term "rated" was deleted 

elsewhere therefore should be deleted here but it appears in underlined 

format in (2). I believe it needs to be removed.

David R. Carpenter clarification

Negative  0

Abstain  0

Affirmative 17

FR‐100, Section No. 5.3.3.2.1, See FR‐100

Eligible to Vote:23

Choice Comments VotesAffirmative with Comment  1

David R. Carpenter comply with the NFPA Manual of Style

Negative  0

Abstain  0

Affirmative 18

FR‐46, Section No. 6.1, See FR‐46

Eligible to Vote:23

Choice Comments VotesAffirmative with Comment  2

David R. Carpenter needed information which does not need to be in the body of the text

Page 14

Page 16: EEI-AAA A2014 FD ballotfinal - NFPANFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL FR‐50, Global Input, See FR‐50 Eligible to Vote:23 Choice Comments Votes Affirmative with Comment 1

NFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL

Mark R. Hilbert Continue to accept the revision. The requirements of Chapter 6 are intended 

to warn a worker of a potential arc‐flash hazard. The requirement in 6.1 

mirrors the National Electrical Code which already requires control cabinets 

to be field labeled to warn workers of a potential arc‐flash hazard. Keeping 

this requirement in NFPA 79 will be a benefit those working on electrical 

equipment of industrial machinery in cases where NFPA 79 is the only 

document used.

Page 15

Page 17: EEI-AAA A2014 FD ballotfinal - NFPANFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL FR‐50, Global Input, See FR‐50 Eligible to Vote:23 Choice Comments Votes Affirmative with Comment 1

NFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL

Negative  3

Paul Dobrowsky This change should not be made. Placing live parts in an enclosure inherently 

reduces the likelihood of an arc flash event occurring. An indirect contact 

electric shock incident can occur as a result of an insulation failure if the 

enclosure integrity or the effective fault current path is compromised. 

Electrical equipment does not warn of potential arc‐flash hazards and 

marking requirements seem to belong in Chapter 16. First Revision No. 47‐

added Annex material to .6.2 that supports this concept.

Palmer L. Hickman The submitter of the Public Input has recommended a significant reduction in 

personnel protection without technical substantiation. The assertion is made 

that "Current language could be interpreted to require that the equipment 

must be designed to protect person(s) from arc flash hazards." The present 

requirements are clear. They do require protection against arc flash hazards. 

See present requirements below: Electrical equipment shall provide 

protection of persons from electric shock, from direct and indirect contact, 

and from arc‐flash hazards.

Daniel R. Neeser Providing protection from direct contact or indirect contact does provide a 

degree of protection from arc flash hazards, and as such it is more than just 

“warn of potential” of arc flash hazards, as indicated in the new annex A.6.1. 

Therefore the change would reduce the level of safety.

Abstain  0

Affirmative 14

FR‐101, Section No. 6.2.2.1, See FR‐101

Eligible to Vote:23

Page 16

Page 18: EEI-AAA A2014 FD ballotfinal - NFPANFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL FR‐50, Global Input, See FR‐50 Eligible to Vote:23 Choice Comments Votes Affirmative with Comment 1

NFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL

Choice Comments VotesAffirmative with Comment  1

David R. Carpenter compliance with the NFPA Manual of Style

Negative  0

Abstain  0

Affirmative 18

Page 17

Page 19: EEI-AAA A2014 FD ballotfinal - NFPANFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL FR‐50, Global Input, See FR‐50 Eligible to Vote:23 Choice Comments Votes Affirmative with Comment 1

NFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL

FR‐74, Section No. 6.4.1.1, See FR‐74

Eligible to Vote:23

Choice Comments VotesAffirmative with Comment  1

David R. Carpenter compliance with the NFPA Manual of Style

Negative  0

Abstain  0

Affirmative 18

FR‐48, Section No. 6.6, See FR‐48

Eligible to Vote:23

Choice Comments VotesAffirmative with Comment  3

David R. Carpenter needed to be consistant concerning arc flash with other NFPA standards

Jay Tamblingson The reference here to 16.2.3 is too limiting. Subsection 16.2.7 also references 

the requirement for warning against arc flash hazards. Should not 16.2.7 be 

also referenced in 6 6? What is missing is some lower limit of the arc flash 

hazard which could exclude those devices or assemblies for which the 

warning is not needed. As of now the only exclusion is found in 16.2.3.2 

which excludes items too small to place a label on.

Mark R. Hilbert Continue to accept the revision. See my ballot statement on FR 46.

Negative  0

Abstain  0

Affirmative 16

Page 18

Page 20: EEI-AAA A2014 FD ballotfinal - NFPANFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL FR‐50, Global Input, See FR‐50 Eligible to Vote:23 Choice Comments Votes Affirmative with Comment 1

NFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL

FR‐20, Section No. 7.2.1.2, See FR‐20

Eligible to Vote:23

Choice Comments VotesAffirmative with Comment  1

David R. Carpenter correct wording for application

Negative  0

Abstain  0

Affirmative 18

Page 19

Page 21: EEI-AAA A2014 FD ballotfinal - NFPANFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL FR‐50, Global Input, See FR‐50 Eligible to Vote:23 Choice Comments Votes Affirmative with Comment 1

NFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL

FR‐13, Section No. 7.2.4.2.5, See FR‐13

Eligible to Vote:23

Choice Comments VotesAffirmative with Comment  1

David R. Carpenter correlation with NEC and style manual

Negative  0

Abstain  0

Affirmative 18

FR‐103, Section No. 7.2.7.1, See FR‐103

Eligible to Vote:23

Choice Comments VotesAffirmative with Comment  2

Paul Dobrowsky Transformers and overload device requirements are provided with 

references to the NEC. A similar requirement should be included for motor 

controllers possibly as part of 7.2.10. Motor controllers shall be provided in 

accordance with Article 430, Part VII of NFPA 70.

