Edgewater Exploration (EDW) - Corporate Presentation

download Edgewater Exploration (EDW) - Corporate Presentation

of 20

Transcript of Edgewater Exploration (EDW) - Corporate Presentation

  • 8/6/2019 Edgewater Exploration (EDW) - Corporate Presentation

    1/20

  • 8/6/2019 Edgewater Exploration (EDW) - Corporate Presentation

    2/20

    Forward Looking StatementForward Looking Statement

    Certain statements in this document constitute forward lookings a emen s w c may no e ase on s or ca ac . uc orwar

    looking statements involve known and unknown risk, uncertainties andother factors which may cause the actual results, performance orachievements of the Company, or industry results to be materially

    eren rom any u ure resu s, per ormance, or ac evemen sexpressed or implied by such forward looking statements. Such factorsinclude, among others, the following: actual results of exploration anddevelopment activities; the estimation or realization of mineral reservesan resources; e m ng an e amoun o u ure pro uc on; e cos sand timing of the development of new deposits; future prices of preciousand base metals; accidents; risks inherent in mineral exploration; risksassociated with development, construction and mining operations;

    res r c ons on ore gn owners p; e ompany s s ory o opera nglosses and uncertainty of future profitability; uncertainty of access toadditional capital; environmental liability claims and insurance; anddependence on joint venture partners.

    2

  • 8/6/2019 Edgewater Exploration (EDW) - Corporate Presentation

    3/20

    Management and AdvisoryManagement and Advisory TeamTeam

    George Salamis Ed FarrautoPresident & CEO

    +20 years experience directing exploration,development, and mining operations of anumber of gold, base metal and coal projects

    , rec or

    +20 years experience as CFO and Director ofpublic companies

    Directly involved in raising over $500 million

    Dome and Cameco Corporation

    Completed M & A transactions valued over$1B

    Completed M & A transactions valued over$750 million

    Greg Smith, P.GeoVice President Exploration

    +23 years exploration experience working for

    Doug Forster, M.Sc. P.GeoAdvisor

    30+ years resource project development,

    ot junior & senior mining operationsInvolved in outlining +10Moz gold discovery

    M&A, equity inance an pu ic companymanagement

    President & CEO of Featherstone Capital

    Founder and director of several publiccompanies

    3

  • 8/6/2019 Edgewater Exploration (EDW) - Corporate Presentation

    4/20

    Capital Structure | March 2011Capital Structure | March 2011

    Share StructureShare Structure

    Kinross

    Equity Ownership

    Issued & Outstanding 49,790,500

    Warrants

    Mgmt &Insiders

    Gold Corp

    4%

    , , .

    624,780 @ $1.10 (2012)

    7,806,500 @ $1.40 (2013)

    11,196,280

    O tions 4 827 000

    34%Retail 34%

    CashCash $9,000,000$9,000,000

    Fully Diluted*70,958,780

    *

    Institutional

    28%

    * If Edgewater delineates a NI43-101 compliant resource of $3Moz of gold in the M&I category on the Enchi

    Gold Project, then Red Back Mining can exercise an additional 2.5M warrants at $0.50 and 2.5M warrants at

    $1.00 (included in the fully diluted number above).

    4

  • 8/6/2019 Edgewater Exploration (EDW) - Corporate Presentation

    5/20

    Edgewater ProjectsEdgewater Projects

    5

  • 8/6/2019 Edgewater Exploration (EDW) - Corporate Presentation

    6/20

    Corcoesto P roject | OverviewCorcoesto P roject | Overview

    Located 35km W of the La Coruna, -

    mining regions

    100% ownershi

    2010 NI43-101 Compliant Resource

    Measured & Indicated: 315,000oz GoldInferred: 885,000oz Gold

    7 major gold vein systems open along strike and at depth

    Active drill program underway

    Highlight Drill Hole to date 10E10: 10.72 g/ t Gold over 17m

    Potential for both open pit and underground operations

    6

  • 8/6/2019 Edgewater Exploration (EDW) - Corporate Presentation

    7/20

    Corcoesto P roject | DetailsCorcoesto P roject | Details

    Previous work on the project has consisted ofgeological mapping, geophysical surveying,and soil and rock eochemistr includintrenching and 42,000m of diamond and RC

    drilling in +400 holes

    Gold mineralization associated with quartz,

    Amenable to conventional open-pit mining

    (low strip ratio due to favorable topography)

    Excellent infrastructure; roads and 22 Kvpower line crossing project

    Permit to be resubmitted due to increase in

    resource size.

