DR. LUXMON ATTAPICH DEPUTY SECRETARY GENERAL EASTERN ECONOMIC CORIDOR OFFICE OF THAILAND

Transcript of EEC Connectivity...2019/04/01  · The High Speed Rail Linking 3 Airports U-Tapao International...

Page 1: EEC Connectivity...2019/04/01  · The High Speed Rail Linking 3 Airports U-Tapao International Airport TG MRO Campus Laem Chabang Port Phase 3 Map Ta Phut Industrial Port Phase 3

DR. LUXMON ATTAPICHDEPUTY SECRETARY GENERAL

EASTERN ECONOMIC CORIDOR OFFICE OF THAILAND

Page 2: EEC Connectivity...2019/04/01  · The High Speed Rail Linking 3 Airports U-Tapao International Airport TG MRO Campus Laem Chabang Port Phase 3 Map Ta Phut Industrial Port Phase 3

EEC Connectivity

Page 3: EEC Connectivity...2019/04/01  · The High Speed Rail Linking 3 Airports U-Tapao International Airport TG MRO Campus Laem Chabang Port Phase 3 Map Ta Phut Industrial Port Phase 3

Targeted IndustriesFirst S-Curve

• The next generation automotive

industry

• The intelligent electronics industry

• Advanced agriculture and

biotechnology enterprise

• Food processing industries

• World Class tourism

Second S-Curve

• Robotics and automations

• Aviation and Logistics

• Biofuels and biochemical

industries

• Medical Hub and Total Healthcare

services Digital Industry

• EEC of Innovation (EECi)

• Digital Park Thailand (EECd)

Education

Innovation and Technology

Defense Industry and Human Resource Development

Page 4: EEC Connectivity...2019/04/01  · The High Speed Rail Linking 3 Airports U-Tapao International Airport TG MRO Campus Laem Chabang Port Phase 3 Map Ta Phut Industrial Port Phase 3

Oct Nov Dec Jan Feb Mar Apr Start of Operation

2018 2019

5 Main EEC Infrastructure Projects have been in accordance with the schedule...

The High Speed Rail Linking 3 Airports

U-Tapao International Airport

TG MRO Campus

Laem Chabang Port Phase 3

Map Ta Phut Industrial Port Phase 3

2023

2023

2022

2025

2023

Project owner: State Railway of Thailand

Project owner: Royal Thai Navy

Project Owner: Thai Airways International PCL

Project Owner: Industrial Estate Authority of Thailand

Project Owner: Port Authority of Thailand

Page 5: EEC Connectivity...2019/04/01  · The High Speed Rail Linking 3 Airports U-Tapao International Airport TG MRO Campus Laem Chabang Port Phase 3 Map Ta Phut Industrial Port Phase 3

INNER AEROTROPOLIS• 10 km. around the airport (Approximately 140,000

Rai) Sattahip Banchang (In the centre) MIDDLE AEROTROPOLIS• 30 km. from the Airport (From Pattaya to Rayong)

Pattaya Rayong Laem Chabang• High speed train : 17 – 19 minutes• Road : No more than 40 minutes

OUTER AEROTROPOLIS• 60 km. from the Airport ( From Chonburi and

Rayong) Sriracha Bankai Banbueng• High speed train : 30 – 35 minutes• Road : No more than 60 minutes

AREA CONNECTIVITY

AVIATION HUB Eastern Airport City to Eastern Aerotropolis

Page 6: EEC Connectivity...2019/04/01  · The High Speed Rail Linking 3 Airports U-Tapao International Airport TG MRO Campus Laem Chabang Port Phase 3 Map Ta Phut Industrial Port Phase 3
Page 7: EEC Connectivity...2019/04/01  · The High Speed Rail Linking 3 Airports U-Tapao International Airport TG MRO Campus Laem Chabang Port Phase 3 Map Ta Phut Industrial Port Phase 3
Page 8: EEC Connectivity...2019/04/01  · The High Speed Rail Linking 3 Airports U-Tapao International Airport TG MRO Campus Laem Chabang Port Phase 3 Map Ta Phut Industrial Port Phase 3
Page 9: EEC Connectivity...2019/04/01  · The High Speed Rail Linking 3 Airports U-Tapao International Airport TG MRO Campus Laem Chabang Port Phase 3 Map Ta Phut Industrial Port Phase 3

Tax Incentives on Aviation in EEC11

Targeted Activities

Tax Incentives

BasicCIT Exemption

EEC Privileges*

50% CIT Reduction

▪ Manufacture of Aircraft or Aircraft Parts such as airframe, critical parts (e.g. Engine and parts, Propeller), appliance (e.g. Flight recorder, Radar), equipment and other components

8 years(no cap)

+ 5 years

▪ Manufacture of onboard devices and equipment (except disposable and reusable aircraft utilities and supplies) such as seats, life vests, trolley, galley, etc.

5 years(100% of

investment)**

+ 5 years

▪ Repair of Aircraft or Aircraft Parts

8 years(100% of

investment)**+ 5 years

** Excluding cost of land and working capitalSource: Announcement of the Board of Investment No. 2/2557 Announcement of the Board of Investment No. 6/2561

* + in order

Page 10: EEC Connectivity...2019/04/01  · The High Speed Rail Linking 3 Airports U-Tapao International Airport TG MRO Campus Laem Chabang Port Phase 3 Map Ta Phut Industrial Port Phase 3

Tax Incentives on Aviation in Eastern Airport City (EEC-A)

Targeted Activities(located in EEC-A)

Tax Incentives

BasicCIT Exemption

EEC-A Privileges*

CIT Exemption

50% CIT Reduction

▪ Manufacture of Aircraft or Aircraft Parts such as airframe, critical parts (e.g. Engine and parts, Propeller), appliance (e.g. Flight recorder, Radar), equipment and other components

8 years(no cap)

+ 4 years(no cap)

-

▪ Manufacture of onboard devices and equipment (except disposable and reusable aircraft utilities and supplies) such as seats, life vests, trolley, galley, etc.

5 years(100% of

investment)**

+ 2 years (100% of

investment)**+5 years

▪ Repair of Aircraft or Aircraft Parts

8 years(100% of

investment)**

+ 4 years(100% of

investment)**-

Source: Announcement of the Board of Investment No. 2/2557 Announcement of the Board of Investment No. 6/2561

* + + In order

** Excluding cost of land and working capital

Page 11: EEC Connectivity...2019/04/01  · The High Speed Rail Linking 3 Airports U-Tapao International Airport TG MRO Campus Laem Chabang Port Phase 3 Map Ta Phut Industrial Port Phase 3

Project Eligible

Source: Announcement of the Board of Investment No. 2/2557 Announcement of the Board of Investment No. 6/2561

EEC Promoted Zone and EEC-A Privileges Conditions:

▪ Projects in Targeted Activities;

▪ Projects must locate in the Promoted Zone for targeted industries Eastern

/ Airport City (EEC-A);

▪ Have cooperation with Institutions/Organizations in specified forms; and

▪ Project application must be submitted before December 30, 2019

Page 12: EEC Connectivity...2019/04/01  · The High Speed Rail Linking 3 Airports U-Tapao International Airport TG MRO Campus Laem Chabang Port Phase 3 Map Ta Phut Industrial Port Phase 3

Procedural Faci l i tat ion

One Stop Service (OSS)

Page 13: EEC Connectivity...2019/04/01  · The High Speed Rail Linking 3 Airports U-Tapao International Airport TG MRO Campus Laem Chabang Port Phase 3 Map Ta Phut Industrial Port Phase 3