David R. Carpenter comply with the NFPA Manual of Style

Negative  0

Abstain  0

Affirmative 17

FR‐14, Section No. 7.2.8, See FR‐14

Eligible to Vote:23

Choice Comments VotesAffirmative with Comment  1

David R. Carpenter clarifies application

Negative  0

Page 20

Page 22: EEI-AAA A2014 FD ballotfinal - NFPANFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL FR‐50, Global Input, See FR‐50 Eligible to Vote:23 Choice Comments Votes Affirmative with Comment 1

NFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL

Abstain  0

Affirmative 18

FR‐2, Section No. 7.2.10.1.1, See FR‐2

Eligible to Vote:23

Choice Comments VotesAffirmative with Comment  1

David R. Carpenter compliance with the NFPA Manual of Style

Negative  0

Abstain  0

Affirmative 18

Page 21

Page 23: EEI-AAA A2014 FD ballotfinal - NFPANFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL FR‐50, Global Input, See FR‐50 Eligible to Vote:23 Choice Comments Votes Affirmative with Comment 1

NFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL

FR‐17, Section No. 7.2.10.2, See FR‐17

Eligible to Vote:23

Choice Comments VotesAffirmative with Comment  3

David R. Carpenter consistancy and clarification of other articles/sections

Daniel R. Neeser Recommend deleting "ground fault" since this is redundant ‐ a ground fault is 

a type of short‐circuit.

Jay Tamblingson It would be better, structure wise, if the added sentence was inserted as a 

new listed item. If not, an "and" should be inserted before the two clauses so 

the listed item (2) would be one sentence.

Negative  0

Abstain  0

Affirmative 16

FR‐16, Section No. 7.2.10.3, See FR‐16

Eligible to Vote:23

Choice Comments VotesAffirmative with Comment  3

David R. Carpenter consistancy and clarification of other articles/sections

Daniel R. Neeser Recommend deleting "ground fault" since this is redundant ‐ a ground fault is 

a type of short‐circuit.

Jay Tamblingson The "is" in the last sentence should be "shall be"

Negative  0

Abstain  0

Affirmative 16

FR‐22, Section No. 7.2.11.3, See FR‐22

Eligible to Vote:23

Page 22

Page 24: EEI-AAA A2014 FD ballotfinal - NFPANFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL FR‐50, Global Input, See FR‐50 Eligible to Vote:23 Choice Comments Votes Affirmative with Comment 1

NFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL

Choice Comments VotesAffirmative with Comment  2

Paul Dobrowsky The opening phase should be improved for clarity such as "shall meet all the 

following requirements" or "shall be:"

David R. Carpenter clarification

Negative  0

Abstain  0

Affirmative 17

Page 23

Page 25: EEI-AAA A2014 FD ballotfinal - NFPANFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL FR‐50, Global Input, See FR‐50 Eligible to Vote:23 Choice Comments Votes Affirmative with Comment 1

NFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL

FR‐84, Section No. 7.3.1, See FR‐84

Eligible to Vote:23

Choice Comments VotesAffirmative with Comment  2

David R. Carpenter compliance with the NFPA Manual of Style

Stephen W. Douglas Is it necessary to include “motor controller”? Some may read this to mean 

the overlaod protection needs to be installed ahead of the motor controller. I 

recommend we remove “motor controller” from this requirement.

Negative  0

Abstain  0

Affirmative 17

FR‐18, Section No. 7.8, See FR‐18

Eligible to Vote:23

Choice Comments VotesAffirmative with Comment  3

Paul Dobrowsky Delete new 7.8.3 Where provided, SPDs shall be connected across the 

terminals of all equipment requiring such protection. I understand this is an 

existing requirement but SPD's are installed by choice so why shouldn't the 

designer or installer be permitted to decide where to connect them.

David R. Carpenter Needed information to properly install, inspect or troubleshoot

Page 24

Page 26: EEI-AAA A2014 FD ballotfinal - NFPANFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL FR‐50, Global Input, See FR‐50 Eligible to Vote:23 Choice Comments Votes Affirmative with Comment 1

NFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL

Jay Tamblingson The new language appears to mandate that only devices classified as SPD's 

can be used for surge suppression of switching transients, but does not 

differentiate between transients in power circuits vs. control circuits. It is 

common practice to use diodes on dc inductive loads to suppress switching 

transients, but it is unclear if these are classified under as SPD's. In addition, 

accessories for industrial components that provide suppression are not listed 

as SPD's but as motor controller accessories.

Negative  0

Abstain  0

Affirmative 16

FR‐86, Section No. 7.9, See FR‐86

Eligible to Vote:23

Choice Comments VotesAffirmative with Comment  1

David R. Carpenter needed information and clarification

Negative  0

Abstain  0

Affirmative 18

FR‐57, Section No. 8.1, See FR‐57

Eligible to Vote:23

Choice Comments VotesAffirmative with Comment  2

Page 25

Page 27: EEI-AAA A2014 FD ballotfinal - NFPANFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL FR‐50, Global Input, See FR‐50 Eligible to Vote:23 Choice Comments Votes Affirmative with Comment 1

NFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL

Paul Dobrowsky Removing the parenthetical terms is a good change and should improve 

clarity. In addition replacing the phrase "equipment grounding circuit" with 

"equipment grounding conductor", "bonding conductor" or "equipment 

bonding jumper" might be more appropriate.

Jay Tamblingson Rather than deleting the the annex note reference under 8.1, it should be 

retained and the annex note changed to refer to the new annex J on 

grounding and bonding terminology.

Negative  1

David R. Carpenter See FR‐50 comments ‐ This especially applies to industrial machines and 

should not be treated as facilities type language. There are times when the 

two do overlap.

Abstain  0

Affirmative 16

Page 26

Page 28: EEI-AAA A2014 FD ballotfinal - NFPANFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL FR‐50, Global Input, See FR‐50 Eligible to Vote:23 Choice Comments Votes Affirmative with Comment 1

NFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL

FR‐75, Section No. 8.2, See FR‐75

Eligible to Vote:23

Choice Comments VotesAffirmative with Comment  1

Paul Dobrowsky Removing the parenthetical terms is a good change and should improve 

clarity. In addition replacing the phrase "equipment grounding circuit" with 

"equipment grounding conductor", "bonding conductor" or "equipment 

bonding jumper" might be more appropriate.

Negative  3

Mike Soter Exception allows the use of machine members for establishing the continuity 

of a ground path. This is not an acceptable practice(regardless of machine 

member size)for multiple reasons: 1. The resistivity of that path (based on 

the number of bolted connections)may not be the least resistive path to the 

source. 2. The path then becomes a "function" of non‐qualified individuals. 

ie. Personnel familiar with electrical installations lose "functional" control of 

the ground path integrity. 3. Non‐Electrical maintenance personnel may 

inadvertantley break, or add resistance to that unlabeled/unidentified path 

during the course of the machine's life expectancy.