    7

  • 8/6/2019 Edgewater Exploration (EDW) - Corporate Presentation

    8/20

    Corcoesto | 2010 Resource EstimateCorcoesto | 2010 Resource Estimate

    NI 43-101 Mineral Resource Summary

    (g/t Au) (x1000)

    (x1000 oz)

    Measured0.65 3,834 1.76 217

    Indicated0.65 1,823 1.67 98

    Measured + Indicated0.65 5,657 1.73 315

    Inferred0.65/ 2.0 16,542 1.66 885

    o a o , . m o sur ace renc ng n renc es, . m o a samp ng n a s an

    42,326.2 m of diamond and RC drilling in 436 drill holes were used in the resource with sample

    spacings that were less than 30 m for Measured resources, less than 40 metres for Indicated resources

    and less than 195 m for Inferred resources except for Inferred resources below 200 m from surface and

    for the northern two vein systems that used drill spacings of 196 m

    A base cutoff grade of 0.65 g/t Au was used for reporting resources above a depth of 200 m from

    surface and a cutoff grade of 2.0 g/t Au was used for reporting resources below 200 m from surface

    8

  • 8/6/2019 Edgewater Exploration (EDW) - Corporate Presentation

    9/20

    Corcoesto | Aerial ViewCorcoesto | Aerial View

    12,000m

    -

    9

    Diamon DriProgram

    Underway

    Drill RigsOnsite

    $2.5M Budget

    with extensiveexperience

  • 8/6/2019 Edgewater Exploration (EDW) - Corporate Presentation

    10/20

    Corcoesto | 2010Corcoesto | 2010 --2011 Drill Results2011 Drill Results

    ong u na sec onPozo del Ingles Ore Zone PI-27Cut-0ff 1.0g/t Au

    Longitudinal sectionCova Crea Ore Zone PI-27

    Cut-0ff 0.5 g/t Au

    1.51 g/t Gold over 43.40m10.72 g/t Gold over 17m

    2.66 g/t Gold over 13.3m

    Dri ll HoleMineralized Intercept Length Au

    Zone From To (m) (g/ t)

    Hole 10E01 Peton de Lobo 25.10 30.05 4.95 1.60

    . . . .

    Hole 10E03 Cova Crea 155.0 167.5 12.50 0.75

    Hole 10E05 Cova Crea 174.7 182.8 8.10 1.71

    Hole 10E07 Cova Crea 261.2 304.6 43.40 1.51

    10

    Hole 10E09 Pozo De Ingles 0.00 8.60 8.60 1.29

    Hole 10E10 Pozo De Ingles 164.0 181.0 17.00 10.72Hole 11E13 Pozo De Ingles 320.8 334.1 13.3 2.66

  • 8/6/2019 Edgewater Exploration (EDW) - Corporate Presentation

    11/20

    Corcoesto | Development TimelineCorcoesto | Development Timeline

    2 0 1 1 2 0 1 2

    12,000m Diamond Drill Program

    NI 43-101ResourceNI 43-101ResourceEstimateEstimate

    cop ng u y

    11

    $2.5 M Drilling / Scoping Budget

  • 8/6/2019 Edgewater Exploration (EDW) - Corporate Presentation

    12/20

    2nd

    largestproducerin Africa

    EnchiEnchi Gold ProjectGold Project

    Located in Ghana, 70km SW of the

    5Moz Chirano gold mine associated

    with 9km long Bibiani Shear Zone

    Mid-stage exploration comprised of 8

    licenses totalling 568km2

    290km west of the ca ital cit Accra

    12

    Spending $5M to earn net 51%

    interest from Kinross GoldCorp(TSX:K)

    accessed via sealed roads

  • 8/6/2019 Edgewater Exploration (EDW) - Corporate Presentation

    13/20

    EnchiEnchi | Location| Location

    5Moz Gold Mine

    $2.5MBudget

    Enchi geology is analogousto Chirano Gold mine,

    12,000mDiamond Drill

    ProgramUnderwa

    ep gene c meso erma

    quartz vein style gold

    deposits2 Drill RigsOnsite

    Gold mineralization is

    Ashanti-type the most

    important type of gold in

    West Africa

    Includes 16 known gold

    13

    40 km section of the Bibiani

    Shear Zone

  • 8/6/2019 Edgewater Exploration (EDW) - Corporate Presentation

    14/20

    EnchiEnchi | Shear Zones| Shear Zones

    Similar geology following theChirano and Bibiani shearzones

    40,000m of drillingconducted by previous

    Abundant drill ready targets

    Edgewater to focus on 3Main Zones to begin:

