ECM: - Maryland Energy Administration · Web viewCooling Tower Replacement: Replace old cooling...

10
Appendix B - List of Potential Energy Conservation Measures (ECMs) Use this list to help you target energy conservation measures that you will assist you in reaching your energy reduction goals. Energy Saving Opportunities Checklist Behavioral Modification – Required Y N Already Completed See Agency Energy Conservation Checklist. This checklist must be completed by Energy Management Teams for each building. Energy Management team members should be included on Page 1 of the State Agency Energy Plan. Please describe your efforts, activities, and/or programs to reduce your building portfolio’s energy consumption under #7 - Projects of the State Agency Energy Plan. Recommissioning & Building Tune-up (Assistance from Facility Managers recommended) Y N Already Completed See Facility Operations Energy Conservation Checklist. This checklist must be completed by Facility Managers for each building. Training of facility operations personnel in the efficient operation of mechanical equipment and systems. Please provide a list of facility managers to the MEA Program Manager to coordinate training opportunities. Reduce run time of major HVAC equipment: Schedule through Energy Management Control Systems (EMCS) the proper equipment operating parameters for occupied periods. Controllers, through a PID algorithm, can optimize the start time for major HVAC equipment to allow for the building to be within the comfort parameters by the desired occupied time. Reduce Outside Air During Unoccupied Mode: Outside air dampers will be programmed closed during all hours unoccupied in the building schedule. Demand Controlled Ventilation: Provide CO2 sensors as part of the EMCS to monitor the level of CO2 in relation to the outdoor level of CO2. This provides as accurate measurement of occupancy in the Zone and the outdoor air dampers can be modulated to maintain adequate ventilation air. Enthalpy Economizer: Actively monitor outdoor air dry bulb and April 2008 ***Required*** ***Required***

Transcript of ECM: - Maryland Energy Administration · Web viewCooling Tower Replacement: Replace old cooling...

ECM:

Appendix B - List of Potential Energy Conservation Measures (ECMs)

Use this list to help you target energy conservation measures that you will assist you in reaching your energy reduction goals.

Energy Saving Opportunities Checklist

Behavioral Modification – Required

Y

N

Already

Completed

See Agency Energy Conservation Checklist. This checklist must be completed by Energy Management Teams for each building. Energy Management team members should be included on Page 1 of the State Agency Energy Plan. Please describe your efforts, activities, and/or programs to reduce your building portfolio’s energy consumption under #7 - Projects of the State Agency Energy Plan.

Recommissioning & Building Tune-up

(Assistance from Facility Managers recommended)

Y

N

Already

Completed

See Facility Operations Energy Conservation Checklist. This checklist must be completed by Facility Managers for each building.

Training of facility operations personnel in the efficient operation of mechanical equipment and systems. Please provide a list of facility managers to the MEA Program Manager to coordinate training opportunities.

Reduce run time of major HVAC equipment: Schedule through Energy Management Control Systems (EMCS) the proper equipment operating parameters for occupied periods. Controllers, through a PID algorithm, can optimize the start time for major HVAC equipment to allow for the building to be within the comfort parameters by the desired occupied time.

Reduce Outside Air During Unoccupied Mode: Outside air dampers will be programmed closed during all hours unoccupied in the building schedule.

Demand Controlled Ventilation: Provide CO2 sensors as part of the EMCS to monitor the level of CO2 in relation to the outdoor level of CO2. This provides as accurate measurement of occupancy in the Zone and the outdoor air dampers can be modulated to maintain adequate ventilation air.

Enthalpy Economizer: Actively monitor outdoor air dry bulb and wet bulb temperatures and compare to return-air dry bulb and wet bulb temperatures to draw the air with the least enthalpy.

Condenser Water Reset: After investigation with the chiller manufacturer to determine if the water-cooled chiller can operate with low condenser water temperature, this ECM will lower the entering condenser water temperature to allow the chiller to operate more efficiently.

