EASTERN REGIONAL POWER COMMITTEE, KOLKATA · 2019. 6. 19. · ERPC, KOLKATA 6 . ERPC, KOLKATA 7 0...
Transcript of EASTERN REGIONAL POWER COMMITTEE, KOLKATA · 2019. 6. 19. · ERPC, KOLKATA 6 . ERPC, KOLKATA 7 0...
EASTERN REGIONAL POWER COMMITTEE, KOLKATA
ERPC, KOLKATA 1
% OF TIME FREQUENCY LYING WITHIN IEGC BAND HAS
DECREASED
% OF TIME FREQUENCY LYING IN THE HIGH FREQUENCY
REGION HAS INCREASED
SUSTAINED OVERDRAWAL HAS SIGNIFICANTLY
DECREASED
ERPC, KOLKATA 2
ERPC, KOLKATA 3
0
10
20
30
40
50
60
70
80
90
< 49.9 Hz 49.9 -
50.05 Hz
> 50.05 Hz
Jan-18
Jan-19
0
10
20
30
40
50
60
70
80
90
< 49.9 Hz 49.9 -
50.05 Hz
> 50.05 Hz
Feb-18
Feb-19
ERPC, KOLKATA 4
0
10
20
30
40
50
60
70
80
90
< 49.9 Hz 49.9 - 50.05
Hz
> 50.05 Hz
Mar-18
Mar-19
0
10
20
30
40
50
60
70
80
90
< 49.9 Hz 49.9 - 50.05
Hz
> 50.05 Hz
Apr-18
Apr-19
ERPC, KOLKATA 5
49.2
49.4
49.6
49.8
50
50.2
50.4
Oct/
18
Nov/18
Dec/1
8
Jan/19
Feb/19
Mar/
19
Fre
q in
Hz
Max Freq
Min Freq
0
10
20
30
40
50
60
70
80
90
Oct/
18
Nov/18
Dec/1
8
Jan/19
Feb/19
Mar/
19
Perc
enta
ge
<49.90
49.9-50.05
>50.05
INSTEAD OF RELAXATION OF +/- 10 MW ON SCHEDULE, RELAXATION BASED ON % OF SCHEDULE SHALL BE GIVEN.
NO. OF METER READINGS REQUIRED FOR FINDING THE ACTUAL VALUE OF DRAWAL/ INJECTION SHOULD BE CONSIDERED FOR GIVING THE RELAXATION.
RELAXATION OF SIGN CHANGE PENALTY (FROM 6TH TO 12TH TIME BLOCK) WOULD HAVE ADVERSE EFFECT ON MANAGING FREQUENCY. POSSIBILITY OF GAMING CAN NOT BE RULED OUT.
IT IS APPREHENDED THAT THE % TIME THE FREQUENCY REMAINING BELOW 49.9 HZ SHALL INCREASE.
POOL BALALNCE MAY BE NEGATIVE IN MANY WEEKS
ERPC, KOLKATA 6
ERPC, KOLKATA 7
0
20
40
60
80
100
120
140
160
Rs in
Lakhs
4th Amend
5th Amend
0
50
100
150
200
250
BSPH
CL
JUV
NL
DV
C
GR
IDC
O
SIK
KIM
WBSET
CL
Rs in
Lakhs
4th Amend
5th Amend
GENERATORS UTILITIES
UTILITIES GENERATORS
ERPC, KOLKATA 8
0
50
100
150
200
250
300
350
BSPH
CL
JUV
NL
DV
C
GR
IDC
O
SIK
KIM
WBSET
CL
Axis
Tit
le
4th Amend
5th Amend
0
5
10
15
20
25
30
FSTPP-I &
II
KH
STPP-I
BA
RH
BRBC
L
TH
EP
TU
L
Axis
Tit
le
4th Amend
5th Amend
01/04/19-07/04/19
4th Amend 5th Amend
Payable to the Pool 6830.94383 6884.40613
Receivable from the Pool 7565.67761 7590.31139 Diff amt due capping of Gen Stations -734.73379 -705.90526
ADC due to Block-wise Violation 869.2135 312.29302
ADC due to sign change Violation 973.74302 2.67272
POOL BALANCE(ER) 1108.22273 -390.93952
Payable to RRAS Provider 94.21664 94.21664
Receivable from RRAS Provider 94.53347 94.53347
Payable to FRAS Provider 0.173 0.173
TOTAL POOL BALANCE(ER) 1108.36656 -390.79569 ERPC, KOLKATA 9
The volume limit for deviation may be made dynamic.
