ASIA CLEAN ENERGY FORUM 2016 JUNE 7 TH , 2016 MANILA, PHILIPPINES Large Scale Grid Integration of Renewable Energy: Early Actions & Lessons from India

Transcript of Early Actions & Lessons from India

Page 1: Early Actions & Lessons from India

A S I A C L E A N E N E R G Y F O R U M 2 0 1 6

J U N E 7 T H , 2 0 1 6

M A N I L A , P H I L I P P I N E S

Large Scale Grid Integration of Renewable Energy:

Early Actions & Lessons from India

Page 2: Early Actions & Lessons from India

Renewable Energy (RE) Targets for India and

Policy Measures

2

Page 3: Early Actions & Lessons from India

Indian Grid: a snapshot

5 regional grids now interconnected- all India synchronized grid as of December 2013

Installed Capacity: >300 GW

Peak Demand: 150 GW

907 Generating Stations

Per capita consumption: 1010 kWh/yr

Morning Peak @ 140 MW/min for 40 minutes

Evening Peak @ 200 MW/min for 40 minutes

3

Page 4: Early Actions & Lessons from India

Wind

Bio Power

Solar

SHP

RES

Nuclear

Hydro

Generation Overview

Total Installed Capacity of ~303 GW

Renewable Energy (RE) Capacity of 43 GW (more than 14% of installed capacity), as on April 30, 2016

India enacted the National Action Plan on Climate Change (NAPCC) & Jawaharlal Nehru National Solar Mission (JNNSM) in 2009-2010

69.80%

1.89%

14.13% 8.87%

2.31% 1.41% 1.59%

14.18%

Thermal

4

Page 5: Early Actions & Lessons from India

INDCs by India at CoP21

Comprehensive and balanced: includes Adaptation, Mitigation, requirement for Finance, Technology transfer, Capacity Building

To reduce the emissions intensity of GDP by 33 - 35% by 2030 from 2005 level.

To achieve 40% of electric power installed capacity from non-fossil fuel by 2030: 175 GW of Renewables by 2022

To create additional carbon sink of 2.5 -3 billion tonnes of CO2 equivalent through additional forest and tree cover

Backdrop:

Per capita CO2 emissions of India are one-tenth of US & one-third of world avg

Rapid growth till 2030: power, infrastructure, housing, poverty eradication etc

5

Page 6: Early Actions & Lessons from India

Renewable Energy Goal by 2022

India has set a target of reaching 175 GW of Renewable Energy capacity by 2022 (from the present

level of 43 GW~ 14% of total capacity and 6% of generation)

Nodal Ministry: Ministry of New & Renewable Energy (MNRE)

6

Page 7: Early Actions & Lessons from India

Region-wise Renewable Energy targets by 2022

Technology Solar Power (in MW)

Wind Power (in MW)

Bio Power (in MW)

Small Hydro Power ) in MW)

Northern Region 31,120 8,600 4,149 2,450

Western Region 28,410 22,600 2,875 125

Southern Region 26,531 28,200 2,612 1,675

Eastern Region 12,237 244 135

North-Eastern Region

1,205 615

Others 30 600 120

ALL INDIA 99,533 60,000 10,000 5,000

Source: MNRE Further broken down into State level targets Each state will have a solar Renewable Purchase Obligation (RPO) of 8% for Solar by 2022

7

Page 8: Early Actions & Lessons from India

6.7 GW of Solar & 12.6 GW of Wind capacity added in last 5 yrs

904

3,197

745

1,699

961

2,085

1,097

2,308

3,019

3,300

0

500

1000

1500

2000

2500

3000

3500

Solar Wind Solar Wind Solar Wind Solar Wind Solar Wind

2011-12 2012-13 2013-14 2014-15 2015-16

Yearwise Capacity Addition in Solar and Wind Segments (MW)

Source: MNRE Technology Installed capacity as on April 30, 2016 (in MW)