Page 27

Page 29: EEI-AAA A2014 FD ballotfinal - NFPANFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL FR‐50, Global Input, See FR‐50 Eligible to Vote:23 Choice Comments Votes Affirmative with Comment 1

NFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL

David R. Carpenter See comments FR‐50 and FR‐57

Jay Tamblingson The permission of the exception to 8.2.2.1 was removed from the 2007 NFPA 

79 for reasons that included alignment with IEC 60204‐1 in accordance with 

the July 23, 1998 letter from the Standards Council which read in part: 

"Concur with the efforts of the NFPA 79 Committee to harmonize the 

technical requirements of NFPA 79 and IEC 204, where feasible and where in 

concert with the NEC and its related codes and standards." Further, the "in 

concert with the NEC and its related codes and standards" part of the 

permission from the Standards Council was then deemed to be met, as cited 

by Lynn Saunders in his Comment, in that the removal of the allowance to 

substitute machine members for an equipment grounding conductor met the 

requirements of Article 300.3(B) of the NEC. It required that the equipment 

grounding conductor be contained in the same raceway with the other 

conductors of the same circuit. The proposed exception is, in effect, ignoring 

the agreement to align with IEC 60204‐1 and the NEC 300.3(B) requirement. 

It has been proposed on the basis of Article 250.136(A) which permits a 

grounded metal rack or structure provided for the support of electrical 

equipment to, in turn, ground the electrical equipment that is securely 

Abstain  0

Affirmative 15

FR‐96, Section No. 8.3, See FR‐96

Eligible to Vote:23

Choice Comments VotesAffirmative with Comment  1

David R. Carpenter needed change

Negative  0

Abstain  0

Affirmative 18

Page 28

Page 30: EEI-AAA A2014 FD ballotfinal - NFPANFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL FR‐50, Global Input, See FR‐50 Eligible to Vote:23 Choice Comments Votes Affirmative with Comment 1

NFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL

FR‐107, Section No. 8.4.2, See FR‐107

Eligible to Vote:23

Choice Comments VotesAffirmative with Comment  1

Paul Dobrowsky NFPA Staff's name incorrectly appears as the submitter. Removing the 

parenthetical terms is a good change and should improve clarity. In addition 

replacing the phrase "equipment grounding circuit" with "equipment 

grounding conductor", "bonding conductor" or "equipment bonding jumper" 

might be more appropriate.

Negative  1

David R. Carpenter See comments FR‐50 and FR‐57

Abstain  0

Affirmative 17

FR‐76, Section No. 9.1.1.2, See FR‐76

Eligible to Vote:23

Choice Comments VotesAffirmative with Comment  1

Paul Dobrowsky Removing the parenthetical terms is a good change and should improve 

clarity. In addition replacing the phrase "equipment grounding circuit" with 

"equipment grounding conductor", "bonding conductor" or "equipment 

bonding jumper" might be more appropriate.

Negative  1

David R. Carpenter See comments FR‐50 and FR‐57

Abstain  0

Affirmative 17

Page 30

Page 31: EEI-AAA A2014 FD ballotfinal - NFPANFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL FR‐50, Global Input, See FR‐50 Eligible to Vote:23 Choice Comments Votes Affirmative with Comment 1

NFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL

FR‐63, Section No. 9.1.4.2, See FR‐63

Eligible to Vote:23

Choice Comments VotesAffirmative with Comment  1

David R. Carpenter correction needed

Negative  0

Abstain  0

Affirmative 18

FR‐24, Section No. 9.2.2, See FR‐24

Eligible to Vote:23

Choice Comments VotesAffirmative with Comment  1

David R. Carpenter correction needed

Negative  0

Abstain  0

Affirmative 18

FR‐59, Sections 9.2.5.3.1, 9.2.5.3.2, See FR‐59

Eligible to Vote:23

Choice Comments VotesAffirmative with Comment  1

David R. Carpenter correction needed

Negative  1

Page 31

Page 32: EEI-AAA A2014 FD ballotfinal - NFPANFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL FR‐50, Global Input, See FR‐50 Eligible to Vote:23 Choice Comments Votes Affirmative with Comment 1

NFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL

Mark R. Hilbert I agree with the recommendation to change the word “where” to “as” 

however, no action should be taken on the remainder of the proposed 

revisions. By removing 9.2.5.3.1 there is no longer a mandatory requirement 

to provide a Category 0 stop. I do not agree that 9.2.5.3 is redundant with 

9.2.5.3.2. Section 9.2.5.3.2 only requires the Category 0, 1, or 2 stop(s) to be 

provided and located as required by the risk assessment. There is no 

mandatory requirement for a Category 0 stop to be provided. That 

requirement is in 9.2.5.3.1.

Abstain  0

Affirmative 17

FR‐25, Section No. 9.2.5.4.2.1, See FR‐25

Eligible to Vote:23

Choice Comments VotesAffirmative with Comment  1

David R. Carpenter gives needed guidance

Negative  0

Abstain  0

Affirmative 18

Page 32

Page 33: EEI-AAA A2014 FD ballotfinal - NFPANFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL FR‐50, Global Input, See FR‐50 Eligible to Vote:23 Choice Comments Votes Affirmative with Comment 1

NFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL

FR‐42, Section No. 9.3.6, See FR‐42

Eligible to Vote:23

Choice Comments VotesAffirmative with Comment  1

David R. Carpenter different nomenclature is used to be consistant

Negative  0

Abstain  0

Affirmative 18

FR‐67, Section No. 9.4.1, See FR‐67

Eligible to Vote:23

Choice Comments VotesAffirmative with Comment  1

David R. Carpenter compliance with the NFPA Manual of Style

Negative  0

Abstain  0

Affirmative 18

FR‐26, Section No. 9.4.3.2, See FR‐26

Eligible to Vote:23

Choice Comments VotesAffirmative with Comment  1

David R. Carpenter improper annex note

Negative  0

Abstain  0

Affirmative 18

FR‐66, Section No. 9.4.3.4, See FR‐66

Eligible to Vote:23

Page 33

Page 34: EEI-AAA A2014 FD ballotfinal - NFPANFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL FR‐50, Global Input, See FR‐50 Eligible to Vote:23 Choice Comments Votes Affirmative with Comment 1

NFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL

Choice Comments VotesAffirmative with Comment  3

Paul Dobrowsky During the meeting there was considerable discussion about the necessary 

provisions for software and firmware based controllers used in safety related 

functions. Some indicated that the existing conditions cannot be met. Listed 

products are available that supposedly meet these provisions. If the 

provisions are not accurate they need to be modified but they need to 

remain in the standard and not only determined by anyone's risk assessment 

with no specific stated method.