For the 1st time block of the day (i.e. 00.00 hrs), the volume limit for deviation (positive or negative deviation) shall be 12% of Schedule of the 1st time block or 150MW whichever is less.
Subsequently from 2nd time block onwards, the allowable volume limit for deviation shall decrease for deviation in the same direction and shall be made zero at the 12th time block.
For time blocks between 1st and 12th time blocks, the volume limit for deviation shall decrease linearly at the rate of 8.33% of Schedule of that time block or 12.5MW whichever is less.
Additional Deviation Charges at the rate of 50% of Deviation rate of the corresponding time block shall be payable by an entity for violation of volume limit in case of over-drawal/under-injection.
ERPC, KOLKATA 10
No Deviation Charges shall be receivable by an entity for
violation of volume limit in case of under-drawal/over-injection.
For sustained deviation beyond 12th time block, additional
deviation charges at the rate of 100% of Deviation rate of the
corresponding time block shall be payable by an entity for any
negative deviation (Over-drawal/under-injection)
For sustained deviation beyond 12th time block, no deviation
charges shall be receivable by an entity for any positive deviation
(Under-drawal/Over-injection)
ERPC, KOLKATA 11
When an entity changes its sign of deviation (from negative to
positive or vice-versa) in any of the 12 time blocks, the allowable
volume limit for deviation and the applicable penalty shall then
be calculated as proposed above by considering time block in
which the sign change occurred as the 1st time block.
All existing provisions of different slabs for calculation of
Additional Deviation charges for violation of volume limits and
sign change may be done away with.
ERPC, KOLKATA 12
12
11
10
9
8
7
6
5
4
3
2
1
0 0 0 0 0 0 0 0 0 0 0 0
12
11
10
9
8
7
12
11
10
9
8
7
6
12
11
10
9
8
7
6
5
4
3
2
0
2
4
6
8
10
12
14
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Series1
Series2
EXAMPLE
ERPC, KOLKATA 14
12
11
10
9
8
7
6
5
4
3
2
1
0 0 0 0 0 0 0 0 0 0 0 0
12
11
10
9
8
7
12
11
10
9
8
7
6
12
11
10
9
8
7
6
5
4
3
2
0
2
4
6
8
10
12
14
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Series1
Series2
EXAMPLE
ERPC, KOLKATA 15 -15%
-10%
-5%
0%
5%
10%
15%
T1 T2 T3 T4 T5 T6 T7 T8 T9 T10 T11 T12 T13 T14 T15 T16 T17 T18 T19 T20
DC Receivable
No DC Receivable
No ADC Payable
DC Receivable
UNDER-DRAWAL/OVER INJECTION
OVER-DRAWAL/UNDER INJECTION
ADC Payable
EXAMPLE
For first time block, score will be zero.
For deviation in the same direction, score will increase by one
point for each time block.
For change in direction of deviation, score will reduce by one
point ( Minimum Score would be ZERO).
For any day(96 blocks), total score will be computed. Graded
penalty beyond a threshold score (say 12) may be thought of.
ERPC, KOLKATA 16
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
0 0 0 0 0
0 0 0
1 0 0 0
0 0 0 0
2 3
1 3 4 3
2 5 5
3 4
2 4
6
5
EXAMPLE
ERPC, KOLKATA 18
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
1 2
3 4
5 6
5 6
7 8
9 10
11 10
11 12
13 14
15 16
17 18
19 20
1 0 0
1 2
1 2
1 2
3 4
3 2
3 4
5 6
7 6
7 8
9 10
11
0
5
10
15
20
25
30
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Series1
Series2
Series3
ERPC, KOLKATA 19