Wind Power 26,867

Solar Power 6,998

Bio Power 4,831

Small Hydro Power 4,275

8

Page 9: Early Actions & Lessons from India

Price of utility scale solar has dropped 60% since 2010

12.76

9.39

12.45

15.99

7.12 8.6

5.08

10.95

7.49 7

5.5 6.17

4.63

4.34

0

2

4

6

8

10

12

14

16

18

2010 2011 2012 2013 2014 2015 2016

Rs/

KW

H

Axis Title

Trend Analysis for solar Bid results (2010-2016)

Highest Bid (Rs./KWh) Lowest (Rs./KWh)

Source: MNRE

9

Page 10: Early Actions & Lessons from India

Institutional Structure of RE sector

DISCOMS

MNRE

SNA2

CERC &

SERC3

CEA5

IREDA8, National/ Privatised

Banks, Multilateral Institutions

Consumer

Solar Developer &

Installer

Equipment Manufacturer

& Supplier

Utilities &

Transmission

Policy &

Governing

Institutions

Regulator

& Grid

Operator

Technical

Authority Funding

Institutions

Others

SECI6 NIWE7 State

Govt PGCIL1

NLDC, RLDC, SLDC4

1: Power Grid Corporation of India Ltd 4: National/Regional/State Load 6: Solar Energy Corp. of India

2: State Nodal Agency Despatch Center 7: National Institute of Wind Energy

3: State Electricity Regulatory Commission 5: Central Electricity Authority 8. Indian Ren Energy Devel Assoc

10

Page 11: Early Actions & Lessons from India

Policy Support for RE in India

Support for RE

Development

Feed in Tariff

State RE Policies

Renewable Purchase

Obligation (RPO)

Renewable Energy

Certificate

Accelerated Depreciation

Viability Gap

Funding

Key Instrument for success of wind

installations, available for solar and bio-power

Various support mechanisms under

National Solar Mission

Mechanism introduced to fulfill RPO and enable separate sale of

green attribute of renewable power

Mandated by EA 2003 and National Tariff

Policy

Most States have formulated Polices to

provide impetus to RE generation

Introduced by most states for all RE

Technologies

11

Page 12: Early Actions & Lessons from India

Improving bankability of RE projects

Indian Government & Regulators have worked hard to reduce risk for RE projects

Bankability of Projects

Market Risk

Regulatory Risk

Operational Risk

Long term

PPAs, must-

run status,

payment

guarantees

Yearly review of FIT,

indexation, O&M

escalation, RPO

Guaranteed

grid

connectivity,

land lease,

force majeure

12

Page 13: Early Actions & Lessons from India

Grid Integration & Regulatory Interventions

13

Page 14: Early Actions & Lessons from India

Grid Integration of Infirm RE sources

Grid integration

of VRE sources

Transmission

Ancillary Services

Forecasting & Scheduling

Increasing flexibility of

power system

14

Page 15: Early Actions & Lessons from India

Transmission Planning & Support

ADB is lending $1 Billion to PowerGrid or the Central Transmission Utility (CTU) for strengthening transmission infrastructure between southern & western regional grids

Green Energy Corridors (GEC)- Phase I & Phase II- conceptualized to strengthen transmission network

765 kilovolt (kV) and 400 kV high voltage transmission lines, sub-stations, HVDC terminals, etc

GEC I: RE Capacity envisaged - about 33 GW (in 12th plan) ; ~INR 40,000 crores (~USD 6 billion)

GEC II: connectivity for solar parks ~8 GW already under planning

In 13th Plan (2017-2022): investment of INR 120,000 crores envisaged

Tariff Policy 2016: Inter-state transmission charges & losses to be waived for solar & wind projects commissioned by 2022

15

Page 16: Early Actions & Lessons from India

Scheduling, Forecasting & Commercial Settlement (Framework for solar & wind generators)

Most renewable capacity connected to the State Transmission Network; must-run status

All PPAs are single part tariff, based on actual generation => did not incentivize generators to invest in forecasting and submit schedules to SLDCs

Framework issued by CERC in August 2015 lays the foundation for sustainable integration of RE sources

System operators will now have visibility into how much solar & wind power is expected on the grid in a time-block*