Page 34

Page 35: EEI-AAA A2014 FD ballotfinal - NFPANFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL FR‐50, Global Input, See FR‐50 Eligible to Vote:23 Choice Comments Votes Affirmative with Comment 1

NFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL

David R. Carpenter annex note which was incorrectly referenced has now been corrected

Jay Tamblingson The annex note revision was correct, but the committee action to reject the 

changes proposed in Public Input 47 by the NFPA 79 Control and Technology 

Task Force was not. Most of today's safety relays and controllers use 

software or firmware, and the existing language essentially prescribes a level 

of safety control system performance that may not be appropriate or 

achievable for the level of risk identified. Functional safety solutions are 

given in probabilistic terms. They are based on the theory that any electronic 

component can fail at any time. This is quite different from the deterministic 

approach used for electromechanical devices that have B10 life 

characterizations where it is very improbable that a well‐designed redundant 

system will fail during the derated B10 life of the devices. In addition, the 

committee discussed the listing requirements in 9.4.3.4.1 for software and 

firmware controllers. As it is not clear at this time if NRTL's are approved for 

listing to appropriate functional safety standards, the language in this section 

needs to be addressed in conjunction with 9.4.3.4.2 during the comment 

stage to align with approval methods.

Negative  0

Abstain  0

Affirmative 16

FR‐1, Section No. 10.3.1.1, See FR‐1

Eligible to Vote:23

Choice Comments VotesAffirmative with Comment  1

David R. Carpenter compliance with the NFPA Manual of Style

Page 35

Page 36: EEI-AAA A2014 FD ballotfinal - NFPANFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL FR‐50, Global Input, See FR‐50 Eligible to Vote:23 Choice Comments Votes Affirmative with Comment 1

NFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL

Negative  0

Abstain  0

Affirmative 18

FR‐62, Section No. 10.7.4.1, See FR‐62

Eligible to Vote:23

Choice Comments VotesAffirmative with Comment  1

David R. Carpenter removed non‐applicable reference

Negative  0

Abstain  0

Affirmative 18

FR‐34, Section No. 11.2.1.5.1, See FR‐34

Eligible to Vote:23

Choice Comments VotesAffirmative with Comment  1

David R. Carpenter This guidance is needed

Negative  0

Abstain  0

Affirmative 18

FR‐32, Section No. 11.3.2, See FR‐32

Eligible to Vote:23

Choice Comments VotesAffirmative with Comment  2

Paul Dobrowsky The term "NEMA" should be removed from this section. The NEC simply uses 

the term "Type". leaving the term "NEMA" can infer that something different 

than the NEC Type rations are intended.

Page 36

Page 37: EEI-AAA A2014 FD ballotfinal - NFPANFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL FR‐50, Global Input, See FR‐50 Eligible to Vote:23 Choice Comments Votes Affirmative with Comment 1

NFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL

David R. Carpenter clarification makes the principle easier to apply

Negative  0

Abstain  0

Affirmative 17

FR‐33, Section No. 11.4.2, See FR‐33

Eligible to Vote:23

Choice Comments VotesAffirmative with Comment  1

David R. Carpenter needed reference

Negative  0

Abstain  0

Affirmative 18

Page 37

Page 38: EEI-AAA A2014 FD ballotfinal - NFPANFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL FR‐50, Global Input, See FR‐50 Eligible to Vote:23 Choice Comments Votes Affirmative with Comment 1

NFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL

FR‐35, Section No. 11.5, See FR‐35

Eligible to Vote:23

Choice Comments VotesAffirmative with Comment  3

Paul Dobrowsky The additional text submitted in PI ? Log 114 needs to be added to this 

section. It is my understanding that the NEC working spaces requirements are 

applicable for the enclosure that contains the supply conductor. This is 

supported by NEC 670.1, Informational Note 2. During the meeting there was 

considerable discussion and disagreement about this issue. Clear direction 

needs to be provided regarding which working space requirements are 

applicable.

Drake A. Drobnick I agree with the submitter's substantiation (PI#96). Required equipment 

working spaces shall be flat in both the entire depth and width dimentions.

David R. Carpenter This clarification needed

Negative  1

Page 38

Page 39: EEI-AAA A2014 FD ballotfinal - NFPANFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL FR‐50, Global Input, See FR‐50 Eligible to Vote:23 Choice Comments Votes Affirmative with Comment 1

NFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL

Mark R. Hilbert I voted negative as I do not agree with all the proposed changes. I agree with 

the recommendations in PIs 104 & 56 to revise the metric measurement, the 

recommendation in PI 55 to clarify Exception No. 4 by changing “and” to 

“where” and the recommendation in PI 10 to relocate 11.5.1 to a new 

11.5.1.4. I do not agree with the recommendation in PI 56 to add “opening 

into the” in front of the words “control cabinet” in 11.5.1.2. The 

requirements of this section are necessary to provide adequate space for 

personnel to perform adjustment, examination, maintenance and servicing 

tasks on the outside of enclosures as well as the inside. The proposed 

changes only consider tasks that are performed inside of the enclosure when 

in fact there are tasks performed on the outside of enclosures as well. For 

example repair or replacement of the operating handle for a disconnecting 

means mounted on the outside flange of a control cabinet. As revised 

adjacent machine equipment could be placed in front of a control cabinet as 

long as the cabinet opening is clear and I can operate the disconnecting 

means operator. This will compromise the access to components mounted 

on the outside of equipment and will significantly reduce the likelihood of 

Abstain  0

Affirmative 15

Page 39

Page 40: EEI-AAA A2014 FD ballotfinal - NFPANFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL FR‐50, Global Input, See FR‐50 Eligible to Vote:23 Choice Comments Votes Affirmative with Comment 1

NFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL

FR‐11, Section No. 12.5.5, See FR‐11

Eligible to Vote:23

Choice Comments VotesAffirmative with Comment  2

Paul Dobrowsky The term " derating" should be replaced with "adjustment" related to 

"numbers of conductors" and "correction" relating to ambient temperature. 

