Building With Earth a Guide to Flexible-Form Earthbag Construction
EARTHBAG BUILDING BASICS
Transcript of EARTHBAG BUILDING BASICS
![Page 1: EARTHBAG BUILDING BASICS](https://reader034.fdocuments.in/reader034/viewer/2022042114/625771fc437dba36eb0acc3c/html5/thumbnails/1.jpg)
EARTHBAG BUILDING BASICSEARTHBAG INFO PART 2
Patti Stouter (www.BuildSimple.org)
December 2020
with Natural building blog friends
![Page 2: EARTHBAG BUILDING BASICS](https://reader034.fdocuments.in/reader034/viewer/2022042114/625771fc437dba36eb0acc3c/html5/thumbnails/2.jpg)
EARTHBAG BUILDING BASICSEARTHBAG INFO PART 2
Projects built around the world are featured at
both the Earthbag Building and Calearth websites.
This file introduces the concepts of building with
contained earth earthbag.
See the other parts of the Earthbag Info series
available online to learn more.
Strong buildings of natural materials require care
and advice. Before building, purchase a book or
video, take a course, and seek advice from
experienced builders and architects or engineers.
Before building in areas with seismic risk, check
www.BuildSimple.org for the latest structural
information. Check online for the latest version of
Best Practices for Quake-resistant Earthbag.
This work by Patti Stouter is licensed under a Creative
Commons Attribution-ShareAlike 3.0 Unported License.
![Page 3: EARTHBAG BUILDING BASICS](https://reader034.fdocuments.in/reader034/viewer/2022042114/625771fc437dba36eb0acc3c/html5/thumbnails/3.jpg)
PREPARE
Soil
Supplies
Plans
3EARTHBAG INFO 2: Earthbag Basics
![Page 4: EARTHBAG BUILDING BASICS](https://reader034.fdocuments.in/reader034/viewer/2022042114/625771fc437dba36eb0acc3c/html5/thumbnails/4.jpg)
4EARTHBAG INFO 2: Earthbag Basics
Soil masses that break
when lifted 24 hours after
tamping are weak soil
Tamping firms moist cohesive soil in a bag
![Page 5: EARTHBAG BUILDING BASICS](https://reader034.fdocuments.in/reader034/viewer/2022042114/625771fc437dba36eb0acc3c/html5/thumbnails/5.jpg)
Weak or dry soil is loose
Breaks apart when dropped
Loose after tamping
5EARTHBAG INFO 2: Earthbag Basics
![Page 6: EARTHBAG BUILDING BASICS](https://reader034.fdocuments.in/reader034/viewer/2022042114/625771fc437dba36eb0acc3c/html5/thumbnails/6.jpg)
Drop balls from 5’ (1.5 m)
Test for moisture level- most
good soil breaks in 2- 3
pieces
6EARTHBAG INFO 2: Earthbag Basics
Too wet: leaving a
wet spot, cracking
![Page 7: EARTHBAG BUILDING BASICS](https://reader034.fdocuments.in/reader034/viewer/2022042114/625771fc437dba36eb0acc3c/html5/thumbnails/7.jpg)
How strong is your soil?
Sticks to fingers
Gritty when wet
Dry ten 30 mm balls
Most balls should
hold up 130 lbs (59
kg) under a soft shoe
for strength of ±200
psi (1.4 MPa)
7EARTHBAG INFO 2: Earthbag Basics
![Page 8: EARTHBAG BUILDING BASICS](https://reader034.fdocuments.in/reader034/viewer/2022042114/625771fc437dba36eb0acc3c/html5/thumbnails/8.jpg)
Size bags for wall height
1: 15” (38 cm) wide for site wall
2: 17- 18” (43- 46 cm) wide for building wall
8EARTHBAG INFO 2: Earthbag Basics
![Page 9: EARTHBAG BUILDING BASICS](https://reader034.fdocuments.in/reader034/viewer/2022042114/625771fc437dba36eb0acc3c/html5/thumbnails/9.jpg)
Choose plans for risk
9EARTHBAG INFO 2: Earthbag Basics
www.BuildSimple.org
![Page 10: EARTHBAG BUILDING BASICS](https://reader034.fdocuments.in/reader034/viewer/2022042114/625771fc437dba36eb0acc3c/html5/thumbnails/10.jpg)
Strong plansStrong
corners.
10EARTHBAG INFO 2: Earthbag Basics
Walls or 2-
3’(600- 900 mm)
buttresses every
12’(3.7 m)
![Page 11: EARTHBAG BUILDING BASICS](https://reader034.fdocuments.in/reader034/viewer/2022042114/625771fc437dba36eb0acc3c/html5/thumbnails/11.jpg)
Strong plans
More wall
than
openings
11EARTHBAG INFO 2: Earthbag Basics
Connect ends of
walls- stubs 4’
(1.2 m) max.