    Boin Zone

    Sewum Zone

    Over 45 drill holes andtrenches > 1g/t over 10Mnot followed up

    14

  • 8/6/2019 Edgewater Exploration (EDW) - Corporate Presentation

    15/20

    EnchiEnchi | Key Gold Zones| Key Gold Zones

    Mineralization +10km associated Over 1.5 km of continuous gold

    mineralization identified

    BoinBoin NyamebekyereNyamebekyere

    Work by Red Back included 26trenches totalling 3,945m and 112RC drill holes totaling 13,033 m

    Shallow: drilled to avg depth of less than100m

    Consistent: widths of 10 20m of economic

    No deep drilling has been conducted

    Major resource delineation drill

    program planned

    As of yet, no 43-101 resource estimatedone

    Completely open on-strike and at depth

    Hole From(m)

    To(m)

    Intercept (m)

    Au(g/t)

    Hole From(m)

    To(m)

    Intercept(m)

    Au(g/t)

    Historical RC Drilling Results Historical RC Drilling Results*

    KRC021 29 43 14 1.57

    KRC027 3 14 11 3.60

    KRC032 69 85 16 1.83

    KBRC001 29 49 20 1.57

    KBCR004 67 83 16 2.26

    KBRC007 84 96 12 1.75

    15

    .

    KRC075 12 28 16 1.66

    KRC097 7 16 9 2.77

    *RC drilling results greater than 1.0 g/t Au from Nyamebekyere Gold zone

    .

    KBRC012 31 64 33 2.1

  • 8/6/2019 Edgewater Exploration (EDW) - Corporate Presentation

    16/20

    EnchiEnchi | Undrilled Gold Zones| Undrilled Gold Zones

    Three parallel soil anomalies

    EradiEradi

    . .

    length

    Only 2 trenches totaling 435m

    were completed on the

    anoma es

    Not drilled to date

    Assayed 37m of 1.47 g/ t

    Highly prospective, multiple

    kilometers of strike length

    Previous trench highlights:

    1.14g/t over 24.2m

    2.35 g/t over 11m

    Obuasi-Enchi Lineament is

    associated with the major

    40 Moz Ashanti gold

    0.70g/t over 221m1.06g/t over 17 m

    0.88g/t over 50 m

    1.86 /t over 17 m

    east of the Enchi Project

    16

    Land access negotiations are underway,

    road construction to begin shortly

  • 8/6/2019 Edgewater Exploration (EDW) - Corporate Presentation

    17/20

    EnchiEnchi | Project Timeline| Project Timeline

    2 0 1 1 2 0 1 2

    Geological Mapping, Trenching, &

    NI 43-101ResourceNI 43-101ResourceEstimateEstimate

    12,000m Diamond Drill Program

    17

  • 8/6/2019 Edgewater Exploration (EDW) - Corporate Presentation

    18/20

    Enterprise Value (US$/ oz)Enterprise Value (US$/ oz)

    $259

    $250

    $300

    )

    Edgewater Exploration is currently trading

    at a market value ofC$48.08/ oz of gold

    $170

    $155

    $200

    e

    (US$/o

    z

    Au

    average market value of C$87.5/oz thatwe estimate for junior gold companies.

    $86 $86 $82 $81 $79 $76 $75$100

    $150

    Tot

    alResour - Canaccord, Junior Mining Weekly, 1 February 2011

    $66$59

    $49

    $30$19

    $50EV/

    AZM RN LYD OLE KGN VTR AGC EPZ BSX RVS SPM KBR OYM AYX EDW CPN

    18Date February 28/2010

  • 8/6/2019 Edgewater Exploration (EDW) - Corporate Presentation

    19/20

    SummarySummary

    Ghana Enchi Gold Project: located in one of the most prolific gold

    program. A 12,000m Diamond drilling program underway

    Spain Advanced stage 100% controlled Corcoesto gold deposit:- , ,

    Inferred, the deposit is open for resource expansion and is potentiallyamenable to low cost open pit mine development. A 12,000m Diamond

    drilling program underway

    Management team - in place with a proven track record of advancingundervalued gold projects and maximizing shareholder value

    19

  • 8/6/2019 Edgewater Exploration (EDW) - Corporate Presentation

    20/20

    Acquiring and AdvancingAcquiring and Advancing

    Contact: Ryan King, Vice-President

    Contact: Ryan King, Vice-PresidentPhone: 604 628 1012

    Email: [email protected]: www.edge-water.com

    Phone: 604 628 1012Email: [email protected]

    Website: www.edge-water.com

    TSX-V: EDWTSX-V: EDW