This cange has been made in the NEC and NFPA 79 should be consistent to 

avoid confusion.

Jay Tamblingson Given that 4.4.3 states that the ambient operating temperature of the 

equipment shall be betweeen 5c and 40C, it would be useful to update the 

correction factors and ampacity tables based on 40C rather than requiring 

users to always adjust from 30C ambient values and would improve 

harmonization with IEC 60204‐1.

Negative  0

Abstain  0

Affirmative 17

FR‐10, Section No. 12.6.1.1, See FR‐10

Eligible to Vote:23

Choice Comments VotesAffirmative with Comment  2

David R. Carpenter Difference between ampacity and current in the sentence structure is 

needed to keep definitions consist to application...Ampacity defines the 

capability of a circuit to handle current.. Current Rating is the ability to 

produce... This term is now consistent with other motor related standards 

such as the DOE..

Page 40

Page 41: EEI-AAA A2014 FD ballotfinal - NFPANFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL FR‐50, Global Input, See FR‐50 Eligible to Vote:23 Choice Comments Votes Affirmative with Comment 1

NFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL

Daniel R. Neeser Class CF fuses which have the same performance requirements as Class J 

fuses should be added to the list of acceptable fuses in 1(c)iii, 2(c)iii, and 

3(c)iii. In addition, Class CF fuses should be added to Table 7.2.10.1. So it 

should say "Class J or CF".

Negative  0

Abstain  0

Affirmative 17

Page 41

Page 42: EEI-AAA A2014 FD ballotfinal - NFPANFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL FR‐50, Global Input, See FR‐50 Eligible to Vote:23 Choice Comments Votes Affirmative with Comment 1

NFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL

FR‐9, Section No. 12.6.1.2, See FR‐9

Eligible to Vote:23

Choice Comments VotesAffirmative with Comment  2

David R. Carpenter see FR‐10 comments

Daniel R. Neeser Class CF fuses which have the same performance requirements as Class J 

fuses should be added to the list of acceptable fuses in 1(c)iii, 2(c)iii, and 

3(c)iii. In addition, Class CF fuses should be added to Table 7.2.10.1. So it 

should say "Class J or CF".

Negative  0

Abstain  0

Affirmative 17

FR‐73, Section No. 12.9.2, See FR‐73

Eligible to Vote:23

Choice Comments VotesAffirmative with Comment  2

David R. Carpenter revised language clarifies the intent

Mark R. Hilbert This revision also meets the intent of PI 103, Log #59.

Negative  0

Abstain  0

Affirmative 17

FR‐90, Section No. 13.1.4, See FR‐90

Eligible to Vote:23

Choice Comments VotesAffirmative with Comment  3

David R. Carpenter revised language clarificaton is needed

Page 42

Page 43: EEI-AAA A2014 FD ballotfinal - NFPANFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL FR‐50, Global Input, See FR‐50 Eligible to Vote:23 Choice Comments Votes Affirmative with Comment 1

NFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL

Daniel R. Neeser The term "supply circuits" should be better defined in the standard. Is it for 

the supply to the main industrial control panel of a machine? Does it also 

apply to industrial control panels downstream of the main industrial control 

panel? I would think the requirements for downstream industrial control 

panels, may not necessarily have the same requirements.

Stephen W. Douglas Is it the intent of the committee to prevent these supplies to be installed in 

separate cables? Provide each supply is installed in a separate cable I believe 

the intent of this requirement will be met. I recommend we add “or cables” 

after the word raceway to read: Where the equipment is supplied from two 

or more sources of power or from two or more independent disconnecting 

means, the power wiring from each supply source or from each 

disconnecting means shall be run in raceways, or cables and shall not 

terminate in or pass through common junction boxes.

Negative  0

Abstain  0

Affirmative 16

FR‐77, Section No. 13.2.2.1, See FR‐77

Eligible to Vote:23

Choice Comments VotesAffirmative with Comment  0

Negative  1

David R. Carpenter See comment FR‐50

Abstain  0

Affirmative 18

Page 43

Page 44: EEI-AAA A2014 FD ballotfinal - NFPANFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL FR‐50, Global Input, See FR‐50 Eligible to Vote:23 Choice Comments Votes Affirmative with Comment 1

NFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL

FR‐78, Section No. 13.4.5.3, See FR‐78

Eligible to Vote:23

Choice Comments VotesAffirmative with Comment  1

Paul Dobrowsky Removing the parenthetical terms is a good change and should improve 

clarity. In addition replacing the phrase "equipment grounding circuit" with 

"equipment grounding conductor", "bonding conductor" or "equipment 

bonding jumper" might be more appropriate.

Negative  1

David R. Carpenter See comment FR‐50

Abstain  0

Affirmative 17

FR‐105, Section No. 13.5.10.1, See FR‐105

Eligible to Vote:23

Choice Comments VotesAffirmative with Comment  1

David R. Carpenter compliance with the NFPA Manual of Style

Negative  0

Abstain  0

Affirmative 18

FR‐106, Section No. 14.1.1, See FR‐106

Eligible to Vote:23

Choice Comments VotesAffirmative with Comment  3

David R. Carpenter compliance with the NFPA Manual of Style

Page 44

Page 45: EEI-AAA A2014 FD ballotfinal - NFPANFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL FR‐50, Global Input, See FR‐50 Eligible to Vote:23 Choice Comments Votes Affirmative with Comment 1

NFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL

Paul R. Warndorf This item should be harmonized with FR‐90‐NFPA 79‐2012 and delete the 

word "separate" from "separate raceway".

Stephen W. Douglas Is it the intent of the committee to prevent these supplies to be installed in 

separate cables? Provide each supply is installed in a separate cable I believe 

the intent of this requirement will be met. I recommend we add “or cables” 

after the word raceway to read: Where the equipment has two or more 

sources of power or two or more independent disconnecting means, power 

wiring from each disconnecting means shall be run in separate raceways or 

cables and shall not terminate in or pass through common junction boxes.

Negative  1

Jay Tamblingson This section should have been deleted as it is redundant with 13.1.4 which 

applies to all conductors, including motor circuits.

