Economic Stimulus Information Meeting Project Information Overview March 18, 2009 W. H. Stuart...

33
Economic Stimulus Information Meeting Project Information Overview March 18, 2009 W. H. Stuart Center

Transcript of Economic Stimulus Information Meeting Project Information Overview March 18, 2009 W. H. Stuart...

Page 1: Economic Stimulus Information Meeting Project Information Overview March 18, 2009 W. H. Stuart Center.

Economic Stimulus Information Meeting

Project Information Overview

March 18, 2009W. H. Stuart Center

Page 2: Economic Stimulus Information Meeting Project Information Overview March 18, 2009 W. H. Stuart Center.

Presentation Agenda• Project Categories• Contract Types• Project Overviews

– Capacity– Resurfacing– Bridge– Operational– Enhancement

• Sidewalk• Trail• Landscaping

• CEI

Page 3: Economic Stimulus Information Meeting Project Information Overview March 18, 2009 W. H. Stuart Center.

Project Categories• State Priorities

• Local Priorities

• Enhancements

• Transit

• Aviation

Page 4: Economic Stimulus Information Meeting Project Information Overview March 18, 2009 W. H. Stuart Center.

Project Categories• State Priorities

– Smaller number, larger cost, capacity

• Local Priorities

• Enhancements

• Transit

• Aviation

Page 5: Economic Stimulus Information Meeting Project Information Overview March 18, 2009 W. H. Stuart Center.

Project Categories• State Priorities

• Local Priorities– Larger number, districtwide, different types

• Enhancements

• Transit

• Aviation

Page 6: Economic Stimulus Information Meeting Project Information Overview March 18, 2009 W. H. Stuart Center.

Project Categories• State Priorities

• Local Priorities

• Enhancements– Local roadways, smaller amounts, primarily sidewalks

• Transit

• Aviation

Page 7: Economic Stimulus Information Meeting Project Information Overview March 18, 2009 W. H. Stuart Center.

Project Categories• State Priorities

• Local Priorities

• Enhancements

• Transit– Mostly bus and other vehicle purchases

• Aviation

Page 8: Economic Stimulus Information Meeting Project Information Overview March 18, 2009 W. H. Stuart Center.

Project Categories• State Priorities

• Local Priorities

• Enhancements

• Transit

• Aviation– Grants directly through FAA to airports

Page 9: Economic Stimulus Information Meeting Project Information Overview March 18, 2009 W. H. Stuart Center.

Contract Types

• Local Agency Program Projects

• State Produced– Design/Build– Construction– CEI

Page 10: Economic Stimulus Information Meeting Project Information Overview March 18, 2009 W. H. Stuart Center.

Example Projects• More detailed project descriptions on disc

• Consist primarily:– Capacity– Resurfacing– Bridge– Operational– Enhancement

Page 11: Economic Stimulus Information Meeting Project Information Overview March 18, 2009 W. H. Stuart Center.

Example Capacity Projects• Projects likely

let Design/Build• Most are in final

stages of Design• May be required

to obtain permits

• Construction must be complete within 3 years SR 559 in Aurburndale

Page 12: Economic Stimulus Information Meeting Project Information Overview March 18, 2009 W. H. Stuart Center.

Example Capacity Projects• Projects likely

let Design/Build• Most are in final

stages of Design• May be required

to obtain permits

• Construction must be complete within 3 years US 301 in Sarasota County

Page 13: Economic Stimulus Information Meeting Project Information Overview March 18, 2009 W. H. Stuart Center.

Example Capacity Projects• Projects can be

conventionally let as a construction bid

• Likely have 5-10 capacity projects districtwide

• Cost range from $12 M to $60 M

SR 739 in Lee County

Page 14: Economic Stimulus Information Meeting Project Information Overview March 18, 2009 W. H. Stuart Center.

Example Resurfacing Projects• Most will be let

as a Design/Build

• Construction must be complete within 3 years

• A few will have distance defined by bid CR 832 from SR 29 East

Page 15: Economic Stimulus Information Meeting Project Information Overview March 18, 2009 W. H. Stuart Center.

Example Resurfacing Projects• Most will be let

as a Design/Build

• Construction must be complete within 3 years

• Others have defined limits

CR 17 from Poinsettia St to W Interlake

Page 16: Economic Stimulus Information Meeting Project Information Overview March 18, 2009 W. H. Stuart Center.

Example Resurfacing Projects• Most will be let

as a Design/Build

• Construction must be complete within 3 years

• Scopes will define curb and gutter, shoulders,or edge of pavement

10th St from 8th Ave to 14th Ave

Page 17: Economic Stimulus Information Meeting Project Information Overview March 18, 2009 W. H. Stuart Center.

Example Resurfacing Projects• Most will be let

as a Design/Build

• Projects can be several miles or couple hundred feet

• Between 15-20 resurfacing projects expected

Home Ave Resurfacing

Page 18: Economic Stimulus Information Meeting Project Information Overview March 18, 2009 W. H. Stuart Center.