![Page 12: EARTHBAG BUILDING BASICS](https://reader034.fdocuments.in/reader034/viewer/2022042114/625771fc437dba36eb0acc3c/html5/thumbnails/12.jpg)
START BUILDING
Footings
Base wall
12EARTHBAG INFO 2: Earthbag Basics
![Page 13: EARTHBAG BUILDING BASICS](https://reader034.fdocuments.in/reader034/viewer/2022042114/625771fc437dba36eb0acc3c/html5/thumbnails/13.jpg)
Dig to firm ground
13EARTHBAG INFO 2: Earthbag Basics
![Page 14: EARTHBAG BUILDING BASICS](https://reader034.fdocuments.in/reader034/viewer/2022042114/625771fc437dba36eb0acc3c/html5/thumbnails/14.jpg)
Add stone, rubble or gravel
14EARTHBAG INFO 2: Earthbag Basics
![Page 15: EARTHBAG BUILDING BASICS](https://reader034.fdocuments.in/reader034/viewer/2022042114/625771fc437dba36eb0acc3c/html5/thumbnails/15.jpg)
Water-resistant gravel bags first
Use gravel to
above finish
floor level
15EARTHBAG INFO 2: Earthbag Basics
![Page 16: EARTHBAG BUILDING BASICS](https://reader034.fdocuments.in/reader034/viewer/2022042114/625771fc437dba36eb0acc3c/html5/thumbnails/16.jpg)
Gravel full but not bulging
16EARTHBAG INFO 2: Earthbag Basics
Double bags Pin closed
![Page 17: EARTHBAG BUILDING BASICS](https://reader034.fdocuments.in/reader034/viewer/2022042114/625771fc437dba36eb0acc3c/html5/thumbnails/17.jpg)
Tilt down into place
17EARTHBAG INFO 2: Earthbag Basics
Offset ends
of bags like
bricks
Foot tamp,
then tamp
gently with
tool
![Page 18: EARTHBAG BUILDING BASICS](https://reader034.fdocuments.in/reader034/viewer/2022042114/625771fc437dba36eb0acc3c/html5/thumbnails/18.jpg)
Barbed wire on each course
18EARTHBAG INFO 2: Earthbag Basics
Straight
lines
Continuous
around
corners
![Page 19: EARTHBAG BUILDING BASICS](https://reader034.fdocuments.in/reader034/viewer/2022042114/625771fc437dba36eb0acc3c/html5/thumbnails/19.jpg)
EARTH WALLS
Earthbags
Tamp
Lay wire
Attachments
19EARTHBAG INFO 2: Earthbag Basics
![Page 20: EARTHBAG BUILDING BASICS](https://reader034.fdocuments.in/reader034/viewer/2022042114/625771fc437dba36eb0acc3c/html5/thumbnails/20.jpg)
Moisture barrier
Gravel bags block moisture and salt
On stabilized earth use plastic or tar to stop damp rising
20EARTHBAG INFO 2: Earthbag Basics
![Page 21: EARTHBAG BUILDING BASICS](https://reader034.fdocuments.in/reader034/viewer/2022042114/625771fc437dba36eb0acc3c/html5/thumbnails/21.jpg)
Turn bags inside-out
Put soil in
single bags
Tuck corners
in so bags
end up
rounded
21EARTHBAG INFO 2: Earthbag Basics
![Page 22: EARTHBAG BUILDING BASICS](https://reader034.fdocuments.in/reader034/viewer/2022042114/625771fc437dba36eb0acc3c/html5/thumbnails/22.jpg)
Check moisture often
Damp enough?
Well mixed?
22EARTHBAG INFO 2: Earthbag Basics
Drop balls to
check- see slide 5
![Page 23: EARTHBAG BUILDING BASICS](https://reader034.fdocuments.in/reader034/viewer/2022042114/625771fc437dba36eb0acc3c/html5/thumbnails/23.jpg)
Fill on the wall
23EARTHBAG INFO 2: Earthbag Basics
Carry small
buckets to
heavy bags or
tubes
![Page 24: EARTHBAG BUILDING BASICS](https://reader034.fdocuments.in/reader034/viewer/2022042114/625771fc437dba36eb0acc3c/html5/thumbnails/24.jpg)
Tamp earth smooth and hard
24EARTHBAG INFO 2: Earthbag Basics
Course height reduced 20%
![Page 25: EARTHBAG BUILDING BASICS](https://reader034.fdocuments.in/reader034/viewer/2022042114/625771fc437dba36eb0acc3c/html5/thumbnails/25.jpg)
Check level as you tamp
25EARTHBAG INFO 2: Earthbag Basics
![Page 26: EARTHBAG BUILDING BASICS](https://reader034.fdocuments.in/reader034/viewer/2022042114/625771fc437dba36eb0acc3c/html5/thumbnails/26.jpg)
Barbed wire every courseContinuous around
corners
Leave room in the
middle to insert
rebar
26EARTHBAG INFO 2: Earthbag Basics
![Page 27: EARTHBAG BUILDING BASICS](https://reader034.fdocuments.in/reader034/viewer/2022042114/625771fc437dba36eb0acc3c/html5/thumbnails/27.jpg)
