Eclipse Cyclotron Users MeetingTechnology Development UpdateJames Hinderer, Siemens CCS R&D, July 31, 2014

Answers for life.

Page 2: Eclipse Cyclotron Users Meeting Technology Development Update

Unrestricted © Siemens AG 2014 All rights reserved.

2014-07-31Page 2 J. Hinderer / CCS R&D

Outline

Siemens Cyclotrons and Chemsitry SolutionsUpdate

Eclipse™ v3.0: Updated Radio-Frequency (RF)System*

What’s Next: Future Directions*

* The product/feature (mentioned herein) is not commercially available. Due to regulatory reasons its future availabilitycannot be guaranteed.

Page 3: Eclipse Cyclotron Users Meeting Technology Development Update

Unrestricted © Siemens AG 2014 All rights reserved.

2014-07-31Page 3 J. Hinderer / CCS R&D

Siemens Cyclotron and ChemistryDepartment Update

Recent Developments• Released single solution Chemistry synthesis

module–Explora One–in 2013

More Experts• Continue to build and develop a top-notch R&D

team–added a senior physicist and twoengineers to focus on accelerating developmentefforts

Proven Partnerships• Harness partnerships with cyclotron technical

experts and proven industry leaders

Install Base Growth• Continue to expand the installation footprint for

the Eclipse Cyclotron as well as upgradingexisting systems to enhance performance. (DV2was upgraded this year.)

Page 4: Eclipse Cyclotron Users Meeting Technology Development Update

Unrestricted © Siemens AG 2014 All rights reserved.

Page 4 2014-07-31 J. Hinderer / CCS R&D

Explora OneOne Integration. Infinite Possibilities.

system for18F PET imagingbiomarker production

One

Page 5: Eclipse Cyclotron Users Meeting Technology Development Update

Unrestricted © Siemens AG 2014 All rights reserved.

Page 5 2014-07-31 J. Hinderer / CCS R&D

Outline

Siemens Cyclotrons and Chemsitry SolutionsUpdate

Eclipse v3.0: Updated Radio-Frequency (RF)System*

What’s Next: Future Directions*

* The product/feature (mentioned herein) is not commercially available. Due to regulatory reasons its future availabilitycannot be guaranteed.

Page 6: Eclipse Cyclotron Users Meeting Technology Development Update

Unrestricted © Siemens AG 2014 All rights reserved.

2014-07-31Page 6 J. Hinderer / CCS R&D

Cyclotron v3.0 Radio-Frequency (RF) SystemIncrease power and simplify troubleshooting/setup

v3.0 RF Cabinet

IntermediatePowerAmplifier

Final PowerAmplifier

RF ControllerNew Firmware

§ More rapid resonance searching§ Faster recovery from crowbars§ Text error messages aids diagnostics§ Tracks operating hours of final amp

Combined Digital MeterDisplay

§ Eliminates noise seen on analog meters. More accurate, less likely to fail§ Flexible – get more information to aid troubleshooting

Pallet Amplifier § Increased power pallet amplifier (500 W to 1 kW) to increase reliabilityCombined Digital MeterDisplay

§ Eliminates noise seen on analog meters. More accurate, less likely to fail§ Flexible – get more information to aid troubleshooting

Higher Power § 800 W capacity gives more head room to drive final amp (improved reliability)

Eliminate matchingnetwork

§ Makes two tuning controls redundant hence simplifies setup / reduces service complexity (requires new matched50W final)

Indexed tuning § Easier tuning due to ability to record current setting and turn up/down in known increments

50W Final Input § Directly matches IPA input, eliminating need to tune IPA matching network, simplifying setup

Increased structuralstrength

§ Reduce failure rate of electrical components currently seen due to mechanical stress, e.g. failures of solder joints§ Reduce shipping damage by replacing fragile components such as Ultem standoffs

Increase output to 12kW

§ Increase from 10 to 12 kW§ Increased head room, hence less stress on system and fewer failures

High voltage powersupply § Increased output to support higher-output final amplifier

Breaker Panel PCB § Updated components to improve reliability

Input circuit breaker § Increased rating to reduce unnecessary trip events

The product/feature (mentioned herein) is not commercially available. Due to regulatory reasons, its future availabilitycannot be guaranteed.

Page 7: Eclipse Cyclotron Users Meeting Technology Development Update

Unrestricted © Siemens AG 2014 All rights reserved.