Chilled Water Reset: Based on the outdoor temperature, raise the chilled water temperature to more closely match the load on the building.

Hot Water Reset: Based on the outdoor temperature, lower the HW supply temperature to more closely match the load in the building.

Supply Air Temperature Reset: Based on the outdoor temperature, raise the air handler supply air temperature to prevent over cooling and reduce the cooling coil load.

Reset Hot/Cold Deck Temperatures: Based on outdoor temperatures of design conditions, the hot and /or cold deck temperatures can be lowered and raised, respectively to more closely match the zone loads.

Eliminate Simultaneous Heating and Cooling: Through the control system, provide lockout measures for the heating and cooling systems to prevent them from operating together.

Variable-Air –Volume Tracking: Provide calibrated damper positioning feedback for control of VAV systems.

HVAC Re-commissioning: Replace, repair or modify HVAC components in order to bring the system performance to its design intent. Opportunities are often identified as part of the evaluation or installation of another ECM.

Coil Cleaning: Inspecting all air-handler coils and removing any scale on the coils.

Chiller Sequencing: In plants where there are multiple chillers, modify the sequence of operation to optimize the performance while minimizing energy costs.

Optimize Chilled Water and Condenser Water Temperatures: Raise the leaving chilled water temperature and low entering condenser water temperature to optimize the performance of the plant while meeting the load of the building.

Proper Pump Sizing: Provide new pumps or trim impellers to properly size the pumps for the flow requirements.

Boiler Combustion Efficiency Improvements: Properly tuned burners will yield energy savings and optimize combustion in many boiler applications. Replacing linkage systems with new, electronically controlled systems will improve and help main combustion efficiency in fuel switching applications.

Steam Trap Maintenance: Implement a regular steam trap inspection and maintenance program.

Water-side Economizer: A plate and frame heat exchanger is installed to utilize condenser water for cooling in low ambient temperatures. The cooling tower can sufficiently cool water to be used for cooling through a heat exchanger so mechanical cooling is not required.

Pipe Insulation: Insulate all pipe runs, valves and fittings to reduce heat loss/gain in hot water, chilled water, and steam distribution systems

Other ECMs: __________________________________________________________________

Lighting

Y

N

Already

Completed

New HID (Metal Halide) Technology: Reduced energy metal halide lamps and ballasts; Pulse-start metal halide; Electronic dimmable metal halide.

New Fluorescent Technology: Install new T8, T5, compact fluorescents (CFLs), specular aluminum reflectors, and electronic ballasts

Lighting Reconfiguration: Make Changes Physical Layout of Lighting System.

Other Lighting Technologies: Install Induction Lighting, LEDs, Fiber Optics, Dimmable Fluorescents and HID.

Traffic Lights/Signals: Replace traffic lights and signals with new energy efficient LED lights and signals.

Daylighting: Install Windows, Skylights, De-lamping, Day lighting Controls for Lights/Blinds.

Daylight harvesting with dimming ballasts: Provide dimming ballasts at the building perimeter with ambient light sensors to automatically dim the lights when there is adequate lighting from another source.

Skylights: Install skylights for day lighting.

Other ECMs: __________________________________________________________________

HVAC – Heating and Cooling Equipment

Y

N

Already

Completed

Packaged Equipment Replacement with High Efficiency Units: Replace older direct expansion (DX) package equipment with higher efficiency new units.

Convert CAV Air Handling System to VAV: Install variable speed fan control and pressure sensor in supply duct system. Calculate zone loads and properly size VAV terminal devices to satisfy zone loads and ventilation air

Convert Dual Duct Air Handling System to VAV: Provide normally closed damper operation for the hot duct to use for warm-up mode and mixing during periods of low cooling requirements. Install Variable speed fan control and pressure senor in cold duct system. Calculate zone loads and properly size VAV terminal devices to satisfy zone loads and ventilation air requirements.

Reduce Outside Air through Increased Filtration: Provide high efficiency filters and or gaseous filters to allow more air to be re-circulated rather than dilution ventilation.