Abstain  0

Affirmative 15

FR‐79, Section No. 15.1.1, See FR‐79

Eligible to Vote:23

Choice Comments VotesAffirmative with Comment  1

Paul Dobrowsky Removing the parenthetical terms is a good change and should improve 

clarity. In addition replacing the phrase "equipment grounding circuit" with 

"equipment grounding conductor", "bonding conductor" or "equipment 

bonding jumper" might be more appropriate. The parenthetical terms 

(plug/sockets) should also be deleted.

Negative  2

Page 45

Page 46: EEI-AAA A2014 FD ballotfinal - NFPANFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL FR‐50, Global Input, See FR‐50 Eligible to Vote:23 Choice Comments Votes Affirmative with Comment 1

NFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL

Drake A. Drobnick I agree with the submitter's substantiation (PI#1) for removing 20 ampere 

receptacles.

David R. Carpenter See comment FR‐50

Abstain  0

Affirmative 16

FR‐88, Section No. 16.2.3 [Excluding any Sub‐Sections], See FR‐88

Eligible to Vote:23

Choice Comments VotesAffirmative with Comment  1

David R. Carpenter Sign must be durable

Negative  0

Abstain  0

Affirmative 18

FR‐89, Section No. 16.4.1, See FR‐89

Eligible to Vote:23

Choice Comments VotesAffirmative with Comment  1

David R. Carpenter needed to stop confusion

Negative  0

Abstain  0

Affirmative 18

FR‐80, Section No. 18.1, See FR‐80

Eligible to Vote:23

Choice Comments VotesAffirmative with Comment  1

Page 46

Page 47: EEI-AAA A2014 FD ballotfinal - NFPANFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL FR‐50, Global Input, See FR‐50 Eligible to Vote:23 Choice Comments Votes Affirmative with Comment 1

NFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL

Paul Dobrowsky Removing the parenthetical terms is a good change and should improve 

clarity. In addition replacing the phrase "equipment grounding circuit" with 

"equipment grounding conductor", "bonding conductor" or "equipment 

bonding jumper" might be more appropriate.

Negative  1

David R. Carpenter This change does not stop or clear up confusion when Industrial Machine 

design is based on IEC standards. See FR‐50.. Removing the term "protective 

ground" does not explain how it (the term "Protective Ground")is to be 

applied when referred to within specifications and wiring diagrams of IEC 

based equipment. When the engineer or installer encounters the IEC Wirng 

Diagram they are not aware that this in reference to the US equivalent of the 

equipment ground... some think it is referring to the neutral....

Abstain  0

Affirmative 17

Page 47

Page 48: EEI-AAA A2014 FD ballotfinal - NFPANFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL FR‐50, Global Input, See FR‐50 Eligible to Vote:23 Choice Comments Votes Affirmative with Comment 1

NFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL

FR‐81, Section No. 18.2, See FR‐81

Eligible to Vote:23

Choice Comments VotesAffirmative with Comment  1

Paul Dobrowsky Removing the parenthetical terms is a good change and should improve 

clarity. In addition replacing the phrase "equipment grounding circuit" with 

"equipment grounding conductor", "bonding conductor" or "equipment 

bonding jumper" might be more appropriate.

Negative  1

David R. Carpenter See comments FR ‐50 & FR ‐ 80

Abstain  0

Affirmative 17

FR‐82, Section No. 18.3, See FR‐82

Eligible to Vote:23

Choice Comments VotesAffirmative with Comment  1

Paul Dobrowsky Removing the parenthetical terms is a good change and should improve 

clarity. In addition replacing the phrase "equipment grounding circuit" with 

"equipment grounding conductor", "bonding conductor" or "equipment 

bonding jumper" might be more appropriate.

Negative  1

David R. Carpenter See comments FR ‐50 & FR ‐ 80

Abstain  0

Affirmative 17

FR‐83, Section No. 18.4, See FR‐83

Page 48

Page 49: EEI-AAA A2014 FD ballotfinal - NFPANFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL FR‐50, Global Input, See FR‐50 Eligible to Vote:23 Choice Comments Votes Affirmative with Comment 1

NFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL

Eligible to Vote:23

Choice Comments VotesAffirmative with Comment  1

Paul Dobrowsky Removing the parenthetical terms is a good change and should improve 

clarity. In addition replacing the phrase "equipment grounding circuit" with 

"equipment grounding conductor", "bonding conductor" or "equipment 

bonding jumper" might be more appropriate.

Negative  1

David R. Carpenter See comments FR ‐50 & FR ‐ 80

Abstain  0

Affirmative 17

FR‐87, Section No. 19.1, See FR‐87

Eligible to Vote:23

Choice Comments VotesAffirmative with Comment  2

David R. Carpenter This clarification is long over due. However, there is still work needed for this 

section concerning existing applications with no manufactures guidance 

concerning SCCR. This must be compliant with the manufactures testing 

results for application.

Daniel R. Neeser It would be beneficial to clarify that the branch circuit overcurrent protective 

device is really only providing short‐circuit protection. Recommend the 

standard refer to the branch‐circuit short‐circuit and ground fault protection 

be changed to branch‐circuit short‐circuit protection. In addition, it would be 

beneficial to define the term in Chapter 3, such as Short‐circuit (fault). A 

short‐circuit is a type of overcurrent condition where current flows outside of 

the normal path. The fault can be line‐line, line‐ground (ground fault), line‐

neutral or combination.

Page 49

Page 50: EEI-AAA A2014 FD ballotfinal - NFPANFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL FR‐50, Global Input, See FR‐50 Eligible to Vote:23 Choice Comments Votes Affirmative with Comment 1

NFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL

Negative  0

Abstain  0

Affirmative 17

FR‐55, Section No. A.3.3.9, See FR‐55

Eligible to Vote:23

Choice Comments VotesAffirmative with Comment  0

Negative  1

David R. Carpenter See comments FR ‐50 & FR ‐ 80

Abstain  0

Affirmative 18

FR‐95, Section No. A.3.3.32, See FR‐95

Eligible to Vote:23

Choice Comments VotesAffirmative with Comment  2

Palmer L. Hickman Delete the parenthetical references: Conduits, cable trunking systems (see 

3.3.15), and underfloor channels are types of duct. (See also 3.3.80, 

Raceway.)