Tie cords to barbed wire
Every 24” (600
mm) along the
wall, every 4th
course
Hang cords out
both sides to
attach plaster
mesh
27EARTHBAG INFO 2: Earthbag Basics
![Page 28: EARTHBAG BUILDING BASICS](https://reader034.fdocuments.in/reader034/viewer/2022042114/625771fc437dba36eb0acc3c/html5/thumbnails/28.jpg)
Anchor door frames
Wood or metal Velcro plates
nailed to bags above and below
28EARTHBAG INFO 2: Earthbag Basics
![Page 29: EARTHBAG BUILDING BASICS](https://reader034.fdocuments.in/reader034/viewer/2022042114/625771fc437dba36eb0acc3c/html5/thumbnails/29.jpg)
FINISH
Plaster
Rebar
Lintels
Bond Beam
Roof
29EARTHBAG INFO 2: Earthbag Basics
![Page 30: EARTHBAG BUILDING BASICS](https://reader034.fdocuments.in/reader034/viewer/2022042114/625771fc437dba36eb0acc3c/html5/thumbnails/30.jpg)
First plaster levels the wall
30EARTHBAG INFO 2: Earthbag Basics
Stabilized
earth plaster
under stucco
Earth plaster
under lime
plaster
Rough surface
and cords out
![Page 31: EARTHBAG BUILDING BASICS](https://reader034.fdocuments.in/reader034/viewer/2022042114/625771fc437dba36eb0acc3c/html5/thumbnails/31.jpg)
Mesh unites walls
31EARTHBAG INFO 2: Earthbag Basics
Tie mesh with cords
from barbed wire
and attach to
footing and bond
beam
Plastic mesh lasts
longer than chicken
wire in earth or
lime plaster
![Page 32: EARTHBAG BUILDING BASICS](https://reader034.fdocuments.in/reader034/viewer/2022042114/625771fc437dba36eb0acc3c/html5/thumbnails/32.jpg)
Protect bags for best strength
32EARTHBAG INFO 2: Earthbag Basics
Tropical/
high
altitude sun
can damage
in 2 weeks
![Page 33: EARTHBAG BUILDING BASICS](https://reader034.fdocuments.in/reader034/viewer/2022042114/625771fc437dba36eb0acc3c/html5/thumbnails/33.jpg)
Add rebar near openings
33EARTHBAG INFO 2: Earthbag Basics
Hammer 5- 6’
(1.5- 1.8 m)
lengths into
damp walls
Overlap but
Space 12” (300
mm) apart
horizontally
![Page 34: EARTHBAG BUILDING BASICS](https://reader034.fdocuments.in/reader034/viewer/2022042114/625771fc437dba36eb0acc3c/html5/thumbnails/34.jpg)
Lintels over openings
34EARTHBAG INFO 2: Earthbag Basics
Extend 12- 16” (30- 40 cm) into walls
![Page 35: EARTHBAG BUILDING BASICS](https://reader034.fdocuments.in/reader034/viewer/2022042114/625771fc437dba36eb0acc3c/html5/thumbnails/35.jpg)
Strong bond beam needed
35EARTHBAG INFO 2: Earthbag Basics
Reinforced cement or
lap-jointed wood
![Page 36: EARTHBAG BUILDING BASICS](https://reader034.fdocuments.in/reader034/viewer/2022042114/625771fc437dba36eb0acc3c/html5/thumbnails/36.jpg)
Rebar pins attach bond beam
36EARTHBAG INFO 2: Earthbag Basics
Hammer in
while wall is
damp
24” (600 mm)
long
Alternating
45° angles
![Page 37: EARTHBAG BUILDING BASICS](https://reader034.fdocuments.in/reader034/viewer/2022042114/625771fc437dba36eb0acc3c/html5/thumbnails/37.jpg)
Add a roof
37EARTHBAG INFO 2: Earthbag Basics
Use collar-ties or
trusses so weight
doesn’t push wall
tops outward
![Page 38: EARTHBAG BUILDING BASICS](https://reader034.fdocuments.in/reader034/viewer/2022042114/625771fc437dba36eb0acc3c/html5/thumbnails/38.jpg)
Thanks for hard work and sharing photos:
Slides:
1- Small World School, Phuleli, Nepal
11(left)- Utah, US
13, 14(right)- P. Dubois
14(l.), 25(l.), 37(l.)- M. Gunn & R. Lewis/ Children of Hope, Haiti
15(l.), 17, 25(r.)- O. Geiger
20- J. Vallejo, Colombia
24(r.)- Barber/ EMI, Free Burma Rangers Clinic, Thailand
27(bottom), 33- E. Bellamy, University of Cincinnati prototype for Haiti, Kentucky, US
14(l.), 28, 34(r.), 35(r.)- M. Long/ Haiti Christian Dev. Project, Haiti
37(r.)- Aman Setu School, India
All other photos and graphics by Patti Stouter
A public service of www.BuildSimple.org
Volunteers are welcome to translate this series! Please email BSI at [email protected]. Ask for an original file and let us post a copy.
38EARTHBAG INFO 2: Earthbag Basics