Convert Multi-Zone Air Handling System to VAV: Provide normally closed damper operation for the hot duct to use for warm-up mode and mixing during periods of low cooling requirements. Install Variable speed fan control and pressure senor in cold duct system. Calculate zone loads and properly size VAV terminal devices to satisfy zone loads and ventilation air requirements.

Re-zone HVAC system: Reconfigure the ductwork to new zone configuration.

Chiller Replacement: Replace an inefficient chiller with a more efficient chiller.

Cooling Tower Replacement: Replace old cooling towers with new inducted draft cooling towers.

Retrofit Chiller for Environmentally Friendly Refrigerant: Chillers that currently use R-11 and R-12 refrigerant can be retrofitted to operate using R123 or R-134a refrigerants.

Re-size Chiller Plant: Through energy awareness, other energy conservation measures, or building renovations, the existing chiller plant may be oversized. Load calculations will be performed to validate sizing and chillers can be modified or replaced to reduce electricity demand.

Provide Smaller Chiller for Off-peak Loads: Some buildings have areas that require cooling when the rest of the building does not. If these off peak loads are low enough, the plant may be operating at greatly reduced efficiency. A smaller chiller, with greater part load efficiency, can be installed to satisfy the low load conditions and allow the larger equipment to be shut down.

Provide Smaller Chiller for Off-peak Loads: Some buildings have areas that require cooling when the rest of the building does not. If these off peak loads are low enough, the plant may be operating at greatly reduced efficiency. A smaller chiller, with greater part load efficiency, can be installed to satisfy the low load conditions and allow the larger equipment to be shut down.

Provide Other Sources of Cooling to Shut Down Chiller Plant: Some buildings have areas that require cooling when the rest of the building does not. Separate cooling systems can be installed to allow the large central plant to be shut down.

De-centralization of Inefficient Steam Systems: Aging steam and condensate lines in a central steam plant may yield an opportunity to and improve efficiency at the end user for space heating, domestic hot water production and even process use through the elimination of an inefficient distribution system.

Boiler Replacement: New boilers offer improved efficiencies and better controls to optimize operations in steam and hot water systems.

Boiler Stack Economizers: Extract heat from the products of combustion to pre-heat make-up, return water, or condensate to the system.

Baffle Inserts: Utilize baffle inserts to slow down the flow of the hot gases through the boiler. The longer residence time permits the extraction of more heat to the water.

Blow-down Heat Recovery: Extract heat from the boiler blow-down to pre-heat boiler feed-water.

Install a Summer Boiler: Add a smaller boiler to serve summer time loads.

Natural Gas Rate Switch: Modifications of the burners to use oil in addition to natural gas, which allows a switch to a lower cost interruptible rate.

Other ECMs: __________________________________________________________________

Mechanical/Motors/Fans

Y

N

Already

Completed

Energy-Efficient Motors: Replace old, inefficient motors with more energy efficient motors.

Motor Variable Speed Drives: Where applicable, install variable frequency drives to control motor speed.

Variable Speed Chiller Control: Add a variable frequency drive to the centrifugal compressor motor to modulate the capacity and disable the inlet guide vanes.

Variable Speed Cooling Tower Fans: Provide variable frequency drives for the cooling tower fans. Control based on the desired leaving water temperature from the cooling tower.

Compressed Air System Optimization: Replace compressors, add receivers to reduce cycling, and repair leaks to increase overall system efficiency.

Air–side Economizer: Provide outside air intake and damper with controls to bring in up to 100% outside air for cooling when the ambient temperature and humidity is adequate for cooling.

Variable Flow Pumping (CW or HW): Two-way valves replace 3-way valves at the air handler chilled and/or hot water coils. The chilled and/or hot water pumps are then provided with Variable Frequency Drives (VFDs) to modulate the water flow based on a pressure sensor in the piping.

Low Leakage Dampers: Retrofit outside air, return air and relief air dampers with low leakage dampers to minimize blow-by and more precisely control the amount of outdoor air introduced.

