EDWARD PLUMBING CONTRACTOR#8 Panganiban St., Brgy. Sta Lucia
Novaliches, Quezon CityMobile # 09476988293 / 09127582269
Date: August 18, 2015
Project: THREE STOREY 6-UNITS TOWNHOUSE (UNIT 3)
Location: Proj. 6 Road 7, Quezon City
Owner: RB H. Villoria
Sir,
We are here to submit our quotation for the plumbing works, (Labor Only) here
with our estimated cost for your information. The total amount of the lump sum price of
the project is One Hundred Two Thousand Five Hundred Pesos Only (₱ 102,500.00).
SCOPE OF WORK
Ground Floor:
Preparation/Excavation chipping and layout, installation of storm drainage
pipeline system to main street, installation of cold waterline system from MWSI water
meter with all plumbing fixtures and road drainage system, P.V.C. 200 MM and 150 MM.
1) Drainage System
2) Downspout
3) Catch Basin without Cover
4) Sewerage System
5) Water Closet (W.C.) One (1) Set
6) Lavatory One (1) Set
7) Kitchen Sink w/ Service Area
8) Soap Holder
9) Paper Holder
10) Faucet with Shower
11) Service Faucet
12) Towel Holder
Amount of ₱ 35,500
Second Floor:
Layout/Chipping with complete installation of sewerage system/downspout and
cold watering system, with all plumbing fixtures, hot waterline for multi point heater.
1) Water Closet (W.C.) – One (1) Set2) Lavatory (Lav) – One (1) Set3) Faucet with Rain Shower4) Soap Holder 5) Paper Holder6) Towel Holder7) Kitchen Sink8) Multi-Point Water Heater
Amount of ₱ 21,500
Third Floor:
Layout/Chipping with complete installation of sewerage system, downspout and
cold watering system, with all plumbing fixtures.
1) Water Closet (W.C.) – Two (2) Sets2) Lavatory – Two (2) Sets3) Faucet with Rain Shower4) Soap Holder 5) Paper Holder6) Towel Holder7) Multi-Point Water Heater
Amount of ₱ 45,500
On the above project lump-sum cost of (labor only). We proposed to complete installation. All plumbing materials with fixtures for the complete works as indicated in scope of works here to provide (in the base of plan) with road drainage system.
Note: For additional plumbing works not included in this form. Should you find our proposal acceptable, we shall be more than glad to confer with you and ask 15% down payment and 85% progress billing.
Terms of Payment: Progress Billing (Weekly)
Confirm by: Quotation Submitted by:
Mr. RB H. Villoria Mr. Eduardo P. DesameroPlumbing Contractor