Model Regulations for States in October 2015 (six states in process of finalizing)

* Indian grid operates on 15-min despatch; 96 time-blocks in a day

16

Page 17: Early Actions & Lessons from India

Scheduling, Forecasting & Commercial Settlement (Framework for solar & wind generators)

System Operator shall forecast from grid security perspective

RE generators, independently or through Qualified Coordinating Agency (QCA)*, shall forecast & submit schedule which’ll form the basis for commercial settlement, on a day-ahead basis

Due to the infirm nature of these sources, more flexibility provided w.r.t schedule

Incentive to improve forecasting- deviation charges outside a tolerance band, which could be tightened over time

Bringing RE generators in alignment with existing commercial framework opens the entire country as a market for them

* Within States, forecasting & scheduling at the pooling station level

17

Page 18: Early Actions & Lessons from India

Deviation Settlement Framework for Regional Entities

Error definition: [(Actual generation – Scheduled generation)/Available Capacity] x 100

Payment as per schedule @PPA Rate

Deviation Settlement within tolerance band (+/- 15%):

Receipt from/payment to pool @PPA rate (i.e. in effect, payment as per actuals)

Beyond 15%, a gradient band for deviation charges is proposed as follows:

Abs Error (% of AvC) Deviation Charge

15%-25% 10% of PPA rate

25%-35% 20% of PPA rate

>35% 30% of PPA rate

16 revisions allowed, one for every one-and-half-hour block, effective from 4th time-block.

18

Page 19: Early Actions & Lessons from India

Renewable Energy Management Centers (REMCs)

Renewable Energy Management Centers (REMCs) to be established at Regional & State Load Despatch Centers

Technical assistance by GIZ (€2 M) to PowerGrid (implementation lead)

on Conceptual Design of REMCs, including network management

Detailed Project Reports (DPRs) prepared for RLDCs and 7 States

REMC Control Center comprises of following modules:

REMC SCADA

Forecasting Tool

RE Scheduling Tool

Control Reserve Monitoring Tool

WAMS for RE Substations

19

Page 20: Early Actions & Lessons from India

Conceptual Architecture of REMC 20

Page 21: Early Actions & Lessons from India

Ancillary Services Regulation

Operationalized in April 2016*

NLDC, through RLDCs, operates Ancillary Services

Objective: to restore the grid frequency to desired level (tertiary frequency control) and to relieve congestion in the transmission network

Triggering criteria:

Extreme weather forecasts and/or special day;

Generating unit or transmission line outages;

Trend of load met & frequency;

Excessive loop flows leading to congestion.

* For Inter-State Generating Stations, directly under purview of CERC & NLDC

21

Page 22: Early Actions & Lessons from India

Ancillary Services- Operations

Regulation Up: utilize un-requisitioned surplus of regional generating stations to increase supply (e.g. generator outage or transmission congestion)

Regulation Down: instructions to decrease generation if load is lower than expected (e.g. weather changes)

Merit order stacking, based on variable cost

Regulated incentive to generators for participating

Mark-up for Regulation Up;

a % of variable charges for Regulation Down

22

Page 23: Early Actions & Lessons from India

Un-requisitioned Surplus (URS) available with Inter-state Generating Stations

Average Un-requisitioned Surplus (URS) in a time-block: 6,175 MW

23

Page 24: Early Actions & Lessons from India

Example: Outage of HVDC Mundra – Mohindergarh Pole

Event Date: 28th April, 2016, Event Time: 1434 Hrs

DM water leakage in valve hall, TTC/ATC of WR-NR corridor reduced from 7450 MW/6950 MW to 6200 MW/5700 MW

RRAS despatch : 14:45 To 17:00 hrs, Regulation UP - 300 MW

Effect of RRAS: Frequency improvement

24

Page 25: Early Actions & Lessons from India

Despatch of Ancillary Services

2 months operational experience: April & May 2016

During May 2016:

Regulation Up- on average ~3 / day; total MUs: 45

Regulation Down- on average ~1/day; total MUs: 27

(Daily total energy at national level ~3300 MUs)