Other ECMs: _________________________________________________________________

Building Envelope

Y

N

Already

Completed

Window Replacement: Replace single pane inefficient windows with new double or triple glazed thermally insulated frame windows. Potentially reduce the total window area through the use of insulated panels.

Window External Shading: Install awnings to shade the window on the South and sometimes the East and/or West sides of the building to reduce the cooling requirements due to solar gain.

Window Internal Coverings: Install polystyrene insulated panels on the interior window surfaces to reduce total window exposure without affecting the exterior appearance of the building.

Roof Insulation: Provide rigid roof insulation as part of a re-roofing capital project.

Window Tinting: Install internal reflective window tinting film to reduce the solar gain through the glass.

Install Vestibule: Install an entrance vestibule to create an “air-lock” and prevent excess infiltration of outdoor air.

Other ECMs: __________________________________________________________________

Load Reduction

Y

N

Already

Completed

Vending Misers: Vending and snack Misers consist of an occupancy sensor and a plug in devices that operate a vending machine based on occupancy in the general vicinity of the machine.

Energy Star Equipment: Provide more energy efficient equipment such as copiers, fax machines, and refrigerators.

Computer Network Management Software: Provide software that offers network level control over the PC power management settings.

Front-load Clothes Washers: Replace top loading clothes washers with front loading type.

Energy Efficient Transformers: Replace old electric transformers with new dry type energy efficient transformers.

Replace Kitchen equipment: Replace inefficient cooking and dishwashing equipment with more efficient equipment.

Other ECMs: __________________________________________________________________

Renewable Energy/Demand Response

Y

N

Already

Completed

Cogeneration: Install a combustion turbine or internal combustion engine that uses the exhaust heat to produce steam or hot water. This is but one example of a cogeneration ECM as this ECM can take a variety of forms.

Emergency Generation and Peak Shaving: Provide natural gas or diesel-fueled emergency generators and interconnect with automatic transfer switching to run a dedicated load for peak shaving.

Back-pressure Turbine: Install a back pressure turbine to replace a steam PRV station to produce electricity.

Sub-metering: Provide electric meters at individual buildings.

Solar Domestic Water or Pool Heating: Install solar water heating panels on the roof or other suitable area and pipe into the domestic or pool heating system.

Fuel Cell: Install a fuel cell system to generate electricity and heat with the only reaction product of water.

Wind Energy: Install a wind turbine to generate electricity without producing any harmful emissions.

Photovoltaic Array: Install Photovoltaic (PV) solar electric panels to produce electricity without generating any greenhouse emissions.

Bio Energy Harvesting: Landfill gas is harvested and piped to fire boilers directly or to run an engine driven electric generator.

Ground-source (Geothermal) Heat Pumps: Install geothermal water source heat pump units and either a closed ground loop heat exchanger or open loop wells.

Other ECMs: __________________________________________________________________

Water Conservation

Y

N

Already

Completed

New Toilets and Flush Valves: Standard toilets can have flush rating of up to 7 gallons per flush. Installing new china and new flush valves capable of low flow can reduce water consumption significantly. New low flow components can flush toilets with as little as 1.5 gallons per flush. Although it is typically advocated to perform a complete china and flush valve upgrade, there may be some cases where a new valve is all that is needed.

New Urinals and/or Flush Valves: Replace existing urinals with new low flow components.

Faucet Aerator: Install aerators to reduce flow through sink faucets.

New faucets – Manual or Automatic: Install new faucets to reduce water flow in sinks.

Low-flow Shower Heads: Install low flow shower heads.

Sensor Flush Valves: Install automatic flush valves on urinals and toilets.

Eliminate Domestic Water for process Cooling: Covert water cooled systems to air cooled systems.

Cooling Tower Filtration: Provide a cooling tower water filter to reduce blow down.

Sub-meter Cooling Tower Makeup Water or Irrigation Water: Provide a sub-meter for the cooling tower make-up water or irrigation water to obtain a sewage credit from the waste water treatment authority.