Page 50

Page 51: EEI-AAA A2014 FD ballotfinal - NFPANFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL FR‐50, Global Input, See FR‐50 Eligible to Vote:23 Choice Comments Votes Affirmative with Comment 1

NFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL

David R. Carpenter needed editorial change

Negative  1

Paul Dobrowsky This section and the definition of "Duct" in Chapter 3 should be deleted. The 

term "Raceway" is defined and is the correct term. Adding information in the 

proposed annex related to the term "duct" is appropriate.

Abstain  0

Affirmative 16

FR‐52, Section No. A.3.3.77, See FR‐52

Eligible to Vote:23

Choice Comments VotesAffirmative with Comment  1

David R. Carpenter See comments FR ‐50 & FR ‐ 80

Negative  0

Abstain  0

Affirmative 18

FR‐69, Section No. A.3.3.85, See FR‐69

Eligible to Vote:23

Choice Comments VotesAffirmative with Comment  1

David R. Carpenter needed change

Negative  0

Abstain  0

Affirmative 18

FR‐8, Section No. A.4.1, See FR‐8

Eligible to Vote:23

Page 51

Page 52: EEI-AAA A2014 FD ballotfinal - NFPANFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL FR‐50, Global Input, See FR‐50 Eligible to Vote:23 Choice Comments Votes Affirmative with Comment 1

NFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL

Choice Comments VotesAffirmative with Comment  2

Palmer L. Hickman The Correlating Committee should review this action. It may be beyond the 

scope of NFPA 79 to address static electricity.

David R. Carpenter needed reference

Negative  1

Daniel R. Neeser Adding this standard is not appropriate since the text does not address static 

electricity (only in the annex material).

Abstain  0

Affirmative 16

Page 52

Page 53: EEI-AAA A2014 FD ballotfinal - NFPANFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL FR‐50, Global Input, See FR‐50 Eligible to Vote:23 Choice Comments Votes Affirmative with Comment 1

NFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL

FR‐70, Section No. A.5.4.3, See FR‐70

Eligible to Vote:23

Choice Comments VotesAffirmative with Comment  2

Palmer L. Hickman Recommend removal of the parenthetical reference: The selection of other 

means is dependent on many factors, taking into account those persons for 

whom its use is intended. (See ANSI B11.0 and ISO 12100.)

David R. Carpenter Needed Reference

Negative  0

Abstain  0

Affirmative 17

FR‐47, New Section after A.6.2, See FR‐47

Eligible to Vote:23

Choice Comments VotesAffirmative with Comment  2

David R. Carpenter best language for intent

Mark R. Hilbert Continue to accept the revisions. See my ballot comment on FR 46.

Negative  1

Daniel R. Neeser There are not currently UL 50E enclosures that are available as arc resistant, 

only some low‐voltage and medium voltage equipment (switchgear and 

motor control centers) is currently available.

Abstain  0

Affirmative 16

FR‐56, Section No. A.6.3.1.1, See FR‐56

Eligible to Vote:23

Page 53

Page 54: EEI-AAA A2014 FD ballotfinal - NFPANFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL FR‐50, Global Input, See FR‐50 Eligible to Vote:23 Choice Comments Votes Affirmative with Comment 1

NFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL

Choice Comments VotesAffirmative with Comment  2

Paul Dobrowsky Removing the parenthetical terms is a good change and should improve 

clarity. In addition replacing the phrase "equipment grounding circuit" with 

"equipment grounding conductor", "bonding conductor" or "equipment 

bonding jumper" might be more appropriate.

Jay Tamblingson This is the only place where the term "equipment grounding system" is used. 

The term "equipment grounding circuit" is used in Chapter 8 and elsewhere.

Negative  1

David R. Carpenter See comments FR ‐50 & FR ‐ 80

Abstain  0

Affirmative 16

Page 54

Page 55: EEI-AAA A2014 FD ballotfinal - NFPANFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL FR‐50, Global Input, See FR‐50 Eligible to Vote:23 Choice Comments Votes Affirmative with Comment 1

NFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL

FR‐58, Section No. A.8.1, See FR‐58

Eligible to Vote:23

Choice Comments VotesAffirmative with Comment  0

Negative  2

David R. Carpenter See comments FR ‐50 & FR ‐ 80

Jay Tamblingson The annex note should be retained but revised to point to the new Annex J 

containing details on grounding and bonding terminology.

Abstain  0

Affirmative 17

FR‐61, New Section after A.9.2, See FR‐61

Eligible to Vote:23

Choice Comments VotesAffirmative with Comment  2

Palmer L. Hickman The first sentence does not appear to read correctly. Also, it is recommended 

to remove the parenthetical reference: For removal of power it can be 

sufficient to remove the power needed to generate a torque or force. This 

can be achieved by declutching, disconnecting, switching off, or by electronic 

means (see 9.2.5.4.1.4). When stop functions are initiated it can be necessary 

to discontinue machine functions other than motion.

David R. Carpenter annex needed

Negative  0

Abstain  0

Affirmative 17

Page 55

Page 56: EEI-AAA A2014 FD ballotfinal - NFPANFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL FR‐50, Global Input, See FR‐50 Eligible to Vote:23 Choice Comments Votes Affirmative with Comment 1

NFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL

FR‐64, Section No. A.9.2, See FR‐64

Eligible to Vote:23

Choice Comments VotesAffirmative with Comment  2

David R. Carpenter See comments FR ‐50 & FR ‐ 80

Jay Tamblingson The term "emergency stopping" should be changed to "stopping" as it 

generically applies with the other items listed. As described in A9.2.5.4, 

"emergency stop" is a complementary protective measure.

Negative  0

Abstain  0

Affirmative 17

Page 56

Page 57: EEI-AAA A2014 FD ballotfinal - NFPANFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL FR‐50, Global Input, See FR‐50 Eligible to Vote:23 Choice Comments Votes Affirmative with Comment 1

NFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL

FR‐60, New Section after A.9.2.3.3, See FR‐60

Eligible to Vote:23

Choice Comments VotesAffirmative with Comment  2

Palmer L. Hickman This sentence does not appear to read correctly: The supply circuit 

disconnecting means when opened achieves a Category 0 stop.

