Agenda
• Update on RIDE Presentation to SBC & 12/11 meeting
• Educational Program Update
◦ Space Summary 2nd Program Draft
• Preferred Building Plan Option B.1
• Preferred Site Option B.1 (Revised)
• Next Steps & Schedule
RIDE STAGE II
9-12 Grade Range
Enrollment Projection: 1,600 Students
Met with RIDE on four occasions and will continue to meet throughout the process
Reviewed “Bubble” and organizational diagrams for Building plan Option B.1
Reviewed Preferred Site Option B.1 (revised)
Stage 2 submittal requires 5/10 Year Masterplan updates
Existing Conditions
SITE
• EPHS Site: 28.2 acres
• CTC Site: 4.5 acres
Total Site Area: 32.7 acres
BUILDING
• CTC Building: 43,081 GSF*
• EPHS Building: 240,047
GSF**
Total Building Area: 283,128 GSF
* from Jacobs Report
** from SLAM Facilities Cond. Assessment
Stage I Submission
• Enrollment:
1,600 students
• Proposed Program Area:
268,250 GSF
Stage II Current
• Enrollment:
1,600 students
• Proposed Program Area:
318,000 GSF (est.)
Differences between Stage I and Stage II:
• CTE programs
Removed Cosmetology Program
• Review Renovations of CTC Building
Early Childhood Education
Central office
Storage
• Commissary Kitchen
Critical Adjacencies
HUB’s form Integrated Learning Environments
CTE
Support
CTE or MAJOR ACADEMIC PROGRAM
ACADEMIC CLASSROOMS/LABS
Interior
Exterior access
3 GROUPS
Group A -occupying northern portion of site
Group B –occupying eastern portion of site
Group C –occupying southern portion of site
GROUP B
GROUP AOPTION A.1
GROUP ANA
GROUP BNA
GROUP BOPTION B.1
GROUP COPTION C.1
GROUP COPTION C.2
2 Options
Additions & Renovations
3 Options
All New Construction
GROUP BOPTION B.2
GROUP AOPTION A.1
GROUP ANA
GROUP BNA
GROUP BOPTION B.1 (Rev)
GROUP COPTION C.1
GROUP COPTION C.2
2 Options
Additions & Renovations
3 Options
All New Construction
GROUP BOPTION B.2
GROUP B OPTION B.1(Revised) (All New)
• Strong Educational Diagram
• 3 story classroom Hubs/
neighborhoods (TBD)
• 2 separate entries and
drop-off zones
• Strong “Civic” relationship
to Pawtucket Avenue
• Close affinity to CTC
Building/Programs
Gymnasium
Service
Auditorium
MainEntrance
After HoursEntrance
CTE
Student Commons & Media Center
CTECTE
Fine Arts & Music
Transportation Technologies PLTW: Project Lead the Way Building Arts
Hospitality Specialty Sciences Communications Arts
Integrated Learning HUBs
GROUP BOPTION B.1 (Revised)
• Removes pool to locate school
closer to Pawtucket Avenue
• Majority of classrooms with
south or north facing exposure
• Stronger connection to
CTC/Administration Building
• Orientation creates improved
visibility from Pawtucket Ave
• 2 separate entries and drop-off
GROUP B SITE
OPTION B.1 (Revised)
Gymnasium
Service
Auditorium
MainEntrance
Gym/Public Events Entrance
CTE
Student Commons & Media Center
CTC (New Entrance)
CTE
CTE
Plaza
6 New Tennis Courts
Existing High School Tower Sign
Relocated Site Entrance /Exit
Exiting Site Entrance /Exit
New Turf Soccer Field
New Turf Softball Field
Renovated Track & Field
Renovated Baseball Field
Early Education Outdoor Play Space
Concession & Toilets Building
GROUP B SITE
OPTION B.1 (Revised)
• Fields with correct orientation for
play
• Clear view corridors for site
observation
• Works with current topography
• Expands current football field and
track to support multi-sport fields
• Existing Baseball Field can remain
• Opportunity for spectator seating
in slope along Pawtucket Ave for
soccer field
• Loop for bus circulation & security
• Sufficient tennis courts for
tournament play without lighting
ParentCirculation
Bus Circulation
Student Circulation
Mixed Circulation
RIPTA Bus Shelter
Student Parking
Staff & Visitor Parking
CTC/Admin Parking
Traffic Signal Modifications
GROUP B SITE
OPTION B.1 (Revised) –AM Circulation
• Segregates student traffic
• Encourages drop-offs to occur
on-site to reduce congestion and
improve safety on Pawtucket Ave
• Promote use of RIPTA Buses with
new bus canopy/shelter
• Keeps bus and parent drop-off in
front of school for safety and
security
ParentCirculation
Bus Circulation
Student Circulation
Mixed Circulation
RIPTA Bus Shelter
Student Parking
Staff & Visitor Parking
CTC/Admin Parking
Traffic Signal Modifications
GROUP B SITE
OPTION B.1 (Revised)-PM Circulation
• Segregated bus traffic w/
adequate queue length/stacking
on-site
• Encourages pick-ups to occur
on-site to reduce congestion and
improve safety on Pawtucket Ave
GROUP B SITE
OPTION B.1 (Revised)
Other Site Considerations
• One-way circulation to help control traffic
flow
• Outdoor Dining/Classroom/Study Areas
• Courtyard Areas between CTE wings
• Re-use of Existing Clock Tower
• Fence along Pawtucket Ave
• Other gates, barricades, etc. for safety and
traffic control
• Option to have baseball field and football
field and track renovations as Add-Alternate
Gymnasium
Service
Auditorium
MainEntrance
Gym Public EventsEntrance
CTE
CTC (New Entrance)
CTE
CTE
Plaza
GROUP B SITE
OPTION B.1 (Revised)
New Track & Field
Renovated Baseball Field
New Turf Soccer Field
New Softball Field
Existing High School Tower Sign
New Site Entrance
Existing Site Entrance
6 New Tennis Courts
Early Education Outdoor Play Space
Concession & Toilets Building