Well Water makeup for cooling towers and boilers: Drill wells to supply water for cooling tower make-up or boiler make-up water.

Waterless Urinals: Install waterless urinals in place of conventional urinals that use flush valve technology.

Rainwater collection: Provide a rainwater collection and storage system.

Other ECMs: __________________________________________________________________

***Required***

***Required***

April 2008

_1272278049.unknown
_1272280972.unknown
_1272281458.unknown
_1272281594.unknown
_1272281855.unknown
_1272281939.unknown
_1272282056.unknown
_1272282071.unknown
_1272282089.unknown
_1272282103.unknown
_1272282060.unknown
_1272282063.unknown
_1272282043.unknown
_1272282047.unknown
_1272282052.unknown
_1272281944.unknown
_1272281950.unknown
_1272281885.unknown
_1272281906.unknown
_1272281911.unknown
_1272281915.unknown
_1272281889.unknown
_1272281893.unknown
_1272281870.unknown
_1272281873.unknown
_1272281877.unknown
_1272281858.unknown
_1272281862.unknown
_1272281817.unknown
_1272281832.unknown
_1272281836.unknown
_1272281840.unknown
_1272281822.unknown
_1272281827.unknown
_1272281781.unknown
_1272281804.unknown
_1272281810.unknown
_1272281813.unknown
_1272281790.unknown
_1272281797.unknown
_1272281761.unknown
_1272281766.unknown
_1272281757.unknown
_1272281511.unknown
_1272281550.unknown
_1272281573.unknown
_1272281577.unknown
_1272281556.unknown
_1272281561.unknown
_1272281528.unknown
_1272281533.unknown
_1272281537.unknown
_1272281516.unknown
_1272281520.unknown
_1272281485.unknown
_1272281498.unknown
_1272281501.unknown
_1272281505.unknown
_1272281489.unknown
_1272281493.unknown
_1272281471.unknown
_1272281477.unknown
_1272281480.unknown
_1272281463.unknown
_1272281466.unknown
_1272281145.unknown
_1272281227.unknown
_1272281243.unknown
_1272281392.unknown
_1272281419.unknown
_1272281425.unknown
_1272281451.unknown
_1272281396.unknown
_1272281400.unknown
_1272281380.unknown
_1272281383.unknown
_1272281377.unknown
_1272281238.unknown
_1272281241.unknown
_1272281231.unknown
_1272281234.unknown
_1272281203.unknown
_1272281217.unknown
_1272281220.unknown
_1272281223.unknown
_1272281207.unknown
_1272281210.unknown
_1272281179.unknown
_1272281190.unknown
_1272281194.unknown
_1272281197.unknown
_1272281184.unknown
_1272281187.unknown
_1272281170.unknown
_1272281174.unknown
_1272281167.unknown
_1272281093.unknown
_1272281117.unknown
_1272281129.unknown
_1272281141.unknown
_1272281120.unknown
_1272281123.unknown
_1272281107.unknown
_1272281110.unknown
_1272281113.unknown
_1272281098.unknown
_1272281102.unknown
_1272280997.unknown
_1272281069.unknown
_1272281082.unknown
_1272281086.unknown
_1272281089.unknown
_1272281073.unknown
_1272281077.unknown
_1272281060.unknown
_1272281063.unknown
_1272281057.unknown
_1272280991.unknown
_1272280994.unknown
_1272280981.unknown
_1272280986.unknown
_1272278160.unknown
_1272278862.unknown
_1272280939.unknown
_1272280950.unknown
_1272280953.unknown
_1272280957.unknown
_1272280942.unknown
_1272280946.unknown
_1272280924.unknown
_1272280929.unknown
_1272280934.unknown
_1272278866.unknown
_1272278869.unknown
_1272278176.unknown
_1272278839.unknown
_1272278852.unknown