2014-07-31Page 7 J. Hinderer / CCS R&D

Cyclotron v3.0 RF SystemHigher power to handle increased Eclipse output

1. RF Controller• More rapid resonance searching and

faster recovery from crowbars• Digital displays eliminate need for analog

meter panelpower levels

2. Intermediate Power Amp (IPA)• Digital display with enhanced features to

aid in troubleshooting• 800 Watts of power provides more head

room to drive the power amp

3. Final Power Amp• Extended life high power tube• Easy access knobs for simple tuning• Direct 50-Ohm input from IPA removing

need for matching network

The product/feature (mentioned herein) is not commercially available. Due to regulatory reasons its future availability cannotbe guaranteed.

Page 8: Eclipse Cyclotron Users Meeting Technology Development Update

Unrestricted © Siemens AG 2014 All rights reserved.

2014-07-31Page 8 J. Hinderer / CCS R&D

Cyclotron v3.0 RF SystemNew higher rated v3.0 RF flexible cable

Key Features

• New RF cable rated at 15 kW (vs. 10 kW)

• Pre-assembled with connectors for easyinstallation

• Thin and flexible

• Maintains low temperature at full load

The product/feature (mentioned herein) is not commercially available. Due to regulatory reasons its future availability cannotbe guaranteed.

Page 9: Eclipse Cyclotron Users Meeting Technology Development Update

Unrestricted © Siemens AG 2014 All rights reserved.

2014-07-31Page 9 J. Hinderer / CCS R&D

Outline

Siemens Cyclotrons and Chemsitry SolutionsUpdate

Eclipse v3.0: Updated Radio-Frequency (RF)System*

What’s Next: Future Directions*

* The product/feature (mentioned herein) is not commercially available. Due to regulatory reasons its future availabilitycannot be guaranteed.

Page 10: Eclipse Cyclotron Users Meeting Technology Development Update

Unrestricted © Siemens AG 2014 All rights reserved.

2014-07-31Page 10 J. Hinderer / CCS R&D

Focus Areas of Development for Eclipse HP System

AcceleratorIon Source

RF System

Water Cooling

Power Distribution

Shields

Controls System

Targets

Focus areas of development in red

The product/feature (mentioned herein) is not commercially available. Due to regulatory reasons its future availability cannotbe guaranteed.

Page 11: Eclipse Cyclotron Users Meeting Technology Development Update

Unrestricted © Siemens AG 2014 All rights reserved.

2014-07-31Page 11 J. Hinderer / CCS R&D

Eclipse Technology Focus Areas

The critical areas being addressed to increase the performance and sustainablity of the Eclipse:

• Improved beam dynamics and injector output: Reduce the beam losses from the source into thefield of acceleration and improve beam dynamics

• Higher power and modern RF system: 12kW v3.0 RF system to be released

• Improved conditions for beam acceleration: Higher vacuum (10^-8 Torr) and improved heat transferfrom the dees

• 18F target saturation yield: Opportunities to increase saturation yield in process of being optimized

The product/feature (mentioned herein) is not commercially available. Due to regulatory reasons its future availability cannotbe guaranteed.

Page 12: Eclipse Cyclotron Users Meeting Technology Development Update

Unrestricted © Siemens AG 2014 All rights reserved.

2014-07-31Page 12 J. Hinderer / CCS R&D

In Development: Higher Output Cyclotron

High AccuracyMagnet Mapping

Improved Cooling onHP Target Changer

Improved Control of theMagnet Power Supply

Improving BeamDynamics

• Build on the successful Eclipse platform

• Increase output

• Maintain reliability

• Maintain upgradeability

• Maintain convenience

The product/feature (mentioned herein) is not commercially available. Due to regulatory reasons its future availability cannotbe guaranteed.

Page 13: Eclipse Cyclotron Users Meeting Technology Development Update

Unrestricted © Siemens AG 2014 All rights reserved.

2014-07-31Page 13 J. Hinderer / CCS R&D

High Accuracy Magnetic MappingImproved beam dynamics

Azimuth Radial Vertical• Range of Motion 0-360 Deg 0-45 cm ± 0.02 mm• Accuracy ± 0.125 Deg ± 0.1 cm N/A• Resolution ± 0.125 Deg ± 0.1 cm N/A• Repeatability ±0.01 Deg ± 0.1 cm ± 0.01 mm

High AccuracyMagnet Mapping

Improved Cooling onHP Target Changer

Improved Control of theMagnet Power Supply

Improving BeamDynamics

Factor of 10 improvement in resolution

The product/feature (mentioned herein) is not commercially available. Due to regulatory reasons its future availability cannotbe guaranteed.