25

Page 26: Early Actions & Lessons from India

Flexibility of Power System for Balancing

Flexing of coal plants: technical minimum now 55% (CERC Amendment to Grid Code in April 2016)

Generators are compensated for degradation in Station Heat Rate through increased energy charges

Pumped storage present capacity: ~4800 MW (only half is being operated in pumping mode)

Gas plants installed capacity: ~24,500 MW (Operating at very low PLF)

26

Page 27: Early Actions & Lessons from India

Other Regulatory measures

Roadmap on Spinning Reserves

Automatic Generator Control (AGC) for secondary frequency control to be operationalized in regional generators by 2017

POSOCO to create a market framework for Ancillary Services

States encouraged to align their Ancillary Services Regulations

Power Markets: 24x7, intra-day trades

Communication infrastructure: metering and telemetry upgrades in every State

27

Page 28: Early Actions & Lessons from India

Grid Operation Challenge: the Duck Curve

Greening the Grid: despatch modeling study to simulate grid operation in 2022 Participants: NREL, LBNL, NLDC, RLDCs, sponsored by USAID

Enhanced flexibility of coal plants

Fast ramping gas plants

Storage solutions such as pumped hydro

28

Page 29: Early Actions & Lessons from India

The Roadmap to achieve RE Targets

Scheduling & deviation

accounting of ALL generators

Ancillary services in the State

Regional balancing

Intra-day trades at 24x7

exchange

Large scale integration of wind & solar

Frequent schedule

revisions, closer to dispatch

State gener: flexing & balancing

SEMs, Data, process, tech

upgrades, process

29

Page 30: Early Actions & Lessons from India

S H R U T I M . D E O R A H

A D V I S O R - R E N E W A B L E E N E R G Y , C E R C

s m d e o r a h @ c e r c i n d . g o v . i n

h t t p : / / p o w e r m i n . n i c . i n / s i t e s / d e f a u l t / f i l e s / u p l o a d s/ U j w a l _ B h a r a t _ B r o c h u r e _ E n g l i s h . p d f

THANK YOU 30

Page 31: Early Actions & Lessons from India

APPENDIX 31

Page 32: Early Actions & Lessons from India

Yearly goals to reach 100,000 MW of Solar

Year Yearly Target (MW) Cumulative Target (MW)

2015-16 2,000 5000

2016-17 12,000 17,000

2017-18 15,000 32,000

2018-19 16,000 48,000

2019-20 17,000 65,000

2020-21 17,500 82,500

2021-22 17,500 1,00,000

Broken down into State level targets Each state will have an RPO of 8% for Solar by 2022

32

Page 33: Early Actions & Lessons from India

Progress so far - overview

Technology Target by 2022 Achievements as on April 30, 2016 (in MW)

Wind Power 60 GW 26,867

Solar Power 100 GW 6,998

Bio Power 10 GW 4,831

Small Hydro Power 5 GW 4,275

Source: Ministry of New and Renewable Energy

Source: MNRE

33

Page 34: Early Actions & Lessons from India

Renewable Energy Certificates (RECs)

REC mechanism instituted to overcome resource variation across States- for RPO compliance.

Recognizes the green attribute of renewable power; enables RE generator to sell at brown power rate and sell green attribute separately

RECs issued by central agency NLDC based on actual metered generation of RE power

RE generators can sell these certificates to obligated entities (utilities/open access consumers) who need to fulfil their RPO

RECs compensated at a market determined price (@power exchanges) within a price band (floor and forbearance price) determined by CERC

Floor & forbearance price move with the solar and non-solar tariffs and Average Power Purchase Cost (APPC) of the States

34

Page 35: Early Actions & Lessons from India

Enforcement of RPO has been challenging 35

Page 36: Early Actions & Lessons from India

Market clearing happens at the floor price

Source: REConnect, IEX, PXIL With UDAY (Ujwal DISCOM Assurance Yojana)- power sector

reform to revamp DISCOMs- RPO compliance to get a boost

36