Example Bridge Projects

• Most will be let as conventional, some design build

• Projects may be culvert replacement/ improvement

9th Ave W bridge replacement at Wares Creek

Page 19: Economic Stimulus Information Meeting Project Information Overview March 18, 2009 W. H. Stuart Center.

Example Bridge Projects

• Most will be let as conventional, some design build

• Projects may be culvert replacement/ improvement

SE 43rd Ave bridge replacement

Page 20: Economic Stimulus Information Meeting Project Information Overview March 18, 2009 W. H. Stuart Center.

Example Bridge Projects

• Most will be let as conventional, some design build

• Projects may be culvert replacement/ improvement

Cape Haze Bridge Culvert Replacement

Page 21: Economic Stimulus Information Meeting Project Information Overview March 18, 2009 W. H. Stuart Center.

Example Bridge Projects

• Most will be let as conventional, some design build

• Projects may be culvert replacement/ improvement

• Between 5-7 bridge jobs

Jolley Bridge Replacement

Page 22: Economic Stimulus Information Meeting Project Information Overview March 18, 2009 W. H. Stuart Center.

Example Operational Projects• Most will be let

as conventional, some design build

• Consist of intersection improvements, turn lanes, resurfacing, mast arms,

SR 776 at Coliseums Blvd

Page 23: Economic Stimulus Information Meeting Project Information Overview March 18, 2009 W. H. Stuart Center.

Example Operational Projects• Most will be let

as conventional, some design build

• Consist of intersection improvements, turn lanes, resurfacing, mast arms,

US 41 at Midway Blvd

Page 24: Economic Stimulus Information Meeting Project Information Overview March 18, 2009 W. H. Stuart Center.

Example Operational Projects• Most will be let

as conventional, some design build

• Consist of intersection improvements, turn lanes, resurfacing, mast arms,

Murdock Circle add turn lanes

Page 25: Economic Stimulus Information Meeting Project Information Overview March 18, 2009 W. H. Stuart Center.

Example Operational Projects• Most will be let

as conventional, some design build

• Consist of intersection improvements, turn lanes, resurfacing, mast arms,

East Bay Dr./Gulf Dr. Signal upgrade

Page 26: Economic Stimulus Information Meeting Project Information Overview March 18, 2009 W. H. Stuart Center.

Example Operational Projects• Most will be let

as conventional, some design build

• Consist of intersection improvements, turn lanes, resurfacing, mast arms,

Siesta Drive Drainage Improvements

Page 27: Economic Stimulus Information Meeting Project Information Overview March 18, 2009 W. H. Stuart Center.

Example Operational Projects• Most will be let as

conventional, some design build

• ITS Improvements also possible

• Between 15-20 projects districtwide

Manatee County Phase 2 ATMS System

Page 28: Economic Stimulus Information Meeting Project Information Overview March 18, 2009 W. H. Stuart Center.

Example Enhancement Projects• Most will be let

as design build

• Consist of sidewalk, bikepath/trails, or landscaping

City of Bradenton on 23rd Ave between 26th St. and 27th St. W

Page 29: Economic Stimulus Information Meeting Project Information Overview March 18, 2009 W. H. Stuart Center.

Example Enhancement Projects• Most will be let

as design build

• Consist of sidewalk, bikepath/trails, or landscaping

Gulf Blvd from Palm to Magnolia

Page 30: Economic Stimulus Information Meeting Project Information Overview March 18, 2009 W. H. Stuart Center.

Example Enhancement Projects• Most will be let

as design build

• Consist of sidewalk, bikepath/trails, or landscaping

Bald Eagle Pathway Shared Use Path

Page 31: Economic Stimulus Information Meeting Project Information Overview March 18, 2009 W. H. Stuart Center.

Example Enhancement Projects• Most will be let

as design build

• Consist of sidewalk, bikepath/trails, or landscaping

• Between 15-25 projects

Ft. Fraser Trail in Polk County

Page 32: Economic Stimulus Information Meeting Project Information Overview March 18, 2009 W. H. Stuart Center.

Example Project Summary• Mix of Design/Build and Conventionally Let

construction projects

• Wide range of projects available from bridge, resurfacing, sidewalks, landscaping, minor intersection improvements, drainage, and capacity

• Spread over all the district and most municipalities

• Project costs also range from several thousand to multi million

Page 33: Economic Stimulus Information Meeting Project Information Overview March 18, 2009 W. H. Stuart Center.

CEI• Consultant CEI’s will be used for all Stimulus Projects

• Contracts will be competitively selected using Expanded Letter of Response

• Number of CEI contracts will be based on number of construction projects

• Email notification will go to all firms on our CEI Contact List when contract groupings are confirmed

• If you have not met our Operation Center Staff, please schedule time with them before project advertisements