Econnect Ltd Independent specialists in the grid integration of renewable energy...

21
Econnect Ltd Independent specialists in the grid integration of renewable energy...

Transcript of Econnect Ltd Independent specialists in the grid integration of renewable energy...

Page 1: Econnect Ltd Independent specialists in the grid integration of renewable energy...

Econnect LtdEconnect Ltd

Independent specialists in the grid integration of renewable energy...

Page 2: Econnect Ltd Independent specialists in the grid integration of renewable energy...

Grid Connections: Lessons from Round One

Grid Connections: Lessons from Round One

Paul Glendinning

Operations Manager

Page 3: Econnect Ltd Independent specialists in the grid integration of renewable energy...

Econnect Offshore Credentials

Econnect Offshore Credentials

• Designed 7 offshore wind farms

• Research for the DTI – Medium Voltage Systems for Offshore Windfarms

• Electrical Construction Management at North Hoyle

Page 4: Econnect Ltd Independent specialists in the grid integration of renewable energy...

IntroductionIntroduction

• Onshore work for Offshore Projects

• Differences ?

• What are the issues ?

• Solutions

• Conclusions

Page 5: Econnect Ltd Independent specialists in the grid integration of renewable energy...

Onshore work for Offshore Projects

Onshore work for Offshore Projects

• Substation connections

• Either at 132kV or 33kV for the 30 to 60 turbine wind farms

• Cable connections

• Onshore Cable interconnection facility

Page 6: Econnect Ltd Independent specialists in the grid integration of renewable energy...

North Hoyle ProgressNorth Hoyle Progress

• Onshore works

• Offshore / Onshore Interface

Page 7: Econnect Ltd Independent specialists in the grid integration of renewable energy...

North Hoyle ProgressNorth Hoyle Progress

• Onshore works

• Cable Installation through the streets

Page 8: Econnect Ltd Independent specialists in the grid integration of renewable energy...

North Hoyle ProgressNorth Hoyle Progress

• Onshore Works

• Careful management in public areas

Page 9: Econnect Ltd Independent specialists in the grid integration of renewable energy...

North Hoyle ProgressNorth Hoyle Progress

• Onshore works

• Protection of cables in road

Page 10: Econnect Ltd Independent specialists in the grid integration of renewable energy...

North Hoyle ProgressNorth Hoyle Progress

• Onshore works

• Careful route selection around a playing field

Page 11: Econnect Ltd Independent specialists in the grid integration of renewable energy...

Differences ?Differences ?

• Electrical connection arrangements

• Radial versus Interconnected systems

• Cost of repairs – mobilisation of vessels

• Shore link cable environment

Page 12: Econnect Ltd Independent specialists in the grid integration of renewable energy...

Differences ?Differences ?

• Repair and fault finding Crew ?

Page 13: Econnect Ltd Independent specialists in the grid integration of renewable energy...

What are the issues ?What are the issues ?

• Switching, protection and Isolation

• Subsea cable fault repair

• Failure minimisation – maximise revenue

• Electrical losses

Page 14: Econnect Ltd Independent specialists in the grid integration of renewable energy...

Solutions - Switching, Protection and IsolationSolutions - Switching,

Protection and Isolation

• Increasing degrees of automation required

• Use of motorised ring switches

• Use of Fault Passage Indicators

• Reduce visits to farm

• Avoid personnel transfer to turbines

Page 15: Econnect Ltd Independent specialists in the grid integration of renewable energy...

Solutions - Switching, Protection and IsolationSolutions - Switching,

Protection and Isolation

Wind Turbine 1 Wind Turbine 2 Wind Turbine 3 Wind Turbine 4 Wind Turbine 5

Fault Current Fault Current

Cable Fault

FPI FPI FPI FPI

Grid Connection

Page 16: Econnect Ltd Independent specialists in the grid integration of renewable energy...

Solutions - Subsea cable fault repair

Solutions - Subsea cable fault repair

• Use of Time Domain Reflectometers or search coil

• Cable on shore link may be tens of meters away from original burial position

• Burial methods require careful analysis

Page 17: Econnect Ltd Independent specialists in the grid integration of renewable energy...

Solutions - Failure minimisation

Solutions - Failure minimisation

• Cost of single cable fault in 60 MW wind farm is £650K

• Use of standby power from Offshore diesel equipment

• Use of interconnected electrical systems

Page 18: Econnect Ltd Independent specialists in the grid integration of renewable energy...

Solutions - Failure minimisation

Solutions - Failure minimisation

• Layout at North Hoyle

Page 19: Econnect Ltd Independent specialists in the grid integration of renewable energy...

Solutions - environmentSolutions - environment

• Equipment utilised must have a marinised specification

• Shore link cable requires careful analysis of burial depth and protection requirements – Geotechnical data required.

Page 20: Econnect Ltd Independent specialists in the grid integration of renewable energy...

ConclusionsConclusions

• Onshore electrical arrangements – not valid

• The protection of the shore link cable is critical compared to inter-link cables

• Equipment utilised must be marinised• Invest in cable specification and

installation protection• Invest in Electrical topology

Page 21: Econnect Ltd Independent specialists in the grid integration of renewable energy...

Econnect LtdEconnect Ltd

Independent specialists in the grid integration of renewable energy...