DR. LUXMON ATTAPICHDEPUTY SECRETARY GENERAL
EASTERN ECONOMIC CORIDOR OFFICE OF THAILAND
EEC Connectivity
Targeted IndustriesFirst S-Curve
• The next generation automotive
industry
• The intelligent electronics industry
• Advanced agriculture and
biotechnology enterprise
• Food processing industries
• World Class tourism
Second S-Curve
• Robotics and automations
• Aviation and Logistics
• Biofuels and biochemical
industries
• Medical Hub and Total Healthcare
services Digital Industry
• EEC of Innovation (EECi)
• Digital Park Thailand (EECd)
Education
Innovation and Technology
Defense Industry and Human Resource Development
Oct Nov Dec Jan Feb Mar Apr Start of Operation
2018 2019
5 Main EEC Infrastructure Projects have been in accordance with the schedule...
The High Speed Rail Linking 3 Airports
U-Tapao International Airport
TG MRO Campus
Laem Chabang Port Phase 3
Map Ta Phut Industrial Port Phase 3
2023
2023
2022
2025
2023
Project owner: State Railway of Thailand
Project owner: Royal Thai Navy
Project Owner: Thai Airways International PCL
Project Owner: Industrial Estate Authority of Thailand
Project Owner: Port Authority of Thailand
INNER AEROTROPOLIS• 10 km. around the airport (Approximately 140,000
Rai) Sattahip Banchang (In the centre) MIDDLE AEROTROPOLIS• 30 km. from the Airport (From Pattaya to Rayong)
Pattaya Rayong Laem Chabang• High speed train : 17 – 19 minutes• Road : No more than 40 minutes
OUTER AEROTROPOLIS• 60 km. from the Airport ( From Chonburi and
Rayong) Sriracha Bankai Banbueng• High speed train : 30 – 35 minutes• Road : No more than 60 minutes
AREA CONNECTIVITY
AVIATION HUB Eastern Airport City to Eastern Aerotropolis
Tax Incentives on Aviation in EEC11
Targeted Activities
Tax Incentives
BasicCIT Exemption
EEC Privileges*
50% CIT Reduction
▪ Manufacture of Aircraft or Aircraft Parts such as airframe, critical parts (e.g. Engine and parts, Propeller), appliance (e.g. Flight recorder, Radar), equipment and other components
8 years(no cap)
+ 5 years
▪ Manufacture of onboard devices and equipment (except disposable and reusable aircraft utilities and supplies) such as seats, life vests, trolley, galley, etc.
5 years(100% of
investment)**
+ 5 years
▪ Repair of Aircraft or Aircraft Parts
8 years(100% of
investment)**+ 5 years
** Excluding cost of land and working capitalSource: Announcement of the Board of Investment No. 2/2557 Announcement of the Board of Investment No. 6/2561
* + in order
Tax Incentives on Aviation in Eastern Airport City (EEC-A)
Targeted Activities(located in EEC-A)
Tax Incentives
BasicCIT Exemption
EEC-A Privileges*
CIT Exemption
50% CIT Reduction
▪ Manufacture of Aircraft or Aircraft Parts such as airframe, critical parts (e.g. Engine and parts, Propeller), appliance (e.g. Flight recorder, Radar), equipment and other components
8 years(no cap)
+ 4 years(no cap)
-
▪ Manufacture of onboard devices and equipment (except disposable and reusable aircraft utilities and supplies) such as seats, life vests, trolley, galley, etc.
5 years(100% of
investment)**
+ 2 years (100% of
investment)**+5 years
▪ Repair of Aircraft or Aircraft Parts
8 years(100% of
investment)**
+ 4 years(100% of
investment)**-
Source: Announcement of the Board of Investment No. 2/2557 Announcement of the Board of Investment No. 6/2561
* + + In order
** Excluding cost of land and working capital
Project Eligible
Source: Announcement of the Board of Investment No. 2/2557 Announcement of the Board of Investment No. 6/2561
EEC Promoted Zone and EEC-A Privileges Conditions:
▪ Projects in Targeted Activities;
▪ Projects must locate in the Promoted Zone for targeted industries Eastern
/ Airport City (EEC-A);
▪ Have cooperation with Institutions/Organizations in specified forms; and
▪ Project application must be submitted before December 30, 2019
Procedural Faci l i tat ion
One Stop Service (OSS)