David R. Carpenter nedded

Negative  0

Abstain  0

Affirmative 17

FR‐68, Section No. A.9.4.1.1, See FR‐68

Eligible to Vote:23

Choice Comments VotesAffirmative with Comment  1

David R. Carpenter corrected reference

Negative  0

Abstain  0

Affirmative 18

FR‐65, Section No. A.9.4.3.2, See FR‐65

Eligible to Vote:23

Choice Comments VotesAffirmative with Comment  1

David R. Carpenter corrected reference

Negative  0

Abstain  0

Affirmative 18

Page 57

Page 58: EEI-AAA A2014 FD ballotfinal - NFPANFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL FR‐50, Global Input, See FR‐50 Eligible to Vote:23 Choice Comments Votes Affirmative with Comment 1

NFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL

FR‐71, Section No. A.14.1, See FR‐71

Eligible to Vote:23

Choice Comments VotesAffirmative with Comment  1

David R. Carpenter corrected reference

Negative  0

Abstain  0

Affirmative 18

Page 58

Page 59: EEI-AAA A2014 FD ballotfinal - NFPANFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL FR‐50, Global Input, See FR‐50 Eligible to Vote:23 Choice Comments Votes Affirmative with Comment 1

NFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL

FR‐72, Section No. C.5, See FR‐72

Eligible to Vote:23

Choice Comments VotesAffirmative with Comment  1

David R. Carpenter clarification

Negative  1

Mark R. Hilbert Adding “conveyors and conveying machines” to the examples of industrial 

machines is not necessary and will likely add more confusion than 

clarification from an inspection standpoint. For example would a conveyor 

with a manual start/stop arrangement and loading that is permanently 

installed between grade level or the 1st floor and the 2nd floor storage area 

of an industrial or commercial facility be an considered an industrial 

machine? The large complex types of “conveying machines” recommended in 

the recommendation can be considered under C.5 (2) and (3) transfer and 

sortation machines.

Abstain  0

Affirmative 17

FR‐91, Section No. D.1, See FR‐91

Eligible to Vote:23

Choice Comments VotesAffirmative with Comment  2

Palmer L. Hickman It is suggested to remove the parenthetical information: Figure D.1(a) 

through Figure D.1(q) are not intended to be (design) guidelines. They are 

included only to illustrate documentation methods.

David R. Carpenter Agree that output and input are wrong in existing text

Negative  0

Page 59

Page 60: EEI-AAA A2014 FD ballotfinal - NFPANFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL FR‐50, Global Input, See FR‐50 Eligible to Vote:23 Choice Comments Votes Affirmative with Comment 1

NFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL

Abstain  0

Affirmative 17

FR‐92, Section No. F.2, See FR‐92

Eligible to Vote:23

Choice Comments VotesAffirmative with Comment  1

David R. Carpenter compliance and clarity

Negative  0

Abstain  0

Affirmative 18

Page 60

Page 61: EEI-AAA A2014 FD ballotfinal - NFPANFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL FR‐50, Global Input, See FR‐50 Eligible to Vote:23 Choice Comments Votes Affirmative with Comment 1

NFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL

FR‐104, Section No. F.5.3.1, See FR‐104

Eligible to Vote:23

Choice Comments VotesAffirmative with Comment  1

David R. Carpenter compliance with the NFPA Manual of Style

Negative  0

Abstain  0

Affirmative 18

FR‐31, New Section after F.5.4, See FR‐31

Eligible to Vote:23

Choice Comments VotesAffirmative with Comment  0

Negative  0

Abstain  0

Affirmative 19

FR‐43, Section No. H.2, See FR‐43

Eligible to Vote:23

Choice Comments VotesAffirmative with Comment  2

Palmer L. Hickman It is suggested to remove the parentheical references.

David R. Carpenter consistent terminology

Negative  0

Abstain  0

Affirmative 17

FR‐49, New Section after H.5, See FR‐49

Eligible to Vote:23

Page 61

Page 62: EEI-AAA A2014 FD ballotfinal - NFPANFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL FR‐50, Global Input, See FR‐50 Eligible to Vote:23 Choice Comments Votes Affirmative with Comment 1

NFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL

Choice Comments VotesAffirmative with Comment  1

Mark R. Hilbert Continue to develop this Annex. See my ballot statement on FR 50.

Negative  1

David R. Carpenter The IEC terms and definition should be compared to NFPA to help the reader 

understand how to apply.

Abstain  0

Affirmative 17

Page 62

Page 63: EEI-AAA A2014 FD ballotfinal - NFPANFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL FR‐50, Global Input, See FR‐50 Eligible to Vote:23 Choice Comments Votes Affirmative with Comment 1

NFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL

FR‐7, Section No. J.1.1, See FR‐7

Eligible to Vote:23

Choice Comments VotesAffirmative with Comment  2

Palmer L. Hickman The Correlating Committee should review this action. It may be beyond the 

scope of NFPA 79 to address static electricity.

David R. Carpenter Needed reference

Negative  2

Drake A. Drobnick If we didn't accept any public inputs concerning static electricity there is no 

need to reference this publication.

Daniel R. Neeser Adding this standard is not appropriate since the text does not address static 

electricity (only in the annex material).

Abstain  0

Affirmative 15

FR‐30, Section No. J.1.2, See FR‐30

Eligible to Vote:23

Choice Comments VotesAffirmative with Comment  3

Drake A. Drobnick I agree with the submitter of PI#60. The dates for ISO 12100 and 13849‐1 

should be updated.

David R. Carpenter ISO information needed

J. B. Titus According to the PI 60 and FR 30 statements for my submittal on J.1.2.5, the 

recommended action was approved. Yet, the date for ISO 12100 was not 

changed from 2003 to 2010 and likewise the date for ISO 13849‐1 was not 

changed from 1990 to 2006.

Negative  0

Abstain  0

Affirmative 16

Page 63

Page 64: EEI-AAA A2014 FD ballotfinal - NFPANFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL FR‐50, Global Input, See FR‐50 Eligible to Vote:23 Choice Comments Votes Affirmative with Comment 1

NFPA 79 A2014 (EEI‐AAA) FD BALLOT FINAL

FR‐94, Section No. J.1.2.8, See FR‐94

Eligible to Vote:23

Choice Comments VotesAffirmative with Comment  2

Drake A. Drobnick The UL publication dates within this FR do not agree with dates for the same 

publications found in FR#30.

David R. Carpenter the best reference available

Negative  0

Abstain  0

Affirmative 17

Page 64