_1272278856.unknown
_1272278859.unknown
_1272278845.unknown
_1272278848.unknown
_1272278830.unknown
_1272278835.unknown
_1272278827.unknown
_1272278169.unknown
_1272278172.unknown
_1272278163.unknown
_1272278166.unknown
_1272278118.unknown
_1272278140.unknown
_1272278151.unknown
_1272278154.unknown
_1272278157.unknown
_1272278144.unknown
_1272278147.unknown
_1272278129.unknown
_1272278132.unknown
_1272278136.unknown
_1272278122.unknown
_1272278125.unknown
_1272278093.unknown
_1272278106.unknown
_1272278111.unknown
_1272278114.unknown
_1272278097.unknown
_1272278101.unknown
_1272278065.unknown
_1272278069.unknown
_1272278073.unknown
_1272278055.unknown
_1272278059.unknown
_1272277756.unknown
_1272277875.unknown
_1272277997.unknown
_1272278018.unknown
_1272278032.unknown
_1272278036.unknown
_1272278040.unknown
_1272278022.unknown
_1272278026.unknown
_1272278008.unknown
_1272278011.unknown
_1272278014.unknown
_1272278000.unknown
_1272278004.unknown
_1272277924.unknown
_1272277955.unknown
_1272277988.unknown
_1272277991.unknown
_1272277994.unknown
_1272277979.unknown
_1272277984.unknown
_1272277939.unknown
_1272277942.unknown
_1272277946.unknown
_1272277929.unknown
_1272277933.unknown
_1272277902.unknown
_1272277912.unknown
_1272277916.unknown
_1272277919.unknown
_1272277906.unknown
_1272277909.unknown
_1272277894.unknown
_1272277897.unknown
_1272277891.unknown
_1272277813.unknown
_1272277858.unknown
_1272277869.unknown
_1272277872.unknown
_1272277862.unknown
_1272277866.unknown
_1272277846.unknown
_1272277850.unknown
_1272277853.unknown
_1272277825.unknown
_1272277841.unknown
_1272277778.unknown
_1272277793.unknown
_1272277798.unknown
_1272277805.unknown
_1272277781.unknown
_1272277784.unknown
_1272277767.unknown
_1272277770.unknown
_1272277774.unknown
_1272277759.unknown
_1272277762.unknown
_1272277607.unknown
_1272277679.unknown
_1272277704.unknown
_1272277711.unknown
_1272277747.unknown
_1272277751.unknown
_1272277744.unknown
_1272277707.unknown
_1272277691.unknown
_1272277694.unknown
_1272277698.unknown
_1272277683.unknown
_1272277686.unknown
_1272277640.unknown
_1272277661.unknown
_1272277665.unknown
_1272277673.unknown
_1272277644.unknown
_1272277653.unknown
_1272277627.unknown
_1272277631.unknown
_1272277635.unknown
_1272277613.unknown
_1272277618.unknown
_1272277408.unknown
_1272277523.unknown
_1272277569.unknown
_1272277581.unknown
_1272277597.unknown
_1272277602.unknown
_1272277572.unknown
_1272277575.unknown
_1272277538.unknown
_1272277548.unknown
_1272277553.unknown
_1272277530.unknown
_1272277534.unknown
_1272277490.unknown
_1272277512.unknown
_1272277516.unknown
_1272277519.unknown
_1272277504.unknown
_1272277508.unknown
_1272277445.unknown
_1272277448.unknown
_1272277453.unknown
_1272277412.unknown
_1272277416.unknown
_1272277262.unknown
_1272277328.unknown
_1272277381.unknown
_1272277387.unknown
_1272277401.unknown
_1272277332.unknown
_1272277343.unknown
_1272277315.unknown
_1272277319.unknown
_1272277323.unknown
_1272277267.unknown
_1272277270.unknown
_1272277205.unknown
_1272277241.unknown
_1272277245.unknown
_1272277250.unknown
_1272277210.unknown
_1272277213.unknown
_1272277198.unknown
_1272277201.unknown
_1272277185.unknown