Page 14: Eclipse Cyclotron Users Meeting Technology Development Update

Unrestricted © Siemens AG 2014 All rights reserved.

2014-07-31Page 14 J. Hinderer / CCS R&D

Eclipse HP Target AssemblyTesting changes to improve heat transfer and production efficiency

Collimator

TargetHubBarrel

High AccuracyMagnet Mapping

Improved Cooling onHP Target Changer

Improved Control of theMagnet Power Supply

Improving BeamDynamics

The product/feature (mentioned herein) is not commercially available. Due to regulatory reasons its future availability cannotbe guaranteed.

Page 15: Eclipse Cyclotron Users Meeting Technology Development Update

Unrestricted © Siemens AG 2014 All rights reserved.

2014-07-31Page 15 J. Hinderer / CCS R&D

Target Collimator ModificationsAllow increased cooling flow resulting in >30% heat transfer

Target flow rate can be increased with collimator modifications*:

Improved target cooling results in lower temperatures in theassembly*:

Flow Trajectory @ 1gpm*:

*Analysis developed by Bruce Technologies Inc. (BTI)The product/feature (mentioned herein) is not commercially available. Due to regulatory reasons its future availability cannotbe guaranteed.

Page 16: Eclipse Cyclotron Users Meeting Technology Development Update

Unrestricted © Siemens AG 2014 All rights reserved.

2014-07-31Page 16 J. Hinderer / CCS R&D

Testing Changes to 18F HP TargetRemoval of hex grid gives ~5% increase saturation yield

• Current design uses a copper nose piece with hexgrid for Arnavar window support• Hex grid prevents major window failure but

copper gets highly activated which increasesexposure when rebuilding target

• Testing ongoing using Aluminum nose piecewithout hex grid• Aluminum doesn't get activated, but higher risk

of window failure causing distribution of activityand activated Arnavar material withincyclotron– avoided by diligent PM schedule

Copper Spacer w/ Hex Grid (Stock)

Aluminum Spacer w/o Hex Grid

The product/feature (mentioned herein) is not commercially available. Due to regulatory reasons its future availability cannotbe guaranteed.

Page 17: Eclipse Cyclotron Users Meeting Technology Development Update

Unrestricted © Siemens AG 2014 All rights reserved.

2014-07-31Page 17 J. Hinderer / CCS R&D

Magnet Power Supply Controller with Hall SensorRemoves shunt and increases magnet stability

Key Features• More precise control of the magnet

current to stabilize the beam• Hall probe more accurate and less

temperature dependent• Does away with the shunt and

necessary plumbing

High AccuracyMagnet Mapping

Improved Cooling onHP Target Changer

Improved Control of theMagnet Power Supply

Improving BeamDynamics

The product/feature (mentioned herein) is not commercially available. Due to regulatory reasons its future availability cannotbe guaranteed.

Page 18: Eclipse Cyclotron Users Meeting Technology Development Update

Unrestricted © Siemens AG 2014 All rights reserved.

2014-07-31Page 18 J. Hinderer / CCS R&D

Improving Beam DynamicsStable beam dynamics equals increased reliability

High AccuracyMagnet Mapping

Improved Cooling onHP Target Changer

Improved Control of theMagnet Power Supply

Improving BeamDynamics

The product/feature (mentioned herein) is not commercially available. Due to regulatory reasons its future availability cannotbe guaranteed.

Page 19: Eclipse Cyclotron Users Meeting Technology Development Update

Unrestricted © Siemens AG 2014 All rights reserved.

2014-07-31Page 19 J. Hinderer / CCS R&D

James H. HindererSr. Manager, EngineeringHealthcare MI / USA / CCS R&D

810 Innovation DriveKnoxville, TN USA 37932-2751

Phone: +1 (865) 218-1669E-mail: [email protected]

Thank you!

Answers for life.

MI-1869 07.2014

Page 20: Eclipse Cyclotron Users Meeting Technology Development Update

Unrestricted © Siemens AG 2014 All rights reserved.

2014-07-31Page 20 J. Hinderer / CCS R&D

BACKUP