EE/CS 480 Fall 2007 1November, 2007 University of Portland School of Engineering Project Merlin WOC...

10
EE/CS 480 Fall 2007 November, 2007 1 University of Portland School of Engineering Project Merlin WOC 60 :Wind Output Converter to 60Hz Team Tammy Okubo Will Acorda Meghan Tisdell Advisor Dr. Wayne Lu Industry Representative Ms. Swetha Varadharajan Intel

Transcript of EE/CS 480 Fall 2007 1November, 2007 University of Portland School of Engineering Project Merlin WOC...

Page 1: EE/CS 480 Fall 2007 1November, 2007 University of Portland School of Engineering Project Merlin WOC 60 :Wind Output Converter to 60Hz Team Tammy Okubo.

EE/CS 480 Fall 2007

November, 2007 1University of Portland School of Engineering

Project MerlinWOC60:Wind Output Converter to 60Hz

TeamTammy Okubo

Will Acorda

Meghan Tisdell

AdvisorDr. Wayne Lu

Industry RepresentativeMs. Swetha Varadharajan Intel

Page 2: EE/CS 480 Fall 2007 1November, 2007 University of Portland School of Engineering Project Merlin WOC 60 :Wind Output Converter to 60Hz Team Tammy Okubo.

EE/CS 480 Fall 2007

November, 2007 2University of Portland School of Engineering

Overview

• Introduction

• Scorecard

• Additional Accomplishments

• Plans

• Issues/Concerns

• Conclusions

Page 3: EE/CS 480 Fall 2007 1November, 2007 University of Portland School of Engineering Project Merlin WOC 60 :Wind Output Converter to 60Hz Team Tammy Okubo.

EE/CS 480 Fall 2007

November, 2007 3University of Portland School of Engineering

IntroductionWOC60

InverterBattery Bank

12 volts DC120 AC voltage

60HzWind

Turbine

AIR-X

zoom in

metisdel
Briefly explain what your project does, why it is significant, and who will benefit from itThis is helpful to remind the audience what you are designingInclude a picture, block diagram, or other graphic
Page 4: EE/CS 480 Fall 2007 1November, 2007 University of Portland School of Engineering Project Merlin WOC 60 :Wind Output Converter to 60Hz Team Tammy Okubo.

EE/CS 480 Fall 2007

November, 2007 4University of Portland School of Engineering

Scorecard

• Complete Project Plan - DONE

• Complete Budget - DONE

• Prepare and send Design Review to IR

metisdel
List the previous month's plansShow what was completed, focus on things that were done (not started)Describe any shortcomings and explain why
Page 5: EE/CS 480 Fall 2007 1November, 2007 University of Portland School of Engineering Project Merlin WOC 60 :Wind Output Converter to 60Hz Team Tammy Okubo.

EE/CS 480 Fall 2007

November, 2007 5University of Portland School of Engineering

Additional Accomplishments

• Put together AIR-X

• Opened up the UPS and started identifying parts

• Acquired: cable, fuse, resistive loads, test fan

metisdel
List any additional accomplishmentsInclude from 3-5 of themLimit to the past month
Page 6: EE/CS 480 Fall 2007 1November, 2007 University of Portland School of Engineering Project Merlin WOC 60 :Wind Output Converter to 60Hz Team Tammy Okubo.

EE/CS 480 Fall 2007

November, 2007 6University of Portland School of Engineering

Plans

• Complete Design Review

• Complete circuit design and simulation

• Measure and record output information from UPS

• Order parts

metisdel
List your team's plans for the next monthInclude from 3-5 of themRemember, the following month we will check to see that you did these things
Page 7: EE/CS 480 Fall 2007 1November, 2007 University of Portland School of Engineering Project Merlin WOC 60 :Wind Output Converter to 60Hz Team Tammy Okubo.

EE/CS 480 Fall 2007

November, 2007 7University of Portland School of Engineering

MilestonesNumber Description Original Previous Present

1 Project Plan Approval 11/09/07 11/09/07 11/12/07

2 Put together wind turbine 11/14/07 11/14/07 11/14/07

3Build battery bank and interface with

wind turbine11/23/07 11/23/07 11/23/07

4 Complete Circuit Design 11/30/07 11/30/07 11/3007

5 Design Review 12/07/07 12/07/07 12/07/07

6 Order Parts 12/14/07 12/14/07 12/14/07

7 Parts Received 01/14/08 01/14/08 01/14/08

8 Complete PIC program 01/14/08 01/14/08 01/14/08

9 Interface PIC and Circuitry 02/14/08 02/14/08 02/14/08

10 TOP’s Approval 02/22/08 02/22/08 02/22/08

Page 8: EE/CS 480 Fall 2007 1November, 2007 University of Portland School of Engineering Project Merlin WOC 60 :Wind Output Converter to 60Hz Team Tammy Okubo.

EE/CS 480 Fall 2007

November, 2007 8University of Portland School of Engineering

Milestones Continued

11 Complete Building 02/28/08 02/28/08 02/28/08

12 Test, Debug 03/22/08 03/22/08 03/22/08

13 Collect Output Data, Package 03/30/08 03/30/08 03/30/08

14 Prototype Release 04/04/08 04/04/08 04/04/08

15 Founder’s Day 04/08/08 04/08/08 04/07/04

16 Final Report 1.0 04/25/08 04/25/08 04/25/08

Page 9: EE/CS 480 Fall 2007 1November, 2007 University of Portland School of Engineering Project Merlin WOC 60 :Wind Output Converter to 60Hz Team Tammy Okubo.

EE/CS 480 Fall 2007

November, 2007 9University of Portland School of Engineering

Concerns/Issues• Simulation with software difficult because the center tapped XFMR does not

exist in library– Solutions:

• working with web resources and some books to model the part• Seek help from faculty

• High Current– Solutions:

• Circuit Protection• Ordering of extra parts

metisdel
List your concerns/issuesBe prepared to discuss some possible solutions and what you plan to do about itDo not include "Having enough time" or "project will work"; instead, focus on important problems
Page 10: EE/CS 480 Fall 2007 1November, 2007 University of Portland School of Engineering Project Merlin WOC 60 :Wind Output Converter to 60Hz Team Tammy Okubo.

EE/CS 480 Fall 2007

November, 2007 10University of Portland School of Engineering

Conclusions

• Project Plan 1.0 Approved• AIR-X put together• Plans:

– Design Review– Circuit Design– Order Parts

• Any Questions?

metisdel
Recap your main pointsProvide a sense of closureAsk the audience if "anyone has a question?"